Project
Owner
Conntractor

C
D
E
F
M/S Indcon Projects & Equipment Ltd.

Job Procedure No. IPEL-PJPL-ST-CIVIL-04


:PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
:I.O.C.L.
: M/s Indcon Projects & Equipment Ltd.

Job Procedure For :


Form work
NO: IPEL-PJPL-ST-CIVIL-04

44
45
46
47
48
49
50
51
52
53
54
0
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88

Rev. No.

Date

For
review &
Approval
Descriptio Prepared Checked Approved
n
by IPEL
by IPEL
by IPEL

Reviewed &
approved by IOCL

Index
Sl. No.
1
2
3
4
5
6

Description Page No.


Scope
Reference
Method
Documenta
ITP
Pour Card

3
3
3
4
IPEL-PJPL-ST-CIVIL-ITP-04 ( Enclosed)
IPEL-PJPL-ST-CIVIL-FM-03 ( Enclosed)

89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132

1 Scope:
This Procedure covers erection and removal of formwork and checking of formwork.
2 Reference:
a) Contract specification PL/E&C/CONTR/CIVIL/SSPL/ML/2002-03/20 VOLUME II of IV,
b) IS 456 - 2000.
3 Method:3.1 Erection of form work:Erect stagging/shuttering as per drawing/sketches in such a way that
3.1.1 deshuttering can be done easily including provision for re-propping, if being
planned.
3.1.2 Check the location, line, level, plumb and dimensions of the formwork to
ensure that the deviations are within the permissible limits.
3.1.3 Provide bracing at proper places & intervals as specified by the manufacturer
or as per formwork scheme to take care of lateral loads.
3.1.4 Apply approved form oil/other coatings as release agents before reinforcement s
Check all the shutters are properly aligned and fixed firmly with required
3.1.5 lateral supports and ties. Check all the spanning members have proper
bearinng at the supports.
3.1.6 Wedges or jacks shall be secured in position after the final check of alignment.
Forms shall be thoroughly cleaned of all dirt, mortar and other matters such as
3.1.7 metals, blocks, saw dust and foreign materials before concreting if required
through clean-out openings.
3.1.8 Check all the gaps/openings are properly closed to avoid leakages.
3.1.9 Check all the inserts/embedments and openings are exactly placed as per the
3.1.10 Inspection of forms before concreting.
In case of leakages, bulging and sagging immediate actions shall be taken by
3.1.11 tightening wedges or adjusting by jacks which must be done before the
concrete takes its initial set.
3.2 Removal of Forms:3.2.1 All forms shall be removed after the minimum period stipulated below without
damage to the concrete including removal without shock.
Minimum period before removal of formwork
Wall, columns and vertical faces of all structural
members : 12 to 24 hours
Slab (props left under) : 3 days
Beam soffits(props left under) : 7 days
Cantelever construction : Form work shall remain till structures for counter ac

133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180

Removal of props under slabs:


Spanning upto 4.5m 7 days
Spanning over 4.5m 14 days
Removal of props under beams:
Spanning upto 6m
14 days
Spanning over 6m
21 days

3.2.2 Formwork components shall not be dropped but shall be lowered without
damage to the components and structures.
3.2.3 All the removed formwork materials shall be cleaned immediately an
4 Tolerance on Construction. As per IS 456-2000 Cl. 11.1.
The following are the permissible tolerances.
4.1 Columns and beams.
4.1.1 Variation from specified dimensio 6 to 12 mm
4.2 Footing:
4.2.1 Variations in plan dimension
- 12 mm to + 50 mm
4.2.2 Eccentricity
0.02 times the width of the footing in the direction of deviation but
not more than 50mm.
4.2.3 Thickness
+/- 0.5 times the specified thickness.
4.2.2 Deviation in length (major dimension of single unit)
Upto 3 m +/- 6mm
3 m to 4.5 m +/- 9mm
4.5m to 6m +/-12mm
Additional deviation
for every subsequent 6m +/- 6mm
4.2.3 Deviation in straightness or bow (deviation from specified line) for a single or
cotinuous member eg. Beam column or slab edge.
Upto 3m 6mm
3m to 6m 9mm
6m to 12m 12mm
Additional deviation for every
subsequent 6m 6mm
5 Documentation:ITP
Formats

IPEL-PJPL-ST-CIVIL-ITP-04
IPEL-PJPL-ST-CIVIL-FM-03

Note:
This procedure is only guideline to work at site. For detail refer contract specif

This procedure is only guideline to work at site. For detail refer contract specif

181
182
183
184
185
186
187
188
189
190
191

ITP04
A
1
2
3
4
5
6

B
C
D
E
F
G
M/S Indcon Projects & Equipment Ltd.
Inspection & Test Plan for Form Work
Project:PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
Client:I.O.C.L.
Conntractor
IPEL, NEW DELHI

8
9
10
11

S.No
1
2
3
4

12
5
13
14
15
16
17
18
19

Activity Description
Layout, lines and levels.
Preparation of form work with
proper support and stagings.
Application of form work release
agent
Fixing incetrs, anchor bolts and
pipe.
Check for obstalces
encountered such as electrical,
conduits, pipes etc.
Removal of formwormk &
stagings.

W - Witness
RM - Random
R - Review Documents

Records
Verificati
to be
Inspectio
on by
Submitte
n by IPEL
IOCL
d by IPEL
W
W
AFC Drawing
W

IPEL-PJPL-ST-CIVIL-FM-03
RM

RM

- do -

- do -

RM

- do -

RM

- do -

20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
For
review &
Approval

37
0
38
Rev. No.
39
40
41

Date

Reviewed
&
Descriptio Prepared Checked Approved approved
n
by IPEL
by IPEL
by IPEL by IOCL

No. IPEL-PJPL-ST-CIVIL-ITP-03

FM03
A
1
2
3
4
5
6
7
8
9
10
11
12

1
2
3
4
5

B
C
D
E
F
G
M/S Indcon Projects & Equipment Ltd.
Concreting Work
Project:PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
Client:I.O.C.L.
Contractor
IPEL, NEW DELHI
REPORT NO:
DATE:
POUR CARD/INSPECTION DURING CONCRETING WORKS
DATE
:
STATION
:
DARAWING NO.
:
STRUCTURE DESCRI
:
REINFORCEMENT
:

13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

6
7
8
9
10
11
12
13
14
15
16
17
18
19

SHUTTERING
COVER
DIMENSIONS
LEVELS/LINES/LAYO
POCKET/OPENING/B
MIX
MIX RATIO
W/C RATIO
SLUMP
PLACEMENT & COMP
TOP OF CONCRETE
APPROX. QTY.
NO. OF CUBE TAKEN
EXTRA BARS

IPEL

:
:
:
:
:
:
:
:
:
:
:
:
:
:

IOCL
No. IPEL-PJPL-ST-CIVIL-FM-03