ELC DEFINITION
Electronic Load Controller (ELC) is a controller used in small hydro power generation to
control the frequency of generator by diverting excess power to dummy/ballast load, thus
the speed, frequency and voltage of generator will be maintained.
Excess power normally happened during low power consumption on main load/villagers
during day or midnight. On the plant without ELC or appropriate governor, this condition will
lead to higher generator speed, high frequency and voltage which will destroy most of
electrical appliances and even generator it self due to runaway speed. In most large hydro
power generation, control is done by adjusting flow entering turbine through guide vane to
match the power output required and maintain the speed. This will be too complicated and
costly for small hydro power, especially for rural electrification that required simple and
affordable system.
Power diversion to dummy load is done electronically through thyristor as electronic switch
which controlled by ELC main board. It will keep the frequency at set point with smooth and
steady operation without the need of operator interferences. Our ELC panel is integrated
with standard protection for main load and generator and metering to monitor the plant
operation at real time.
Pgenerator
= Pload + Pballast
Page 2
ADVANTAGE OF ELC
1. Constant frequency and voltage generated by the system, thus preventing the damaged
on electronic appliances due to high frequency/voltage
2. Avoid damage on generator due to runaway speed when the main load is switched off
or decreased
3. No water hammer risk on the penstock, since no need of sudden flow closing when full
load rejection
4. No frequent turbine opening adjustment needed to regulate the power during the
operation. Once turbine opening position is possible for long period of operation, thus
operator work is simpler
5. Easy in installation, operation and maintenance as well as longer life time expectancy.
Standard components are used and widely available
6. Fast recovery time upon sudden load change. Frequency will be recover to set point less
than 2 second (adjustable)
7. Affordable price compared to any other control system type
8. ELC panel is integrated with standard protection and metering, as well as customized
system for data monitoring and logging, no more cubicle required
9. Customized metering and protection, based on customer requirements and applied
national standard
10. Suitable for synchronous generator, on/off grid application and can be integrated with
existing control system as back up.
11. Suitable for remote data monitoring system (RMS) to view the data of the plant through
web interface and mobile phone (SMS) (on demand)
Typical Single Line Diagram of Small hydro power with ELC off grid
Page 3
Page 4
CONDITION
BALLAST FREQUENCY
ACTION
25 kW
10 kW
15 kW
F = 50 Hz
ELC WORKING
UNDERLOAD
25 kW
18 kW
7 kW
F = 50 Hz
ELC WORKING
NORMAL
25 kW
26 kW
0 kW
F < 50 Hz
OVERLOAD
Reduce turbine
opening
increase ow or
reduce load
ELC works to detect and regulate the frequency and not the voltage! Generator voltage is
controlled by Automatic Voltage Regulator (AVR) which normally included on generator.
Brushless generator with AVR normally will be able control the voltage output when
frequency between 47.5 - 52.5 Hz. In most cases generator without AVR will have
uncontrolled voltage output, even when the frequency is 50 Hz the generator voltage can
reach up to 250 Volt or even more. Therefore the use of brushes generator without AVR
should be avoided to get the better quality of electrical power output.
BALLAST LOAD
Ballast load or dummy load basically is a resistive load (resistance) used to dump the excess
power. We normally used tubular air heater type, industrial standard which have good
quality to ensure long life time expectancy. Its normally used in industrial process for
heating and drying purpose. Air heater doesnt need forced air for cooling, natural water
flow should be sufficient to cool the heater, thus placement of ballast load on the good air
ventilation is recommended. We also use water heater resistance made from stainless steel
tubing if customer required the hot water for other purpose. But water heater system
require appropriate tank and maintain water availability to prevent overheating and damage.
Considering that voltage applied to ballast load is not sinusoidal waveform, it is
recommended not to use any normal appliances to be used as ballast load. Replace the
ballast load resistance immediately in case of any damage occurring, to avoid over speed of
generator. Ballast load capacity is recommended to be 20% higher than designed power
output to compensate thyristor waveform and expected higher output of the turbine. If
Ballast load is too small the generator speed and frequency might increase when all power
dumped, it is mean that generated power are bigger than ballast load capacity.
Page 5
ELC METERING
Our ELC panel is provided with standard metering to monitor the electrical output and
electrical consumption by load, thus no additional panel required. Customer can request
additional metering system if standard version is not sufficient. Digital or analog version is
available on request. Following is our standard ELC metering;
1. Pilot lamps generator, 3 phase
2. Ampermeter ballast, 3 phase
3. Ampermeter konsumen, 3 phase
4. Voltmeter generator, 1 Phase
5. Frequency generator, 1 Phase
6. Hour counter, 1 unit
Standard metering is analog type with 72x72 mm
display dimension.
Page 6
ELC PROTECTION
Besides metering, ELC panel is integrated with
standard protection to protect generator, main load
and ELC for standard application. Some additional
protection might be added upon customer
requirements especially for other application such as
grid connected and parallel operation with other
generator. Following are the included standard
protection of ELC;
1. Main load MCCB for overload and short circuit
2. Main load Contactor for on/off consumer
3. Protection Fuse/MCB
4. Grounding terminal
5. Under/over frequency relay (optional)
6. Lightning arrester (optional)
7. Exhaust fan for ELC>30 kW
FUNCTION
Proportional Value
Integral Value
Set Point -1 = 49 Hz
Set Point +1 = 51 Hz
System freq. (50/60 Hz)
Droop setting (52Hz)
DEFAULT POSITION
STATUS
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
VALUE
3
3
50 Hz
50 Hz
50 Hz
Disable
Detailed setting of dip switch is provided on ELC manual operation come with ELC unit.
Page 7
6. Phase
7. Frequency
8. Freq. accuracy
: 1 and 3 Phase
: 50 / 60 Hz
: < 0.2
9. Freq. sensing
; every half cycle or every 10 ms or 100 times/second at 50 Hz
10. Recovery time
: 2 seconds
11. Standard protection
-
Page 8
SPECIFICATIONS
5-10 kW
11-20 kW
21-30 kW
31-40 kW
41-50 kW
Yes
Yes
Yes
Yes
Yes
DIRECT 30A
CT 50/5 A
CT 50/5 A
CT 75/5 A
CT 100/5 A
CT 50/5 A
CT 50/5 A
CT 50/5 A
CT 75/5 A
CT 100/5 A
Voltmeter generator - 1P
0-300 V
0-300 V
0-300 V
0-300 V
0-300 V
45-55 Hz
45-55 Hz
45-55 Hz
45-55 Hz
45-55 Hz
6 digit
6 digit
6 digit
6 digit
6 digit
20A
20/30A
50/60A
80A
100A
20A
20/30A
50/60A
80A
100A
Fuse/MCB protection
3x2A
3x2A
3x2A
3x2A
3x2A
Over/underfrequency relay
Optional
Cooling fan
12 cm fan
12 cm fan
12 cm fan
Lightning arrester
PEN
PEN
PEN
PEN
PEN
4 mm
6 mm
10 mm
16 mm
25 mm
1.5 mm
2.5 mm
4 mm
6 mm
10 mm
THYRISTOR Size
3xSKKT42
6xSKKT42
6xSKKT42
6xSKKT57
6xSKKT57
40x60x20
40x60x20
50x70x20
50x70x20
50x70x20
4x6
4x10
4x16
4x25
4x35
15 kg
20 kg
24 kg
31 kg
38 kg
220 or 230
220 or 230
220 or 230
220 or 230
220 or 230
1.5 - 2 kW
2 - 4 kW
4 - 6 kW
6 - 8 kW
8 - 10 kW
4x2.5
4x2.5 mm2
4x4 mm2
4x6 mm2
4x10 mm2
Approximate Weight
7 kg
15kg
22 kg
28 kg
35 kg
METERING
Pilot lamp - 3P
Ampermeter ballast load - 3P
Ampermeter main load - 3P
Hour Counter
Digital multi meter CVM NRG
(V,I,Hz,kW,kWh,PF,kVA,etc)
PROTECTION
Grounding
Page 9
SPECIFICATIONS
51-60 kW
61-70 kW
71-80 kW
81-90 kW 91-100 kW
Yes
Yes
Yes
Yes
Yes
CT 100/5 A
CT 150/5 A
CT 150/5 A
CT 200/5 A
CT 200/5 A
CT 100/5 A
CT 150/5 A
CT 150/5 A
CT 200/5 A
CT 200/5 A
Voltmeter generator - 1P
0-300 V
0-300 V
0-300 V
0-300 V
0-300 V
45-55 Hz
45-55 Hz
45-55 Hz
45-55 Hz
45-55 Hz
6 digit
6 digit
6 digit
6 digit
6 digit
Included
Included
Included
Included
Included
100A
125A
160A
200A
200A
100A
125A
160A
200A
200A
Fuse/MCB protection
3x2A
3x2A
3x2A
3x2A
3x2A
METERING
Pilot lamp - 3P
Hour Counter
Digital multi meter CVM NRG
(V,I,Hz,kW,kWh,PF,kVA,etc)
PROTECTION
Over/underfrequency relay
Cooling fan
12 cm fan
12 cm fan
12 cm fan
12 cm fan
3P+N
3P+N
3P+N
3P+N
3P+N
PEN
PEN
PEN
PEN
PEN
25 mm
35 mm
35 mm
50 mm
50 mm
10 mm
16 mm
16 mm
25 mm
25 mm
THYRISTOR Size
6xSKKT57
6xSKKT92
6xSKKT92
6xSKKT132
6xSKKT132
60x80x30
60x80x30
60x80x30
80x120x40
80x120x40
4x35
4x35
4x50
4x50
4x50
45 kg
53 kg
58 kg
80 kg
80 kg
220 or 230
220 or 230
220 or 230
220 or 230
220 or 230
12 - 14 kW
14 - 16 kW
16 - 18 kW
18 - 20 kW
19 - 21 kW
4x10 mm2
4x16 mm2
4x16 mm2
4x25 mm2
4x25 mm2
40 kg
47kg
54 kg
68 kg
73 kg
Lightning arrester
Grounding
CABLES & DIMENSION
Approximate Weight
Page 10
ELC installed rural electrification projects (PNPM) in Sumatera and Sulawesi Indonesia
Page 11
Page 12