Anda di halaman 1dari 3

Road Name

Spec.
Description
Clause
No.
BILL No. 1 General

Unit

Rates
BOQ

Progress
%

Amount
0.00

TOTAL FOR BILL NO.1 (Carried forward to summary)


BILL No. 2 Earth Works and Aliens Activities
2.1(1) Clearing & Grubbing on shoulder and selecte
2.2(1) Roadway excavation, Common
2.2(2) Roadway excavation, Unsuitable
2.4(1) Channel Excavation, Common
2.5(1) Structural Excavation, Common
2.5(3) Structural Backfill
2.6(1) Embankments, 90% MDD
2.6(3) Selected Sub-Grade Material
2.7
Removal of Existing Structures
TOTAL FOR BILL NO.2 (Carried forward to summary)

0.00

sq.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
no.

0.40

1.50

1.20

16.00
5.10

1,691.91

8,628.74
-

10,000.00

8,628.74

BILL No. 3 Sub-base and Base Course


3.1(1)

Sub-base material, CBR=>30%, 95%MDD

3.2(1) Reconstruction Sub-base


Aggregate basecourse,
3.3(1)
CBR=>80%,98%MDD
3.4(1) Cement Stablilised Base
3.6(1) Shoulder,CBR=>30%, 95% MDD
TOTAL FOR BILL NO.3 (Carried forward to summary)
BILL No. 4 Pavement (Bituminous) Works
4.1 (1) Bituminous Prime Coat
4.2 (1) DBST Bottom Layer (19mm)
4.2 (2) DBST Top Layer (12mm)
Asphalt Concrete Wearing Course
4.4
(100mm)
TOTAL FOR BILL NO.4 (Carried forward to summary)

cu.m
sq.m
cu.m
cu.m
cu.m

20.33

153.12

3,112.93

21.50

67.50

1,451.25

20.33

29.70

603.80

5,167.98

sq.m
sq.m
sq.m
sq.m

BILL No. 5 Structures


5.1(3) Concrete class B1, (32 Mpa)
cu.m
5.1(6) Concrete class E, (15 Mpa)
cu.m
5.2(1) Reinforcement Bar Grade 300
tonne
5.2(2) Reinforcement Bar Grade 400
tonne
5.3(2) RC pile 300mmx300mmx1200mm
m
5.3(13) Dynamic Load test on RC Pile
nr
5.3(16) Steel pile Dia 500mmx2400mm
nr
5.3.3(1) Steel Splice
nr
5.4(1) PSC Deck Unit L= 21m Type - A
nos
5.4(2) PSC Deck Unit L= 21m Type - B
nos
5.4(3) PSC Deck Unit L= 25m Type - A
nos
5.4(4) PSC Deck Unit L= 25m Type - B
nos
5.4(21) Transverse Stressing Bar
nos
5.6(1)
Bearing Paid
m (no.)
5.8(1) Porous Rock Backfill
cu.m
Expansion Joint (Wabo Strip Seal+Wabo
5.9(2)
nr (m)
neopree SE-40)
5.9(6) Shear block
nr
5.12(1) Foundation investigation
nr
5.13(1) Survey for bridge
nr
TOTAL FOR BILL NO.5 (Carried forward to summary)

1.50

1327.50

1,991.25

2.50

2.05

16.00

1297.50

20,760.00
22,751.25

238.00

444.16

105,710.08

135.00

8.802

1,188.27

924.00

61.071

56,429.60
66,798.60

891.00

66.00

1,012.10

260.00

6.00

1,560.00

360.00

1,092.94

393,458.40

7,084.00

44.00

311,696.00

9,918.00

8.00

79,344.00

8,328.00

11.00

91,608.00

11,704.00

2.00

23,408.00

1,100.00

52.00

57,200.00

370.00

26.00

9,620.00

21.00
642.00

16.00

210.00
2,600.00
500.00

10,272.00
-

4.00

10,400.00
1,218,692.95

BILL No. 6 Drainage and Protection Works


Reinforcement Concrete Pipeculvert,
6.1(1)
800mm dia
6.1(2) Reinforcement Concrete Pipe, 1000mm dia
6.1(3) Reinforcement Concrete Pipe, 1200mm dia
6.1(4) Reinforcement Concrete Pipe, 1500mm dia
6.2(4) Grouted Riprap class A
6.6(1) Strip sodding
Topsoil for embankment slopes and side
6.7(2)
drains
6.8(1) Gully drainage and PVC pipe
6.9(1) Gabion boxes
TOTAL FOR BILL NO.6 (Carried forward to summary)

m
m
m
m
cu.m
sq.m
sq.m
nr
cu.m

BILL No. 9 Miscellaneous


9.1(2) Provide Materials Testing Laboratory for the
Engineer
9.1(3) Provide housing accommodation for Eng.
Provide Engineer's Communications,
9.1(18)
Mobile Telephone, Service and running
cost
9.4(1)
Construction Design
9.5(1)
Maintenance of diversion road
9.6(1)
Progress Photograph
9.7(1)
Project Information board
9.8(1)
Setting up and site clean up
Socially transmitted diseases information
9.9(1)
and.
9.5.2.2
Diversion Road
TOTAL FOR BILL NO.9 (Carried forward to summary)

0.00
0.00
0.00
390.00
3.00

487.38

1462.14

3.00

0.00

12.00

0.00

105.00

0.00
1,462.14

BILL No. 7 Ancillary Works


7.4(1) Guide Post
nr
7.5(1) Sign Posts
nr
7.5(2) Road sign
nr
Reflectorised Thermoplastic Markings,
7.8(1)
sq.m
Yellow
TOTAL FOR BILL NO.7 (Carried forward to summary)
BILL No. 8 Unexploded Ordnance
8.2 (1) Mine and UXONormal (provisional)
8.2 (2) Mine and UXO-Intense (provisional)
TOTAL FOR BILL NO.8 (Carried forward to summary)

0.00

ha
ha

mon

mon
ls
mon
mon
nr
ls
nr
Unit

BILL No. 10 Dayworks Schedule (Provisional)


1
Total Daywork for Labour
2
Total Daywork for Material
3
Total Daywork for Construction equip..
TOTAL FOR BILL NO.10 (Carried forward to summary)
Bill No. EE, Specified Provisional Sums
Daywork schedule
2.7(1)
Removal of Existing Structures
5.12(1) Foundation investigation(Provisional)
nr
5.13(1) Survey for bridge(Provisional)
nr
8.2(1)
ha
Mine and UXO -Normal (provisional)
8.2(2)
ha
Mine and UXOl-Intense (provisional)
9.4(2)
Construction design(Provisional)
Socially transmitted diseases information
nr
9.9(1)
and education programme (provisional)
All
Daywork All Summary
TOTAL FOR BILL No.E (Carried forward to summary)

10.00

48.00

480.00

70.00

2.00

140.00

70.00

2.00

140.00

180.00

59.15

10647.00
11,407.00

2,500.00
3,000.00

220.00

20.00

4,400.00

350.00

18.00

6,300.00

220.00

18.00

3,960.00

8,000.00

80.00

20.00

1,600.00

80.00

20.00

1,600.00

220.00

2.00

440.00

2,600.00

1.00

2,600.00

800.00

20,900.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

Bill No. F, Summary of all Bills


1
General
2
Earth Works and Aliens Activities
3
Sub-base and Base Course
4
Pavement (Bituminous) Works
5
Structures
6
Drainage and Protection Works
7
Ancillary Works
8
Unexploded Ordnance
9
Miscellaneous
10
Dayworks All (Provisional Sum)
(A) Sub-Total of Bills
(B) Specified Provisional Sums
(C) Total of Bills = (A - B)
(D)Contingency Allowance (10%) = (C*10%)
(E) Bid Price (A + D) (Carried forward to Form of Bi

8,628.74
5,167.98
22,751.25
1,218,692.95
1,462.14
11,407.00
20,900.00
1,289,010.07
1,289,010.07
1,289,010.07

Anda mungkin juga menyukai