Anda di halaman 1dari 3

WIP is not getting calculated

This question has been Answered.

Rajender ch
Jul 20, 2012 11:55 AM

Hi Experts,
In our BOM structure, there are 2 levels, as per that we have two production orders. production orders
also confirmed
we want to check the WIP for the semi finished and finished product.
But we are unable get the WIP materials and its cost also not hitting WIP GL accounts(showing 0 value)
in KKAX.
Actual qty of finished product available in storage location 2.
Selection of Production order and period is correct as 07.2012.
Please help on this issue.
Thanks in advance

Correct Answer by ramakrishna nougatla on Jul 20, 2012 1:13 PM


Hi,
WIP will not be updated to g/l accounts when you run the KKAX.. after settlement of production order
only wip will be updated to G/L accounts.
And also check the status of the production order if the status id Rel and PLDV then only system will
calculate the wip. If the status of the order is DLV or TECO then system wont calculate the wip.
Regards,
Ram
See the answer in context

Helpful Answer by varsha p

1270 Views
Products: sap_erp_financials Topics: enterprise_resource_planning

Helpful AnswerRe: WIP is not getting calculated

Average User Rating


(0 ratings)

varsha p Jul 20, 2012 12:18 PM (in response to Rajender ch)


Hi,
To determine WIP you need to do following settings. Please whether you have maintained the below
settings or not .
Pre requisites :
1.
Define Result Analysis Keys : OKG1
2.

Define Cost Elements for WIP Calculation : KA06

3.

Define Result Analysis Versions : OKG9

4.

Define Valuation Method (Actual Costs) : OKGC

5.

Define Line IDs

6.
7.

Define Assignment : OKGB


Define Update : OKGA

8.

Define Posting Rules for Settling Work in Process : OKG8

From the above mentioned steps, steps # 6 & 7 are very important. I hope after
doing all the above settings WIP will get calculated.
Regards,
Varsha
1.

Alert Moderator
2.

3.

Like (0)

Re: WIP is not getting calculated

Rajender ch Jul 20, 2012 1:28 PM (in response to varsha p)


Hi Varsha,
Thank you very much for your prompt reply,
As per you, we have cross checked each and every step, but we couldn't able trace out the problem.
We are not understanding how to identify the root cause.
Please help.
Thanks,
Alert Moderator

Like (0)

Re: WIP is not getting calculated

varsha p Jul 20, 2012 1:38 PM (in response to Rajender ch)


Hi,
So considering all the settings for WIP in place & as mentioned by Mr. Ram did you check the
production order status ?? i.e. did you confirm the production order partially or fully ?? If production
order is partially settled then only WIP is calculated otherwise not. Please check & let us know.
Regards,
Varsha
Alert Moderator

Like (0)

Correct AnswerRe: WIP is not getting calculated

ramakrishna nougatla Jul 20, 2012 1:13 PM (in response to Rajender ch)
Hi,
WIP will not be updated to g/l accounts when you run the KKAX.. after settlement of production order
only wip will be updated to G/L accounts.
And also check the status of the production order if the status id Rel and PLDV then only system will
calculate the wip. If the status of the order is DLV or TECO then system wont calculate the wip.
Regards,
Ram
1.

3.

Re: WIP is not getting calculated

Alert Moderator
2.

Like (0)

Rajender ch Jul 20, 2012 2:14 PM (in response to ramakrishna nougatla)


Many thanks Varsha / Ramakrishna,
The below statement is working fine :
And also check the status of the production order if the status id Rel and PLDV then only
system will calculate the wip. If the status of the order is DLV or TECO then system wont
calculate the wip.
Now we are able to get the WIP , Iam closing the Issue, points given for the correct and helpful answer.
Thanks experts,