RELAY ROOM
2
10
11
3
4
5
6
7
8
9
12
13
14
15
16
17
18
CONTROL ROOM
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
All above panels Control Cables Feruling not yet done properly.
49
50
51
All above panels Fiber optical Cable Plugs labels are temporary it
should be permanent.
52
53
54
All above panels Some door locks are damage it should be repaire.
55
56
57
All above panels name plates should be provide steel less steel in
graved on top side.
All above panels extra hole in the panel should be covered.
All CT.PT.AC & DC Cables should be dressed separately & properly.
AUXILIARY ROOM
MAIN DCDB PANEL
58
59
60
61
62
125 Volts Main DCDB Panel name plate should be provide Steen
less steel in graved on the top side.
All MCB's Label are temporary it should be permanently.
63
64
65
66
67
Main DCDB Panel Power & Control cables have no Ferules it should
be provide clearly.
All Sockets & Telephone Jacks have no label in the panels.
Extra Holes should be cover in the panels properly.
Panels lights not working.
All panels cable trough covers not yet provided.
68
69
70
71
75
Many cables are hanging in the panels its not yet connected.
Main ACDB Panel name plate should be provide Steen less steel in
graved on the top side.
Incomer-1.Incmer-2 & Bustie labels not properly.
Single line diagram should be past on the panel
Tool Board not yet installed in the Main ACDB Panel.
Telephone set not yet provide the Auxiliary room.
Floor side finishing work not yet completed.
All Sockets & Telephone Jacks have no label in the panels.
76
77
78
79
80
81
82
83
84
85
86
Main DCDB Panel Power & Control cables have no Ferules it should
be provide clearly.
Panels lights not working.
Bustie-2 & Incomer-2 labels not yet provided properly.
Many power cables are touching with the panel body it should be
protect.
All Battery Chargers name plate not yet installed on the panel.
All Power & control cables & Ferules not yet provided.
ATS Name plate not yet provide.
In ATS Q1,2,3 & 4 Label not yet provide properly.
All Sockets & Telephone Jacks have no label in the panels.
Extra Holes should be cover in the panels properly.
93
94
95
Many extra control cables are still inside the panel it should be
removed permanently.
Panels lights not working.
Cables glands not yet grounded.
99
105
106
107
108
113
Power cable not dressed properly it touching with the panel body.
114
115
137
138
139
148
panel side covering plates are open it should be tight with nut
bolts.
149
150
151
152
153
154
155
156
157
158
TOILET
166
167
168
169
170
174
175
176
177
178
179
180
181
All control cables ducts should be cover the steel covering plates.
182
183
HVAC not yet installed in the TCR 1,2 & 3 rooms.it should be
installed.
Safety warning plates should be installed on the indoor fence.
185
186
187
Provide inlet & oulet arrow sticker additional on water flow pipes.
Fire Extinguisher labels not yet provided.
188
189
190
Fiber optical cable trays should be cover with the covering plates.
All control cable sould be cover with covering plates.
Many grounding cables are dressed on the control cables it should
be segregates.
191
192
184
193
194
195
Power & control cables ferules not yet provided in the Heater Panel.
Many grounding cables are loose it should be tight properly.
Both motors frame should be grounded properly.
196
197
198
199
200
204
205
206
207
208
209
210
211
212
213
215
216
217
Provide inlet & oulet arrow sticker additional on water flow pipes.
Fire Extinguisher labels not yet provided.
218
219
Fiber optical cable trays should be cover with the covering plates.
All control cable sould be cover with covering plates.
214
221
222
223
224
225
Power & control cables ferules not yet provided in the Heater Panel.
Many grounding cables are loose it should be tight properly.
Both motors frame should be grounded properly.
226
227
228
229
230
231
220
STORE ROOM
233
BATTERY ROOM
234
235
236
237
238
239
240
241
242
243
UPS 04 Battery banks 1,2,3 & 4 labels not yet provide on the wall.
Exhaust fan side hole should be covered properly.
Eye wash system not yet working.
All Power Ferules not yet provided.
244
245
246
247
248
249
250
251
252
253
254
255
256
257
263
264
265
266
267
268
Around the Transformers (Power cables) cable trays still not yet
cover.
All cables trays not yet grounded.
269
270
271
272
273
274
275
276
277
278
279
Many nut bolts still missing from the transformers covering plates.
Fire Extinguisher labels not yet provided.
Beside the Transformers lighting mast not yet grounded.
All wiring work still remaining from the lighting mast.
lighting mast froundation still damage it should be repaire.
287
288
289
290
291
292
293
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
CT junction box control cables pvc pipes not yet sealed properly.
CT Junction box many T.B. nos are missing.
Phase marking R,Y & B not yet provided..
Many structures are not yet grounded.
Capacitor information plate should be provided clearly.
All Resistor name plate should be provided.
All Reactors phase marking & labeling not yet done.
324
325
326
327
From bus bar side CT box control cables labeling (1,2 & 3) not yet
done.
some cables trough covers are missing.
330
331
332
333
CT junction box control cables pvc pipes not yet sealed properly.
CT Junction box many T.B. nos are missing.
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
CT junction box control cables pvc pipes not yet sealed properly.
CT Junction box many T.B. nos are missing.
Phase marking R,Y & B not yet provided..
Many structures are not yet grounded.
Capacitor information plate should be provided clearly.
All Resistor name plate should be provided.
All Reactors phase marking & labeling not yet done.
386
387
388
389
From bus bar side CT box control cables labeling (1,2 & 3) not yet
done
some cables trough covers are missing.
392
393
394
395
396
397
398
399
400
CT junction box control cables pvc pipes not yet sealed properly.
CT Junction box many T.B. nos are missing.
Phase marking R,Y & B not yet provided..
Many structures are not yet grounded.
Capacitor information plate should be provided clearly.
All Resistor name plate should be provided.
All Reactors phase marking & labeling not yet done.
410
411
412
413
Fron bus bar side CT Junction Box control cables feruling not yet
done.
414
415
416
417
From bus bar side CT junction box control cables pvc pipes not yet
sealed properly.
From bus bar side CT Junction box many T.B. nos. are missing.
Bus bar side CT Phase marking R,Y & B not yet provided..
From bus bar side all surge arrestor labeling not yet done.
401
402
403
404
405
406
407
408
409
433
434
435
436
437
438
439
440
445
446
From 230 KV side Power Cables 2000 mm sq not yet provide labeld.
Transformer Gage ladder not yet paint with yellow & balck.
Transformer Gage ladder stopper not yet provided.
Fire fighting support structure not allow to installed on transformer
foundation wall.
Every valve name plate should be provide properly.
All recepticals of Transformer fire wall mounted should be provided
proper labled.
All recepticals power cables covering plate not yet provided.
From LV side Surge Arrestor & Surge Capacitor provide proper
labels.
From HV side Surge Attestor phase marking not yet done.
447
448
449
450
453
From High Voltage side cable link box plat form not yet provided.
From HV Bushind side (H1,H2 & H3) and LV Bushing side (L1,L2 &
L3) it should be written.
Neutral bushing should be marked properly.
Transformer serial no. should be clearly written on transformer
body.
454
455
456
457
458
459
Bus bar from transformer side should be marked (R,Y & B) clearly.
All radiators nos.should be written properly.
All Fans nos. should be written properly.
441
442
443
444
451
452
460
461
477
478
479
480
481
482
483
484
487
488
From 230 KV side Power Cables 2000 mm sq not yet provide labeld.
Transformer Gage ladder not yet paint with yellow & balck.
Transformer Gage ladder stopper not yet provided.
Fire fighting support structure not allow to installed on transformer
foundation wall.
Every valve name plate should be provide properly.
All recepticals of Transformer fire wall mounted should be provided
proper labled.
All recepticals power cables covering plate not yet provided.
489
490
491
492
493
494
Transformer (T-702) = (T0 -TR1) 230/26KV D-06 & A-716 not yet
provide labeld.
A-716 breaker side platform not yet provided.
A-716 Breaker control cables feruling not yet provided.
A-716 dispatch no. not yet provided.
485
486
495
496
From HV Bushind side (H1,H2 & H3) and LV Bushing side (L1,L2 &
L3) it should be written.
Neutral bushing should be marked properly.
497
498
499
500
501
502
503
Bus bar from transformer side should be marked (R,Y & B) clearly.
All radiators nos.should be written properly.
All Fans nos. should be written properly.
504
505
508
509
510
511
512
513
518
519
520
521
Door lock control cables is tight with plastic cable tie it should be in
cable tray.
All PVC Pipes for control cables should be sealed properly.
Danger caution should be provide on the fence door.
Asphalting work not yet completed.
522
523
524
Door lock hole from down side not properl allign it should be
proper.
Disconnecting switch (DS-174) still not yet labeld.
Disconnecting switch (DS-174) Plate form not yet provided.
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
549
550
551
552
Door lock control cables is tight with plastic cable tie it should be in
cable tray.
All PVC Pipes for control cables should be sealed properly.
Danger caution should be provide on the fence door.
Asphalting work not yet completed.
553
Door lock hole from down side not properl allign it should be
proper.
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
580
581
582
583
Door lock control cables is tight with plastic cable tie it should be in
cable tray.
All PVC Pipes for control cables should be sealed properly.
Danger caution should be provide on the fence door.
Asphalting work not yet completed.
584
585
586
Door lock hole from down side not properl allign it should be
proper.
Disconnecting switch (DS-474) still not yet labeld.
Disconnecting switch (DS-474) Plate form not yet provided.
587
588
595
596
597
598
599
600
601
602
603
604
605
606
589
590
591
592
593
594
610
611
612
613
614
615
616
Door lock control cables is tight with plastic cable tie it should be in
cable tray.
All PVC Pipes for control cables should be sealed properly.
Danger caution should be provide on the fence door.
Asphalting work not yet completed.
All control cables feruling not yet done properly.
617
618
619
620
Clearance between the Structure & cables on the CT's is very less
installed it properly.
Disconnecting switch (DS-274) still not yet labeld.
Disconnecting switch (DS-274) Plate form not yet provided.
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
Earthing switch (ES-271) control cables PVC Pipes not yet sealed
properly.
Earthingswitch (ES-271) some T.B.nos. are missing.
CT,s control box (1,2,3 & 4) Name plate not yet provided.
CT's control cables not yet provide feruling.
CT;s phase marking not yet done.
CT's control cables not yet protected.
All Capacitor bank not yet marked properly.
All Reactors phase marking & labeling not yet done.
Bus bar labeling not yet done.
Surge Arrestor labeling not yet provided from the wall side.
639
640
Phase marking from wall side for Bushing (R,Y & B) not yet done.
All Slab should be sealed properly.
641
642
643
644
645
646
647
GROUNDING TRANSFORMER
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
VALVE COOLERS.
678
679
680
681
682
683
684
685
Every Fans should be provide name plate with steen less steel
ingraved.
Inlet & Outlet on water pipes should be marked.
All Control cables PVC Pipes should be sealed properly.
All Control Cables covering plates should be provide.
TCR 1,2 &3 Terminal box should be labeld.
some T.B. nos. are missing it should be provide.
686
687
701
702
703
704
705
706
707
708
709
710
Earthing switch (ES-1171) control cables PVC Pipes not yet sealed
properly.
Earthingswitch (ES-1171) some T.B.nos. are missing.
711
712
713
714
715
716
GENERAL
717
718
719
720
721
722
From Reactor side non standard sleaves use it should be removed &
put proper sleaves.
723
All D/S & All Earthing Switches are not alligned, not properly
operated and are non standard.In the past, at other area of SEC
facilities same type of disconnect were experienced with many
difficulties and operational problems
724
725
726
HVAC for entire SVC building is not yet copmmissioned and not
ready
) Substation
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
in progress.
Need
permanent AC
Supply
done
done
done
done
done
done
done
done
Done
done
Done
done
done
done
done
Done
done
done
done
Done
done
done
done
done
done
done
done
done
done
done
done
done
Done
done
done
As per Design
of SVC
done
Done
done
done
As per Design
of SVC
done
Done
done
done
done
done
done
done
AS per SVC
Design
done
done
done
done
done
done
done
done
done
done
Not is Scope
As per Design
of SVC
As per Design
of SVC
Not is Scope
Final testing
with ISD on
17.06.2015
AS per
Contract,
Spare will be
given
In Progress.
Needs
permanent AC
Supply.