Project
Owner
Conntractor

C
D
E
F
M/S Indcon Projects & Equipment Ltd.

Job Procedure No. IPEL-PJPL-ST-CIVIL-08


:PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
:I.O.C.L.
: M/s Indcon Projects & Equipment Ltd.

Job Procedure For :


Plastering
NO:IPEL-PJPL-ST-CIVIL-08

44
45
46
47
48
49
50
51
52
53
54
0
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88

Rev. No.

For
review &
15.11.03 Approval
Descriptio Prepared Checked Approved
Date
n
by IPEL
by IPEL
by IPEL

Index
Sl. No.
1
2
3
4
5
6
7
8

Description Page No.


Purpose
3
Scope
3
Controling
3
Materials
3
Procedure
3
Inspection
4
ITP
IPEL-PJPL-ST-ITP-09(Enclosed)
Inspection IPEL-PJPL-ST-FM-10(Enclosed)

Reviewed &
approved by IOCL

89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132

1. Purpose
The purpose covers supervision and method of record keeping for plastering works at site.
2. Reference
All Plastering works will comply with contract document
PL/E&C/CONTR/CIVIL/SSPL/ML/2002-03/20 VOLUME II of IV and AFC drawings.
4. Materials
All the materials will be in accordance with specifications mentioned in the contract
document PL/E&C/CONTR/CIVIL/SSPL/ML/2002-03/20 VOLUME II of IV and relavant IS
codes.
A. Cement
Cement Unless otherwise specified it will be ordinary portland cement conforming to IS :
269. MTC will be produced with every batch of cement.
B. Sand:
Sand for plastering shall conform to specifications mentioned in the contract document
PL/E&C/CONTR/CIVIL/SSPL/ML/2002-03/20 VOLUME II of IV and IS 383.
5. Procedure:
Unless otherwise specified 12 mm thick cement plaster in cement sand mortar (1:6) on
inner side of all internal walls, 15 mm thick using medium coarse sand with (1:6) cement :
sand mortar on rough side of 230 mm thick brick wall shall be applied. 6 mm thick plaster
in 1:4 (cement:sand) in ceilings, chajja, columns etc shall be applied. Where specified in
the AFC drawings the sand face plaster, exposed aggregate finish plastering or water
proof plaster shall be done on walls as per specs.
Preparation of surface:
Before plastering work is started over masonry work, the joints shall be raked out
properly. Dust and loose mortar shall be brushed off. Efflorescence if any shall be
removed by brushing and serapping. For concrete surface, the surface will be thoroughly
chipped. Then surface shall be thoroughly washed with water with sufficient pressure.
Application of Plaster:
a) Ceiling plaster shall be completed before commencement of wall plaster.
b) Plastering shall be started from the top and worked downwards to the floor.
c) All putlog holes shall be properly filled in advance of plastering as the scaffolding is be
d) To ensure even thickness and true surface plaster about 15X15 cm shall be first
applied horizontally and vertically, at not more than 2 meters intervals over the entire
surface.

133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158

d) To ensure even thickness and true surface plaster about 15X15 cm shall be first
applied horizontally and vertically, at not more than 2 meters intervals over the entire
surface.
e) Neat cement slurry shall be applied on the surface before plastering.
f) Mortar shall be mixed in the mortar tray properly.
g) The Mortar shall be then applied on the wall between the gauges with trowel.

h) The mortar shall then be applied in a uniform surface slightly more than the specified thic
I) Application of rough cast plaster and neat cement punning will as per specifications.
j) Curing shall be started as soon as the plaster has hardened sufficiently that is generally
the next day of work, so that the plaster does not gets damaged when watered. Plasters
shall be kept wet for a period of 07 days.
6. Inspection
* Visual inspection will be done for proper raking, chiping & brushing of surfaces where plas
* All put log holes shall be properly filled in advance of plastering as the scaffolding is bei
* The mortar of the specified mix shall be used.
* Thickness of cement sand mortar shall be checked at random.
* Surface shall be thoroughly washed with water, cleaned and kept wet before commencing
* Excessive trowlling or over working the float shall be avoided.
* All corners, arrises, angles & junctions shall be truly vertical or horizontal as the case may
* Inspection report shall be prepared as per the attached annexure A.
7. Documents:
ITP- IPEL-PJPL-ST-ITP-09(Enclosed)
Formats- IPEL-PJPL-ST-FM-10(Enclosed)
NOTE:

In case of any conflict between this procedure and contract specification, the later shall govern.

ITP08
A
1
2
3
4
5
6
7

B
C
D
E
F
G
INDCON PROJECTS & EQUIPMENTS LTD
Inspection & Test Plan for Brick Masonary Works
Project:PANIPAT-JALLANDHAR PIPELINE PROJECT
Client:I.O.C.L.
Conntractor
IPEL, NEW DELHI

8
S.No

Activity Description

Records
Verificati
to be
Inspectio
on by
Submitte
n by IPEL
IOCL
d by IPEL

9
1
10
2
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

3
4

Mix proportoin
Cleaning the surface removing
loose particles , wetting the
surface before plastering
Check for thickness of plaster,
plumb and even surface
Curing
W - Witness
RM - Random
R - Review Documents

49
0

12.11.03

For
review &
Approval

RM

RM

W
W

RM
RM

IPELPJPL-STFM-09

50
Rev. No.

Date

Reviewed
&
Descriptio Prepared Checked Approved approved
n
by IPEL
by IPEL
by IPEL by IOCL

51
52

No. IPEL-PJPL-ST-CIVIL-ITP-08

FM09
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

B
C
D
E
F
G
H
INDCON PROJECTS & EQUIPMENTS LTD.
QUALITY ASSURANCE CARD FOR PLASTERING
Project:PANIPAT -JALLANDHAR PIPELINE PROJECT.
Client:I.O.C.L.
Contractor
L & T, ECC Division
REPORT NO:
DATE:

LOCATION:

STRUCTURE:

IPEL
1 All points raked, cut and loose mortars are brushed out
from the bricks and concrete surface before plastering
2 All put log holes filled up

3 Check for the mix proportion of mortar and the amount of


mixing water to prepare it.
4 The surface to be watered and kept wet before plaster

5 Check for proper line, level and thickness of


the plastering surface.
6 Check for corners, angles, junctions etc.

7 Check for loose mortar dropping and its


disposal after the day's work

IOCL

35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53

8 Curing of the plastered surface for a period of 7 days.

The work at the above location was checked and found to be in accordance with relevant drawings and
specification of the contract.

IPEL

IOCL

IPEL-PJPL-ST-CIVIL-FM-09

ater shall govern.

drawings and

AA

AB

AC

AD

AE

AF

AG

AH

AI

AJ

AK

AL

AM

AN

AO

AP

AQ

AR

AS

AT

AU

AV

AW

AX

AY

AZ

BA

BB

BC

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

BR

BS

BT

BU

BV

BW

BX

BY

. This strata should be recorded for necessary action.