PROYECTO ESTRUCTURAL
f'c=
fy=
f'm=
210
4200
45
kg/cm
kg/cm
kg/cm
=
=
2400
1800
kg/m
kg/m
300
kg/m
S/C=
S/C=
S/C=
S/C=
S/C=
250
400
400
400
150
kg/m
kg/m
kg/m
kg/m
kg/m
Cargas:
CM = Carga Muerta
Losa Aligerada
CV = Carga Viva
Oficinas
Pasillos y Pasadizos:
Escaleras y Rampas:
S.S.H.H.:
Azotea :
FACTOR U
1.50
DESCRIPCION
Suelos Blandos
Tp (seg)
1.00
S
2
0.23
10.71
Coef. de Reduccin R
7
Lmite de Altura
-----
ZUCS/R g
ESPECTRO E - 030
3.000
2.500
2.000
1.500
1.000
0.500
0.000
0.00
0.50
1.00
1.50
2.00
DATOS
Z=
U=
S=
Tp =
C=
R=
g=
0.10
1.50
2
1.00
2.5
7
9.81
Ag
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00
1.05
1.10
1.15
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
1.85
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.38
2.27
2.17
2.08
2.00
1.92
1.85
1.79
1.72
1.67
1.61
1.56
1.52
1.47
1.43
1.39
1.35
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.00
0.96
0.91
0.88
0.84
0.81
0.78
0.75
0.72
0.70
0.68
0.66
0.64
0.62
0.60
0.58
0.57
Ag = Z.U.S.C/Rd .g
C = 2,5*(Tp/T)
T = Hn/Ct
Ct = 35
Ct = 45
Ct = 60
Porticos
Porticos y Placas
Porticos y Mamposteria
Hn =
Altura de Edificacion
DATOS
Hn =
Ct =
8.30
45
ANALISIS ESTATICO
T=
C=
Ag =
0.18
13.55
1.05
DESPLAZAMIENTO DE LA ESTRUCTURA
A continuacin mostraremos los desplazamientos producidos en cada uno de los bloques
teniendo en cuenta que los ejes X-X es paralela a la direccion de las vigas principales
Por lo tanto los ejes Y-Y es perependicular a los anteriores ejes.
La Frmula para determinar el mximo desplazamiento total sera la siguiente:
max =
0,75 R Xmax
MEMORIA DE CALCULO
MEMORIA DE CALCULO
1.00 RESULTADOS DEL ANALISIS ESTRUCTURAL:
Para determinar el diseo ptimo de la estructura se ha realizado el Anlisis mediante modelado en sofware
ETABS 2015 garantizando de esta manera la distribucion exacta de la fuerza ssmica. Y de esta manera
se cumplir con las Normas de Diseo ssmico y de Concreto Armado.
2.00 ESPECIFICACIONES TECNICAS:
MATERIALES:
ACERO:
ACERO ESTRUCTURAL CORRUGADO
ACERO LISO
fy = 4200 kg/cm
fy = 4200 kg/cm
CONCRETO:
CIMIENTOS CORRIDOS: f'c = 100 kg/cm + 30% P.G. 6" max
SOBRECIMIENTOS :
f'c = 140 kg/cm + 25% P.G. 3" max
SOBRECIMIENTOS REFORZADOS :
f'c = 175 kg/cm + 25% P.G. 3" max
SOLADO DE ZAPATAS: Concreto: 1 : 12 C : H
COLUMNAS:
COLUMNAS DE AMARRE:
VIGAS Y LOSAS:
ZAPATAS:
ALBAILERIA:
f'm = 45 kg/cm
RECUBRIMIENTOS:
ZAPATAS:
VIGAS Y VIGAS DE CIMENTACION:
COLUMNAS Y MUROS DE CORTE:
VIGAS CHATAS Y LOSAS:
COLUMNAS DE AMARRE:
7,50 cm
3,00 cm
3,00 cm
2,50 cm
2,50 cm
SUELO:
CAPACIDAD PORTANTE:
PROFUNDIDAD DE DESPLANTE
TIPO DE SUELO:
ASENTAMIENTO MAXIMO:
ESTRUCTURA:
SISTEMA ESTRUCTURAL
t= 0.80 kg/cm
1.30 m.
ARCILLAS INORGANICAS DE ALTA PLASTICIDAD (CH)
1"
DUAL
SISMICIDAD:
ESPECTRO DE RESPUESTA DE ACELERACION DE ACUERDO A
N.T.E - 030 - 2016
'= Z.U.S.C/Rd .g
PARAMETROS SISMICOS:
FACTOR DE USO DE LA ZONA
Z=
0.10
FACTOR DE USO DE IMPORTANCIA
U=
1.50
FACTOR DE SUELO
S=
2.00
PERIODO DE VIBRACION DEL SUELO
Tp =
1.00
seg
COEFICIENTE SISMICO
C=
2.50
FACTOR DE REDUCCION
Rd =
7.00
ACELARACION DE LA GRAVEDAD
g=
9.81
PERIODOS:
T = 0.18 seg
DESPLAZAMIENTOS DE ENTREPISO:
DESPLAZAMIENTO EN EJE X-X < 0,007
DESPLAZAMIENTO EN EJE Y-Y < 0,007
10.15
9.95
TN/M
TN/M
As(-) =
As(+) =
6.09
5.97
As min =
10.50
CM
1.5
1.3
1.0
1.0
Categora
A
B
C
D
U
1.50
1.30
1.00
1.00
0.10
0.3
0.4
Zona
1
2
3
4
Tipo de estructura:
Z
0.10
0.25
0.35
0.45
Tipo
Regular
Irregular
Factor
1.00
0.75
Parmetros de suelo:
Descripcin
Tipo
S1
S2
S3
S4
Tp
0.40
0.60
0.90
0.90
S
1.0
1.6
2.0
2.0
Regular
Porticos
Dual
Muros estructurales
Muro de ductibilidad limitada
Albaileria armada o confinada
7
6
4
3
1
1
1
1
7
6
4
3
T = hn / CT
CT
35
45
60
Regular
1
1
1
1
1
METRADO DE CARGAS
3 Pisos
343.00 m2
343.00 m2
0.00 m2
Altura de Pisos
h1 = 3.70 m.
h2 = 3.40 m.
h3 = 3.40 m.
Sobrecargas
S/C = 250
S/C = 250
S/C = 250
= 400
S/C Corredor
= 400
S/C Escalera
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
Uso
Oficinas
Azotea
H = 10.50 m.
Elementos Estructurales
Columnas
0.25
Viga VP
0.25
Viga VS
0.25
Concreto F'c =
Acero
F'y =
x
x
x
Carga Muerta
Losa Aligerada
Falso Piso
Cielo Raso
Tabiquera
0.40
0.50
0.40
210 kg/cm2
4200 kg/cm2
=
=
=
=
216
100
20
100
kg/m2
kg/m2
kg/m2
kg/m2
Peso Especfico C =
Peso Esp. Albailera =
2400
1800
kg/m3
kg/m3
4385
2030
406
2030
8851
443
Kg
Kg
Kg
Kg
Kg
Kg/ml
5075
5075
254
Kg
( 216.00 )
( 100.00 )
( 20.00 )
( 100.00 )
( 20.30 )
( 20.30 )
( 20.30 )
( 20.30 )
( 1.00 )
( 1.00 )
( 1.00 )
( 1.00 )
(1)
(1)
(1)
(1)
Carga Viva
Sobre/Carga
=
=
=
=
=
( 250.00 )
( 20 )
( 1.00 )
L=
20
Kg/ml
L=
20
4320
400
4720
236
Kg
Kg
Kg
Kg/ml
L=
20
2400
2400
120
Kg
L=
20
Carga Ultima
Wu=1.4*CM+1.7*CV
Wu= ( 1.4 ) ( 443 )
Wu= 1050.9 Kg/ml
Tercer Piso
Carga Muerta
Losa Aligerada
Cielo Raso
( 216.00 )
( 20.00 )
( 1.7 )
( 254 )
( 20.00 )
( 20.00 )
( 1.00 )
( 1.00 )
Carga Viva
Sobre/Carga
( 120.00 )
(1)
(1)
=
=
=
( 20.00 )
( 1.00 )
=
=
Kg/ml
78%
22%
Carga Ultima
Wu=1.4*CM+1.7*CV
Wu= ( 1.4 ) ( 236 )
Wu= 534.4 Kg/ml
( 1.7 )
( 22.17 )
( 22.17 )
( 22.17 )
( 22.17 )
( 22.17 )
( 120 )
( 2.50 )
( 0.125 )
( 2.50 )
( 2.50 )
( 2.50 )
(1)
(1)
(1)
(1)
(1)
Carga Viva
Sobre/Carga
=
=
=
=
=
=
( 250.00 )
( 22 )
( 2.50 )
11972
6651
5543
1109
5543
30816
1926
Kg
Kg
Kg
Kg
Kg
Kg
Kg/ml
13856
13856
866
Kg
L=
16
Kg/ml
L=
16
17280
4800
8000
1600
8000
39680
2480
Kg
Kg
Kg
Kg
Kg
Kg
Kg/ml
L=
16
20000
20000
1250
Kg
Kg/ml
L=
16
8640
4800
800
4000
18240
1140
Kg
Kg
Kg
Kg
Kg
Kg/ml
L=
16
Carga Ultima
Wu=1.4*CM+1.7*CV
Wu= ( 1.4 ) ( 1926 ) +
Wu= 4168.7 Kg/ml
EJE B-B, C-C, D-D
Carga Muerta
Losa Aligerada
Peso PP Viga
Falso Piso
Cielo Raso
Tabiqueria
( 216.00 )
( 2400.00 )
( 100.00 )
( 20.00 )
( 100.00 )
( 1.7 )
( 866 )
( 16.00 ) ( 5.00 )
( 16.000 ) ( 0.125 )
( 16.00 ) ( 5.00 )
( 16.00 ) ( 5.00 )
( 16.00 ) ( 5.00 )
(1)
(1)
(1)
(1)
(1)
Carga Viva
Sobre/Carga
=
=
=
=
=
=
( 250.00 )
( 16 )
( 5.00 )
Carga Ultima
Wu=1.4*CM+1.7*CV
Wu= ( 1.4 ) ( 2480 ) +
Wu=
5597 Kg/ml
Tercer Nivel
EJE 1-1, 5-5
Carga Muerta
Losa Aligerada
Peso PP Viga
Cielo Raso
Tabiqueria
( 216.00 )
( 2400.00 )
( 20.00 )
( 100.00 )
( 1.7 )
( 1250 )
( 16.00 ) ( 2.50 )
( 16.000 ) ( 0.125 )
( 16.00 ) ( 2.50 )
( 16.00 ) ( 2.50 )
(1)
(1)
(1)
(1)
=
=
=
=
=
Carga Viva
Sobre/Carga
( 250.00 )
( 16.00 )
( 2.50 )
10000
10000
625
Kg
Kg/ml
L=
16
17280
4800
1600
8000
31680
1980
Kg
Kg
Kg
Kg
Kg
Kg/ml
L=
16
20000
20000
1250
Kg
Kg/ml
L=
16
17280
4800
8000
1600
8000
39680
1984
Kg
Kg
Kg
Kg
Kg
Kg
Kg/ml
L=
20
20000
20000
1000
Kg
L=
20
34560
4800
16000
3200
16000
74560
Kg
Kg
Kg
Kg
Kg
Kg
Carga Ultima
Wu=1.4*CM+1.7*CV
Wu= ( 1.4 ) ( 1140 ) +
Wu= 2658.5 Kg/ml
EJE 2-2, 3-3, 4-4
Carga Muerta
Losa Aligerada
Peso PP Viga
Cielo Raso
Tabiqueria
( 216.00 )
( 2400.00 )
( 20.00 )
( 100.00 )
( 1.7 )
( 625 )
( 16.00 ) ( 5.00 )
( 16.000 ) ( 0.125 )
( 16.00 ) ( 5.00 )
( 16.00 ) ( 5.00 )
(1)
(1)
(1)
(1)
Carga Viva
Sobre/Carga
=
=
=
=
=
( 250.00 )
( 16.00 )
( 5.00 )
Carga Ultima
Wu=1.4*CM+1.7*CV
Wu= ( 1.4 ) ( 1980 ) +
Wu=
4897 Kg/ml
PORTICOS SECUNDARIOS
Primer Nivel y Segundo Nivel
EJE 1-1, 5-5
Carga Muerta
Losa Aligerada
( 216.00 )
Peso PP Viga
( 2400.00 )
Falso Piso
( 100.00 )
Cielo Raso
( 20.00 )
Tabiqueria
( 100.00 )
( 1.7 )
( 1250 )
( 20.00 ) ( 4.00 )
( 20.000 ) ( 0.100 )
( 20.00 ) ( 4.00 )
( 20.00 ) ( 4.00 )
( 20.00 ) ( 4.00 )
(1)
(1)
(1)
(1)
(1)
Carga Viva
Sobre/Carga
=
=
=
=
=
=
( 250.00 )
( 20 )
( 4.00 )
Kg/ml
Carga Ultima
Wu=1.4*CM+1.7*CV
Wu= ( 1.4 ) ( 1984 ) +
Wu= 4477.6 Kg/ml
EJE 2-2, 3-3, 4-4
Carga Muerta
Losa Aligerada
Peso PP Viga
Falso Piso
Cielo Raso
Tabiqueria
( 216.00 )
( 2400.00 )
( 100.00 )
( 20.00 )
( 100.00 )
( 1.7 )
( 1000 )
( 20.00 ) ( 8.00 )
( 20.000 ) ( 0.100 )
( 20.00 ) ( 8.00 )
( 20.00 ) ( 8.00 )
( 20.00 ) ( 8.00 )
(1)
(1)
(1)
(1)
(1)
=
=
=
=
=
Carga Viva
Sobre/Carga
( 250.00 )
( 20 )
( 8.00 )
3728
Kg/ml
40000
40000
2000
Kg
L=
20
Kg/ml
L=
20
17280
4800
1600
8000
31680
1584
Kg
Kg
Kg
Kg
Kg
Kg/ml
L=
20
20000
20000
1000
Kg
Kg/ml
L=
20
34560
4800
3200
16000
58560
2928
Kg
Kg
Kg
Kg
Kg
Kg/ml
L=
20
40000
40000
2000
Kg
L=
20
Carga Ultima
Wu=1.4*CM+1.7*CV
Wu= ( 1.4 ) ( 3728 ) +
Wu= 8619.2 Kg/ml
Tercer Nivel
EJE 1-1, 5-5
Carga Muerta
Losa Aligerada
Peso PP Viga
Cielo Raso
Tabiqueria
( 216.00 )
( 2400.00 )
( 20.00 )
( 100.00 )
( 1.7 )
( 2000 )
( 20.00 ) ( 4.00 )
( 20.000 ) ( 0.100 )
( 20.00 ) ( 4.00 )
( 20.00 ) ( 4.00 )
(1)
(1)
(1)
(1)
Carga Viva
Sobre/Carga
=
=
=
=
=
( 250.00 )
( 20.00 )
( 4.00 )
Carga Ultima
Wu=1.4*CM+1.7*CV
Wu= ( 1.4 ) ( 1584 ) +
Wu= 3917.6 Kg/ml
EJE 2-2, 3-3, 4-4
Carga Muerta
Losa Aligerada
Peso PP Viga
Cielo Raso
Tabiqueria
( 216.00 )
( 2400.00 )
( 20.00 )
( 100.00 )
( 1.7 )
( 1000 )
( 20.00 ) ( 8.00 )
( 20.000 ) ( 0.100 )
( 20.00 ) ( 8.00 )
( 20.00 ) ( 8.00 )
Carga Viva
Sobre/Carga
( 250.00 )
=
=
=
=
=
( 20.00 )
( 8.00 )
=
=
Carga Ultima
Wu=1.4*CM+1.7*CV
Wu= ( 1.4 ) ( 2928 ) +
Wu= 7499.2 Kg/ml
(1)
(1)
(1)
(1)
( 1.7 )
( 2000 )
Kg/ml
METRADO DE CARGAS
BLOCK "2"
1. Parmetros y Predimensionamiento
Nmero de Pisos
=
Area Techada 1 PISO =
Area Techada 2 PISO =
Area Techada 3 PISO =
Area Techada 4 PISO =
Area Techada 5 PISO =
Elementos Estructurales
Columna C1
0.30
Columna C2
0.25
Viga VP
0.30
Viga VS
0.30
Viga VCH
0.25
Concreto F'c =
Acero
F'y =
4
Pisos
230.63 m2
215.03 m2
223.91 m2
207.87 m2
0.00
m2
Altura de Pisos
h1 = 3.70
h2 = 3.40
h3 = 3.40
h4 = 3.40
h5 = 0.00
H = 13.90
m.
m.
m.
m.
m.
m.
Sobrecargas
S/C = 250
S/C = 150
S/C =
0
S/C =
0
S/C =
0
S/C =
0
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
Uso
Oficinas
Azotea
Carga Muerta
x
x
x
x
x
0.50
0.25
0.60
0.40
0.20
280 kg/cm2
4200 kg/cm2
Losa Aligerada
Falso Piso
Cielo Raso
Tabiquera
=
=
=
=
300
100
20
100
kg/m2
kg/m2
kg/m2
kg/m2
Peso Especfico C =
Peso Esp. Albailera =
2400
1800
kg/cm2
kg/cm2
=
=
=
=
=
=
=
=
=
=
69189
27676
34632
2775
23371
18996
834
32660
50154
4253
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Total = 264540
44973
Kg
Total =
309513 kg
2. Metrado de Cargas
Primer Piso
Carga Muerta
Losa Aligerada
Acabados
Columna C1
Columna C2
Viga VP
Viga VS
Viga VCH
Albailera
Carga Viva
Sobre/Carga
( 230.63 )
( 300.00 )
( 230.63 )
( 120.00 )
( 0.15 )
( 3.70 )
( 0.06 )
( 3.70 )
( 0.18 )
( 54.10 )
( 0.12 )
( 65.96 )
( 0.05 )
( 6.95 )
( 0.15 ) ( 39.02 ) ( 3.10 )
( 0.15 ) ( 56.29 ) ( 3.30 )
( 0.15 ) ( 10.50 ) ( 1.50 )
Carga Total
Wtotal 1 Piso =
Wtotal 1 Piso =
( 230.63 )
Wd + W L
264540
+
( 250 )
( 2400 )
( 2400 )
( 2400 )
( 2400 )
( 2400 )
( 1800 )
( 1800 )
( 1800 )
( 0.78 )
44973
(1)
(1)
( 26 )
(5)
(1)
(1)
(1)
(1)
(1)
(1)
44973
Segundo Piso
Carga Muerta
Losa Aligerada
Acabados
Columna C1
Columna C2
Viga VP
Viga VS
Viga VCH
Albailera
Albailera
Carga Viva
Sobre/Carga
( 215.03 )
( 300.00 )
( 215.03 )
( 120.00 )
( 0.15 )
( 3.40 )
( 0.06 )
( 3.40 )
( 0.18 )
( 54.10 )
( 0.12 )
( 65.96 )
( 0.05 )
( 6.95 )
( 0.00 )
( 33.55 )
( 0.15 ) ( 39.02 ) ( 2.80 )
( 0.15 ) ( 56.29 ) ( 3.00 )
( 0.15 ) ( 10.50 ) ( 1.50 )
Carga Total
Wtotal 2 Piso =
Wtotal 2 Piso =
( 230.63 )
( 150 )
Wd + W L
247235
+
( 2400 )
( 2400 )
( 2400 )
( 2400 )
( 2400 )
( 2400 )
( 1800 )
( 1800 )
( 1800 )
(1)
(1)
( 26 )
(5)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
( 0.22 )
7611
=
=
=
=
=
=
=
=
=
=
=
64509
25804
31824
2550
23371
18996
834
0
29499
45595
4253
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Total = 247235
7611
Kg
Total =
254846 kg
=
=
=
=
=
=
=
=
=
=
67173
26869
31824
2040
23371
19572
0
28350
43578
4253
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
7611
Tercer Piso
Carga Muerta
Losa Aligerada
Acabados
Columna C1
Columna C2
Viga VP
Viga VS
Viga VCH
Albailera
Carga Viva
Sobre/Carga
( 223.91 )
( 300.00 )
( 223.91 )
( 120.00 )
( 0.15 )
( 3.40 )
( 0.06 )
( 3.40 )
( 0.18 )
( 54.10 )
( 0.12 )
( 67.96 )
( 0.05 )
( 5.20 )
( 0.15 ) ( 37.50 ) ( 2.80 )
( 0.15 ) ( 53.80 ) ( 3.00 )
( 0.15 ) ( 10.50 ) ( 1.50 )
=
Carga Total
Wtotal 3 Piso =
Wtotal 3 Piso =
( 223.91 )
Wd + W L
242778
+
(0)
( 2400 )
( 2400 )
( 2400 )
( 2400 )
( 1800 )
( 1800 )
( 1800 )
( 1800 )
(1)
(1)
( 26 )
(4)
(1)
(1)
(1)
(1)
(1)
(1)
( 0.00 )
242778 kg
=
=
=
=
=
=
=
=
62361
24944
31824
510
23371
17988
26762
41796
Cuarto Piso
Carga Muerta
Losa Aligerada
Acabados
Columna C1
Columna C2
Viga VP
Viga VS
Albailera
( 207.87 )
( 300.00 )
( 207.87 )
( 120.00 )
( 0.15 )
( 3.40 )
( 0.06 )
( 3.40 )
( 0.18 )
( 54.10 )
( 0.12 )
( 62.46 )
( 0.15 ) ( 35.40 ) ( 2.80 )
( 0.15 ) ( 51.60 ) ( 3.00 )
( 2400 )
( 2400 )
( 2400 )
( 2400 )
( 1800 )
( 1800 )
(1)
(1)
( 26 )
(1)
(1)
(1)
(1)
(1)
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Total = 242778
Total =
Carga Viva
Sobre/Carga
( 0.15 ) ( 14.60 )
( 1.50 )
( 1800 )
( 0.00 )
(0)
( 0.00 )
Carga Total
Wtotal 4 Piso =
Wtotal 4 Piso =
Wtotal 4 Piso
Wtotal 3 Piso
Wtotal 2 Piso
Wtotal 1 Piso
Wd + W L
235470
+
=
=
=
=
Wtotal de la Edificacin =
235470
242778
254846
309513
0
kg
kg
kg
kg
1042607 kg
(1)
5913
Kg
Total = 235470
Kg
Total =
235470 kg
78%
22%
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
235470.48
242777.88
254845.59
309512.76
1042.61
h4 =
h3 =
h2 =
h1 =
3.40
3.40
3.40
3.70
TN
T = ht/Ct
Htotal =
Ct =
10.50 m
35
0.30 Seg
T=
C = 2.5 (Tp/T) ;
Tp =
Ct =
C=
Rx =
Ry =
C/R =
C< 2.5
0.90 Seg
35
2.50
8
8
0.3125
* CALCULO DE V :
V = ZUSC/RP
Z=
0.40
U=
1.30
S=
1.20
Vx =
0.40
Vx =
203.31
1.30
x 1.20
x 0.3125 x
1042.61
TN
Pi
309.51
254.85
242.78
235.47
Vy =
0.40
Vy =
203.31
hi
3.70
7.10
10.50
13.90
1.30
TN
Pi hi
1145.20
1809.40
2549.17
3273.04
8776.81
x 1.20
Fi
26.53
41.91
59.05
75.82
203.31
x 0.3125 x
1042.61
Pi
309.51
254.85
242.78
235.47
hi
3.70
7.10
10.50
13.90
Pi hi
1145.20
1809.40
2549.17
3273.04
8776.81
Fi
26.53
41.91
59.05
75.82
203.31
* CALCULO DE RIGIDECES:
COL
C-1
C-A
10
18
4
bx
30
20
15
hx
Kxx
H=280
30
15
20
39.67
5.95
2.35
77.49
11.62
4.59
47.98
93.70
235.47 Tn
26.53 Tn
41.91 Tn
Tn-cm
309.51 Tn
47.98
59.05 Tn
Tn-cm
254.85 Tn
93.70
75.82 Tn
Tn-cm
242.78 Tn
93.70
41.91 Tn
hy
30
15
20
30
20
15
93.70
59.05 Tn
by
H=350
Tn-cm
26.53 Tn
235.47
Tn
100.73
Tn-cm
242.78
Tn
100.73
Tn-cm
254.85
Tn
100.73
Tn-cm
309.51
Tn
51.58
Tn-cm
Kyy
H=350
H=280
39.67
10.58
1.32
77.49
20.66
2.58
51.58
100.73
ANALISIS ESTATICO
0
# PISO
4
3
2
1
xx =
DIRECCION X-X
Absoluto (cm)
0.70200
0.62600
0.41300
0.19400
1.31 cm
Relativos
(cm)
0.295
0.407
0.219
0.194
= 75%R
(cm)
1.77
2.44
1.31
1.16
Di Mx. Relativo
Hi (cm)
Di = /Hi
340
340
340
370
0.0052058824
0.007
0.004
0.003
NTE030
OK
RECALCULAR
OK
OK
DIRECCION Y-Y
# PISO
4
3
2
1
yy =
Absoluto (cm)
0.70200
0.62600
0.57400
0.25100
2.39 cm
Relativos
(cm)
0.399
0.303
0.323
0.251
= 75%R
(cm)
2.39
1.82
1.94
1.51
Di Mx. Relativo
Hi (cm)
Di = /Hi
340
340
340
370
0.0070
0.005
0.006
0.004
NTE030
OK
OK
OK
OK
DESPLAZAMIENTOS ABSOLUTOS
Absoluto (cm)
Relativos (cm)
= 75%R
(cm)
Hi (cm)
/Hi
Di
PISOS
0.000000
0.000000
0.272702
0.125802
0.146900
-0.146900
0.146900
0.125802
0.000000
0.000000
0.881400
0.754812
-340
340
340
370
0.000
0.000
0.003
0.002
OK
OK
OK
OK
4
3
2
1
Absoluto (cm)
Relativos (cm)
= 75%R
(cm)
Hi (cm)
/Hi
Di
PISOS
0.000000
0.000000
0.487833
0.223838
0.263995
-0.263995
0.263995
0.223838
0.000000
0.000000
1.583970
1.343028
-340
340
340
370
0.000
0.000
0.005
0.004
OK
OK
OK
OK
4
3
2
1
xx =
yy =
0.88 cm
1.58 cm
A =
Xcg =
Ycg =
Ixx cg =
Iyy cg =
Modos de Traslacin
Mt2 =
Mt1 =
254846
9.81
309513
9.81
343.00
9.59
6.59
1312.87
240.68
m2
m
m
m4
m4
Modos de Rotacin
= 25978 kg
= 31551 kg
MR2 = 25978
343.00
MR1 = 31551
343.00
(1313
241)
(1313
241)
= 142903 kg
Modos de Vibracin
Tx = 1 T = 0.3288 seg.
Tx = 3 T = 0.2202 seg.
TR = 5 T = 0.0322 seg.
2T =
4T =
6T =
0.2668 seg.
0.1100 seg.
0.0280 seg.
117663 kg
VISTA TRIDIMENSIONAL
DISEO DE ZAPATAS
1.-
TIPO Z-1
Predimensionamiento
t
=
0.90
Columnas
= 0.40
V-P
=
5.00
V-S
=
3.00
Losa Aligerada=
300
Falso Piso
100
Cielo Raso
=
20
Tabiquera
=
100
N Pisos
=
2
Longitud h (m) = 3.30
kg/cm2
x 0.45
/
10 =
/
10 =
kg/m2
+ 3.00 +
x 0.60
x 0.60
kg/m2
kg/m2
Biblioteca
Azotea
0.00
0.00
+ 0.00
+ 0.00
( 16.80 )
( 16.80 )
( 350 )
( 150 )
Wd + W L
26674
+
35074
kg
(1)
(1)
=
=
=
=
=
=
14112
3360
4320
2160
2722
26674
Kg
Kg
Kg
Kg
Kg
Kg
= 5880 Kg
= 2520 Kg
Total = 8400 Kg
8400
P
t
= 35074
0.90
Seccin =
1.70
N de Bastones =
6.-
0.30
0.25
350
150
( 420 )
(2)
( 100 )
(2)
( 5.00 ) ( 2400 ) ( 2 )
( 3.00 ) ( 2400 ) ( 2 )
( 6.30 ) ( 2400 )
Total
s = 1.97 m.
5.-
=>
=>
S/C =
S/C =
Seccin de la Zapata
s =
4.-
0.50
0.30
kg/m2
kg/m2
kg/m2
At =
0.0020
As = . b . t
As = 0.0020 x
197.41
As =
19.74
cm2
19.74
1.978
cm2
cm2
1.98
cm
x 2.30
0.99734 =
0.50 m.
Para ( 5/8" )
50
10 Bastones
17.04 m.
0.20 m.
10
1.-
TIPO Z-2
Predimensionamiento
t
=
0.90
Columnas
= 0.40
V-P
=
5.00
V-S
=
3.00
Losa Aligerada=
300
Falso Piso
100
Cielo Raso
=
20
Tabiquera
=
100
N Pisos
=
2
Longitud h (m) = 3.30
kg/cm2
x 0.45
/
10 =
/
10 =
kg/m2
+ 3.00 +
x 0.60
x 0.60
kg/m2
kg/m2
Biblioteca
Azotea
0.00
0.00
+ 0.00
+ 0.00
( 11.55 )
( 11.55 )
( 350 )
( 150 )
Wd + W L
21214
+
26989
kg
(1)
(1)
=
=
=
=
=
=
9702
2310
4320
2160
2722
21214
Kg
Kg
Kg
Kg
Kg
Kg
= 4043 Kg
= 1733 Kg
Total = 5775 Kg
5775
P
t
= 26989
0.90
Seccin =
1.50
N de Bastones =
6.-
0.30
0.25
350
150
( 420 )
(2)
( 100 )
(2)
( 5.00 ) ( 2400 ) ( 2 )
( 3.00 ) ( 2400 ) ( 2 )
( 6.30 ) ( 2400 )
Total
s = 1.73 m.
5.-
=>
=>
S/C =
S/C =
Seccin de la Zapata
s =
4.-
0.50
0.30
kg/m2
kg/m2
kg/m2
At =
0.0020
As = . b . t
As = 0.0020 x
173.17
As =
17.32
cm2
17.32
1.978
cm2
cm2
1.98
1
cm
x 2.00
0.99734 =
0.50 m.
Para ( 5/8" )
50
Bastones
17.15 m.
0.20 m.
1.-
TIPO Z-3
Predimensionamiento
t
=
0.90
Columnas
= 0.40
V-P
=
5.00
V-S
=
3.00
Losa Aligerada=
300
Falso Piso
100
Cielo Raso
=
20
Tabiquera
=
100
N Pisos
=
2
Longitud h (m) = 3.30
kg/cm2
x 0.45
/
10 =
/
10 =
kg/m2
At =
0.50
0.30
2.80 x 3.00 =
=>
=>
S/C =
S/C =
0.30
0.25
350
150
x 0.60
x 0.60
kg/m2
kg/m2
Biblioteca
Azotea
0.00
+ 0.00
+ 0.00
kg/m2
kg/m2
kg/m2
+ 3.00 +
0.00
( 8.40 )
( 8.40 )
( 0.18 )
( 0.15 )
( 0.18 )
( 420 )
(2)
( 100 )
(2)
( 5.00 ) ( 2400 ) ( 2 )
( 3.00 ) ( 2400 ) ( 2 )
( 6.30 ) ( 2400 )
Total
( 8.40 )
( 8.40 )
( 350 )
( 150 )
Wd + W L
17938
+
22138
kg
3.-
P
t
= 22138
0.90
s = 1.57 m.
5.-
7056
1680
4320
2160
2722
17938
Kg
Kg
Kg
Kg
Kg
Kg
= 2940 Kg
= 1260 Kg
Total = 4200 Kg
4200
Seccin =
1.50
N de Bastones =
6.-
(1)
(1)
=
=
=
=
=
=
Seccin de la Zapata
s =
4.-
8.40 m2
0.0020
As = . b . t
As = 0.0020 x
156.84
As =
15.68
cm2
15.68
1.978
cm2
cm2
1.98
1
cm
x 1.65
0.99734 =
0.50 m.
Para ( 5/8" )
50
Bastones
19.20 m.
0.20 m.
5.00
3
20
METRADO DE CARGAS
17
Carga Muerta
0.10
300.00
0.30
0.10
kg/m2
100.00 kg/m2
100.00 kg/m2
500.00 kg/m2
Carga Viva
S/C Biblioteca
WL =
250.00 kg/m2
250.00 kg/m2
AMPLIFICACION DE CARGAS
Wu = 1.4 WD + 1.7 WL =
Wu =
1.4 (500.00) +
1125.00
=
2.5 Viguetas/m2
1.7 (250.00)
1125.00 kg/m2
450.00 kg/ml
ANALISIS ESTRUCTURAL
2
Mu = Wu.Ln2
10
(450.00)
10
(5.00)
1125
kg-m
q = 0.18
d=
Mu
=
. f ' c .b .k
e=d+r=
22
(0.90)
1125
(210.00) (0.10) (0.1609)
19.23
cm
u = Vu/bd
1293.75
(10.00) (17.00)
Verificando
Realizando la Correccin
Espesor e =
Recubrim. r =
d=e-r=
Base b =
(450.00) (5.00) =
2
20
3
17
13
1293.75
7.61
kg
kg/cm2
u Vu
7.61 kg/cm2 6.52 kg/cm2
NO Cumple
cm.
a = d/5 =
3.40
u = Vu/bd
1293.75
(13.45) (17.00)
Verificando
5.66
kg/m2
u Vu
5.66 kg/cm2 6.52 kg/cm2
OK
DISEO FINAL
5
20
15
0.13
0.30
0.13
Iterando
Wu.Ln2 =
14
(450.00) (5.00) =
14
s = Mu/0.85.f'y.(d-a/2)
803.57
kg-m
a = s.f'y/0.85.f'c.b
s =
(803.57) (100.00)
= 1.47 cm2
0.85 x 4,200 ( 17 - 3.40 2)
a=
(1.47)
(0.85)
(4200.00)
(210) (13)
= 2.57
s =
(803.57) (100.00)
= 1.43 cm2
0.85 x 4,200 ( 17 - 2.57 2)
a=
(1.43)
(0.85)
(4200.00)
(210) (13)
= 2.51
s =
(803.57) (100.00)
= 1.43 cm2
0.85 x 4,200 ( 17 - 2.51 2)
a=
(1.43)
(0.85)
(4200.00)
(210) (13)
= 2.50
s =
MBC(+) =
Iterando
1.43
Wu.Ln2 =
16
cm2 = 1 1/2"
(450.00) (5.00) =
16
s = Mu/0.85.f'y.(d-a/2)
703.13
kg-m
a = s.f'y/0.85.f'c.b
s =
(703.13) (100.00)
= 1.29 cm2
0.85 x 4,200 ( 17 - 3.40 2)
a=
(1.29)
(0.85)
(4200.00)
(210) (13)
= 2.25
s =
(703.13) (100.00)
= 1.24 cm2
0.85 x 4,200 ( 17 - 2.25 2)
a=
(1.24)
(0.85)
(4200.00)
(210) (13)
= 2.17
s =
(703.13) (100.00)
= 1.24 cm2
0.85 x 4,200 ( 17 - 2.17 2)
a=
(1.24)
(0.85)
(4200.00)
(210) (13)
= 2.16
s =
1.24
cm2 = 1 1/2"
Momentos Negativos
MA(-) =
Wu.Ln2 =
11
Iterando
(450.00) (5.00) =
11
s = Mu/0.85.f'y.(d-a/2)
1022.73
kg-m
a = s.f'y/0.85.f'c.b
s =
(1022.73) (100.00)
= 1.87 cm2
0.85 x 4,200 ( 17 - 3.40 2)
a=
(1.87)
(0.85)
(4200.00)
(210) (13)
= 3.28
s =
(1022.73) (100.00)
= 1.86 cm2
0.85 x 4,200 ( 17 - 3.28 2)
a=
(1.86)
(0.85)
(4200.00)
(210) (13)
= 3.26
s =
(1022.73) (100.00)
= 1.86 cm2
0.85 x 4,200 ( 17 - 3.26 2)
a=
(1.86)
(0.85)
(4200.00)
(210) (13)
= 3.26
s =
MB(-) =
1.86
Wu.Ln2 =
10
Iterando
cm2 = 1 5/8"
(450.00) (5.00) =
10
s = Mu/0.85.f'y.(d-a/2)
1125.00
kg-m
a = s.f'y/0.85.f'c.b
s =
(1125.00) (100.00)
= 2.06 cm2
0.85 x 4,200 ( 17 - 3.40 2)
a=
(2.06)
(0.85)
(4200.00)
(210) (13)
= 3.60
s =
(1125.00) (100.00)
= 2.07 cm2
0.85 x 4,200 ( 17 - 3.60 2)
a=
(2.07)
(0.85)
(4200.00)
(210) (13)
= 3.63
s =
(1125.00) (100.00)
= 2.08 cm2
0.85 x 4,200 ( 17 - 3.63 2)
a=
(2.08)
(0.85)
(4200.00)
(210) (13)
= 3.63
s =
2.08
cm2 = 1 5/8"
1 1/2"
SISTEMA ESTRUCTURAL
1 1/2"
1 5/8"
1 1/2"
1 5/8"
1 1/2"
5.00
5.00
1 1/2"
1 1/2"
4.00
1 1/2"
1 1/2"
4.50
DISEO DE COLUMNAS
TIPO C-1
1.- Predimensionamiento
At
=
Carga Muerta
e de Losa
=
Losa Aligerada=
Falso Piso
Cielo Raso
=
Tabiquera
=
Peso de Vigas=
Peso Columna=
N Pisos
=
3.99
20
300
100
20
100
140
65
4
x 4.00 =
cm
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
15.96
m2
Carga Viva
S/C = 250
S/C = 150
S/C = 400
S/C = 400
kg/m2
kg/m2
kg/m2
kg/m2
Oficina
Azotea
Corredor
Escalera
2900.00 kg/m2
900.00 kg/m2
3800.00 kg/m2
15.96
m2 x 3800.00 kg/m2
60648.00
kg
(Peso x Piso)
60.648 Tn
1.25 x P
n x F'c
b . D = 1353.75 cm.
Seccin Final =
30 x
1.25 ( 60648.00 ) kg
0.20 ( 280 ) kg/cm2
Si b D =
30
D = 30 x 45 cm
1 Alternativa
Si b = D =
37
D = 37 x 37 cm
2 Alternativa
50 cm
Mu = 15.00 Tn-m
e = Mu/Pu =
24.73
r =
3
cm
d = 47.5 cm
De acuerdo R.N.C.
Segn WHITNEY
= As min =>
As =
. b.t
b.t
As = 0.0100 x 1500
As min. =
15.00
cm2
Pu=0.7
+
As'.fy +
e/(d-r)+0.5
60648 = 2801.015
As' =
As = 2 As' =
Varillas
6 5/8"
4 3/4"
= 11.87 cm2
=
11.4 cm2
As = 23.27 cm2
-15.51 cm2
-31.02 cm2
f'c.b.h
3.h.e/d2+1.18
As ' + 104096.90
TIPO C-2
1.- Predimensionamiento
At
=
Carga Muerta
e de Losa
=
Losa Aligerada=
Falso Piso
Cielo Raso
=
Tabiquera
=
Peso de Vigas=
Peso Columna=
N Pisos
=
1.12
20
300
100
20
100
140
90
4
x 3.12 =
cm
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
3.49
m2
Carga Viva
S/C = 350
S/C = 150
kg/m2
kg/m2
Aula
Azotea
VP y VS
750.00 kg/m2
350.00 kg/m2
1100.00 kg/m2
3.49
m2 x
1100.00 kg/m2 x 4
15375.36
kg
(Peso x Piso)
15.37536 Tn
b.D=
1.25 x P
n x F'c
411.84
Seccin Final =
Concreto
Acero
cm.
25 x
1.50 ( 15375.36 ) kg
0.20 ( 280 ) kg/cm2
Si b D =
25
D = 25 x 16 cm
1 Alternativa
Si b = D =
20
D = 20 x 20 cm
2 Alternativa
25 cm
Mu = 13.16 Tn-m
e = Mu/Pu =
85.59
r =
3
cm
d = 22.5 cm
De acuerdo R.N.C.
Segn WHITNEY
= As min =>
As =
. b.t
b.t
As = 0.0100 x 625
As min. =
6.25
cm2
Pu=0.7
+
As'.fy +
e/(d-r)+0.5
15375 = 615.1175
As' =
As = 2 As' =
Varillas
8 5/8"
2 1/2"
= 15.82 cm2
= 2.534 cm2
As = 18.36 cm2
10.63
cm2
21.25
cm2
f'c.b.h
3.h.e/d2+1.18
As ' +
8838.24
DISEO DE COLUMNAS
TIPO C-1
1.- Predimensionamiento
At
=
3.99 x 4.00 =
Carga Muerta
e de Losa
=
20 cm
Losa Aligerada= 300 kg/m2
Falso Piso
100 kg/m2
Cielo Raso
=
20 kg/m2
Tabiquera
= 100 kg/m2
Peso de Vigas=
140 kg/m2
Peso Columna=
65 kg/m2
N Pisos
=
4
15.96
m2
Carga Viva
S/C = 250
S/C = 150
S/C = 400
S/C = 400
kg/m2
kg/m2
kg/m2
kg/m2
Oficina
Azotea
Corredor
Escalera
725.00 kg/m2
250.00 kg/m2
975.00 kg/m2
15.96 m2 x
62244.00 kg
62.244 Tn
975.00
kg/m2 x 4
(Peso x Piso)
1.25 x P
n x F'c
b . D = 1482.00 cm.
Seccin Final =
30 x
50 cm
1.25 ( 62244.00 ) kg
0.25 ( 210 ) kg/cm2
Si b D =
30
D = 30 x 49
cm
1 Alternativa
Si b = D =
38
D = 38 x 38
cm
2 Alternativa
METRADO DE COLUMNAS
TIPO C-1
Nivel 1 y 2
Area
Carga Muerta
P. P. de la losa
P. P. de la viga Principal
P. P. de la viga secundaria
P. P. de la columna
Falso Piso
Cielo Raso
Tabiqueria
Carga Viva
S/C
Longitud
Peso
Unitario
Total
5.00 8.00
0.35 0.70
0.35 0.45
0.45 0.60
5.00 8.00
5.00 8.00
5.00 8.00
TOTAL CARGA MUERTA
0.20
7.40
4.55
3.50
1.00
1.00
1.00
2400
2400
2400
2400
100
20
100
19200
4351.2
1719.9
2268
4000
800
4000
36339.1
5.00 8.00
TOTAL CARGA VIVA
1.00
250
10000
10000
Longitud
Peso
Unitario
Nivel 3
Area
Carga Muerta
P. P. de la losa
P. P. de la viga Principal
P. P. de la viga secundaria
P. P. de la columna
Cielo Raso
Carga Viva
S/C
Total
5.00 8.00
0.35 0.70
0.35 0.45
0.45 0.60
5.00 8.00
TOTAL CARGA MUERTA
0.20
7.40
4.55
3.50
1.00
2400
2400
2400
2400
20
19200
4351.2
1719.9
2268
800
28339.1
5.00 8.00
TOTAL CARGA VIVA
1.00
100
4000
4000
TOTAL
32339.1
46339.1
46339.1
125017.3
ACUMULADO
32339.1
78678.2
125017.3
Area
Longitud
TIPO C-2
Nivel 1 y 2
Carga Muerta
P. P. de la losa
P. P. de la viga Principal
P. P. de la viga secundaria
P. P. de la columna
Falso Piso
Cielo Raso
Tabiqueria
Carga Viva
S/C
Peso
Unitario
Total
2.50 8.00
0.35 0.70
0.35 0.45
0.45 0.60
2.50 8.00
2.50 8.00
2.50 8.00
TOTAL CARGA MUERTA
0.20
7.40
2.28
3.50
1.00
1.00
1.00
2400
2400
2400
2400
100
20
100
9600
4351.2
861.84
2268
2000
400
2000
21481.04
2.50 8.00
TOTAL CARGA VIVA
1.00
250
5000
5000
Nivel 3
Area
Carga Muerta
P. P. de la losa
P. P. de la viga Principal
P. P. de la viga secundaria
P. P. de la columna
Cielo Raso
Carga Viva
S/C
Longitud
Peso
Unitario
Total
2.50 8.00
0.35 0.70
0.35 0.45
0.45 0.60
2.50 8.00
TOTAL CARGA MUERTA
0.20
7.40
2.28
3.50
1.00
2400
2400
2400
2400
20
9600
4351.2
861.84
2268
400
17481.04
2.50 8.00
TOTAL CARGA VIVA
1.00
100
2000
2000
TOTAL
19481.04
26481.04
26481.04
72443.12
ACUMULADO
19481.04
45962.08
72443.12
Area
Longitud
TIPO C-3
Nivel 1 y 2
Carga Muerta
P. P. de la losa
P. P. de la viga Principal
P. P. de la viga secundaria
P. P. de la columna
Falso Piso
Cielo Raso
Tabiqueria
Carga Viva
S/C
Peso
Unitario
Total
5.00 4.00
0.35 0.70
0.35 0.45
0.45 0.60
5.00 4.00
5.00 4.00
5.00 4.00
TOTAL CARGA MUERTA
0.20
3.70
4.55
3.50
1.00
1.00
1.00
2400
2400
2400
2400
100
20
100
9600
2175.6
1719.9
2268
2000
400
2000
20163.5
5.00 4.00
TOTAL CARGA VIVA
1.00
250
5000
5000
Longitud
Peso
Unitario
Nivel 3
Area
Carga Muerta
P. P. de la losa
P. P. de la viga Principal
P. P. de la viga secundaria
P. P. de la columna
Cielo Raso
Carga Viva
S/C
Total
5.00 4.00
0.35 0.70
0.35 0.45
0.45 0.60
5.00 4.00
TOTAL CARGA MUERTA
0.20
3.70
4.55
3.50
1.00
2400
2400
2400
2400
20
9600
2175.6
1719.9
2268
400
16163.5
5.00 4.00
TOTAL CARGA VIVA
1.00
100
2000
2000
TOTAL
18163.5
25163.5
25163.5
68490.5
ACUMULADO
18163.5
43327
68490.5
TIPO C-4
Nivel 1 y 2
Area
Carga Muerta
P. P. de la losa
P. P. de la viga Principal
P. P. de la viga secundaria
P. P. de la columna
Falso Piso
Cielo Raso
Tabiqueria
Carga Viva
S/C
Longitud
Peso
Unitario
Total
2.50 4.00
0.35 0.70
0.35 0.45
0.45 0.60
2.50 4.00
2.50 4.00
2.50 4.00
TOTAL CARGA MUERTA
0.20
3.70
2.28
3.50
1.00
1.00
1.00
2400
2400
2400
2400
100
20
100
4800
2175.6
859.95
2268
1000
200
1000
12303.55
2.50 4.00
TOTAL CARGA VIVA
1.00
250
2500
2500
Longitud
Peso
Unitario
Nivel 3
Area
Carga Muerta
P. P. de la losa
P. P. de la viga Principal
P. P. de la viga secundaria
P. P. de la columna
Cielo Raso
Carga Viva
S/C
Total
2.50 4.00
0.35 0.70
0.35 0.45
0.45 0.60
2.50 4.00
TOTAL CARGA MUERTA
0.20
3.70
2.28
3.50
1.00
2400
2400
2400
2400
20
4800
2175.6
859.95
2268
200
10303.55
2.50 4.00
TOTAL CARGA VIVA
1.00
100
1000
1000
TOTAL
11303.55
14803.55
14803.55
40910.65
ACUMULADO
11303.55
26107.1
40910.65
0.30
0.60
0.54
4.40
2.50
300
100
120
m.
m.
m.
m.
m.
kg/m2.
kg/m2.
kg/m2.
432.00
705.00
235.00
282.00
1654.00
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/cm2
kg/cm2
280 kg/cm2
kg/m2
kg/m2 Ofician
kg/m2 Azotea
kg/m2 Corredor y escalera
1.-Metrado de Cargas
a) Carga Muerta
Viga Principal
Peso Propio Viga
=
P .Losa Aligerada .20m=
P. Tabiquera Repartida=
P. Acabados
=
WD =
Azotea
Peso Propio Viga
=
P .Losa Aligerada .20m
P. Cobertura
432.00 kg/m2
705.00 kg/m2
235.00 kg/m2
WD =
1372.00 kg/m2
WL =
352.50 kg/m2
b) Carga Viva
Viga Principal
S/C Viva
WL =
587.50 kg/m2
c) Amplificacin de Cargas
W total = 1.4 WD + 1.7 WL
W total =
5834.40
kg/m2
2.-Diseo de Viga
Secc C-E
Diagrama de Momento Flector Final (Envolvente)
Azotea
S/C Viva
0.910
1.932
1.115
6000
F'y
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
0.910
Acero Minimo
Asmin=14/fy*b*d
Asmin=
5.4 cm2
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
VAR:
2 3/4"
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
91000.0
0.495
0.447
0.447
0.447
0.447
0.447
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.29138313
0.26295426
0.26288488
0.26288471
0.26288471
0.26288471
101111.111 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.00024828
Comprobando
min<<max
0.0033333 <
0.00024828 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
1.932
Acero Minimo
Asmin=14/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
10.8
=
0.9
Mu=
193200.0 kg-cm
As=
1.052 a=
As=
0.952 a=
As=
0.951 a=
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
0.6186288
0.55997347
0.55966776
VAR:
2 3/4"
As=
As=
As=
0.951 a=
0.951 a=
0.951 a=
0.55966617
0.55966616
0.55966616
214666.667 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0005285736
Comprobando
min<<max
0.0033333 <
0.00052857 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
0.35702438
0.32238769
0.32228367
0.32228367
123888.889 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.000304379
Comprobando
min<<max
0.0033333 <
0.00030438 <
0.0214187
6382311.8
2.870
tn-m
F'c . b . d =
Verificando:
Vu
2.87
12.21
tn/m2
Vuc
12.21
x' = Vu - Vuc =
W
L = x' + d =
Distancia Total:
-0.281
-64.048
Vu = Wu L - Wu.d =
2
tn
9.685
kg
Estribo Minimo
-1.601
mts.
-1.061
mts.
Si Cumple
cm
5.40
5.40
cm
cm
0.30
0.60
0.54
4.40
2.50
300
100
120
m.
m.
m.
m.
m.
kg/m2.
kg/m2.
kg/m2.
432.00
705.00
235.00
282.00
1654.00
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/cm2
kg/cm2
280 kg/cm2
kg/m2
kg/m2 Ofician
kg/m2 Azotea
kg/m2 Corredor y escalera
1.-Metrado de Cargas
a) Carga Muerta
Viga Principal
Peso Propio Viga
=
P .Losa Aligerada .20m=
P. Tabiquera Repartida=
P. Acabados
=
WD =
Azotea
Peso Propio Viga
=
P .Losa Aligerada .20m
P. Cobertura
432.00 kg/m2
705.00 kg/m2
235.00 kg/m2
WD =
1372.00 kg/m2
WL =
352.50 kg/m2
b) Carga Viva
Viga Principal
S/C Viva
WL =
587.50 kg/m2
c) Amplificacin de Cargas
W total = 1.4 WD + 1.7 WL
W total =
5834.40
kg/m2
2.-Diseo de Viga
Secc A-B
Diagrama de Momento Flector Final (Envolvente)
Azotea
S/C Viva
1.116
1.332
1.126
6000
F'y
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
1.116
Acero Minimo
Asmin=14/fy*b*d
Asmin=
5.4 cm2
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
VAR:
2 3/4"
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
111600.0
0.607
0.549
0.548
0.548
0.548
0.548
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.35734458
0.32267778
0.3225739
0.32257359
0.32257359
0.32257359
124000 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0003046528
Comprobando
min<<max
0.0033333 <
0.00030465 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
1.332
Acero Minimo
Asmin=14/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
10.8
=
0.9
Mu=
133200.0 kg-cm
As=
0.725 a=
As=
0.655 a=
As=
0.655 a=
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
0.42650805
0.38537917
0.38523188
VAR:
2 3/4"
As=
As=
As=
0.655 a=
0.655 a=
0.655 a=
0.38523135
0.38523135
0.38523135
148000 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0003638296
Comprobando
min<<max
0.0033333 <
0.00036383 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
0.3605466
0.32557885
0.32547279
0.32547279
125111.111 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.000307391
Comprobando
min<<max
0.0033333 <
0.00030739 <
0.0214187
6382311.8
1.700
tn-m
F'c . b . d =
Verificando:
Vu
1.70
12.21
tn/m2
Vuc
12.21
x' = Vu - Vuc =
W
L = x' + d =
Distancia Total:
-1.451
-72.069
Vu = Wu L - Wu.d =
2
tn
9.685
kg
Estribo Minimo
-1.802
mts.
-1.262
mts.
Si Cumple
cm
5.40
5.40
cm
Secc B-C
Diagrama de Momento Flector Final (Envolvente)
cm
1.700
0.280
1.365
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
Reemplazando Valores
a = As.Fy / 0.85.F'c.b
(1)
b.d2
5.4 cm2
10.8
0.9
170000.0
0.925
0.837
0.837
0.837
0.837
0.837
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.54434211
0.49238964
0.4921517
0.49215061
0.4921506
0.4921506
188888.889 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0004648089
Comprobando
min<<max
0.0033333 <
0.00046481 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
0.280
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
5.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
28000.0
0.152
0.137
0.137
0.137
0.137
0.137
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.08965635
0.08075775
0.08075109
0.08075109
0.08075109
0.08075109
31111.1111 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
7.626492E-005
Comprobando
min<<max
0.0033333 <
7.626E-005 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
5.4 cm2
10.8
0.9
136500.0
0.743
0.671
0.671
0.671
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.43707469
0.39496564
0.39481051
0.39481051
151666.667 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0003728766
Comprobando
min<<max
0.0033333 <
0.00037288 <
0.0214187
6382311.8
1.920
tn-m
-1.231
tn/m2
Verificando:
Vuc
12.21
Vu
1.92
x' = Vu - Vuc =
W
L = x' + d =
Distancia Total:
Vu = Wu L - Wu.d =
2
tn
9.685
kg
-1.764
mts.
-1.224
mts.
25.298
Si Cumple
-70.561
cm
5.40
5.40
cm
Secc C-E
Diagrama de Momento Flector Final (Envolvente)
cm
3.177
4.411
1.226
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
tn-m
MCmx. =
65.264
b.d2
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
3.177
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
5.4 cm2
10.8
0.9
317700.0
1.729
1.571
1.570
1.570
1.570
1.570
OK
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
1.01727934
0.92425722
0.92345427
0.92344734
0.92344728
0.92344728
353000 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0008721447
Comprobando
min<<max
0.0033333 <
0.00087214 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
4.411
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
5.4 cm2
10.8
0.9
441070.0
2.401
2.189
2.187
2.187
2.187
2.187
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
1.41231161
1.28792256
1.28642129
1.28640319
1.28640298
1.28640297
490077.778 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0012149361
Comprobando
min<<max
0.0033333 <
0.00121494 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
5.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=
=
Mu=
As=
As=
As=
As=
10.8
0.9
122600.0
0.667
0.603
0.603
0.603
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.39256672
0.35459897
0.35447349
0.35447349
136222.222 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0003347805
Comprobando
min<<max
0.0033333 <
0.00033478 <
0.0214187
6382311.8
6.220
tn-m
F'c . b . d =
Verificando:
Vu
6.22
3.069
12.21
tn/m2
Vuc
12.21
x' = Vu - Vuc =
W
L = x' + d =
Distancia Total:
Vu = Wu L - Wu.d =
2
tn
-1.027
mts.
-0.487
mts.
21.656
-41.081
9.685
Si Cumple
kg
5.40
5.40
cm2
5.40
cm
Secc E-F
Diagrama de Momento Flector Final (Envolvente)
6000
3.041
2.054
3.040
=
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
cm2
a = max. d . F'y =
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
3.041
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
5.4 cm2
10.8
0.9
304100.0
1.655
1.503
1.502
1.502
1.502
1.502
OK
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.97373197
0.88433194
0.88359387
0.88358778
0.88358773
0.88358773
337888.889 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0008344995
Comprobando
min<<max
0.0033333 <
0.0008345 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
0.0214187
As1=
34.698277842 cm2
a=As1*fy/(0.85*fc*b)
a=
20.410751672 cm
Mn1=As1*fy(d-a/2)
Mn1=
6382311.7564 kg-cm
Como Mn<Mn1
337888.88889 <
6382311.76
"As en el Centro":
Mu(+) =
2.054
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
5.4 cm2
10.8
0.9
205400.0
1.118
1.012
1.012
1.012
1.012
1.012
OK
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.65769335
0.59555077
0.59520619
0.59520428
0.59520427
0.59520427
228222.222 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0005621374
Comprobando
min<<max
0.0033333 <
0.00056214 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
As1=
34.698277842 cm2
a=As1*fy/(0.85*fc*b)
a=
20.410751672 cm
Mn1=As1*fy(d-a/2)
Mn1=
6382311.7564 kg-cm
0.0214187
Como Mn<Mn1
228222.22222 <
6382311.8 OK
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
5.4 cm2
10.8
0.9
304000.0
1.655
1.503
1.502
1.502
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.97341177
0.8840385
0.88329476
0.88329476
337777.778 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0008342228
Comprobando
min<<max
0.0033333 <
0.00083422 <
0.0214187
6382311.8
3.430
tn-m
F'c . b . d =
Vu
3.43
0.279
12.21
tn/m2
Vuc
12.21
Vu = Wu L - Wu.d =
2
tn
9.685
kg
Distancia Total:
x' = Vu - Vuc =
W
-1.505
mts.
L = x' + d =
-0.965
mts.
24.318
Si Cumple
-60.209
cm
5.40
5.40
cm
cm2
F
0.30
0.60
0.54
4.40
2.50
300
100
120
m.
m.
m.
m.
m.
kg/m2.
kg/m2.
kg/m2.
432.00
705.00
235.00
282.00
1654.00
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/cm2
kg/cm2
280 kg/cm2
kg/m2
kg/m2 Ofician
kg/m2 Azotea
kg/m2 Corredor y escalera
1.-Metrado de Cargas
a) Carga Muerta
Viga Principal
Peso Propio Viga
=
P .Losa Aligerada .20m=
P. Tabiquera Repartida=
P. Acabados
=
WD =
Azotea
Peso Propio Viga
=
P .Losa Aligerada .20m
P. Cobertura
432.00 kg/m2
705.00 kg/m2
235.00 kg/m2
WD =
1372.00 kg/m2
WL =
352.50 kg/m2
b) Carga Viva
Viga Principal
S/C Viva
WL =
587.50 kg/m2
c) Amplificacin de Cargas
W total = 1.4 WD + 1.7 WL
W total =
5834.40
kg/m2
2.-Diseo de Viga
Secc A-B
Diagrama de Momento Flector Final (Envolvente)
Azotea
S/C Viva
1.567
2.379
1.701
6000
F'y
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
1.567
Acero Minimo
Asmin=14/fy*b*d
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
156700.0
0.853
0.771
0.771
0.771
0.771
0.771
Pmin=
5.16338759 cm2
VAR:
2 3/4"
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.50175534
0.45368759
0.45348481
0.45348396
0.45348395
0.45348395
174111.111 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0004282904
Comprobando
min<<max
0.0033333 <
0.00042829 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
2.379
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
5.4 cm2
10.8
0.9
237900.0 kg-cm
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
VAR:
2 3/4"
As=
As=
As=
As=
As=
As=
1.295
1.174
1.173
1.173
1.173
1.173
a=
a=
a=
a=
a=
a=
0.76175875
0.69045286
0.68999406
0.68999111
0.68999109
0.68999109
264333.333 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0006516583
Comprobando
min<<max
0.0033333 <
0.00065166 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
0.54466231
0.49244144
0.49244144
189000 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0004650836
Comprobando
min<<max
0.0033333 <
0.00046508 <
0.0214187
6382311.8
4.440
tn-m
F'c . b . d =
Verificando:
Vu
4.44
1.289
12.21
tn/m2
Vuc
12.21
x' = Vu - Vuc =
W
L = x' + d =
Distancia Total:
Vu = Wu L - Wu.d =
2
tn
9.685
kg
Estribo Minimo
-1.332
mts.
-0.792
mts.
23.511
Si Cumple
-53.284
cm
5.40
5.40
cm2
Secc B-C
Diagrama de Momento Flector Final (Envolvente)
cm
1.496
0.175
2.706
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
a = As.Fy / 0.85.F'c.b
(1)
b.d2
Reemplazando Valores
"As en el Extremo Izquierdo":
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
Asmin=0.8Raiz(280)/fy*b*d
5.4 cm2
10.8
0.9
149600.0
0.814
0.736
0.736
0.736
kg-cm
a=
a=
a=
a=
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
0.47902106
0.43285379
0.43285379
0.43285379
166222.222 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0004088064
Comprobando
min<<max
0.0033333 <
0.00040881 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
0.175
Acero Minimo
Asmin=14/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
10.8
=
0.9
Mu=
17500.0 kg-cm
As=
0.095 a=
As=
0.086 a=
As=
0.086 a=
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
0.05603522
0.05045788
0.05045527
As=
As=
As=
0.086 a=
0.086 a=
0.086 a=
0.05045527
0.05045527
0.05045527
19444.4444 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
4.765220E-005
Comprobando
min<<max
0.0033333 <
4.765E-005 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
5.4 cm2
10.8
0.9
270600.0
1.473
1.336
1.335
1.335
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.86646456
0.78612504
0.78553162
0.78553162
300666.667 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.000741891
Comprobando
min<<max
0.0033333 <
0.00074189 <
0.0214187
6382311.8
2.860
tn-m
F'c . b . d =
Verificando:
Vu
2.86
Distancia Total:
-0.291
12.21
tn/m2
Vuc
12.21
Vu = Wu L - Wu.d =
2
tn
9.685
kg
x' = Vu - Vuc =
W
-1.603
mts.
L = x' + d =
-1.063
mts.
24.716
Si Cumple
-64.117
cm
5.40
5.40
cm
Secc C-F
Diagrama de Momento Flector Final (Envolvente)
cm
5.594
5.781
4.669
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
tn-m
MCmx. =
65.264
b.d2
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
5.594
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
5.4 cm2
10.8
0.9
559400.0
3.045
2.787
2.783
2.783
2.783
2.783
OK
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
1.79120574
1.63927289
1.63693125
1.63689521
1.63689465
1.63689465
621555.556 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0015459561
Comprobando
min<<max
0.0033333 <
0.00154596 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
As1=
34.698277842 cm2
a=As1*fy/(0.85*fc*b)
a=
20.410751672 cm
Mn1=As1*fy(d-a/2)
Mn1=
6382311.7564 kg-cm
Como Mn<Mn1
0.0214187
621555.55556 <
6382311.76
"As en el Centro":
Mu(+) =
5.781
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
5.4 cm2
10.8
0.9
578100.0
3.147
2.882
2.877
2.877
2.877
2.877
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
1.85108337
1.69502722
1.69253892
1.6924993
1.69249867
1.69249866
642333.333 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.001598471
Comprobando
min<<max
0.0033333 <
0.00159847 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
5.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
10.8
0.9
466900.0
2.542
2.319
2.317
2.317
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
1.49501959
1.36440478
1.36271193
1.36271193
518777.778 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0012870057
Comprobando
min<<max
0.0033333 <
0.00128701 <
0.0214187
6382311.8
7.910
tn-m
F'c . b . d =
Verificando:
Vu
7.91
Distancia Total:
4.759
12.21
tn/m2
Vuc
12.21
19.074
-0.737
mts.
L = x' + d =
-0.197
mts.
Si Cumple
9.685
x' = Vu - Vuc =
W
Vu = Wu L - Wu.d =
2
tn
kg
Verificando:
S max Av . F'y =
3.5 x bw
-29.494
cm
5.40
5.40
cm
cm
0.30
0.60
0.54
4.40
2.50
300
100
120
m.
m.
m.
m.
m.
kg/m2.
kg/m2.
kg/m2.
432.00
705.00
235.00
282.00
1654.00
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/cm2
kg/cm2
280 kg/cm2
kg/m2
kg/m2 Ofician
kg/m2 Azotea
kg/m2 Corredor y escalera
1.-Metrado de Cargas
a) Carga Muerta
Viga Principal
Peso Propio Viga
=
P .Losa Aligerada .20m=
P. Tabiquera Repartida=
P. Acabados
=
WD =
Azotea
Peso Propio Viga
=
P .Losa Aligerada .20m
P. Cobertura
432.00 kg/m2
705.00 kg/m2
235.00 kg/m2
WD =
1372.00 kg/m2
WL =
352.50 kg/m2
b) Carga Viva
Viga Principal
S/C Viva
WL =
587.50 kg/m2
c) Amplificacin de Cargas
W total = 1.4 WD + 1.7 WL
W total =
5834.40
kg/m2
2.-Diseo de Viga
Secc A-B
Diagrama de Momento Flector Final (Envolvente)
Azotea
S/C Viva
0.855
1.243
0.849
6000
F'y
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
0.855
Acero Minimo
Asmin=14/fy*b*d
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
85500.0
0.465
0.420
0.420
0.420
0.420
0.420
Pmin=
5.16338759 cm2
VAR:
2 3/4"
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.27377206
0.24702103
0.24695971
0.24695957
0.24695957
0.24695957
95000 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0002332396
Comprobando
min<<max
0.0033333 <
0.00023324 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
1.243
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
5.4 cm2
10.8
0.9
124300.0 kg-cm
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
VAR:
2 3/4"
As=
As=
As=
As=
0.677
0.611
0.611
0.611
a=
a=
a=
a=
0.39801014
0.35940517
0.35940516
0.35940516
138111.111 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0003394382
Comprobando
min<<max
0.0033333 <
0.00033944 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
5.4 cm2
10.8
0.9
84900.0
0.462
0.417
0.417
0.417
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.27185085
0.24528318
0.24522256
0.24522256
94333.3333 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0002315991
Comprobando
min<<max
0.0033333 <
0.0002316 <
0.0214187
6382311.8
2.390
tn-m
-0.761
tn/m2
Verificando:
Vuc
12.21
Vu
2.39
x' = Vu - Vuc =
W
Distancia Total:
L = x' + d =
Clculo de Espaciamiento entre estribos:
S = Av . F'y . d =
(Vud - Vc )
Verificando:
S max Av . F'y =
3.5 x bw
Vu = Wu L - Wu.d =
2
tn
mts.
-1.143
mts.
-67.339
kg
Estribo Minimo
-1.683
25.017
9.685
Si Cumple
cm
5.40
5.40
cm2
Secc B-C
Diagrama de Momento Flector Final (Envolvente)
cm
0.862
0.125
1.397
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
a = As.Fy / 0.85.F'c.b
(1)
b.d2
Reemplazando Valores
"As en el Extremo Izquierdo":
Acero Minimo
Asmin=14/fy*b*d
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
86200.0
0.469
0.423
0.423
0.423
0.423
0.423
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.27601347
0.24904861
0.24898629
0.24898614
0.24898614
0.24898614
95777.7778 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0002351536
Comprobando
min<<max
0.0033333 <
0.00023515 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
0.125
Acero Minimo
Asmin=14/fy*b*d
Asmin=
5.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
10.8
0.9
12500.0
0.068
0.061
0.061
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
0.04002516
0.03603466
0.03603466
13888.8889 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
3.403274E-005
Comprobando
min<<max
0.0033333 <
3.403E-005 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
5.4 cm2
10.8
0.9
139700.0
0.760
0.687
0.687
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
0.44732113
0.40410103
0.40410103
155222.222 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.000381651
Comprobando
min<<max
0.0033333 <
0.00038165 <
0.0214187
6382311.8
1.580
tn-m
F'c . b . d =
Verificando:
Vu
1.58
Distancia Total:
-1.571
12.21
tn/m2
Vuc
12.21
Vu = Wu L - Wu.d =
2
tn
9.685
kg
x' = Vu - Vuc =
W
-1.822
mts.
L = x' + d =
-1.282
mts.
25.489
Si Cumple
-72.892
cm
5.40
5.40
cm2
Secc C-F
Diagrama de Momento Flector Final (Envolvente)
cm
2.996
3.070
2.378
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
tn-m
MCmx. =
65.264
b.d2
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
2.996
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
5.4 cm2
10.8
0.9
299600.0
1.631
1.481
1.480
1.480
1.480
1.480
OK
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.95932292
0.87112853
0.87041137
0.87040554
0.87040549
0.87040549
332888.889 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0008220496
Comprobando
min<<max
0.0033333 <
0.00082205 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
As1=
34.698277842 cm2
a=As1*fy/(0.85*fc*b)
a=
20.410751672 cm
Mn1=As1*fy(d-a/2)
Mn1=
6382311.7564 kg-cm
Como Mn<Mn1
0.0214187
332888.88889 <
6382311.76
"As en el Centro":
Mu(+) =
3.070
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
5.4 cm2
10.8
0.9
307010.0
1.671
1.518
1.517
1.517
1.517
1.517
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.98304983
0.89287205
0.8921203
0.89211404
0.89211399
0.89211399
341122.222 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0008425521
Comprobando
min<<max
0.0033333 <
0.00084255 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
5.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
10.8
0.9
237800.0
1.294
1.173
1.172
1.172
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.76143855
0.69016057
0.68969918
0.68969918
264222.222 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0006513826
Comprobando
min<<max
0.0033333 <
0.00065138 <
0.0214187
6382311.8
4.320
tn-m
F'c . b . d =
Verificando:
Vu
4.32
Distancia Total:
1.169
12.21
tn/m2
Vuc
12.21
23.615
-1.353
mts.
L = x' + d =
-0.813
mts.
Si Cumple
9.685
x' = Vu - Vuc =
W
Vu = Wu L - Wu.d =
2
tn
kg
Verificando:
S max Av . F'y =
3.5 x bw
-54.107
cm
5.40
5.40
cm
cm
0.30
0.60
0.54
4.40
2.50
300
100
120
m.
m.
m.
m.
m.
kg/m2.
kg/m2.
kg/m2.
432.00
705.00
235.00
282.00
1654.00
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/cm2
kg/cm2
280 kg/cm2
kg/m2
kg/m2 Ofician
kg/m2 Azotea
kg/m2 Corredor y escalera
1.-Metrado de Cargas
a) Carga Muerta
Viga Principal
Peso Propio Viga
=
P .Losa Aligerada .20m=
P. Tabiquera Repartida=
P. Acabados
=
WD =
Azotea
Peso Propio Viga
=
P .Losa Aligerada .20m
P. Cobertura
432.00 kg/m2
705.00 kg/m2
235.00 kg/m2
WD =
1372.00 kg/m2
WL =
352.50 kg/m2
b) Carga Viva
Viga Principal
S/C Viva
WL =
587.50 kg/m2
c) Amplificacin de Cargas
W total = 1.4 WD + 1.7 WL
W total =
5834.40
kg/m2
2.-Diseo de Viga
Secc A-B
Diagrama de Momento Flector Final (Envolvente)
Azotea
S/C Viva
0.893
1.326
0.911
6000
F'y
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
0.893
Acero Minimo
Asmin=14/fy*b*d
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
89300.0
0.486
0.439
0.439
0.439
0.439
0.439
Pmin=
5.16338759 cm2
VAR:
2 3/4"
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.28593971
0.25802889
0.25796205
0.25796189
0.25796189
0.25796189
99222.2222 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0002436307
Comprobando
min<<max
0.0033333 <
0.00024363 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
1.326
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
5.4 cm2
10.8
0.9
132600.0 kg-cm
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
VAR:
2 3/4"
As=
As=
As=
0.722 a=
0.652 a=
0.652 a=
0.42458684
0.38348987
0.38348987
147333.333 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0003621849
Comprobando
min<<max
0.0033333 <
0.00036218 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
0.29170333
0.26324401
0.2631743
0.2631743
101222.222 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0002485535
Comprobando
min<<max
0.0033333 <
0.00024855 <
0.0214187
6382311.8
2.530
tn-m
F'c . b . d =
12.21
-0.621
Vu = Wu L - Wu.d =
2
tn
9.685
kg
tn/m2
Verificando:
Vu
Vuc
2.53
12.21
Estribo Minimo
Distancia a Estribar "L":
x' = Vu - Vuc =
-1.659
mts.
W
Distancia Total:
L = x' + d =
-1.119
mts.
Clculo de Espaciamiento entre estribos:
S = Av . F'y . d =
24.930
cm. < 37.5 Si Cumple
(Vud - Vc )
Verificando:
S max Av . F'y =
3.5 x bw
-66.379
cm
5.40
5.40
cm2
Secc B-C
Diagrama de Momento Flector Final (Envolvente)
cm
0.899
0.147
1.516
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
a = As.Fy / 0.85.F'c.b
(1)
b.d2
Reemplazando Valores
"As en el Extremo Izquierdo":
Acero Minimo
Asmin=14/fy*b*d
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
89900.0
0.489
0.442
0.441
0.441
0.441
0.441
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.28786091
0.2597672
0.25969947
0.2596993
0.2596993
0.2596993
99888.8889 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0002452716
Comprobando
min<<max
0.0033333 <
0.00024527 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
0.147
Acero Minimo
Asmin=14/fy*b*d
Asmin=
5.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
10.8
0.9
14700.0
0.080
0.072
0.072
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
0.04706958
0.04237925
0.04237925
16333.3333 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
4.002485E-005
Comprobando
min<<max
0.0033333 <
4.002E-005 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
5.4 cm2
10.8
0.9
151600.0
0.825
0.746
0.746
0.746
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.48542508
0.43885508
0.4386643
0.4386643
168444.444 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0004142941
Comprobando
min<<max
0.0033333 <
0.00041429 <
0.0214187
6382311.8
1.677
tn-m
F'c . b . d =
Verificando:
Vu
1.68
Distancia Total:
-1.474
12.21
tn/m2
Vuc
12.21
Vu = Wu L - Wu.d =
2
tn
9.685
kg
x' = Vu - Vuc =
W
-1.806
mts.
L = x' + d =
-1.266
mts.
25.435
Si Cumple
-72.227
cm
5.40
5.40
cm2
Secc C-F
Diagrama de Momento Flector Final (Envolvente)
cm
3.211
3.371
2.600
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
tn-m
MCmx. =
65.264
b.d2
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
3.211
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
5.4 cm2
10.8
0.9
321100.0
1.748
1.588
1.587
1.587
1.587
1.587
OK
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
1.02816618
0.93424362
0.93342406
0.93341691
0.93341685
0.93341685
356777.778 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0008815604
Comprobando
min<<max
0.0033333 <
0.00088156 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
As1=
34.698277842 cm2
a=As1*fy/(0.85*fc*b)
a=
20.410751672 cm
Mn1=As1*fy(d-a/2)
Mn1=
6382311.7564 kg-cm
Como Mn<Mn1
0.0214187
356777.77778 <
6382311.76
"As en el Centro":
Mu(+) =
3.371
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
5.4 cm2
10.8
0.9
337100.0
1.835
1.668
1.667
1.667
1.667
1.667
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
1.07939838
0.98126573
0.98036595
0.9803577
0.98035763
0.98035763
374555.556 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0009258933
Comprobando
min<<max
0.0033333 <
0.00092589 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
5.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
10.8
0.9
260000.0
1.415
1.284
1.283
1.283
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.83252322
0.75509156
0.75454252
0.75454252
288888.889 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0007126235
Comprobando
min<<max
0.0033333 <
0.00071262 <
0.0214187
6382311.8
4.666
tn-m
F'c . b . d =
Verificando:
Vu
4.67
Distancia Total:
1.515
12.21
tn/m2
Vuc
12.21
23.310
-1.293
mts.
L = x' + d =
-0.753
mts.
Si Cumple
9.685
x' = Vu - Vuc =
W
Vu = Wu L - Wu.d =
2
tn
kg
Verificando:
S max Av . F'y =
3.5 x bw
-51.735
cm
5.40
5.40
cm
cm
0.30
0.60
0.54
4.40
2.50
300
100
120
m.
m.
m.
m.
m.
kg/m2.
kg/m2.
kg/m2.
432.00
705.00
235.00
282.00
1654.00
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/cm2
kg/cm2
280 kg/cm2
kg/m2
kg/m2 Ofician
kg/m2 Azotea
kg/m2 Corredor y escalera
1.-Metrado de Cargas
a) Carga Muerta
Viga Principal
Peso Propio Viga
=
P .Losa Aligerada .20m=
P. Tabiquera Repartida=
P. Acabados
=
WD =
Azotea
Peso Propio Viga
=
P .Losa Aligerada .20m
P. Cobertura
432.00 kg/m2
705.00 kg/m2
235.00 kg/m2
WD =
1372.00 kg/m2
WL =
352.50 kg/m2
b) Carga Viva
Viga Principal
S/C Viva
WL =
587.50 kg/m2
c) Amplificacin de Cargas
W total = 1.4 WD + 1.7 WL
W total =
5834.40
kg/m2
2.-Diseo de Viga
Secc A-B
Diagrama de Momento Flector Final (Envolvente)
Azotea
S/C Viva
1.518
2.283
1.640
6000
F'y
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
1.518
Acero Minimo
Asmin=14/fy*b*d
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
151800.0
0.826
0.747
0.747
0.747
0.747
0.747
Pmin=
5.16338759 cm2
VAR:
2 3/4"
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.48606548
0.43943667
0.43924616
0.43924539
0.43924538
0.43924538
168666.667 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0004148429
Comprobando
min<<max
0.0033333 <
0.00041484 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
2.283
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
5.4 cm2
10.8
0.9
228300.0 kg-cm
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
VAR:
2 3/4"
As=
As=
As=
As=
As=
As=
1.243
1.126
1.125
1.125
1.125
1.125
a=
a=
a=
a=
a=
a=
0.73101943
0.66240108
0.66197762
0.66197501
0.661975
0.661975
253666.667 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0006251986
Comprobando
min<<max
0.0033333 <
0.0006252 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
5.4 cm2
10.8
0.9
164000.0
0.893
0.807
0.807
0.807
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.52513003
0.47492627
0.47470354
0.47470354
182222.222 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0004483311
Comprobando
min<<max
0.0033333 <
0.00044833 <
0.0214187
6382311.8
4.285
tn-m
4.29
1.134
tn/m2
Vuc
12.21
x' = Vu - Vuc =
W
L = x' + d =
Distancia Total:
Vu = Wu L - Wu.d =
2
tn
9.685
kg
Estribo Minimo
-1.359
mts.
-0.819
mts.
23.645
Si Cumple
-54.347
cm
5.40
5.40
cm
Secc B-C
Diagrama de Momento Flector Final (Envolvente)
cm
0.396
0.121
2.574
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
a = As.Fy / 0.85.F'c.b
(1)
b.d2
Reemplazando Valores
"As en el Extremo Izquierdo":
Acero Minimo
Asmin=14/fy*b*d
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
39600.0
0.216
0.194
0.194
0.194
0.194
0.194
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.12679969
0.11425386
0.11424058
0.11424056
0.11424056
0.11424056
44000 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0001078939
Comprobando
min<<max
0.0033333 <
0.00010789 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
0.121
Acero Minimo
Asmin=14/fy*b*d
Asmin=
5.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
12100.0
0.066
0.059
0.059
0.059
0.059
0.059
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.03874435
0.03488243
0.03488118
0.03488118
0.03488118
0.03488118
13444.4444 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
3.294334E-005
Comprobando
min<<max
0.0033333 <
3.294E-005 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
As1=
34.698277842 cm2
a=As1*fy/(0.85*fc*b)
a=
20.410751672 cm
Mn1=As1*fy(d-a/2)
Mn1=
6382311.7564 kg-cm
Como Mn<Mn1
13444.444444 <
No necesita refuerzo en Compresin
6382311.76
5.4 cm2
10.8
0.9
257400.0
1.401
1.271
1.270
1.270
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.82419799
0.74748258
0.74694417
0.74694417
0.0214187
286000 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0007054473
Comprobando
min<<max
0.0033333 <
0.00070545 <
0.0214187
6382311.8
2.759
tn-m
F'c . b . d =
Vu
2.76
Distancia Total:
12.21
-0.392
tn/m2
Vuc
12.21
Vu = Wu L - Wu.d =
2
tn
9.685
kg
x' = Vu - Vuc =
W
-1.620
mts.
L = x' + d =
-1.080
mts.
cm
5.40
5.40
cm
Secc C-F
Diagrama de Momento Flector Final (Envolvente)
cm
5.350
5.598
4.483
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
tn-m
MCmx. =
65.264
b.d2
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
5.350
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
5.4 cm2
10.8
0.9
535000.0
2.912
2.663
2.660
2.660
2.660
2.660
OK
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
1.71307663
1.56661839
1.56446264
1.56443095
1.56443048
1.56443048
594444.444 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0014775177
Comprobando
min<<max
0.0033333 <
0.00147752 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
As1=
34.698277842 cm2
a=As1*fy/(0.85*fc*b)
a=
20.410751672 cm
Mn1=As1*fy(d-a/2)
Mn1=
6382311.7564 kg-cm
Como Mn<Mn1
0.0214187
594444.44444 <
6382311.76
"As en el Centro":
Mu(+) =
5.598
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
5.4 cm2
10.8
0.9
559800.0
3.047
2.789
2.785
2.785
2.785
2.785
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
1.79248654
1.64046484
1.6381201
1.63808398
1.63808343
1.63808342
622000 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0015470788
Comprobando
min<<max
0.0033333 <
0.00154708 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
5.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
10.8
0.9
448300.0
2.440
2.226
2.223
2.223
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
1.43546216
1.30931851
1.30775125
1.30775125
498111.111 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0012350984
Comprobando
min<<max
0.0033333 <
0.0012351 <
0.0214187
6382311.8
7.728
tn-m
F'c . b . d =
Verificando:
Vu
7.73
Distancia Total:
4.577
12.21
tn/m2
Vuc
12.21
19.407
-0.769
mts.
L = x' + d =
-0.229
mts.
Si Cumple
9.685
x' = Vu - Vuc =
W
Vu = Wu L - Wu.d =
2
tn
kg
Verificando:
S max Av . F'y =
3.5 x bw
-30.742
cm
5.40
5.40
cm
cm
0.30
0.60
0.54
4.40
2.50
300
100
120
m.
m.
m.
m.
m.
kg/m2.
kg/m2.
kg/m2.
432.00
705.00
235.00
282.00
1654.00
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/cm2
kg/cm2
280 kg/cm2
kg/m2
kg/m2 Ofician
kg/m2 Azotea
kg/m2 Corredor y escalera
1.-Metrado de Cargas
a) Carga Muerta
Viga Principal
Peso Propio Viga
=
P .Losa Aligerada .20m=
P. Tabiquera Repartida=
P. Acabados
=
WD =
Azotea
Peso Propio Viga
=
P .Losa Aligerada .20m
P. Cobertura
432.00 kg/m2
705.00 kg/m2
235.00 kg/m2
WD =
1372.00 kg/m2
WL =
352.50 kg/m2
b) Carga Viva
Viga Principal
S/C Viva
WL =
587.50 kg/m2
c) Amplificacin de Cargas
W total = 1.4 WD + 1.7 WL
W total =
5834.40
kg/m2
2.-Diseo de Viga
Secc A-B
Diagrama de Momento Flector Final (Envolvente)
Azotea
S/C Viva
0.721
1.185
0.923
6000
F'y
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
0.721
Acero Minimo
Asmin=14/fy*b*d
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
72100.0
0.392
0.354
0.354
0.354
0.354
0.354
Pmin=
5.16338759 cm2
VAR:
2 3/4"
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.23086509
0.20822369
0.20817996
0.20817987
0.20817987
0.20817987
80111.1111 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0001966143
Comprobando
min<<max
0.0033333 <
0.00019661 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
1.185
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
5.4 cm2
10.8
0.9
118500.0 kg-cm
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
VAR:
2 3/4"
As=
As=
As=
As=
As=
As=
0.645
0.583
0.582
0.582
0.582
0.582
a=
a=
a=
a=
a=
a=
0.37943847
0.34269863
0.34258168
0.34258131
0.34258131
0.34258131
131666.667 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.000323549
Comprobando
min<<max
0.0033333 <
0.00032355 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
5.4 cm2
10.8
0.9
92300.0
0.502
0.453
0.453
0.453
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.29554574
0.26672106
0.26664952
0.26664952
102555.556 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0002518357
Comprobando
min<<max
0.0033333 <
0.00025184 <
0.0214187
6382311.8
2.349
tn-m
2.35
-0.802
tn/m2
Vuc
12.21
x' = Vu - Vuc =
W
L = x' + d =
Distancia Total:
Vu = Wu L - Wu.d =
2
tn
9.685
kg
Estribo Minimo
-1.691
mts.
-1.151
mts.
25.043
Si Cumple
-67.620
cm
5.40
5.40
cm
Secc B-C
Diagrama de Momento Flector Final (Envolvente)
cm
0.849
0.264
0.568
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
MCmx. =
65.264
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
a = As.Fy / 0.85.F'c.b
(1)
b.d2
Reemplazando Valores
"As en el Extremo Izquierdo":
Acero Minimo
Asmin=14/fy*b*d
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
5.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
84900.0
0.462
0.417
0.417
0.417
0.417
0.417
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.27185085
0.24528318
0.2452227
0.24522257
0.24522256
0.24522256
94333.3333 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0002315991
Comprobando
min<<max
0.0033333 <
0.0002316 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
6382311.76
"As en el Centro":
Mu(+) =
0.264
Acero Minimo
Asmin=14/fy*b*d
Asmin=
5.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
10.8
0.9
26400.0
0.144
0.129
0.129
0.129
0.129
0.129
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.08453313
0.07613941
0.07613349
0.07613348
0.07613348
0.07613348
29333.3333 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
7.190385E-005
Comprobando
min<<max
0.0033333 <
7.190E-005 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
As1=
34.698277842 cm2
a=As1*fy/(0.85*fc*b)
a=
20.410751672 cm
Mn1=As1*fy(d-a/2)
Mn1=
6382311.7564 kg-cm
Como Mn<Mn1
29333.333333 <
No necesita refuerzo en Compresin
6382311.76
5.4 cm2
10.8
0.9
56800.0
0.309
0.279
0.279
0.279
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.1818743
0.16396299
0.16393572
0.16393572
0.0214187
63111.1111 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0001548282
Comprobando
min<<max
0.0033333 <
0.00015483 <
0.0214187
6382311.8
1.410
tn-m
F'c . b . d =
Vu
1.41
Distancia Total:
12.21
-1.741
tn/m2
Vuc
12.21
Vu = Wu L - Wu.d =
2
tn
9.685
kg
x' = Vu - Vuc =
W
-1.851
mts.
L = x' + d =
-1.311
mts.
cm
5.40
5.40
cm
Secc C-F
Diagrama de Momento Flector Final (Envolvente)
cm
3.776
4.041
3.562
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
57.093
tn-m
MCmx. =
65.264
b.d2
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
3.776
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
5.4 cm2
10.8
0.9
377600.0
2.055
1.871
1.869
1.869
1.869
1.869
OK
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
1.20907988
1.10049211
1.09937423
1.09936274
1.09936262
1.09936262
419555.556 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0010382869
Comprobando
min<<max
0.0033333 <
0.00103829 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
As1=
34.698277842 cm2
a=As1*fy/(0.85*fc*b)
a=
20.410751672 cm
Mn1=As1*fy(d-a/2)
Mn1=
6382311.7564 kg-cm
Como Mn<Mn1
0.0214187
419555.55556 <
6382311.76
"As en el Centro":
Mu(+) =
4.041
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
5.4 cm2
10.8
0.9
404100.0
2.200
2.004
2.002
2.002
2.002
2.002
Pmin=
5.16338759 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
1.29393321
1.17866127
1.17738936
1.17737535
1.17737519
1.17737519
449000 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0011119655
Comprobando
min<<max
0.0033333 <
0.00111197 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
5.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
5.16338759 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
10.8
0.9
356200.0
1.939
1.764
1.762
1.762
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
1.14055682
1.03745742
1.03644765
1.03644765
395777.778 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0009788672
Comprobando
min<<max
0.0033333 <
0.00097887 <
0.0214187
6382311.8
5.803
tn-m
F'c . b . d =
Verificando:
Vu
5.80
Distancia Total:
2.652
12.21
tn/m2
Vuc
12.21
22.152
-1.098
mts.
L = x' + d =
-0.558
mts.
Si Cumple
9.685
x' = Vu - Vuc =
W
Vu = Wu L - Wu.d =
2
tn
kg
Verificando:
S max Av . F'y =
3.5 x bw
-43.940
cm
5.40
5.40
cm
cm
0.25
0.20
0.14
4.40
2.50
300
100
120
m.
m.
m.
m.
m.
kg/m2.
kg/m2.
kg/m2.
120.00
712.50
237.50
285.00
1355.00
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/cm2
kg/cm2
280 kg/cm2
kg/m2
kg/m2 Ofician
kg/m2 Azotea
kg/m2 Corredor y escalera
1.-Metrado de Cargas
a) Carga Muerta
Viga Principal
Peso Propio Viga
=
P .Losa Aligerada .20m=
P. Tabiquera Repartida=
P. Acabados
=
WD =
Azotea
Peso Propio Viga
=
P .Losa Aligerada .20m
P. Cobertura
120.00 kg/m2
712.50 kg/m2
237.50 kg/m2
WD =
1070.00 kg/m2
WL =
356.25 kg/m2
b) Carga Viva
Viga Principal
S/C Viva
WL =
593.75 kg/m2
c) Amplificacin de Cargas
W total = 1.4 WD + 1.7 WL
W total =
5010.00
kg/m2
2.-Diseo de Viga
Secc C-D
Diagrama de Momento Flector Final (Envolvente)
Azotea
S/C Viva
0.234
0.201
0.301
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
3.198
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
0.234
Acero Minimo
Asmin=14/fy*b*d
Asmin=
1.1666666667 cm2
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
1.1155467 cm2
VAR:
2 3/4"
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
2.8
0.9
23400.0
0.491
0.448
0.447
0.447
0.447
0.447
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.34680539
0.31603928
0.31568806
0.31568405
0.31568401
0.31568401
26000 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.000894438
Comprobando
min<<max
0.0033333 <
0.00089444 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
357491.171
"As en el Centro":
Mu(+) =
0.201
Acero Minimo
Asmin=14/fy*b*d
Asmin=
1.1666666667
a=d/5
a=
2.8
=
0.9
Mu=
20100.0
As=
0.422
As=
0.384
As=
0.384
cm2
kg-cm
a=
a=
a=
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
1.1155467 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
0.29789694
0.27099036
0.2707274
VAR:
2 3/4"
As=
As=
As=
0.384 a=
0.384 a=
0.384 a=
0.27072484
0.27072481
0.27072481
22333.3333 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0007670536
Comprobando
min<<max
0.0033333 <
0.00076705 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
357491.171
cm2
kg-cm
a=
a=
a=
a=
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
1.1155467 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
0.44610437
0.40799422
0.40742225
0.40742225
33444.4444 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.001154363
Comprobando
min<<max
0.0033333 <
0.00115436 <
0.0214187
357491.2
0.658
tn-m
F'c . b . d =
Verificando:
2.64
Vu
0.66
-18.974
10.321
kg
1.17
cm
tn/m2
Vuc
2.64
x' = Vu - Vuc =
W
L = x' + d =
Distancia Total:
Verificando:
S max Av . F'y =
3.5 x bw
-0.043
Vu = Wu L - Wu.d =
2
tn
Estribo Minimo
-0.395
mts.
-0.255
mts.
Si Cumple
cm
1.17
cm
Secc D-E
Diagrama de Momento Flector Final (Envolvente)
0.290
0.197
0.225
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
3.198
MCmx. =
65.264
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
Reemplazando Valores
a = As.Fy / 0.85.F'c.b
(1)
b.d2
2.8
0.9
29000.0
0.609
0.557
0.556
0.556
0.556
0.556
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
1.1155467 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.42980155
0.39285169
0.39232589
0.39231842
0.39231831
0.39231831
32222.2222 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0011115685
Comprobando
min<<max
0.0033333 <
0.00111157 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
357491.171
"As en el Centro":
Mu(+) =
0.197
Acero Minimo
Asmin=14/fy*b*d
Asmin=
1.1666666667 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
1.1155467 cm2
a=d/5
As=Mu/(*fy(d-a/2))
a=
=
Mu=
As=
As=
As=
As=
As=
As=
2.8
0.9
19700.0
0.414
0.376
0.376
0.376
0.376
0.376
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.29196864
0.26554069
0.26528766
0.26528524
0.26528521
0.26528521
21888.8889 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0007516414
Comprobando
min<<max
0.0033333 <
0.00075164 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
357491.171
2.8
0.9
22500.0
0.472
0.430
0.430
0.430
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
1.1155467 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.33346672
0.30373742
0.30340777
0.30340777
25000 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0008596554
Comprobando
min<<max
0.0033333 <
0.00085966 <
0.0214187
357491.2
0.651
tn-m
-0.050
tn/m2
Verificando:
Vuc
2.64
Vu
0.65
x' = Vu - Vuc =
W
L = x' + d =
Distancia Total:
Vu = Wu L - Wu.d =
2
tn
10.321
kg
-0.397
mts.
-0.257
mts.
7.374
-19.041
Si Cumple
cm
1.17
1.17
cm
cm
0.30
0.40
0.34
4.40
2.50
300
100
120
m.
m.
m.
m.
m.
kg/m2.
kg/m2.
kg/m2.
288.00
705.00
235.00
282.00
1510.00
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/cm2
kg/cm2
280 kg/cm2
kg/m2
kg/m2 Ofician
kg/m2 Azotea
kg/m2 Corredor y escalera
1.-Metrado de Cargas
a) Carga Muerta
Viga Principal
Peso Propio Viga
=
P .Losa Aligerada .20m=
P. Tabiquera Repartida=
P. Acabados
=
WD =
Azotea
Peso Propio Viga
=
P .Losa Aligerada .20m
P. Cobertura
288.00 kg/m2
705.00 kg/m2
235.00 kg/m2
WD =
1228.00 kg/m2
WL =
352.50 kg/m2
b) Carga Viva
Viga Principal
S/C Viva
WL =
587.50 kg/m2
c) Amplificacin de Cargas
W total = 1.4 WD + 1.7 WL
W total =
5431.20
kg/m2
2.-Diseo de Viga
Secc 1-2
Diagrama de Momento Flector Final (Envolvente)
Azotea
S/C Viva
0.123
0.411
0.945
6000
F'y
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
22.634
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
0.123
Acero Minimo
Asmin=14/fy*b*d
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
3.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
6.8
0.9
12300.0
0.106
0.096
0.096
0.096
0.096
0.096
Pmin=
3.25102182 cm2
VAR:
2 3/4"
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.06255225
0.05634886
0.05634372
0.05634371
0.05634371
0.05634371
13666.6667 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
7.982026E-005
Comprobando
min<<max
0.0033333 <
7.982E-005 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
2530162
"As en el Centro":
Mu(+) =
0.411
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
3.4 cm2
6.8
0.9
41100.0 kg-cm
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
VAR:
2 3/4"
As=
As=
As=
As=
As=
As=
0.355
0.321
0.321
0.321
0.321
0.321
a=
a=
a=
a=
a=
a=
0.20901607
0.18869446
0.18863792
0.18863776
0.18863776
0.18863776
45666.6667 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0002672368
Comprobando
min<<max
0.0033333 <
0.00026724 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
2530162
3.4 cm2
6.8
0.9
94500.0
0.817
0.741
0.740
0.740
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.48058439
0.43560455
0.43531267
0.43531267
105000 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.000616693
Comprobando
min<<max
0.0033333 <
0.00061669 <
0.0214187
2530162.0
1.210
tn-m
1.21
-0.637
tn/m2
Vuc
7.69
x' = Vu - Vuc =
W
L = x' + d =
Distancia Total:
Vu = Wu L - Wu.d =
2
tn
10.102
kg
3.40
cm
Estribo Minimo
-1.193
mts.
-0.853
mts.
17.392
Si Cumple
-47.717
cm
3.40
cm
Secc 2-3
Diagrama de Momento Flector Final (Envolvente)
0.909
1.039
0.940
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
22.634
MCmx. =
65.264
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
a = As.Fy / 0.85.F'c.b
(1)
b.d2
Reemplazando Valores
"As en el Extremo Izquierdo":
Acero Minimo
Asmin=14/fy*b*d
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
3.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
6.8
0.9
90900.0
0.786
0.712
0.712
0.712
0.712
0.712
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.46227641
0.41889651
0.41862762
0.41862595
0.41862594
0.41862594
101000 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0005930534
Comprobando
min<<max
0.0033333 <
0.00059305 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
2530162
"As en el Centro":
Mu(+) =
1.039
Acero Minimo
Asmin=14/fy*b*d
Asmin=
3.4 cm2
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
6.8
0.9
103900.0
0.898
0.815
0.814
0.814
0.814
0.814
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.52838855
0.47927386
0.47892523
0.47892276
0.47892274
0.47892274
115444.444 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0006784739
Comprobando
min<<max
0.0033333 <
0.00067847 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
As1=
21.847063827 cm2
a=As1*fy/(0.85*fc*b)
a=
12.851214016 cm
Mn1=As1*fy(d-a/2)
Mn1=
2530161.9995 kg-cm
Como Mn<Mn1
115444.44444 <
No necesita refuerzo en Compresin
2530162
3.4 cm2
6.8
0.9
94000.0
0.813
0.737
0.736
0.736
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.47804162
0.43328345
0.43299458
0.43299458
0.0214187
104444.444 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.000613409
Comprobando
min<<max
0.0033333 <
0.00061341 <
0.0214187
2530162.0
1.661
tn-m
F'c . b . d =
Vu
1.66
Distancia Total:
7.69
-0.186
tn/m2
Vuc
7.69
Vu = Wu L - Wu.d =
2
tn
10.102
kg
x' = Vu - Vuc =
W
-1.110
mts.
L = x' + d =
-0.770
mts.
cm
3.40
3.40
cm
Secc 3-4
Diagrama de Momento Flector Final (Envolvente)
cm
0.955
0.775
0.268
6000
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
22.634
tn-m
MCmx. =
65.264
b.d2
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
0.955
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
3.4 cm2
6.8
0.9
95500.0
0.826
0.748
0.748
OK
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
0.48566994
0.43994935
0.43994935
106111.111 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0006232616
Comprobando
min<<max
0.0033333 <
0.00062326 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
2530162
Mu(+) =
0.775
Acero Minimo
Asmin=14/fy*b*d
Asmin=
3.4 cm2
a=d/5
a=
6.8
=
0.9
Mu=
77500.0 kg-cm
As=
0.670 a=
As=
0.606 a=
As=
0.606 a=
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
0.39413006
0.35658697
0.35658697
86111.1111 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0005051649
Comprobando
min<<max
0.0033333 <
0.00050516 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
3.4 cm2
6.8
0.9
26800.0
0.232
0.209
0.209
0.209
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.13629272
0.12290979
0.12288552
0.12288552
29777.7778 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0001740878
Comprobando
min<<max
0.0033333 <
0.00017409 <
0.0214187
2530162.0
1.530
tn-m
F'c . b . d =
Verificando:
7.69
Vu
1.53
Distancia Total:
-0.317
Vu = Wu L - Wu.d =
2
tn
10.102
kg
tn/m2
Vuc
7.69
x' = Vu - Vuc =
W
-1.134
mts.
L = x' + d =
-0.794
mts.
17.194
Si Cumple
-45.361
cm
3.40
3.40
cm2
cm
cm
Secc 5-6
Diagrama de Momento Flector Final (Envolvente)
6000
0.335
1.177
0.972
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
22.634
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
0.335
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
3.4 cm2
6.8
0.9
33500.0
0.290
0.748
0.748
OK
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
0.1703659
0.43994935
0.43994935
37222.2222 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0006232616
Comprobando
min<<max
0.0033333 <
0.00062326 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
As1=
21.847063827 cm2
a=As1*fy/(0.85*fc*b)
a=
12.851214016 cm
0.0214187
Mn1=As1*fy(d-a/2)
Mn1=
2530161.9995 kg-cm
Como Mn<Mn1
37222.222222 <
2530162
"As en el Centro":
Mu(+) =
1.177
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
3.4 cm2
6.8
0.9
117700.0
1.018
0.606
0.606
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
0.59856913
0.35658697
0.35658697
130777.778 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0005051649
Comprobando
min<<max
0.0033333 <
0.00050516 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
3.4 cm2
6.8
0.9
97200.0
0.840
0.210
0.209
0.209
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.49431537
0.12356166
0.12288552
0.12288552
108000 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0001740878
Comprobando
min<<max
0.0033333 <
0.00017409 <
0.0214187
2530162.0
1.755
tn-m
F'c . b . d =
Verificando:
7.69
Vu
1.76
Distancia Total:
-0.092
17.045
Vuc
7.69
x' = Vu - Vuc =
W
-1.093
mts.
L = x' + d =
-0.753
mts.
10.102
tn/m2
Vu = Wu L - Wu.d =
2
tn
Si Cumple
kg
(Vud - Vc )
Verificando:
S max Av . F'y =
3.5 x bw
-43.704
3.40
cm2
3.40
cm
Secc 6-7
Diagrama de Momento Flector Final (Envolvente)
0.503
0.547
tn-m
tn-m
cm2
6
0.566
6000
F'y
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
22.634
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
0.503
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
3.4 cm2
6.8
0.9
50300.0
0.435
0.746
0.748
OK
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
0.25580312
0.43875345
0.43994935
55888.8889 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0006232616
Comprobando
min<<max
0.0033333 <
0.00062326 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
2530162
"As en el Centro":
Mu(+) =
0.547
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
3.4 cm2
6.8
0.9
54700.0
0.473
0.605
0.606
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
0.27817954
0.35617411
0.35658697
60777.7778 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0005051649
Comprobando
min<<max
0.0033333 <
0.00050516 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
As1=Pmax*b*d
As1=
21.847063827 cm2
a=As1*fy/(0.85*fc*b)
a=
12.851214016 cm
Mn1=As1*fy(d-a/2)
Mn1=
2530161.9995 kg-cm
0.0214187
Como Mn<Mn1
60777.777778 <
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
As=
3.4 cm2
6.8
0.9
56600.0
0.489
0.209
0.209
0.209
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.28784208
0.12318488
0.12288552
0.12288552
62888.8889 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0001740878
Comprobando
min<<max
0.0033333 <
0.00017409 <
0.0214187
2530162.0
1.216
tn-m
F'c . b . d =
7.69
Vu
1.22
-0.631
Vu = Wu L - Wu.d =
2
tn
10.102
tn/m2
Vuc
7.69
kg
Distancia Total:
x' = Vu - Vuc =
W
-1.192
mts.
L = x' + d =
-0.852
mts.
17.388
Si Cumple
-47.673
cm
3.40
3.40
cm2
Secc 7-9
Diagrama de Momento Flector Final (Envolvente)
cm
0.152
0.227
0.172
6000
F'y
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
22.634
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
0.152
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
3.4 cm2
6.8
0.9
15200.0
0.131
0.744
0.748
NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
0.07730035
0.4376004
0.43994935
OK
16888.8889 kg-cm
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0006232616
Comprobando
min<<max
0.0033333 <
0.00062326 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
2530162
"As en el Centro":
Mu(+) =
0.227
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
As=
As=
As=
3.4 cm2
6.8
0.9
22700.0
0.196
0.604
0.606
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
0.11544196
0.35532027
0.35658697
25222.2222 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0005051649
Comprobando
min<<max
0.0033333 <
0.00050516 <
Como no se cumple la condicion, se diseara con cuantia minima
Hallando As1,a, y verificar si Mn<Mn1 (Sin refuerzo)
0.0214187
As1=Pmax*b*d
As1=
21.847063827 cm2
a=As1*fy/(0.85*fc*b)
a=
12.851214016 cm
Mn1=As1*fy(d-a/2)
Mn1=
2530161.9995 kg-cm
Como Mn<Mn1
25222.222222 <
3.4 cm2
6.8
0.9
17200.0
0.149
0.209
0.209
0.209
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.08747144
0.12282144
0.12288552
0.12288552
19111.1111 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0001740878
Comprobando
min<<max
0.0033333 <
0.00017409 <
0.0214187
2530162.0
Cortante Max. Vu =
0.629
tn-m
F'c . b . d =
Verificando:
7.69
Vu
0.63
Distancia Total:
-1.218
Vu = Wu L - Wu.d =
2
tn
10.102
kg
tn/m2
Vuc
7.69
x' = Vu - Vuc =
W
-1.300
mts.
L = x' + d =
-0.960
mts.
17.715
Si Cumple
-51.996
cm
3.40
3.40
cm2
cm2
9
0.30
0.40
0.34
4.40
2.50
300
100
120
m.
m.
m.
m.
m.
kg/m2.
kg/m2.
kg/m2.
288.00
705.00
235.00
282.00
1510.00
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/cm2
kg/cm2
280 kg/cm2
kg/m2
kg/m2 Ofician
kg/m2 Azotea
kg/m2 Corredor y escalera
1.-Metrado de Cargas
a) Carga Muerta
Viga Principal
Peso Propio Viga
=
P .Losa Aligerada .20m=
P. Tabiquera Repartida=
P. Acabados
=
WD =
Azotea
Peso Propio Viga
=
P .Losa Aligerada .20m
P. Cobertura
288.00 kg/m2
705.00 kg/m2
235.00 kg/m2
WD =
1228.00 kg/m2
WL =
352.50 kg/m2
b) Carga Viva
Viga Principal
S/C Viva
WL =
587.50 kg/m2
c) Amplificacin de Cargas
W total = 1.4 WD + 1.7 WL
W total =
5431.20
kg/m2
2.-Diseo de Viga
Secc 1-2
Diagrama de Momento Flector Final (Envolvente)
Azotea
S/C Viva
0.152
0.407
0.893
6000
F'y
tn-m
tn-m
tn-m
b = 0.0283
6000+F'y
0.3750
0.85 F'c
Momento Resistente Mximo del Concreto
MCmx. = 0.85 F'c (d - a/2) a b
MCmx. =
22.634
MCmx. =
65.264
b.d2
tn-m
Momento de Diseo Mn
Mn = [As.F'y.(d - a/2)]
a = As.Fy / 0.85.F'c.b
Mn = [ As.F'y.( d - As . F'y ) ]
2x0.85.F'c.b
(1)
Reemplazando Valores
"As en el Extremo Izquierdo":
Mu(-) =
0.152
Acero Minimo
Asmin=14/fy*b*d
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Asmin=
3.4 cm2
a=d/5
a=
=
Mu=
As=
As=
As=
As=
As=
As=
6.8
0.9
15200.0
0.131
0.118
0.118
0.118
0.118
0.118
Pmin=
3.25102182 cm2
VAR:
2 3/4"
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
a=
a=
0.07730035
0.06964949
0.06964164
0.06964163
0.06964163
0.06964163
16888.8889 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.000098659
Comprobando
min<<max
0.0033333 <
9.866E-005 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
2530162
"As en el Centro":
Mu(+) =
0.407
Acero Minimo
Asmin=14/fy*b*d
Asmin=
a=d/5
a=
=
Mu=
3.4 cm2
6.8
0.9
40700.0 kg-cm
OK, NO
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
VAR:
2 3/4"
As=
As=
As=
As=
As=
As=
0.352
0.318
0.318
0.318
0.318
0.318
a=
a=
a=
a=
a=
a=
0.20698185
0.18685241
0.18679695
0.1867968
0.1867968
0.1867968
45222.2222 kg-cm
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0002646288
Comprobando
min<<max
0.0033333 <
0.00026463 <
Como no se cumple la condicion, se diseara con cuantia minima
0.0214187
2530162
3.4 cm2
6.8
0.9
89300.0
0.772
0.700
0.699
0.699
Asmin=0.8Raiz(280)/fy*b*d
Pmin=
3.25102182 cm2
As=Mu/(*fy(d-a/2))
a=As*fy/(0.85*fc*b)
kg-cm
a=
a=
a=
a=
0.45413954
0.41147362
0.41121228
0.41121228
99222.2222 kg-cm
.
b=0.85**fc/fy*(6117/(6117+fy))
b=
0.0285582534
max=0.75*Pb
max=
0.02141869
min=
Pmin=0.8Raiz(280)/fy
min=
0.0033333333 Pmin=
0.00318728
min=
0.0033333333
=As/b*d
=
0.0005825507
Comprobando
min<<max
0.0033333 <
0.00058255 <
0.0214187
2530162.0
1.183
tn-m
1.18
-0.664
tn/m2
Vuc
7.69
x' = Vu - Vuc =
W
L = x' + d =
Distancia Total:
Vu = Wu L - Wu.d =
2
tn
10.102
kg
3.40
cm
Estribo Minimo
-1.198
mts.
-0.858
mts.
17.408
Si Cumple
-47.916
cm
3.40
cm