Professional Experience:1. Senior Construction Engineer (Mechanical)
20th August, 2010 to till date
B.A.K. Consulting Engineers Peshawar Pakistan.
Presently I am working as Senior Construction Engineer (Mechanical) on high Head
Hydropower Complex Projects on ALLAI KHWAR 121 Mw at ALLAI, District Batagram
and Duber Khwar 130 Mw at DUBER, District Kohistan, Khyber Pakhtoon Khwa.
Both the projects consist of two Pelton Type Turbines .Allai Khwar project has 2.7 Km
steel lined pressure tunnel with 687 meter head .Ms DONG FONG ELECTRIC
COMPANY of China is the main contractor for construction supply and design for civil
and hydraulic steel works. More than 2 km of the pressure tunnel is lined with 16 to 60
mm steel armor pinstock. This project has been commissioned on April 20 th 2012 and
working on full capacity. How ever some minor jobs of rectifications are still in progress.
DUBER KHWAR 130 M.W Project at District Kohistan is also consisting of two pelton type
Turbines .
Ms SINOHYDRO CORPORATION of China is the main contractor ,
responsible for design, construction, supply and testing commissioning of civil and
hydraulic part of the project . ANDRITZ Hydro is the main contractor responsible for
supply, erection and testing /commissioning of the Turbines of both the projects. This
project is also almost complete. After testing commissioning of all the hydraulic gates and
water way, the Mechanical has been also completed. Commercial run of both the
turbines is expected any time this year. I was responsible for supervision of installation for
quality control, preparation of inspection protocols for installation of hydraulic structures
including outlet gates, spillway gates, intake gates, flushing gates, steel lining, stop log
gates, trash racks mono rail hoists, de watering pumps Etc . I was also responsible to
review testing protocols for dry and wet commissioning of the hydraulic
components/structure and machines .I got approved method statement for dry testing
and load testing/wet commissioning of gates and machines ( Rack cleaning machines and
Gantry cranes ) from Project Manager and monitored the testing/commissioning .
2. Manager Technical, Hafeez Iqbal Oil & Ghee Industries
(P V T) Ltd Hattar Haripur.
November 2, 2009 to August 19,2010
I worked as Manager Technical with Mujahid Oil & Ghee Mills at Hattar for about 10 months. I
was responsible for Technical advice on Mechanical issues. I was also In charge of printing
shop and tin fabrication shop .In addition to above I worked as Management
Representative (M.R) to deal I.S.O .documentation and implement in full spirit their
standards.
3. Senior Manager (Material)
Azgard.. 9, Pak American Fertilizers Ltd
Iskanderabad District Miawali.
July, 2006 to December 2006.
My last position in Pak American Fertilizers was Senior Engineer (Mechanical) and worked as
in charge ware house. I was responsible to keep up to date the Plant spares level wit
Maximum/Minimum level fixed mutually by the concerned user department head and the
undersigned with in the approved budget .Therefore it was utmost necessary to indent
limited quantity, to meet the factory requirement and meet the approved budget. It was
also necessary to indent the requirement with proper specifications to avoid confusion
during commercial evaluation . Our net work was computerized and I.S.O.9001-2000
and I.S.O.14001 certified. Therefore it was essential to maintain the record up to date
and present for audit as and when asked every year to Government, commercial and
I.S.O auditors
4. Pak American Fertilizers Ltd Iskanderabad, (a unit of N .F.C)
Senior Manager (Commercial )
September 8, 1999 to July 2006.
I joined Pak American Fertilizers ltd on transfer from Hazara Phosphate Fertilizers ltd. I
worked as Manager Field maintenance and Manager Ware house. I worked as Senior
Manager (Commercial) and assisted General Manager (commercial) inviting quotations for
and ventilation network of Raw Material Preparation Plant (R.M.P.P) . At later stage, before
completion the Mills, installation of some of the main heavy equipments were also handed
over to us. I have installed a hug quantity of heavy equipments of different types, pipe
lines, air handling units, rubber conveyor belts used for carrying crushed Sinters, chain
scraper belts and many others departmentally with 300 men power from labor contractor.
After completion of installation and successfully commissioning of the plant, I was re
designated as Assistant Superintendent (Energetic) of R.M.P.P. My last position was
Executive Engineer in Pakistan Steel Mills. During working in Pakistan Mills, I attended a
number of work shops, seminars, refresher courses. I have obtained many appreciation
certificates with cash recognizing my best performance and teamwork.