Anda di halaman 1dari 7

Contractor

Owner

Main Subcontractor

PROJECT NAME: Khabat Thermal Power Plant Units 1&2


OWNER: Ministry of Electricity of Kurdistan Regional Goverment
CONTRACTOR: POSCO Engineering & Construction Co. Ltd.
MAIN SUBCONTRACTOR: GAMA Power Systems Engineering &
Contracting Inc.
PROJE REFERENCE NO:
Re
v
0

Revision
Date
15.09.201
5

Description
For Review

Revision History
Created by
Checked by
A.E.
AKMAN

Emission
Status

Return
Status

B. GKCE

Vendor doc No.:

Vendor Logo

Approved by

Document Code :

Title, Subtitle

VT
TEST PROCEDURE

Format
A4

Rev. 0

Date
15.09.2015

Lang.
En

Date
15.09.2015

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N

VT
TEST PROCEDURE

CLIENT N
REV.

SH/OF
2/7
0

SUMMARY

1.
2.
3.
4.
5.
6.
7.
7.1.
7.2.
8.
9.
10.
11.

PURPOSE OF TESTS
REFERENCE DOCUMENT
SCOPE
TERMINOLOGY
TEST EQUIPMENT UNDER TEST
TEST EQUIPMENT REQUIRED
GENERAL INSPECTION
MECHANICAL CHECKS
ELECTRICAL CHECKS
INSULATION RESISTANCE TEST
POLARITY TEST
TRANSFORMER TURNS RATIO TEST
RECORDING OF INSPECTION AND TEST DATA

3
3
3
3
3
3
4
4
4
4
6
6
7

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

ENG. N

VT
TEST PROCEDURE

CLIENT N
REV.

1. PURPOSE OF TESTS
Check conformity with specifications. Check for satisfactory condition prior to energizing.
2. REFERENCE DOCUMENT
Electrical drawing N
3. SCOPE
All Voltage Transformers at MV switchyard
4. TERMINOLOGY
No applicable.
5. TEST EQUIPMENT UNDER TEST
The concerned equipments are all types of potential transformers
6. TEST EQUIPMENT REQUIRED
- RS polarity test set
or, if not available, storage battery,
milliammeter, and switch
- Megohmmeter, 500 V - 5 kV
- Ohmmeter
- Multimeter (volts, amperes, ohms, etc...)
- Auto transformer
- Step-up transformer

SH/OF
3/7
0

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

ENG. N

VT
TEST PROCEDURE

CLIENT N
REV.

SH/OF
4/7
0

7. GENERAL INSPECTION
7.1.

MECHANICAL CHECKS
- General visual inspection and compliance with drawings and manuals
- Check nameplate ratings and HV and LV terminal markings
- Check that all parts of the transformer are properly assembled and tight
- Check the HV connections for looseness, stressed terminals and poor grounding
- Check the cable connections on the LV side and the markings
- Check the oil levels and inspect for leakage (where applicable)
1/ Capacitor divider type
Check that all parts of the transformer are properly assembled and tight

Capacitors together

Capacitors and measuring set

2/ Electromagnetic type
Check the intermediate connections
7.2.

ELECTRICAL CHECKS
- Check the equipment grounding (continuity and connections)
- Check the fuse ratings
- Perform the operation described in the following pages

8. INSULATION RESISTANCE TEST


To obtain values as close as possible to the manufacturers specifications, the insulators must be
very clean.
Select the Megger range corresponding to the ratings of the equipment under test :
LV: 6 to 100 volts (direct current)
MV: 100 to 1000 volts (direct current)
HV: 1000 to 5000 volts (direct current)

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

ENG. N

VT
TEST PROCEDURE

CLIENT N
REV.

The theoretical values are furnished by the manufacturer.

Measurements between primary and secondary

Measurements between primary and ground

Measurement between secondaries and between secondary and ground

SH/OF
5/7
0

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

ENG. N

VT
TEST PROCEDURE

CLIENT N

SH/OF
6/7

REV.

9. POLARITY TEST
The polarity is checked using the kick method (application of direct current) and check of
deflection on a bidirectional milliammeter.
This test is also used to check primary and secondary circuit continuity.
- When switch K is closed, the milliammeter pointer deflects upscale.
- When the circuit is opened, the milliammeter pointer deflects in the negative direction.

10. TRANSFORMER TURNS RATIO TEST


A variable AC source is applied on the primary side. The primary and secondary voltages are
measured to determine the ratio V2 / V1.

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

ENG. N

VT
TEST PROCEDURE

CLIENT N
REV.

SH/OF
7/7
0

CPC 100 Display


11. RECORDING OF INSPECTION AND TEST DATA
The results of the checks and measurements made during the field tests shall be recorded on the