Anda di halaman 1dari 10

Project

Job Ref.

Section

Sheet no./rev.

1
Calc. by

Date

22-May-16

Chk'd by

Date

App'd by

Date

RETAINING WALL ANALYSIS


In accordance with International Building Code 2009
Tedds calculation version 2.6.07

Retaining wall details


Stem type;

Cantilever

Stem height;

hstem = 700 mm

Stem thickness;

tstem = 200 mm

Angle to rear face of stem;

= 90 deg

Stem density;

stem = 24 kN/m 3

Toe length;

ltoe = 250 mm

Heel length;

lheel = 200 mm

Base thickness;

tbase = 200 mm

Key position;

pkey = 250 mm

Key depth;

dkey = 150 mm

Key thickness;

tkey = 150 mm

Base density;

base = 24 kN/m 3

Height of retained soil;

hret = 500 mm

Angle of soil surface;

= 0 deg

Depth of cover;

dcover = 200 mm

Depth of excavation;

dexc = 200 mm

Retained soil properties


Soil type;

Medium dense well graded sand

Moist density;

mr = 21 kN/m 3

Saturated density;

sr = 23 kN/m 3

Effective angle of internal resistance;

r = 30 deg

Effective wall friction angle;

r = 0 deg

Base soil properties


Soil type;

Medium dense well graded sand

Soil density;

b = 18 kN/m 3

Cohesion;

cb = 0 kN/m 2

Effective angle of internal resistance;

b = 30 deg

Effective wall friction angle;

b = 15 deg

Effective base friction angle;

bb = 30 deg

Allowable bearing pressure;

Pbearing = 200 kN/m 2

Loading details
Live surcharge load;

SurchargeL = 10 kN/m 2

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Project

Job Ref.

Section

Sheet no./rev.

2
Calc. by

Date

22-May-16

250

Chk'd by

200

200

Date

App'd by

Date

10 kN/m2

200

200

200

1050

700

500

3.3 kN/m2

150

9.6 kN/m2

33.9 kN/m2

5.7 kN/m2

250

150

250

650

General arrangement

Calculate retaining wall geometry


Base length;

lbase = ltoe + tstem + lheel = 650 mm

Base height;

hbase = tbase + dkey = 350 mm

Moist soil height;

hmoist = hsoil = 700 mm

Length of surcharge load;

lsur = lheel = 200 mm

- Distance to vertical component;

xsur_v = lbase - lheel / 2 = 550 mm

Effective height of wall;

heff = hbase + dcover + hret = 1050 mm

- Distance to horizontal component;

xsur_h = heff / 2 - dkey = 375 mm

- Distance to horizontal component above key;

xsur_h_a = (heff - dkey) / 2 = 450 mm

Area of wall stem;

Astem = hstem tstem = 0.14 m 2

- Distance to vertical component;

xstem = ltoe + tstem / 2 = 350 mm

Area of wall base;

Abase = lbase tbase + dkey tkey = 0.153 m 2

- Distance to vertical component;

xbase = (lbase2 tbase / 2 + dkey tkey (pkey + tkey / 2)) / Abase = 325 mm

Area of moist soil;

Amoist = hmoist lheel = 0.14 m 2

- Distance to vertical component;

xmoist_v = lbase - (hmoist lheel2 / 2) / Amoist = 550 mm

- Distance to horizontal component;

xmoist_h = heff / 3 - dkey = 200 mm

- Distance to horizontal component above key;

xmoist_h_a = (heff - dkey) / 3 = 300 mm

Area of base soil;

Apass = dcover ltoe = 0.05 m 2

- Distance to vertical component;

xpass_v = lbase - (dcover ltoe (lbase - ltoe / 2)) / Apass = 125 mm

- Distance to horizontal component;

xpass_h = (dcover + hbase) / 3- dkey = 33 mm

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Project

Job Ref.

Section

Sheet no./rev.

3
Calc. by

Date

22-May-16

Chk'd by

Date

App'd by

Date

Using Coulomb theory


Active pressure coefficient;

KA = sin( + r)2 / (sin()2 sin( - r) [1 + [sin(r + r) sin(r - ) /


(sin( - r) sin( + ))]]2) = 0.333

Passive pressure coefficient;

KP = sin(90 - b)2 / (sin(90 + b) [1 - [sin(b + b) sin(b) / (sin(90 +


b))]]2) = 4.977

From IBC 2009 cl.1807.2.3 Safety factor


Load combination 1;

1.0 Dead + 1.0 Live + 1.0 Lateral earth

Sliding check
Vertical forces on wall
Wall stem;

Fstem = Astem stem = 3.4 kN/m

Wall base;

Fbase = Abase base = 3.7 kN/m

Moist retained soil;

Fmoist_v = Amoist mr = 2.9 kN/m

Total;

Ftotal_v = Fstem + Fbase + Fmoist_v = 10 kN/m

Horizontal forces on wall


Surcharge load;

Fsur_h = KA SurchargeL heff = 3.5 kN/m

Moist retained soil;

Fmoist_h = KA mr heff2 / 2 = 3.9 kN/m

Total;

Ftotal_h = Fmoist_h + Fsur_h = 7.4 kN/m

Check stability against sliding


Base soil resistance;

Fexc_h = KP cos(b) b (hpass + hbase)2 / 2 = 5.3 kN/m

Base friction;

Ffriction = Ftotal_v tan(bb) = 5.8 kN/m

Resistance to sliding;

Frest = Fexc_h + Ffriction = 11.1 kN/m

Factor of safety;

FoSsl = Frest / Ftotal_h = 1.502; > 1.5


PASS - Factor of safety against sliding is adequate

Overturning check
Vertical forces on wall
Wall stem;

Fstem = Astem stem = 3.4 kN/m

Wall base;

Fbase = Abase base = 3.7 kN/m

Moist retained soil;

Fmoist_v = Amoist mr = 2.9 kN/m

Total;

Ftotal_v = Fstem + Fbase + Fmoist_v = 10 kN/m

Horizontal forces on wall


Surcharge load;

Fsur_h = KA SurchargeL (heff - dkey) = 3 kN/m

Moist retained soil;

Fmoist_h = KA mr (heff - dkey)2 / 2 = 2.8 kN/m

Base soil;

Fexc_h = -KP cos(b) b (hpass + hbase)2 / 2 = -5.3 kN/m

Total;

Ftotal_h = Fmoist_h + Fexc_h + Fsur_h = 0.5 kN/m

Overturning moments on wall


Surcharge load;

Msur_OT = Fsur_h xsur_h_a = 1.4 kNm/m

Moist retained soil;

Mmoist_OT = Fmoist_h xmoist_h_a = 0.9 kNm/m

Base soil;

Mexc_OT = Fexc_h xexc_h = 0.2 kNm/m

Total;

Mtotal_OT = Mmoist_OT + Mexc_OT + Msur_OT = 2.4 kNm/m

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Project

Job Ref.

Section

Sheet no./rev.

4
Calc. by

Date

22-May-16

Chk'd by

Date

App'd by

Date

Restoring moments on wall


Wall stem;

Mstem_R = Fstem xstem = 1.2 kNm/m

Wall base;

Mbase_R = Fbase xbase = 1.2 kNm/m

Moist retained soil;

Mmoist_R = Fmoist_v xmoist_v = 1.6 kNm/m

Total;

Mtotal_R = Mstem_R + Mbase_R + Mmoist_R = 4 kNm/m

Check stability against overturning


Factor of safety;

FoSot = Mtotal_R / Mtotal_OT = 1.675; > 1.5


PASS - Factor of safety against overturning is adequate

Bearing pressure check


Vertical forces on wall
Wall stem;

Fstem = Astem stem = 3.4 kN/m

Wall base;

Fbase = Abase base = 3.7 kN/m

Surcharge load;

Fsur_v = SurchargeL lheel = 2 kN/m

Moist retained soil;

Fmoist_v = Amoist mr = 2.9 kN/m

Base soil;

Fpass_v = Apass b = 0.9 kN/m

Total;

Ftotal_v = Fstem + Fbase + Fmoist_v + Fpass_v + Fsur_v = 12.9 kN/m

Horizontal forces on wall


Surcharge load;

Fsur_h = KA SurchargeL (heff - dkey) = 3 kN/m

Moist retained soil;

Fmoist_h = KA mr (heff - dkey)2 / 2 = 2.8 kN/m

Base soil;

Fpass_h = max(-KP cos(b) b (dcover + hbase)2 / 2, -(Fmoist_h + Fsur_h)) = 5.8 kN/m

Total;

Ftotal_h = max(Fmoist_h + Fpass_h + Fsur_h - Ftotal_v tan(bb), 0 kN/m) = 0 kN/m

Moments on wall
Wall stem;

Mstem = Fstem xstem = 1.2 kNm/m

Wall base;

Mbase = Fbase xbase = 1.2 kNm/m

Surcharge load;

Msur = Fsur_v xsur_v - Fsur_h xsur_h_a = -0.3 kNm/m

Moist retained soil;

Mmoist = Fmoist_v xmoist_v - Fmoist_h xmoist_h_a = 0.8 kNm/m

Base soil;

Mpass = Fpass_v xpass_v - Fpass_h xpass_h = 0.3 kNm/m

Total;

Mtotal = Mstem + Mbase + Mmoist + Mpass + Msur = 3.2 kNm/m

Check bearing pressure


Distance to reaction;

x = Mtotal / Ftotal_v = 248 mm

Eccentricity of reaction;

e = x - lbase / 2 = -77 mm

Loaded length of base;

lload = lbase = 650 mm

Bearing pressure at toe;

qtoe = Ftotal_v / lbase (1 - 6 e / lbase) = 33.9 kN/m 2

Bearing pressure at heel;

qheel = Ftotal_v / lbase (1 + 6 e / lbase) = 5.7 kN/m 2

Factor of safety;

FoSbp = Pbearing / max(qtoe, qheel) = 5.908;


PASS - Allowable bearing pressure exceeds maximum applied bearing pressure

RETAINING WALL DESIGN


In accordance with ACI 318-08
Tedds calculation version 2.6.07

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Project

Job Ref.

Section

Sheet no./rev.

5
Calc. by

Date

Chk'd by

22-May-16

Date

App'd by

Concrete details
Compressive strength of concrete;

f'c = 28 N/mm 2

Concrete type;

Normal weight

Reinforcement details
Yield strength of reinforcement;

fy = 420 N/mm 2

Modulus of elasticity or reinforcement;

Es = 199948 N/mm 2

Cover to reinforcement
Front face of stem;

csf = 40 mm

Rear face of stem;

csr = 50 mm

Top face of base;

cbt = 50 mm

Bottom face of base;

cbb = 75 mm

From IBC 2009 cl.1605.2.1 Basic load combinations


Load combination no.1;

1.4 Dead

Load combination no.2;

1.2 Dead + 1.6 Live + 1.6 Lateral earth

Load combination no.3;

1.2 Dead + 1.0 Earthquake + 1.0 Live

Load combination no.4;

0.9 Dead + 1.0 Earthquake + 1.6 Lateral earth

Loading details - Combination No.1 - kN/m2

Shear force - Combination No.1 - kN/m

Bending moment - Combination No.1 - kNm/m

Stem

0.46
1.41

0
-0.2

2.37

2
Heel

1.42
1.9

Toe

Key

0.83 0.35
0.46

0.35
0.46
0.46
1.41

0.3

0.1
0

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Date

Project

Job Ref.

Section

Sheet no./rev.

6
Calc. by

Date

22-May-16

Loading details - Combination No.2 - kN/m2

Chk'd by

Shear force - Combination No.2 - kN/m

Date

App'd by

Date

Bending moment - Combination No.2 - kNm/m

Stem

0.37

0.39
1.1
1.21

2.18 0.3
0.39
0.87 0.39
1.1
1.21

0.3
0.39

1.9
1.6
0.37
0.54

0.54
0.37

-0.4

-1.5
3

0.1
4

3.82

-0.6
2

Heel
4

Key

Toe

1.4
3
0.9

0.54
0.37

X
Z

Loading details - Combination No.4 - kN/m2

1.86

0.8
0.5
2

-0.3

-0.2
-0.6
3

0.1
4

Key

Heel

0.2 0.3
0.91

0.54

0.54
Toe

Bending moment - Combination No.4 - kNm/m

1.22 0.22
0.3
0.71 0.3
0.91

0.22
0.3

Stem

Shear force - Combination No.4 - kN/m

0.5
3
0.4

0.54

Check stem design at base of stem


Depth of section;

h = 200 mm

Rectangular section in flexure - Chapter 10


Design bending moment combination 2;

M = 1.9 kNm/m

Depth of tension reinforcement;

d = h - csr - sr / 2 = 144 mm

Compression reinforcement provided;

No.4 bars @ 8.858" c/c

Area of compression reinforcement provided;

Asf.prov = sf2 / (4 ssf) = 563 mm 2/m

Tension reinforcement provided;

No.4 bars @ 198 mm c/c

Area of tension reinforcement provided;

Asr.prov = sr2 / (4 ssr) = 640 mm 2/m

Maximum reinforcement spacing - cl.14.3.5;

smax = min(18 in, 3 h) = 457 mm


PASS - Reinforcement is adequately spaced

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Project

Job Ref.

Section

Sheet no./rev.

7
Calc. by

Date

22-May-16

Chk'd by

Date

App'd by

Date

Depth of compression block;

a = Asr.prov fy / (0.85 f'c) = 11 mm

Neutral axis factor - cl.10.2.7.3;

1 = min(max(0.85 - 0.05 (f'c - 28 N/mm 2) / 7 N/mm 2, 0.65), 0.85) = 0.85

Depth to neutral axis;

c = a / 1 = 13 mm

Strain in reinforcement;

t = 0.003 (d - c) / c = 0.029445
Section is in the tension controlled zone

Strength reduction factor;

f = min(max(0.65 + (t - 0.002) (250 / 3), 0.65), 0.9) = 0.9

Nominal flexural strength;

Mn = Asr.prov fy (d - a / 2) = 37.1 kNm/m

Design flexural strength;

Mn = f Mn = 33.4 kNm/m

M / Mn = 0.058
PASS - Design flexural strength exceeds factored bending moment
By iteration, reinforcement required by analysis;

Asr.des = 36 mm 2/m

Minimum area of reinforcement - cl.10.5.3;

Asr.mod = 4 Asr.des / 3 = 48 mm 2/m

PASS - Area of reinforcement provided is greater than minimum area of reinforcement required
Rectangular section in shear - Chapter 11
Design shear force;

V = 6.5 kN/m

Concrete modification factor - cl.8.6.1;

=1

Nominal concrete shear strength - exp.11-3;

Vc = 0.17 (f'c 1 N/mm 2) d = 129.2 kN/m

Strength reduction factor;

s = 0.75

Design concrete shear strength - cl.11.4.6.1;

Vc = s Vc = 96.9 kN/m

V / Vc = 0.067
PASS - No shear reinforcement is required
Horizontal reinforcement parallel to face of stem
Minimum area of reinforcement - cl.14.3.3;

Asx.req = 0.002 tstem = 400 mm 2/m

Transverse reinforcement provided;

No.3 bars @ 200 mm c/c each face

Area of transverse reinforcement provided;

Asx.prov = 2 sx2 / (4 ssx) = 713 mm 2/m

PASS - Area of reinforcement provided is greater than area of reinforcement required


Check base design at toe
Depth of section;

h = 200 mm

Depth of footing above bottom reinforcement;

df = h - cbb - bb = 112.3 mm

Minimum footing depth - cl.15.7;

dmin = 152.4 mm
FAIL - Depth of footing above bottom reinforcement is less than 6 in

Rectangular section in flexure - Chapter 10


Design bending moment combination 2;

M = 1.2 kNm/m

Depth of tension reinforcement;

d = h - cbb - bb / 2 = 119 mm

Compression reinforcement provided;

No.4 bars @ 5.906" c/c

Area of compression reinforcement provided;

Abt.prov = bt2 / (4 sbt) = 845 mm 2/m

Tension reinforcement provided;

No.4 bars @ 150 mm c/c

Area of tension reinforcement provided;

Abb.prov = bb2 / (4 sbb) = 845 mm 2/m

Maximum reinforcement spacing - cl.10.5.4;

smax = min(18 in, 3 h) = 457 mm


PASS - Reinforcement is adequately spaced

Depth of compression block;

a = Abb.prov fy / (0.85 f'c) = 15 mm

Neutral axis factor - cl.10.2.7.3;

1 = min(max(0.85 - 0.05 (f'c - 28 N/mm 2) / 7 N/mm 2, 0.65), 0.85) = 0.85

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Project

Job Ref.

Section

Sheet no./rev.

8
Calc. by

Date

22-May-16

Chk'd by

Date

App'd by

Depth to neutral axis;

c = a / 1 = 18 mm

Strain in reinforcement;

t = 0.003 (d - c) / c = 0.017302

Strength reduction factor;

f = min(max(0.65 + (t - 0.002) (250 / 3), 0.65), 0.9) = 0.9

Nominal flexural strength;

Mn = Abb.prov fy (d - a / 2) = 39.4 kNm/m

Design flexural strength;

Mn = f Mn = 35.5 kNm/m

Date

Section is in the tension controlled zone

M / Mn = 0.033
PASS - Design flexural strength exceeds factored bending moment
By iteration, reinforcement required by analysis;

Abb.des = 26 mm 2/m

Minimum area of reinforcement - cl.7.12.2.1;

Abb.min = 0.0018 h = 360 mm 2/m

PASS - Area of reinforcement provided is greater than minimum area of reinforcement required
Rectangular section in shear - Chapter 11
Design shear force;

V = 8.4 kN/m

Concrete modification factor - cl.8.6.1;

=1

Nominal concrete shear strength - exp.11-3;

Vc = 0.17 (f'c 1 N/mm 2) d = 106.7 kN/m

Strength reduction factor;

s = 0.75

Design concrete shear strength - cl.11.4.6.1;

Vc = s Vc = 80 kN/m

V / Vc = 0.105
PASS - No shear reinforcement is required
Check base design at heel
Depth of section;

h = 200 mm

Rectangular section in flexure - Chapter 10


Design bending moment combination 2;

M = 0.8 kNm/m

Depth of tension reinforcement;

d = h - cbt - bt / 2 = 144 mm

Compression reinforcement provided;

No.4 bars @ 5.906" c/c

Area of compression reinforcement provided;

Abb.prov = bb2 / (4 sbb) = 845 mm 2/m

Tension reinforcement provided;

No.4 bars @ 150 mm c/c

Area of tension reinforcement provided;

Abt.prov = bt2 / (4 sbt) = 845 mm 2/m

Maximum reinforcement spacing - cl.10.5.4;

smax = min(18 in, 3 h) = 457 mm


PASS - Reinforcement is adequately spaced

Depth of compression block;

a = Abt.prov fy / (0.85 f'c) = 15 mm

Neutral axis factor - cl.10.2.7.3;

1 = min(max(0.85 - 0.05 (f'c - 28 N/mm 2) / 7 N/mm 2, 0.65), 0.85) = 0.85

Depth to neutral axis;

c = a / 1 = 18 mm

Strain in reinforcement;

t = 0.003 (d - c) / c = 0.021579

Strength reduction factor;

f = min(max(0.65 + (t - 0.002) (250 / 3), 0.65), 0.9) = 0.9

Nominal flexural strength;

Mn = Abt.prov fy (d - a / 2) = 48.3 kNm/m

Design flexural strength;

Mn = f Mn = 43.5 kNm/m

Section is in the tension controlled zone

M / Mn = 0.017
PASS - Design flexural strength exceeds factored bending moment
By iteration, reinforcement required by analysis;

Abt.des = 14 mm 2/m

Minimum area of reinforcement - cl.7.12.2.1;

Abt.min = 0.0018 h = 360 mm 2/m

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Project

Job Ref.

Section

Sheet no./rev.

9
Calc. by

Date

22-May-16

Chk'd by

Date

App'd by

Date

PASS - Area of reinforcement provided is greater than minimum area of reinforcement required
Rectangular section in shear - Chapter 11
Design shear force;

V = 7 kN/m

Concrete modification factor - cl.8.6.1;

=1

Nominal concrete shear strength - exp.11-3;

Vc = 0.17 (f'c 1 N/mm 2) d = 129.2 kN/m

Strength reduction factor;

s = 0.75

Design concrete shear strength - cl.11.4.6.1;

Vc = s Vc = 96.9 kN/m

V / Vc = 0.073
PASS - No shear reinforcement is required
Check key design
Depth of section;

h = 150 mm

Rectangular section in flexure - Chapter 10


Design bending moment combination 2;

M = 0.1 kNm/m

Depth of tension reinforcement;

d = h - cbb - k / 2 = 70 mm

Compression reinforcement provided;

No.3 bars @ 7.874" c/c

Area of compression reinforcement provided;

Ak.prov = k2 / (4 sk) = 356 mm 2/m

Tension reinforcement provided;

No.3 bars @ 200 mm c/c

Area of tension reinforcement provided;

Ak.prov = k2 / (4 sk) = 356 mm 2/m

Maximum reinforcement spacing - cl.10.5.4;

smax = min(18 in, 3 h) = 450 mm

Depth of compression block;

a = Ak.prov fy / (0.85 f'c) = 6 mm

Neutral axis factor - cl.10.2.7.3;

1 = min(max(0.85 - 0.05 (f'c - 28 N/mm 2) / 7 N/mm 2, 0.65), 0.85) = 0.85

Depth to neutral axis;

c = a / 1 = 7 mm

Strain in reinforcement;

t = 0.003 (d - c) / c = 0.025487

Strength reduction factor;

f = min(max(0.65 + (t - 0.002) (250 / 3), 0.65), 0.9) = 0.9

Nominal flexural strength;

Mn = Ak.prov fy (d - a / 2) = 10 kNm/m

Design flexural strength;

Mn = f Mn = 9 kNm/m

PASS - Reinforcement is adequately spaced

Section is in the tension controlled zone

M / Mn = 0.016
PASS - Design flexural strength exceeds factored bending moment
By iteration, reinforcement required by analysis;

Ak.des = 6 mm 2/m

Minimum area of reinforcement - cl.7.12.2.1;

Ak.min = 0.0018 h = 270 mm 2/m

PASS - Area of reinforcement provided is greater than minimum area of reinforcement required
Rectangular section in shear - Chapter 11
Design shear force;

V = 2 kN/m

Concrete modification factor - cl.8.6.1;

=1

Nominal concrete shear strength - exp.11-3;

Vc = 0.17 (f'c 1 N/mm 2) d = 63.2 kN/m

Strength reduction factor;

s = 0.75

Design concrete shear strength - cl.11.4.6.1;

Vc = s Vc = 47.4 kN/m

V / Vc = 0.042
PASS - No shear reinforcement is required

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Project

Job Ref.

Section

Sheet no./rev.

10
Calc. by

Date

Chk'd by

22-May-16

Date

App'd by

Date

Transverse reinforcement parallel to base


Minimum area of reinforcement - cl.7.12.2.1;

Abx.req = 0.0018 tbase = 360 mm 2/m

Transverse reinforcement provided;

No.3 bars @ 200 mm c/c each face

Area of transverse reinforcement provided;

Abx.prov = 2 bx2 / (4 sbx) = 713 mm 2/m

PASS - Area of reinforcement provided is greater than area of reinforcement required

40

50

No.3 bars @ 200 c/c


horizontal reinforcement
parallel to face of stem

No.4 bars @ 225 c/c

No.4 bars @ 198 c/c

No.4 bars @ 150 c/c

50

75

No.4 bars @ 150 c/c

No.3 bars @ 200 c/c

No.3 bars @ 200 c/c


transverse reinforcement
in base

Reinforcement details