Table of Content
Preface
v
Part I
SHR 'A'/'B'
2
STR 'A'/'B'
3
SHR 'C'/'D'
4
STR 'C'/'D'
5
Part II
Cross-drainage Structures
6
SHC 'A'/'B'
structure
of
culvert/causeway
of
District/Village
of
culvert/causeway
of District/Village
7
STC 'A'/'B'
7
SHC 'C'/'D'
8
STC 'C'/'D'
8
SHB 'A'/'B'
9
STB 'A'/'B'
9
SHB 'C'/'D'
10
STB 'C'/'D'
10
II
Part I
DHR 'A'/'B'
12
DTR 'A'/'B'
13
Table of Content
DHR 'C'/'D'
14
DTR 'C'/'D'
14
Part II
Cross-drainage Structures
15
DHC 'A'/'B'
structure
of
culvert/causeway
of
District/Village
of
culvert/causeway
of District/Village
16
DTC 'A'/'B'
16
DHC 'C'/'D'
17
DTC 'C'/'D'
17
DHB 'A'/'B'
18
DTB 'A'/'B'
18
DHB 'C'/'D'
19
DTB 'C'/'D'
19
III
S. No. 1
Site Clearance
20
Cutting of Trees
20
Dismantling of Culverts, Bridges, Pavements and Other Structures
S. No. 2
S. No. 3
S. No. 4
S. No. 5
S. No. 6
S. No. 7
S. No. 8
S. No. 9
S. No. 10
Roads
(Construction,
Rehabilitation
and
20
Stripping of Top Soil
21
Excavation in Roadway and Drain
21
Works in the Preparation of Cut Formation
21
Transporting Material from Roadway and Drain Excavation
21
Pre-splitting Work
22
Excavation for Structures
22
Construction of Roadway in Embankments
22
ii
S. No. 11
S. No. 12
S. No. 13
S. No. 14
S. No. 15
S. No. 16
S. No. 17
S. No. 18
S. No. 19
S. No. 20
S. No. 21
S. No. 22
S. No. 23
S. No. 24
S. No. 25
S. No. 26
S. No. 27
S. No. 28
S. No. 29
S. No. 30
S. No. 31
S. No. 32
Table of Content
iii
S. No. 33
S. No. 34
S. No. 35
S. No. 36
S. No. 37
37
S. No. 37-B 12.5 mm Thick Plastering with Cement Sand Mortar
37
S. No. 37-C Pointing Work with Cement Sand Mortar
38
S. No. 37-D Architectural Coping Work
39
S. No. 37-E Ruled Pointing
S. No. 38
39
Stone Masonry Work
39
39
S. No. 38-B Square Rubble - Coursed Rubble Masonry (first sort)
40
S. No. 38-C Square Rubble - Coursed Rubble Masonry (second sort)
41
S. No. 38-D Ashlar Masonry (Plain Ashlar)
S. No. 39
S. No. 40
S. No. 41
42
Formwork Where it is Provided as Separate Item
43
Reinforcement for RCC Work
44
Cement Concrete Work
46
46
S. No. 41-B Work in Super Structural Components
S. No. 42
46
Structural Steel Work for Structures
47
S. No. 42-A Steel Work Riveted or Bolted in Built-up Sections, Trusses including
Cutting, Hoisting and
Fixing in Position
47
S. No. 42-B Steel Work Welded in Built-up Sections, Trusses including Cutting, Hoisting
and Fixing in
Position Excluding Welding
47
iv
S. No. 43
S. No. 44
S. No. 44.1 Fabrication of Gabion Boxes including Rolling, Cutting and Weaving
48
S. No. 44.2 Assembling of Wire Crates/Gabion/Revetment and Placing Them in
Position including
Stretching, Binding Them Together and Tying Down Lids
S. No. 45
S. No. 46
S. No. 47
S. No. 48
S. No. 49
S. No. 50
S. No. 51
S. No. 52
S. No. 53
S. No. 54
50
Packing and Filling of Gabion Crates with Rubble Stones
50
Preparation of Bedding for Pipe with Granular Material
51
Laying, Fitting and Fixing of Hume Pipe Having a Length of 1 m or
More
51
Bedding for Stone Pitching with Granular Material
53
Stone Pitching Work on the Prepared Granular Bedding
53
Dry Rubble Flooring on the Prepared Granular Bedding
53
Collection of Natural Sand, Gravel including Screening and Stacking
at Site (Annex I)
54
Production of Aggregates by Breaking of Stones Manually and
Stacking (Annex II)
55
Preparation of Cement Sand Mortar with Haulage up to a Lead of 50
m along the
Lead Route (Annex III)
56
Work Norms for Routine Maintenance (using labour-based methods)
57
57
S. No. 54.2 Technical Supervision
57
S. No. 54.3 Construction/Maintenance Tools
57
IV
S. No. 55
S. No. 56
S. No. 57
Table of Content
S. No. 58
S. No. 59
S. No. 60
S. No. 61
S. No. 62
S. No. 63
S. No. 64
S. No. 65
S. No. 66
S. No. 67
S. No. 68
S. No. 69
S. No. 70
S. No. 71
S. No. 72
S. No. 73
vi