Requirements

A 26-1/2 conductor required a 1.3 x 0.45m window


machining with 50mm radii 9m from the sea bed for a
mud dump vent clamp to be fitted.
Location: Apache North Sea Forties Delta 115m
water depth.

Solution
Cold cutting was specified due to the 26-1/2
conductor housing 13-3/8 casing and a power line
that could not be damaged during cutting.

Milling rail mounted onto the Gantry system


with large hand wheel for the diver to control
the in feed. The auto stop hydraulic valves
controlled the size of the window and
spindle positioning.

The four corners were pilot drilled and then the 4 off
100mm diameter holes were trepanned at fixed
centres, with hydraulic valves acting as datum point
stops. The gantry system was then used to mill
between the corners to produce the window. The cut
out portion of the conductor was retained by cross
member clamps with drilled and tapped holes in the
conductor.
Drilling and trepanning took 45 minutes per hole,
machining top, bottom and sides through conductor
thickness.
Equipment used

Mirage gantry GM2000 and milling rail MR1500.


Used with a chain pipe clamp.

Outcomes

Machining completed within 2 days.

Operation time kept to a minimum using


hydraulic stops and auto feeds on the main axis.

.
Workshop trial.

www.miragemachines.com
Email sales@miragemachines.com
05.02.16

Click to watch the


YouTube video

PORTABLE PERFORMANCE

Subsea Pipe
Cutting

Case Study
Requirements

The MDWS being lowered into the sea.

To remove a 512 metre length of Super


Duplex pipe from the sea bed, at a depth of
50 metres. Pipe specification 12 diameter
with a 1 wall thickness.

Location: Saudi Arabia.

Solution

The Mirage MDWS used with a 3 circuit


hydraulic controller. The diamond wire
travelled at 1200 metres per minute at a
feed rate set at 8mm per minute.

Outcomes

22 cuts made within 72 hours.

Pipe sections around 23m long raised to deck.

With the pipeline removed the customer was


able to construct a new pipeline.

Click to watch the


Diamond Wire Saw
animation on YouTube
The first two pipe sections recovered from the sea bed.

www.miragemachines.com
Email sales@miragemachines.com
05.02.16

PORTABLE PERFORMANCE

Weld Seam
Removal

Case Study
Requirements
Removal of a longitudinal weld seam to allow fitting
of a Morgrip connector.
Location: Apache North Sea, Forties Delta.

Solution

Workshop trial.

Use of the Mirage MR1500SS milling rail

Workshop trials carried out in advance.

Outcome
Successful machining allowed fitting of the
Morgrip mechanical connector.

Subsea cutting operation.

www.miragemachines.com
Email sales@miragemachines.com
05.02.16

PORTABLE PERFORMANCE

Platform Leg
Crack Termination

Case Study
Requirements

Cracking discovered in the main caisson around a


vent exhaust duct on the platform leg.
The requirement was to machine an elliptical hole
into a 5m diameter platform leg.
Location: Siri Platform, Denmark.

Solution

Use the Mirage 3 axis gantry milling


machine.

Workshop trials carried out in advance.

Outcome
All machining operations were completed first
time, to customers specification and within
time critical operations window.
.

Workshop trial.

www.miragemachines.com
Email sales@miragemachines.com
05.02.16

PORTABLE PERFORMANCE

Tidal Fin Removal

Case Study
Requirements

Structural plates required removal from tidal


turbine monopoles.

Diving time severely restricted to 20 minutes due


to tidal direction change and Neap Tide.

Solution

Plates (1.8m x 150mm x 30mm) removed


using a slitting saw. Remaining material
removed using face milling.

Quick release tooling used to allow fast


project completion.

Outcome
All machining operations were completed first
time, to specification and within time critical
operations window.
.

Workshop trials using the Mirage MR2000.

www.miragemachines.com
Email sales@miragemachines.com
05.02.16

PORTABLE PERFORMANCE

Seam Weld and


Doubler Plate
Removal

Case Study
Requirements

Remove a seam weld from 30 pipeline


over 3m length.
Remove anode doubler plates for
relocation at 90m water depth.
Location: North Sea.

Solution

Cold cutting to prevent cutting into the


parent pipeline.

Use of Mirage gantry MR1000SS with


pipe chain clamping system, fixed feed,
and depth stops.

Workshop trials carried out on a circular


test piece.

Outcomes

www.miragemachines.com
Email sales@miragemachines.com
05.02.16

Milling of seam: less than 1 hour.

Doubler plate removed in 3 hours.

PORTABLE PERFORMANCE

CIMV Removal
& Torque Tool
Development

Case Study
The resulting torque tool created for
the customer.

Requirements
The clients problem was a subsea tree equipped
with a latch lock removal system on a chemical
injection valve which had a mechanical failure on
the connection rod.

Solution
Mirage developed three innovative contingency
solutions to allow an ROV to remove the valve.
The first solution used a one inch, left-handed, four
flute endmill to attempt to turn the inconel rod to
unlatch the CIMV. This solution was delivered to the
Clients design, but was unable to remove the
damaged valve.
Second solution: Having anticipated that a second
solution might be required, we designed and
engineered a contingency tool, which incorporated an
eight inch lathe chuck, with ROV handles, to deploy
the latch onto the inconel rod, in an attempt to turn
the inconel rod to unlatch the valve. This tool was
successful in removing the valve.

Workshop development of contingency solutions.

Third solution: We designed an additional


contingency tool, which was a hydraulically operated
chucking system. This solution was not deployed, as
the valve was removed with solution two.

Outcomes
www.miragemachines.com
Email sales@miragemachines.com
05.02.16

The clients problem was resolved.

All three tooling solutions were provided in 10 days.

Client requested we design a tool to prevent the


problem from occurring in the future.

PORTABLE PERFORMANCE

Injection Point in
Trace Heated
Supply Line

Case Study
Requirements

To machine an injection point within a


heavy wall Super Duplex pipe.

No swarf ingress or tool dwelling.

One chance on offshore application.

Location: Islay Project, North Sea.

Solution

Mirage provided a complete


machine/offshore service package.

A process was identified to series


trepan the external of the supply line.

Extensive workshop testing carried out


in advance.
Machine used: HT50 Portable Drill

Outcomes
Client testimonial:

Images above: Test pieces in the workshop.

www.miragemachines.com
Email sales@miragemachines.com
05.02.16

Did a great job offshore and everyone


was very pleased

About Mirage Machines


Mirage portable machine tools optimise the performance of on-site
assets by achieving operational excellence, maximising uptime and
improving productivity.
Our proprietary technology drives the development of the most reliable,
durable, efficient and precise portable machine tools on the market, that
are capable of delivering the most exacting standards of tolerance with the
highest quality output.
Our portfolio of portable machine tools are suitable for a diverse range of
on-site machining applications. Mirage have been granted ISO 9001:2008
certification for our design and manufacturing systems
and we are able to provide full CE certification for our products.

Industries
Mirage manufacture a range of portable machines for a wide variety of
applications and industries including:

Oil & Gas

Mining & Construction

Wind Power

Subsea

Decommissioning

Utilities

Ship Build & Repair

Nuclear

Petrochemical

Power Generation

Our products are supported by industry experts who work closely with our
customers to optimise performance for industry specific applications.
With extensive experience within service companies, our teams understand
the dynamics of a wide range of industries and have the capability to
deliver turn-key solutions that both meet specific requirements and address
complex challenges.

www.miragemachines.com
Email sales@miragemachines.com

Contact Us
UK
Mirage Machines
8-10 Enterprise Way
Jubilee Parkway
Stores Road
Derby DE21 4BB

Houston
Mirage Subsea Inc.
8615 Jackrabbit Rd
Houston
TX 77095
United States

T: +44 (0) 1332 291767


F: +44 (0) 1332 370356
E: sales@miragemachines.com

Tel: +1-281-859-1234
E: sales@miragesubsea.com

Perth

Singapore

Mirage Machines
15/4 Wharton Road
Kewdale
WA 6105

Mirage Machines
107 Tuas South Avenue 8
Offshore Marine Centre 637036
Singapore

Tel: +61 0 452 48 1964


sales@miragemachines.com

Tel: +65 9855 0117


sales@miragemachines.com

www.miragemachines.com
Email sales@miragemachines.com

Anda mungkin juga menyukai