Anda di halaman 1dari 51

PRESUPUESTO DEL PROYECTO

Apendice 04 -11
Proyecto :

MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA CHILETE

Organismo Proponente :
Ubicacin

MUNICIPALIDAD DISTRITAL DE CHILETE

CHILETE

Item

Descripcin

Und.

Subproyecto 1: MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA DE CHILETE


01.00

OBRAS PRELIMINARES

01.01

ALQUILER DE LOCAL PARA OBRA

mes

01.02

CARTEL DE OBRA DE MADERA DE 3.60 m. X 2.40 m.

DESVO PROVISIONAL DEL RO


02.00

m3

MURO DE ENCAUZAMIENTO

02.01

LIMPIEZA MANUAL DE TERRENO EN ROCA SUELTA

m2

02.02

TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO

m2

02.03

EXCAVACIN DE ZANJAS Y/O ZAPATAS Hmax > 2.00 m. EN T. SEMIROCOSO

m3

02.04

EXTRACCIN DE HORMIGON EN CANTERA

m3

02.05

EXTRACCIN Y SELECIN DE PIEDRA DE RO

m3

02.06

ACARREO MANUAL DE P. G. ( Prom. 10") 50m. < 100 m.

m3

02.07

CARGUIO Y TRANS. MATERIALES Y/O A. A OBRA (D> 1 Km.) INC. VOLQUETE 6m3

m3

02.08

RELLENO CON MATERIAL PROPIO COMPACTACIN CON EQUIPO LIVIANO

m3

02.09

RELLENO C/ MAT. PRESTAMO INC. PLANCHA COMPACTADORA

m3

02.10

ACARREO DE AGUA PARA LA OBRA Dmx <= 50 m.

m3

02.11

SOLADO E= 4", MEZCLA 1:12, C :H, Inc. CURADO.

m3

02.12

PREP. DE AGREGADO POR ZARANDEO DEHORMIGON (PARA C E. )

m3

02.13

MURO DE CONTENCIN CONCRETO CICLOPEO C:H = 1:8 + 30 % PG

m3

02.14

MURO DE CONTENCIN ENCOFRADO Y DESENCOFRADO

m2

02.15

JUNTA DE CONTRUCCIN DE TECNOPORT e = 1" PARA MUROS

m2

Costo Directo del supproyecto 1


Subproyecto 2:
Costo Directo del supproyecto 2
Subproyecto 3:
Costo Directo del supproyecto 3
Resumen del Proyecto
N
1
2
3
Total
Costo Directo (CD)
Costo Indirecto (CI)
Costo Total del Proyecto (CT)

Fecha

05/04/2007

Metrado

Precio S/.

Parcial S/.

3.00

150.00

450.00

1.00

704.39

704.39

540.00

18.38

9,925.20

600.00

0.36

216.00

465.00

0.40

186.00

1,209.00

19.60

23,696.40

2,649.17

3.68

9,748.95

335.25

7.35

2,464.09

335.25

9.61

3,221.75

2,215.14

14.40

31,898.02

273.00

12.84

3,505.32

574.40

12.77

7,336.37

197.82

4.12

815.02

465.00

9.58

4,454.70

2,640.00

3.26

8,606.40

1,117.50

86.93

134,044.13

1,363.56

17.65

24,066.83

258.72

21.72

S/.

5,619.40

270,958.97

S/.

S/.

S/.
S/.
S/.
S/.

Subtotal
270,958.97
0.00
0.00
270,958.97

S/.
S/.
S/.

270,958.97
14120.00
285,078.97

RELACIN DE INSUMOS DEL COSTO DIRECTO


Apendice 06 - 13

Proyecto :

MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA CHILETE

INSUMO

Unidad

Cantidad

Insumos Aporte del Programa


CEMENTO PORTLAND TIPO I (42.5 kg)

bls

2,492.8550

PARTICIPANTE

hh

45,795.9429
Sub Total (1) S/.

Insumos del Confinanciamiento: Por parte del Organismo Proponente


AGUA

m3

198.2933

ALAMBRE NEGRO RECOCIDO # 8

kg

340.8900

ALQUILER DE LOCAL

mes

ASISTENTE DE JEFE DE CUADRILLA

hh

CAMION VOLQUETE 6 m3

hm

295.2652

CEMENTO PORTLAND TIPO I (42.5 kg)

bls

3,607.5100

CLAVOS PARA MADERA CON CABEZA DE 3"

kg

102.0744

CORDEL

23.2500

HERRAMIENTAS MANUALES

% MO

HORMIGON (PUESTO EN OBRA)

m3

0.0000

JEFE DE CUADRILLA

hh

788.7400

LIJA PARA MADERA

MADERA TORNILLO

p2

102.6571

MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO

p2

4,063.4086

MASILLA

kg

0.3000

MATERIAL DE PRESTAMO SELECIONADO EN OBRA

m3

0.0000

MIRAS Y JALONES

hm

PLANCHA DE TECNOPORT DE 1" X 42 X 8"

Pl

271.6560

PLANCHA COMPACTADORA

hm

484.2053

PINTURA ESMALTE SINTETICO

gal

0.4500

TEODOLITO

hm

7.5563

THINNER CORRIENTE

gal

1.0000

TRIPLAY DE 6 mm PARA ENCOFRADO

pl

3.0000

TOPOGRAFO

hh

7.7114

YESO

kg

22.1429

ZARANDA (Fab. 20 Usos - Aprox 50 m3 c/u )

52.8000

3.0000
742.0950

3.0000

6.9750

Sub Total (2) S/.

Insumos del Confinanciamiento: Aporte de otra institucin

Sub Total (3) S/.

Total (1+2+3) S/.

CTO

Precio S/.
20.00
1.75
Sub Total (1) S/.

Parcial S/.
49,857.10
80,142.90
130,000.00

1.50

297.44

4.00

1,363.56

150.00

450.00

4.00

2,968.38

85.00

25,097.54

20.00

72,150.20

4.30

438.92

0.20

4.65
4,054.10

Sub Total (2) S/.

Sub Total (3) S/.

Total (1+2+3) S/.

0.00

0.00

5.00

3,943.70

1.30

3.90

3.50

359.30

3.50

14,221.93

1.50

0.45

0.00

0.00

2.00

13.95

20.00

5,433.12

15.00

7,263.08

40.00

18.00

8.00

60.45

15.50

15.50

35.00

105.00

6.03

46.50

0.42

9.30

50.00

2,640.00
140,958.97

0.00

270958.97

DESAGREGADO DE COSTOS INDIRECTOS SEGN FUENTES


Apendice 06 - 09

Proyecto :

MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA CHILETE

Concepto
Direccin Tcnica y Administrataiva
Responsable Tcnico
Maestro de Obra Civil
Guardiania
Otros
Medidas de Seguridad
Utiles de Escritorio
Totales

Costo Base

2400.00
900.00

3920.00
100.00

Coeficiente de
Participacin

Costo

Nmero de
meses

Costo Total por


concepto (S/.)

1.00
1.00

2400.00
900.00

3.00
3.00

7200.00
2700.00

100.00

3.00

3920.00
300.00
14120.00

1.00

ENTES

Desagregado segn Fuentes


Aporte del
Cofinanciamiento
Programa
0.00
0.00

7200.00
0.00

0.00
0.00
0.00

3920.00
300.00
14120.00

USOS Y FUENTES DEL PROYECTO


Apendice 4-12

Proyecto :

MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA CHILETE


FUENTES

Aporte solicitado al

Cofinanciamiento

Programa
(a)
USOS
1. Costos Directos
- Mano de Obra Calificada
- Mano de Obra No Calificada
- Materiales
- Herramientas
- Equipos y Maquinarias
2. Costos Indirectos
- Direccin Tcnica, Administrativa y otros
3. TOTAL S/.

S/.
130000.00
0
80142.9
49857.1
0.00
0.00
0.00
0.00
130000.00
S/.

Organismo Proponente
Cofinanciantes
(b)
%
S/.
%
S/.
45.60
140958.97
49.45
0.00
0.00
6958.58
2.44
0.00
28.11
0.00
0.00
0.00
17.49
94866.62
33.28
0.00
0.00
4054.10
1.42
0.00
0.00
35079.67
12.31
0.00
0.00
14120.00
4.95
0.00
0.00
14120.00
4.95
0.00
45.60
155078.97
54.40
0.00
130000.00 S/.
155078.97

(c)

ento
Costo Total del Proyecto
( a )+( b )+ ( c )

anciantes
(c)
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

S/.
270958.97
6958.58
80142.90
144723.72
4054.10
35079.67
14120.00
14120.00
285078.97
S/.

%
95.05
2.44
28.11
50.77
1.42
12.31
4.95
4.95
100.00
285078.97

DETALLE DE MEDIDAS DE SEGURIDAD PARA EL PROYECTO


Apendice 06 -10
Proyecto :

MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA CHILETE

Implementos
Gafas de Seguridad
Botas de Jebe
Mascarillas Desechables
Guantes de Trabajo
Cascos de Seguridad
TOTAL

IMPLEMENTOS DE SEGURIDAD
Unidades
Precio Unitario (S/.)
50
5.00
60
32.00
50
5.00
60
10.00
60
15.00

Total (S/.)
250.00
1920.00
250.00
600.00
900.00
3920.00

Total (S/.)
250.00
1920.00
250.00
600.00
900.00
3920.00

DESAGREGADO DE HERRAMIENTAS
Apendice 06 - 14

Proyecto :

MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA CHILETE

INSUMO

Unidad

Cantidad

Herramientas Aporte del Programa

Sub Total S/.

Herramientas del Confinanciamiento: Aporte del Organismo Proponente


CARRETILLAS

und.

13.00

PICOS

und.

25.00

PALAS TIPO CUCHARA

und.

26.00

BARRETAS

und.

10.00

PLANCHA DE BATIR

und.

5.00

COMBA DE 12 LIBRAS

und.

5.00

BARRILES PARA AGUA

und.

8.00

BALDES VACIOS

und.

10.00

ESCOBAS

und.

10.00

MNGUERA 1/2" de Dam.

50.00
Sub Total S/.

Insumos del Confinanciamiento: Aporte de otra institucin


Sub Total S/.

Total S/.

Precio S/.

Sub Total S/.

0.00
105.00

1,365.00

30.00

750.00

25.00

650.00

65.00

650.00

5.50

27.50

23.08

115.40

39.71

317.70

5.00

50.00

5.00

50.00

1.57
Sub Total S/.

Sub Total S/.

Total S/.

Parcial S/.

78.50
4,054.10

0.00

4054.10

PLANILLA DE SUTENTACIN DE METRADOS

Proyecto :

MEJORAMIENTO Y AMPLIACION DE DEFENSA RIBEREA DE LA QUEBRADA AMOJU ZONA URBANA DE LA CIUDAD DE JAEN, DISTRITO
DE JAEN,PROVINCIA DE JAEN-CAJAMARCA

TRABAJOS PRELIMINARES
Partida

CARTE DE IDENTIFICACION DE OBRA DE 2.40 X 3.20

Grfico

DESCRIPCIN

Unidad
Cantidad

CARTEL DE 3.60X2.40 M

Largo (m)

Ancho (m)

Alto (m)

1
Metrado Total
(Und)

Partida

MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA

Grfico

DESCRIPCIN

Unidad

Cantidad

Movilizacion y desmovilizacion de maquinaria

Largo (m)

Ancho (m)

Alto (m)

1
Metrado Total
(Und)

Partida

DEMOLICION DE INFRAESTRUCTURA EXISTETE

Grfico

DESCRIPCIN
Lado derecho

Cantidad
1

Unidad
Ancho
Alto prom.
Promedio.
Largo (m)
(m)
(m)
1000.00
5.00
0.8

lado izquierdo

800

0.8
Metrado Total
(Und)

Partida

ALQUILER DE ALMACEN PARA OBRA

Grfico

Unidad

DESCRIPCIN

Cantidad

ALQUILER

Largo (m)

Ancho (m)

Alto (m)

8
Metrado Total
(Und)

Partida

DESVIO POROVICIONAL DEL RIO

Grfico

DESCRIPCIN

Unidad
Cantidad

EN MARGEN IZQUIERDA AGUAS ABAJO


EN MARGEN DERECHA AGUAS ABAJO

1
1

Largo (m)
2500.00

Ancho (m)
4.00

2500.00

4.00

Alto (m)
2
2
Metrado Total
(Und)

MUROS DE CONTENCION

Partida
Grfico

TRAZO Y REPLANTEO
DESCRIPCIN

Unidad
Cantidad

TRAZO Y REPLANTEO

Largo (m)
2500.00

Ancho (m)
4.00

Alto (m)

Metrado Total
(Und)

Partida
Grfico

EXCAVACION DE ZANJAS PARA ZAPATAS EN TERRENO ROCOSO CON MAQUINARIA


DESCRIPCIN

Cantidad

EXCAVACION PARA CIMIENTACIONES DEL MURO

Largo (m)
2

2500.00

Unidad

Ancho (m)

Alto (m)

5.00

2.5
Metrado Total
(Und)

Partida
Grfico

CONCRETO F'C=175 KG/CM2 + 30% PARA MUROS DE CONCRETO CICLOPEO


DESCRIPCIN
ZAPATAS
PANTALLA DE MURO

Cantidad
2
2

Largo (m)
2500.00
2500

Unidad
Ancho (m)
4.00
7.42

Alto (m)
1.5
Metrado Total
(Und)

Partida
Grfico

EXTRACCION Y SELECCIN DE PIEDRA DE RIO (SUB PARTIDA)


DESCRIPCIN
% DEL VOLUMEN DE CONCRETO

Cantidad
67,100.00

Unidad
factor
0.30

Ancho (m)

Alto (m)

Metrado Total
(Und)

Partida
Grfico

ENCOFRADO YD ESENCOFRADO NORMAL EN MUROS DE CONTENCION


DESCRIPCIN
CARAS DE MURO
LATERALES DE MURO

Cantidad
2.00
500.0

Unidad

Largo (m)
2500.00

CARAS
2.00
7.42

Alto (m)
4.5
Metrado Total
(Und)

Partida
Grfico

JUNTA DE CONSTRUCCION CON TECNOPORT


DESCRIPCIN
JUNTA DE TECNOPOR CADA 10.00 M

Unidad
Cantidad
500.0

AREA

Ancho (m)

Alto (m)

7.42
Metrado Total
(Und)

Partida
Grfico

RELLENO CON MATERIAL PROPIO SELECCIONADO


DESCRIPCIN

Unidad
Cantidad

Largo (m)

Ancho (m)

Alto (m)

RELLENO EN EL TRASDOS
RELLENO EN EL INTRADOS

2.00
2

2500.00
2500

1.50
1.00

1.5
1
Metrado Total
(Und)

Partida
Grfico

ROTECCION CON ROCA MEDIANA EN EL FRONTI DEL MURO


DESCRIPCIN
PROTECCION EN FRONTIS DEL MURO

Cantidad
2.00

Unidad
Largo (m)
2500.00

Ancho (m)
1.70

Alto (m)
1.5
Metrado Total
(Und)

Partida
Grfico

TUBERIA DE 4" PARA REDUCCION PRESIONES HIDROSTATICAS


DESCRIPCIN
TUBERIA DE 4"

Cantidad
1,000.00

Unidad
Largo (m)
2500.00

FACTOR
2.00

Alto (m)
1.5
Metrado Total
(Und)

Partida
Grfico

TUBERIA DE 2" PARA REDUCCION PRESIONES HIDROSTATICAS LATERALES


DESCRIPCIN
TUBERIA DE 2"

Cantidad
1,000.00

Largo (m)
2500.00

Unidad
Ancho (m)
1.50

FACTOR
2.5

Metrado Total
(Und)

LA CIUDAD DE JAEN, DISTRITO

UND
Metrado
Parcial

1.00

1.00

Glb
Metrado
Parcial

1.00

1.00

Glb
Metrado
Parcial

4,000.00

3,200.00
7,200.00

mes
Metrado
Parcial

8.00

8.00

m3
Metrado
Parcial

20,000.00
20,000.00

40,000.00

M2
Metrado
Parcial

20,000.00

20,000.00

M3
Metrado
Parcial

62,500.00
62,500.00

M3
Metrado
Parcial

30,000.00
37,100.00

67,100.00

M3
Metrado
Parcial

40,260.00

40,260.00

M2
Metrado
Parcial

45,000.00
3,710.00

48,710.00

m2
Metrado
Parcial

3710.00

3710.00

M3
Metrado
Parcial

11,250.00
5,000.00
16,250.00

M3
Metrado
Parcial

12,750.00

12,750.00

ML
Metrado
Parcial

3,000.00

3,000.00

ML
Metrado
Parcial

3,750.00

3,750.00

Proyecto :

MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA CHILETE

Partidas

Und.

Metrado

Costo Unitario Desagregado en S/.


Aporte del Programa
MONC

Otros

Subproyecto 1: MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA DE CHILETE


01.00

OBRAS PRELIMINARES

01.01

ALQUILER DE LOCAL PARA ALMACEN

01.02

CARTEL DE OBRA DE MADERA DE 3.60 m. X 2.40 m.


DESVIO PROVISIONAL DEL RO

02.00

mes

3.00

1.00

m3

540.00

0.00
112.00
17.50

0.00
27.60
0.00

0.35
0.08
18.67
3.50
7.00
9.33
2.92
4.00
4.00
4.00
1.12
2.15
10.89
2.80
0.70

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.58
0.00
41.44
0.00
0.00

MURO DE ENCAUZAMIENTO

02.01

LIMPIEZA MANUAL DE TERRENO EN ROCA SUELTA

m2

600.00

02.02

TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO

m2

465.00

02.03

EXCAVACIN DE ZANJAS Y/O ZAPATAS Hmax > 2.00 m. EN T. SEMIROCOSO

m3

1,209.00

02.04

EXTRACCIN DE HORMIGON EN CANTERA

m3

2,649.17

02.05

EXTRACCIN Y SELECIN DE PIEDRA DE RO

m3

335.25

02.06

ACARREO MANUAL DE P. G. ( Prom. 10") 50m. < 100 m.

m3

335.25

02.07

CARGUIO Y TRANS. MATERIALES Y/O A. A OBRA (D> 1 Km.) INC. VOLQUETE 6m3

m3

2,215.14

02.08

RELLENO CON MATERIAL PROPIO COMPACTACIN CON EQUIPO LIVIANO

m3

273.00

02.09

RELLENO C/ MAT. PRESTAMO INC. PLANCHA COMPACTADORA

m3

574.40

02.10

ACARREO DE AGUA PARA LA OBRA Dmx <= 50 m.

m3

197.82

02.11

SOLADO E= 4", MEZCLA 1:12 C :H, Inc. CURADO.

m3

465.00

02.12

PREP. DE AGREGADO POR ZARANDEO DEHORMIGON (PARA C E. )

m3

2,640.00

02.13

MURO DE CONTENCIN CONCRETO CICLOPEO C:H = 1:8 + 30 % PG

m3

1,117.50

02.14

MURO DE CONTENCIN ENCOFRADO Y DESENCOFRADO

m2

1,363.56

02.15

JUNTA DE CONTRUCCIN DE TECNOPORT e = 1" PARA MUROS

m2

258.72

Subproyecto 3:

Total Costo Directo


Costo Indirecto Total
Costo Total
% Avance Fsico Programado

CRONOGRAMA (1 b) PROGRAMA DE VOLORIZACIN MENSUAL


Apendice 06 - 16

Unitario Desagregado en S/.


Cofinanciamient Total Unitario

costo Parcial
metrado

150.00
564.79
0.88

150.00

450.00

704.39

704.39

18.38

9,925.20

0.01
0.32
0.93
0.18
0.35
0.28
11.48
8.84
8.77
0.12
0.88
1.11
67.62
14.85
21.02

0.36

216.00

0.40

186.00

19.60

23,696.40

3.68

9,748.95

7.35

2,464.09

9.61

3,221.75

14.40

31,898.02

12.84

3,505.32

12.77

7,336.37

4.12

815.02

9.58

4,454.70

3.26

8,606.40

119.95

134,044.13

17.65

24,066.83

21.72

5619.4

1.00
1.00
540.00
600.00
465.00
773.76
2649.17
335.25
251.44
1063.27
0.00
0.00
0.00
0.00
2640.00
0.00
0.00
0.00

MES 1
Valorizacin desagregada
Aporte del Programa
Cofinanciamien Valorizacin
MONC
Otros
to
mensual

0.00
112.00
9450.00
0.00
210.00
37.20
14446.10
9272.10
2346.75
2345.91
3104.74
0.00
0.00
0.00
0.00
5676.00
0.00
0.00
0.00

0.00
27.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

150.00
564.79
475.20
0.00
6.00
148.80
719.60
476.85
117.34
70.40
12206.31
0.00
0.00
0.00
0.00
2930.40
0.00
0.00
0.00

ME
metrado

150.00
704.39
9925.20

1
0
0

216.00
186.00
15165.70
9748.95
2464.09
2416.31
15311.05
0.00
0.00
0.00
0.00
8606.40
0.00
0.00
0.00

0.00
0.00
435.24
0.00
0.00
83.81
1151.87
54.60
0.00
89.02
465.00
0.00
558.75
255.67
77.62

270,958.97
14120.00
285,078.97

47000.80

27.60

17865.69
7320.00

64894.09
7320.00
72214.09
25.33

MES 2
Valorizacin desagregada
Aporte del Programa
Cofinanciamie Valorizacin
MONC
Otros
nto
mensual

metrado

MES 3
Valorizacin desagregada
Aporte del Programa
Cofinanciami Valorizacin
MONC
Otros
ento
mensual

0.00
0.00
0.00

0.00
0.00
0.00

150.00
0.00
0.00

150.00
0.00
0.00

1.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

150.00
0.00
0.00

0.00
0.00
8125.93
0.00
0.00
781.97
3363.47
218.40
0.00
356.08
520.80
0.00
6084.79
715.87
54.33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3524.70
0.00
23154.60
0.00
0.00

0.00
0.00
404.77
0.00
0.00
23.47
13223.50
482.66
0.00
10.68
409.20
0.00
37782.68
3796.66
1631.49

0.00
0.00
8530.70
0.00
0.00
805.44
16586.97
701.06
0.00
366.76
4454.70
0.00
67022.07
4512.53
1685.82

0.00
0.00
0.00
0.00
0.00
0.00
0.00
218.40
574.40
108.80
0.00
0.00
558.75
1107.89
181.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00
873.60
2297.60
435.20
0.00
0.00
6084.79
3102.10
126.77

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23154.60
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
1930.66
5037.49
13.06
0.00
0.00
37782.68
16452.20
3806.81

150.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2804.26
7335.09
448.26
0.00
0.00
67022.07
19554.30
3933.58

20221.64

26679.30

57915.11
3400.00

104816.05
3400.00
108216.05
37.96

12920.06

23154.600

65172.90
3400.00

101247.56
3400.00
104647.56
36.71

USO DEL INSUMO MANO DE OBRA NO CALIFICADA (R


Apendice 06-17

Proyecto :

MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA CHILETE

Perido

mes 1

Promedio Participantes x mes:

mes 2

133.875
Semana Semana
2
3
Da
Da
6-10
11-15
5
5

a) Nmero de das tiles

Da
1
5

Da
5
1

b) Nmero de participantes

88

105

103

165

175

175

155

105

90

80

95

30

30

70

28

14

14

70

70

70

14

56

42

14

14

28

12250

12250
49672.00

10850

c) Monto por Compensacin econmica =


(N de das x S/.14)
d) Total de MONC = bxc)

6160 2940 1442 2310

Montos Totales por mes


Por tanto la cantidad de participantes promedio mensual trabajando es

Semana
4
Da
16-20
5

67.27
Semana
Semana
Semana
5
6
7
Da
Da
Da
Da Da Da
21 22-25 26-28 29
30 31-32
1
4
3
1
1
2

Semana
1
Da
Da
2-3
4
2
1

1470 5040 3360 1330 420

840

DE OBRA NO CALIFICADA (RECURSO-PARTICIPANTE)


Apendice 06-17

mes 2

mes 3

67.27
Semana
7
Da
Da
33-35
36
3
1

Promedio General

41.25
Semana
8
Da Da
37 38-39
1
2

Da
40
1

Semana
9
Da
Da
Da
41 - 42 43 - 45 46-47
2
3
2

Semana
10
Da Da
48
49
1
1

Da
50
1

Semana
11
Da
51 - 55
5

Semana
12
Da
56 - 60
5

Semana
13
Da
61 - 63
3

80.80
Total

67

74

74

59

64

72

72

80

80

86

30

20

18

2141

42

14

14

28

14

28

42

28

14

14

14

70

70

42

938

1008

2016

3360

280
9660.00

1260

560

336

80108
3108
1036 826 1792
20776.00

81

2240 1204 420

80108.00

CRONOGRAMA DE DESEMBOLSOS
Apendice 06-18
Proyecto :

MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA CHILETE

a.- Cronograma mensual para pago de MONC


MES
Costo MONC mensual

MES 1

MES 2

MES 3

TOTAL

49672.00

20776.00

9660.00

80108.00

TOTAL

b.- Cronograma de desembolsos del Programa para pago de OTROS


MES
Nmero del Desembolso
Monto del Desembolso

MES 1

MES 2

MES 3

49857.1

49857.1

c.- Cronograma de desembolsos del Cofinanciamiento


MES

MES 1

MES 2

MES 3

TOTAL

Nmero del Desembolso


Costo Directo segn
desagregado de
insumos
Costo Indirecto

17865.69

57915.11

65178.17

140958.97

7320.00

3400.00

3400.00

14120.00

Monto del Confinanciamiento

25185.69

61315.11

68578.17

155078.97

CRONOGRAMA BIMENSUAL DE ADQUISICIN DE INSUMOS SEGN FUENTES DE FINANCIAMIENTO


Apendice 06 - 19

Proyecto :

MURO DE ENCAUZAMIENTO RO JEQUETEPEQUE PARTE BAJA CHILETE

Mes 01
DESCRIPCIN

Unid.

Cantidad

Precio
Unit. S/.

Costo Parcial
S/.

Aporte del
Programa

CANTIDAD
Confinan.

Total

MANO DE OBRA NO CALIFICADA


PARTICIPANTE

28384.00

0.00

28384.00

46.50
3,943.70
2,968.38

0.00
0.00
0.00

7.71
0.00
16.00

7.71
0.00
16.00

297.44
1,363.56
450.00
122,007.30
438.92
0.00
3.90
359.30
14,221.93
0.45
0.00
5,433.12
18.00
15.50

0.00
0.00
0.00
1.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.05
0.00
1.00
0.00
0.60
0.00
3.00
102.66
0.00
0.30
0.00
0.00
0.45
1.00

0.05
0.00
1.00
1.38
0.60
0.00
3.00
102.66
0.00
0.30
0.00
0.00
0.45
1.00

hh

45,776.0

1.75

80,108.00

hh
hh
hh

7.71
788.74
742.10

6.0300
5.0000
4.0000

198.29
340.89
3.00
6,100.365
102.07
0.00
3.00
102.66
4,063.41
0.30
0.00
271.66
0.45
1.00

1.5000
4.0000
150.0000
20.0000
4.3000
0.0000
1.3000
3.5000
3.5000
1.5000
0.0000
20.0000
40.0000
15.5000

MANO DE OBRA CALIFICADA


TOPOGRAFO
JEFE DE CUADRILLA
ASISTENTE DE JEFE DE CUADRILLA

MATERIALES
AGUA
ALAMBRE NEGRO RECOCIDO # 8
ALQUILER DE LOCAL
CEMENTO PORTLAND TIPO I (42.5 kg)
CLAVOS PARA MADERA CON CABEZA DE 3"
HORMIGON (PUESTO EN OBRA)
LIJA PARA MADERA
MADERA TORNILLO
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
MASILLA
MATERIAL DE PRESTAMO SELECIONADO EN OBRA
PLANCHA DE TECNOPORT DE 1" X 42 X 8"
PINTURA ESMALTE SINTETICO
THINNER CORRIENTE

m3
kg
mes
bls
kg
m3
u
p2
p2
kg
m3
Pl
gal
gal

TRIPLAY DE 6 mm PARA ENCOFRADO


YESO

pl
kg

3.00
22.14

35.0000
0.4200

105.00
9.30

0.00
0.00

2.94
22.14

2.94
22.14

und.
und.
und.
und.
und.
und.
und.
und.
und.
m

13.00
25.00
26.00
10.00
5.00
5.00
8.00
10.00
10.00
50.00

105.00
30.00
25.00
65.00
5.50
23.08
39.71
5.00
5.00
1.57

1,365.00
750.00
650.00
650.00
27.50
115.40
317.70
50.00
50.00
78.50

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

13.00
25.00
26.00
10.00
5.00
5.00
8.00
10.00
10.00
50.00

13.00
25.00
26.00
10.00
5.00
5.00
8.00
10.00
10.00
50.00

hm
m
hm
hm
hm
u

295.27
23.25
6.98
484.21
7.56
52.80

85.0000
0.2000
2.0000
15.0000
8.0000
50.0000

25,097.54
4.65
13.95
7,263.08
60.45
2,640.00

0.00
0.00
0.00
0.00
0.00
0.00

141.73
23.25
6.98
0.00
7.56
52.80

141.73
23.25
6.98
0.00
7.56
52.80

28385.38

552.17

28937.55

0.00
0.00
0.00
0.00

2400.00
900.00
3920.00
100.00

2400.00
900.00
3920.00
100.00

HERRAMIENTAS
CARRETILLAS
PICOS
PALAS TIPO CUCHARA
BARRETAS
PLANCHA DE BATIR
COMBA DE 12 LIBRAS
BARRILES PARA AGUA
BALDES VACIOS
ESCOBAS
MNGUERA 1/2" de Dam.

EQUIPO Y MAQUINARIAS
CAMION VOLQUETE 6 m3
CORDEL
MIRAS Y JALONES
PLANCHA COMPACTADORA
TEODOLITO
ZARANDA (Fab. 20 Usos - Aprox 50 m3 c/u )

SUBTOTAL COSTOS DIRECTOS


COSTOS INDIRECTOS
Responsable Tcnico
Maestro de Obra Civil
Medidas de Seguridad
Utiles de Escritorio
SUB TOTAL DE COSTOS INDIRECTOS

hh
hh
glb
glb

3.00
3.00
1.00
3.00

2400.00
900.00
3920
100.00

7200.00
2700.00
3920.00
300.00

TOTAL MENSUAL: APORTE PROG. (OTROS)/ COFINAN. / SUB TOTALES


APORTE PROGRAMA/ COFINA./ TOTALES ( PARA DESEMBOSO BIMENSUAL ACUM.)

Mes 01

Mes 02

Aporte del
Programa

49672.00

0.00
0.00
0.00

0.00
0.00
0.00
27.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

COSTO S/.
Confinan.

Total

CANTIDAD
Aporte del Confinanci
Programa
amiento

Total

Aporte del
Programa

COSTO S/.
Confinan.

CANTIDAD
Total

Aporte del
Programa

0.00

49672.00

11872.00

0.00

11872.00

20776.00

0.00

20776.00

5520.00

46.50
0.00
64.00

46.50
0.00
64.00

0.00
0.00
0.00

0.00
363.39
136.15

0.00
363.39
136.15

0.00
0.00
0.00

0.00
1816.95
544.60

0.00
1816.95
544.60

0.00
0.00
0.00

0.08
0.00
150.00
0.00
2.58
0.00
3.90
359.31
0.00
0.45
0.00
0.00
18.00
15.50

0.08
0.00
150.00
27.60
2.58
0.00
3.90
359.31
0.00
0.45
0.00
0.00
18.00
15.50

0.00
0.00
0.00
1333.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

78.71
63.92
1.00
1803.65
19.03
0.00
0.00
0.00
761.90
0.00
0.00
81.50
0.00
0.00

78.71
63.92
1.00
3137.61
19.03
0.00
0.00
0.00
761.90
0.00
0.00
81.50
0.00
0.00

0.00
0.00
0.00
26679.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

118.07
255.68
150.00
36072.90
81.83
0.00
0.00
0.00
2666.65
0.00
0.00
1630.00
0.00
0.00

118.07
255.68
150.00
62752.20
81.83
0.00
0.00
0.00
2666.65
0.00
0.00
1630.00
0.00
0.00

0.00
0.00
0.00
1157.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

102.90
9.30

102.90
9.30

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1365.00
750.00
650.00
650.00
27.50
115.40
317.70
50.00
50.00
78.50

1365.00
750.00
650.00
650.00
27.50
115.40
317.70
50.00
50.00
78.50

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

12047.05
4.65
13.96
0.00
60.48
2640.00

12047.05
4.65
13.96
0.00
60.48
2640.00

0.00
0.00
0.00
0.00
0.00
0.00

153.54
0.00
0.00
31.19
0.00
0.00

13205.97

3493.98

49699.60

0.00
0.00
0.00
0.00
0.00

19592.76

69292.36

2400.00
900.00
3920.00
100.00

2400.00
900.00
3920.00
100.00

7320.00

7320.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

2400.00
900.00
0.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

153.54
0.00
0.00
31.19
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

13050.90
0.00
0.00
467.85
0.00
0.00

13050.90
0.00
0.00
467.85
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

16699.94

2400.00
900.00
0.00
100.00

47455.30

56855.42

104310.72

0.00
0.00
0.00
0.00

2400.00
900.00
0.00
100.00

2400.00
900.00
0.00
100.00

0.00

3400.00

3400.00

6677.51

0.00
0.00
0.00
0.00

27.60
49727.20

26912.76
26912.76

76639.96

26679.30

60255.42

47455.30

60255.42

107710.72

Mes 03
CANTIDAD
Confinanci
amiento

Total

Aporte del
Programa

COSTO S/.
Confinan.

Total

TOTAL
S/.
Aportes del
Cofinan.
Programa

0.00

5520.00

9660.00

0.00

9660.00

80108.00

0.00

0.00
425.35
589.95

0.00
425.35
589.95

0.00
0.00
0.00

0.00
2126.75
2359.80

0.00
2126.75
2359.80

0.00
0.00
0.00

46.50
3943.70
2968.38

119.53
276.97
1.00
1803.65
84.77
0.00
0.00
0.00
3301.51
0.00
0.00
190.16
0.00
0.00

119.53
276.97
1.00
2961.16
84.77
0.00
0.00
0.00
3301.51
0.00
0.00
190.16
0.00
0.00

0.00
0.00
0.00
23150.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

179.30
1107.88
150.00
36072.90
364.51
0.00
0.00
0.00
11555.29
0.00
0.00
3803.20
0.00
0.00

179.30
1107.88
150.00
59223.10
364.51
0.00
0.00
0.00
11555.29
0.00
0.00
3803.20
0.00
0.00

0.00
0.00
0.00
49857.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

297.44
1363.56
450.00
72150.20
438.92
0.00
3.90
359.30
14221.93
0.45
0.00
5433.12
18.00
15.50

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

105.00
9.30

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1365.00
750.00
650.00
650.00
27.50
115.40
317.70
50.00
50.00
78.50

0.00
0.00
0.00
452.95
0.00
0.00

0.00
0.00
0.00
452.95
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
64483.19
0.00
0.00

0.00
0.00
0.00
64483.19
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

25097.54
4.65
13.95
7263.08
60.45
2640.00

7245.84

2400.00
900.00
0.00
100.00

13923.35

2400.00
900.00
0.00
100.00

32810.20

64483.19

155013.01

129965.10 140958.97

0.00
0.00
0.00
0.00

2400.00
900.00
0.00
100.00

2400.00
900.00
0.00
100.00

0.00
0.00
0.00
0.00

7200.00
2700.00
3920.00
300.00

0.00

3400.00

3400.00

0.00

14120.00

23150.20

67883.19

32810.20

67883.19

49857.10 155078.97
100693.39

129965.10 155078.97

Anda mungkin juga menyukai