Anda di halaman 1dari 14

CALCULATION REPORT

Filling Hall

Bending Moment- M33

Bending Moment- M22

st

Shear force-1 floor

Axial Load

Reaction

Joint
Text
4
13
193
196
230
233

OutputCase CaseType
Text
Text
DL+LL+SDL Combination
DL+LL+SDL Combination
DL+LL+SDL Combination
DL+LL+SDL Combination
DL+LL+SDL Combination
DL+LL+SDL Combination

TABLE: Joint Reactions


F1
F2
F3
Kgf
Kgf
Kgf
93.07 818.78 9829.17
11.41 -815.07 9967.45
-51.04 640.21 9828.19
12.92 -636.27 9957.26
-41.43 -238.88 10515.66
-24.94 231.24 10780.86

M1
M2
M3
Kgf-m Kgf-m Kgf-m
-208.61
8.96
21.86
229.71
-4.31
-8.66
-126.29 -25.12 -26.78
216.11
-4.06
7.71
435.08 -27.35
2.55
-421.19 -15.36
-3.88

Purlin
DATA
Length ,L
Spacing, @
Slope of Roof

8 m.
1.2 m.
5 degree

Load data
Live Load
Dead Load

2
30 kg/m.

Roof Material
Purlin
Other
Total Dead Load

5
8
15
28
50
8.65

Wind Load
Wind Load to perpendicular roof= (2Psin/1+sin^2)
Load Case
Case 1 DL= Purlin spacing x DL=

33.6

kg/m.

Case 2

DL+LL = spacing x(DL+LL )=

69.6

kg/m.

Case 3

0.75(DL+LL+WL) x spacing =

59.98

kg/m.

Load to purlin

W=
Wx =
Wy =

Wsinq
Wcosq

Member force from structural analysis program


Moment max.
=

Use
Sx =

47.22

cm.3

C
Ix =

Max. deflection
Allowable deflection

60 kg/m.
5.23 kg/m.
59.77 kg/m.

=
=

680.00

kg.m.

47.22

cm.3

Section of modulus Sx =

kg/m.2
kg/m.2
kg/m.3
kg/m.2
kg/m.2
kg/m.2

200x 75x20x3.2 mm. @ 1.20 m.


716

cm.4

L/240 =

3.10
3.33

cm
cm

O.K.

Rafter
DATA
Length ,L
Distance between brace, Lb =
2
Fy =
2400 kg/cm
Moment
Shear

=
=

2.04 m.
1.2 m.

220 kg.m
460 kg.
3
15.28 cm.

Modulus of Section, Sx =

Use
Weight =

C 100 X50 X 20 x 3.2


3
Sx =
21.3 cm.

5.5 kg/m.

tw =
tf =
d=

mm.
Ix =
Iy =
bf=

3.2 mm
3.2 mm
100 mm

4
107 cm.
4
24.5 cm.

50 mm

Compact or Noncompact Section


7.81

h/tw =

<

27.25
<
Compacted section

0.38(E/Fy)^0.5 =

10.97

3.76(E/Fy)^0.5 =

108.5

Lateral Support Checking


Compute Lc
=

So

64.91

cm

93.33 cm

Lc =
64.91
cm.
Lb =
120.00
cm.
Lb>Lc Not adequate bracing
Fb=

Shear Checking
h/tw =
29.25

2
1440.00 kg/cm
Ma = Fb.Sx =

<

3179/(Fy^0.5) =

Fv = 0.4Fy =
Va = Aw.Fv =
Max. deflection
Allowable deflection

306.72 kg-m. >

L/180 =

220 kg-m

OK

460 kg.

OK

64.89
2
960 kg/cm

3,072.00 kg. >


0.10
1.13

cm.
cm.

OK

BEAM
DATA
Length ,L
Distance between brace, Lb =
2
Fy =
2400 kg/cm
Moment
Shear

=
=

9 m.
9 m.

5,300 kg.m
3,200 kg.
3
368.06 cm.

Modulus of Section, Sx =

Use
Weight =

WF 250 X250 X 11x 11


3
Sx =
720 cm.

64.4 kg/m.

tw =
tf =
d=

mm.
Ix =
Iy =
bf=

11 mm
11 mm
250 mm

4
8790 cm.
4
2940 cm.

250 mm

Compact or Noncompact Section


11.36

h/tw =

<

18.73
<
Compacted section

0.38(E/Fy)^0.5 =

10.97

3.76(E/Fy)^0.5 =

108.5

Lateral Support Checking


Compute Lc
=

So

324.56

cm

641.67 cm

Lc =
324.56
cm.
Lb =
900.00
cm.
Lb>Lc Not adequate bracing
Fb=

Shear Checking
h/tw =
20.73

2
1031.07 kg/cm
Ma = Fb.Sx =

<

3179/(Fy^0.5) =

Fv = 0.4Fy =
Va = Aw.Fv =
Max. deflection
Allowable deflection

7,423.68 kg-m. >

L/180 =

5,300 kg-m

OK

3,200 kg.

OK

64.89
2
960 kg/cm

26,400.00 kg. >


2.68
5.00

cm.
cm.

OK

Beam

(attach between column head)

DATA
Length ,L
Distance between brace, Lb =
2
Fy =
2400 kg/cm
Moment
Shear

=
=

8 m.
8 m.

232 kg.m
650 kg.
3
16.11 cm.

Modulus of Section, Sx =

Use
Weight =

200 X75 X 20 x 3.2


3
Sx =
147.2 cm.

19.04 kg/m.

tw =
tf =
d=

mm.
Ix =
Iy =
bf=

3.2 mm
3.2 mm
200 mm

4
1472 cm.
4
184.6 cm.

150 mm

Compact or Noncompact Section


23.44

h/tw =

>

0.38(E/Fy)^0.5 =

10.97

58.50
<
3.76(E/Fy)^0.5 =
Partial compact section

108.5

Lateral Support Checking


Compute Lc
=

So

194.73

cm

140.00 cm

Lc =
140.00
cm.
Lb =
800.00
cm.
Lb>Lc Not adequate bracing
Fb=

Shear Checking
h/tw =
60.50

2
253.08 kg/cm
Ma = Fb.Sx =

<

3179/(Fy^0.5) =

Fv = 0.4Fy =
Va = Aw.Fv =
Max. deflection
Allowable deflection

372.53 kg-m. >

L/180 =

232 kg-m

OK

650 kg.

OK

64.89
2
960 kg/cm

6,144.00 kg. >


0.10
4.44

cm.
cm.

OK

Beam B1
Section

0.20x1.10
Width
Depth
Covering
d=
d' =

Dead Load

0.20x1.10

0.20
1.10
0.03
1.054
0.046

m.
m.
m.
m.
m.

528 kg/m.
M+
V

5,500 kg-m.
2,400 kg

Determine Flexural Reinforcement


2
Mc =Rbd =
25,196.93 kg-m.

> M Max.

As1 =

cm2

M+/fs.jd=

3.90

Bottom Bars(Tension)

2
2

DB
DB

20
20

mm As =
mm As =
Total

6.28
6.28
12.56

cm
2
cm
cm2

Top Bars(Compression)

DB

20

mm As =

6.28

cm2

Design of Shear Reinforcement


Shear, V
2400 kg
Shear Capacity Vc = 0.29fc'^0.5(b.d) =
8858.87 kg
V' = V -Vc=
-6458.87 kg
Stirrup
RB
6
mm. Av =
0.57
Spacing
s = Av.fv.d/(V') =
-11.07 cm.
spacing not exceed
0.20 m. OR
0.53 m.
Use Stirrup
RB
6 mm @
0.15
m.

cm2

Beam B2
Section

0.20 x 1.10
Width
Depth
Covering
d=
d' =

Dead Load

0.20 x 1.10

0.20
1.10
0.03
1.056
0.044

528 kg/m.

M-max.
4200 kg-m.
M +max.
2400 kg-m.
Vmax.
2700 kg
Determine Flexural Reinforcement
At column
Mc =Rbd2=
25292.64 kg-m.
As =

M-/fs.jd =

Tension Bars(top)

m.
m.
m.
m.
m.

> M -max.
2
2.97 cm

2
2

DB
DB
total

At Middle span
M+ max.
2400 kg-m.
2
Mc =Rbd =
> M +max.
25292.64 kg-m.
2
M+/fs.jd =
As =
1.70 cm
Tension Bars(bottom)
3
DB
0
DB
Design of Shear Reinforcement
Shear, V

16
16

mm As =
mm As =

4.02
4.02
8.04

cm2
cm2
cm2

16
0

mm As =
mm As =

6.03
0.00

cm2
cm3

2,700 kg

Shear Capacity Vc = 0.29fc'^0.5(b.d) =


8,876 kg
V' = V -Vc=
-6175.68 kg
Stirrup
RB
6
mm. Av =
Spacing
s = Av.fv.d/(V') =
-11.60 cm
spacing not exceed
0.2 m.or
0.528 m
Use Stirrup
RB
6
mm. @
0.15
m.
V' =
4,775 kg. >
-6175.68 kg.

0.57

cm2

Column

C-1

Axial load,P
Moment,M

12,000 kg.
1,650 kg.m

Dimension
b=
h=

25
25

Use rebar
Total area of steel

cm
cm

8
16.08
pg = 0.02572288

m=fy/(0.85f 'c) =
concrete covering
Use Stirrup RB

DB

16

mm Ast =

16.08

cm2
2.57 % OK

16.81 ksc
3
cm
6
mm

t=h=
d' =

25 cm
4.4 cm

eb = (0.67pgm+0.17)(t-d') =
e = M/P =
13.75 cm.

9.47
Tension zone
4
50483.6637 cm

I = bh3/12 + (2n-1)As(hl2/4)
Fa =0.34(1+pgm)f'c =

102.27 ksc

Fb =0.45f'c =

94.5

fb=MxCx/Ix =

40.9 ksc

fa=Pb/Ag =

0.0016 Pb

(fa/Fa) +(fb/Fb) =1
Pb =

36,284.11 kg

Mb = Pb x (eb/100 )=
M=
Mo=0.4Asfyjd =
to be check P
P= Pb(M-Mo)/(Mb-Mo)=

3,435.69 kg.m
1,650 kg.m
887.22 kg.m As =
10,860.15 kg

Use
RB

8
6

<
DB
m. @
25

25

4.02

cm2

12,000 kg.
16
0.20

mm. rebar
m. Stirrup

OK

cm2

SPREAD FOOTING
Axial load
Moment
Below the ground
Size of Column
a parallel Y-axis
b parallel X-axis resist Moment
Allowable Soil Pressure
Self Weigth of Footing

F-1
12,000 kg.
450 kg-m
1.50 m.

0.25 m.
0.25 m.
2
8,000 kg./m
2

720 kg./m

Soil above footing

2028 kg./m

Required area

2
2.40 m use

Size of Footing
B parallel Y-axis

1.70 m.

L parallel X-axis
Depth
Covering
d=

1.70 m. Area =
0.3 m.
0.08 m.
0.22 m.

Gross soil pressure =

7,449.81

<

Net soil pressure ,qmax. =

2
4,701.81 kg./m

Net soil pressure ,qmin. =

2
3,602.69 kg./m

Net soil pressure at edge of column

2
4,233.07 kg./m

q at d/2 from edge of column

2
4,303.22 kg./m

q at d from edge of column

2
4,373.37 kg./m

q at the middle of footing

2
4,152.25 kg./m

2
2.89 m

2
8,000 kg./m

OK

Bending Moment at the edge of column (about Y-axis ,My)


Distance from the edge of the column (X-direction)
My = 2,030.87 kg.m.
Steel bars in X-direction
Ast = M+/fs.jd=
6.99
As,temp =
10.20 cm2
12
16
DB
Bending Moment at the edge of column (about X-axis ,Mx)
Distance from the edge of the column (y-direction)
My = 1,855.15 kg.m.
Steel bars in Y-direction
Ast = M+/fs.jd=
6.38
As,temp =
10.20 cm2
12
16
DB
Shear Checking
1.One way shear
vp =
4.20 ksc
Distance from the edge of the column, d
0.51
Shear force at critical section Vp =
3,918.66
Critical section area
3689 cm2
Vp =
1.06 ksc . <
2.Punching shear
vc =
7.68 ksc
Shear force at critical section Vc = 5,936.05 kg.
Perimeter b0 93.40 cm
Puncing area
2026.78 cm2
Vc =
2.93 ksc . <

0.725 m.

cm2
(0.002bh for SD30 )
mm As = 24.12

cm2 @

0.14

m.

cm2 @

0.14

m.

0.725 m.

cm2
(0.002bh for SD30 )
mm As = 24.12

m.
kg.
4.20

ksc.

OK

7.68

ksc.

OK

Anda mungkin juga menyukai