Anda di halaman 1dari 36

SUMMARY OF PRICES FOR HVAC WORKS

Item #

Description

230010

General Requirements for HVAC System

230100

Operation and maintenance of HVAC System

230500

Common Work Results for HVAC

230700

HVAC Insulation

230800

Commissioning of HVAC

230900

Instrumentation and Control for HVAC

232300

Refrigerant Piping

232500

HVAC Water Treatment

233100

HVAC Ducts and Casings

233300

Air Duct Accessories

233600

Air Terminal Units

233700

Air Outlets and inlets

234100

Particulate Air Filters

235200

Heating Boiler

236400

Chillers

236500

Cooling Tower

237300

Air handling Unit

238200

Convection Heating and Cooling Units

TOTAL COST OF HVAC WORKS

Total Cost Pak Rupees

Updated BOQ (Adden

PARKING BUILDING
(Basement -2 & Baseme
Item #

Description

Unit
Quantity

230010

General Requirements for HVAC System

a.

Making of Shop Drawings with sectional details


complete in all respect for complete HVAC Systems as per Specifications

Job

Making of As Built Drawings with sectional details


complete in all respect for complete HVAC Systems as per Specifications

Job

Equipment foundations and shifting of equipment from


Ground Floor to respective locations including Owner
Supplied Equipment.

Job

Excavation and backfilling the earth for pipe works as


required to complete the HVAC Works as per
Drawings and Specifications.

Job

b.

c.

d.

e.

Painting and identification works of all components,


supports, hangers & brackets etc. complete in all respect as per drawings and
specifications.

1
Job

f.

Contractor to list and price below with quantities any


additional item(s) and/or quantities which are not included but required to complete the
lumpsum tender price for this section of works. Should the tenderer fail to insert any
item(s) and/or quantities here, it will be deemed that this lumpsum price for the
tender includes all items and no subsequent cliams for any additional item will be
entertained.

230100

Operation and maintenance of HVAC System

230113

Operation and maintenance of HVAC System

a.

One month test run

b.

Operation of mainteance of HVAC System for one


Job
year
Special tools and instruments for operation and
Job
maineance
Common Work Results for HVAC
Motor Control Center (MCC)
Supply, Installation of Motor Control Centre (MCC)
complete in all respect including weather proof sheet metal cabinet, bus bars, internal
wiring earth strip, connector strip, MCB, MCCB, Control fueses, magentic contactor,
overload relay, indication lights, voltmeter, ammeter, under voltage phase reversible,
phase failure device, selector switch, related civil works etc. complete in all
respects for HVAC equipment including Owner supplied HVAC equipment as per
scheudle, speicifications and drawings.

c.
230500
230513.13
a.

230513.16
a.

Wires, Cables, Conduites and Cable Tray


Supply and installation of of wire, cables, conduites
and cable tray for power supply, earthing and controls of HVAC system complete in all
respect as per drawings and specifications.

230516

Expansion fittings and loops

Job

1
1
1

Nos

Job

a.

Supply and installation of expansion fittings and loops


for HVAC system complete in all respect as per drawings and specifications.

230519
a.

Job

Meters and gages for HVAC Piping


Supply, installation, testing and commissioning of meters and gagues and accessories
for HVAC piping complete in all respect as per drawings and specifications

1
Job

230523
a.

General-Duty Valves for HVAC Piping


Supply, installation, testing and commissioning of valves complete with flanges and
all other accessories for HVAC piping complete in all respect as per drawings and
specifications

1
Lot

PARKING BUILDING
(Basement -2 & Baseme
Item #

Description

Unit
Quantity

230526

Hangers and Supports for HVAC Ducting

a.

Supply, Installation & Commissioning of hangers and supports for HVAC ducting
complete in all respect as per drawings and specifications.

Job

Job

Job

Seismic Controls for HVAC System


Supply, Installation & Commissioning of Seismic controls for HVAC system complete in
all respect as per drawings and specifications.
Job

230529.13

Hangers and Supports for HVAC Piping

a.

Supply, Installation & Commissioning of hangers and supports for HVAC piping
complete in all respect as per drawings and specifications.

230529.16

Hangers and Supports for HVAC Equipment

a.

Supply, Installation & Commissioning of hangers and supports for HVAC equipment
complete in all respect as per drawings and specifications.

230548
a.

230553

Identification for HVAC Ducting, Piping and


Equipment

a.

Supply, Installation & Commissioning of identification for HVAC ducting, piping and
equipment complete in all respect as per drawings and specifications.

1
Job

230579
a.

Fire Stopping
Supply, Installation & Commissioning of firestopping complete in all respect as per
drawings and specifications.

230700

HVAC Insulation

230713.13

Duct Insulation

a.

Supply and installation of 25 mm thick Fiber Glass


Insulation of density 16 kg/m3 with Aluminum Foil for Internal G.I. sheet metal ducts of
different sections for supply and return air duct with Alumninum tape and protected with
8 oz Canvas Cloth wrapping than painted anti fungus paint complete in all respect as
per schedule, specifications and drawings.

Job

sqm

PARKING BUILDING
(Basement -2 & Baseme
Item #

Description

Unit
Quantity

b.

Supply and installation of 50 mm thick Pre-formed


Polyurethane Insulation of density 50 kg/m3 with bituminous kraft paper facing for
External G.I. sheet metal ducts of different sections for supply and return air duct with
Aluminum tape and protected with 8 oz Canvas Cloth wrapping, anti fungus paint sheet
metal
26 SWG protective cladding over external insulation of the exposed duct work
complete in all respect as per schedule, specifications and drawings.

230713.16

Flue Duct Insulation

a.

Supply and installation of 100 mm thick Rockwool


insulation of deisnity 50 kg/m3, mattress faced with reinforced aluminum foil on one
side complete with sheet metal 26 SWG protective cladding over external insulation of
flue duct work complete in all respect as per schedule, specifications and drawings.

230713.19
a.

Kitchen Exhaust Duct Insulation


Supply and installation of 50 mm thick Fiber Glass
Insulation of density 24 kg/m3 with Aluminum Foil for Internal G.I. sheet metal ducts of
different sections for kitchen exahust air duct with Alumninum tape and protected with 8
oz Canvas Cloth wrapping than painted anti fungus paint complete in all respect as per
schedule, specifications and drawings.

230716

HVAC Equipment Insulation

a.

Supply, installation of thermal insulation for HVAC


Equipment complete in all respect as per drawings and specifications.

230719.13

Chilled Water Piping Insulation

a.

Supply and installation of premoulded polyurethane insulation of density 50 kg/m3 with


bituminous karft paper facing for chilled water pipes, bends, tees, unions, sockets,
valves and on speicals, wrapped with
8 oz. canvas cloth than painted with anti fungus paint, protected 26 SWG painted G.I.
sheet metal cladding complete in all respect as per scheudle, specifications and
drawings.

b.

Supply, installation & commissioning of Chilled Water Valves insulation complete in all
respect as per drawings and specifications

230719.16

Hot Water Piping Insulation

a.

Supply and installation of premoulded polyurethane insulation of density 50 kg/m3 with


bituminous karft paper facing for hot water pipes, bends, tees, unions, sockets, valves
and on speicals, wrapped with 8 oz. canvas cloth than painted with anti fungus paint,
protected 26 SWG painted G.I. sheet metal cladding complete in all respect as per
scheudle, specifications and drawings.

sqm

sqm

sqm

Lot

R.m

Lot

R.m

PARKING BUILDING
(Basement -2 & Baseme
Item #

Description

Unit
Quantity

b.

Supply, installation & commissioning of hot water valves insulation complete in all
respect as per drawings and specifications

230719.23

Refrigerant pipe insulation

a.

Supply and installation of 12 mm thick Pre-moulded


Armaflex Pipe Insulation complete in all respect as per schedule, specifications and
drawings.

230719.26

Condensate Drain Insulation

a.

Supply and installation of 6 mm thick Pre-moulded


Armaflex Pipe Insulation complete in all respect as per schedule, specifications and
drawings.

230800.00

Commissioning of HVAC

230813

Testing, Adjusting and balancing for HVAC


systems

a.

Testing, balancing and commissioning of HVAC


system complete in all respect including one month test run, measurement and
recording of pressure and electrical data and submission of technical/operation
manual, LOG book for each related equipment as per specifications and drawings.

230900

Instrumentation and Control for HVAC

230923

Direct-Digital Control System

a.

Supply, Installation & Commissioning of direct-digital control system complete in all


respect as per drawings and specifications.

Lot

Lot

Lot

Job

Job

1
230926

Building Management System

a.

Supply, Installation & Commissioning of Building Management system complete in all


respect as per drawings and specifications.

Job

1
230936

A/C Varibale Speed Drive for AHUs

a.

Supply, Installation & Commissioning of A/C variable speed drive for AHUs including
logic control assembly, adjustable variable frequency drives, adjustable variable
frequency drive bypass, transmitters etc.complete in all respect as per drawings
and specifications.

230943

Controls for Variable Speed Pumping System

a.

Supply, Installation & Commissioning of controls for variable speed pumping system
including logic control assembly, adjustable variable frequency drives, adjustable
variable frequency drive bypass, transmitters etc.complete in all respect as per
drawings and specifications.

Nos

Nos

PARKING BUILDING
(Basement -2 & Baseme
Item #

Description

Unit
Quantity

232113.23

Hydronic Piping

a.

Supply, Installation, testing & Commissioning of M.S Schedule 40 (as per ASME & API
standard, heavy quality with standard Schedule 40 thickness) pipes & fittings for chilled
water circulation system with bends, tees, unions, sockets as required to complete in
all respects ready to operate as per schedule, drawings and specifications.

3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
8"
10"
12"
20"
24"
30"

b.

R.m
R.m
R.m
R.m
R.m
R.m
R.m
R.m
R.m
R.m
R.m
R.m
R.m
R.m
R.m
R.m

Supply, Installation, testing & Commissioning of M.S Schedule 40 (as per ASME & API
standard, heavy quality with standard Schedule 40 thickness) pipes & fittings for
condenser water circulation system with bends, tees, unions, sockets as required to
complete in all respects ready to operate as per schedule, drawings and specifications.

750mm
600mm
450mm
400mm
350mm
300mm
250mm
200mm

R.m
R.m
R.m
R.m
R.m
R.m
R.m
R.m

c.

Supply, Installation, testing & Commissioning of M.S Schedule 40 (as per ASME & API
standard, heavy quality with standard Schedule 40 thickness) pipes & fittings for hot
water circulation system with bends, tees, unions, sockets as required to complete in
all respects ready to operate as per schedule, drawings and specifications.

1 1/4"

R.m

1 1/2"

R.m

2"

R.m

2 1/2"

R.m

3"

R.m

4"

R.m

232116

Hydronic piping specialties

a.

Supply, Installation, testing & Commissioning of hydronic piping specialties alongwith


flanges, coupling, unions complete in all respect as per drawings and specifications.

232119-23

Pressurized Expansion tank

a.

Supply, Installation, testing and commissioning of insulated pressurized M.S Expansion


tank of required size and capacity including gate valve, check valve, float valve etc.
complete in all respect ready to operate as per schedule, drawings and
specifications.

Lot

Exp. Tank # 1 (For chilled water)

Nos

Exp. Tank # 2 (For Hot water)

Nos

232123

Hydronic pumps

a.

Supply, Installation, testing & Commissioning of condenser water pump-motor set


complete in all respect as per drawings and specifications.

b.

P#1 (For centrifgual chiller)

Nos

P#2 (For absorption chiller)

Nos

Supply, Installation, testing & Commissioning of chilled water pump-motor set


complete in all respect as per drawings and specifications.

c.

P#1 (For centrifgual chiller)

Nos

P#2 (For absorption chiller)

Nos

Supply, Installation, testing & Commissioning of hot water pump-motor set complete in
all respect as per drawings and specifications.

P#5

Nos

Supply, Installation, testing & Commissioning Secondary chilled water pump-motor set
complete in all respect as per drawings and specifications.

P#3

Nos

PARKING BUILDING
(Basement -2 & Baseme
Item #

Description

Unit

Item #

Description

Unit
Quantity

232500

HVAC Water Treatment

232513

Water treatment for closed-loop hydronic system

a.

Supply, Installation, testing & Commissioning of water treatment for closed-loop


hydronic system complete in all respect as per drawings and specifications.

232516

Water treatment for open-loop hydronic system

a.

Supply, Installation, testing & Commissioning of water treatment for open hydronic
system complete in all respect as per drawings and specifications.

233100

HVAC Ducts and Casings

233113.13

Medium/Low pressure G.I. sheet metal ducting

a.

Supply, Installation, testing & Commissioning of medium/low pressure G.I. sheet metal
ducting complete in all respect as per drawings and specifications.

b.

Job

Job

24 gauge

sqm

22 gauge

sqm

20 gauge

sqm

18 gauge

sqm

Supply, Installation, testing & Commissioning of 18 gauge G.I. sheet metal plenums
complete in all respect as per drawings and specifications.

Job

1
233300

Air Duct Accessories

233313

Dampers

a.

Supply, Installation, testing & Commissioning of dampers complete in all respect as per
drawings and specifications.

Volume Control Damper

Job

Fire Damper

Job

Butterfly Round Damper

Job

233343

Flexible Connectors

a.

Supply, Installation, testing & Commissioning of flexible connectors between


blower section and air duct complete in all respect as per drawings and specifications.

233400

HVAC Fans

233419.13

Blowers and fans

Job

1
1
1

Supply, Installation, testing & Commissioning of blowers and fans complete in all
respect as per drawings and specifications.
Nos
a.

Centrifgual fans (cabinet type)

233419.19

Parking Ventilation System

a.

Supply, Installation, testing & Commissioning of jet fans complete in all respect as per
drawings and specifications.
Nos
2400 cfm & 0.2" ESP

40

PARKING BUILDING
(Basement -2 & Baseme
Item #

Description

Unit
Quantity

a.

233419-23
a.

233419-26
a.

Supply, Installation, testing & Commissioning of centrifugal cabinet type exhaust fans
complete in all respect as per drawings and specifications.

Nos

Nos

8000 cfm & 1.2" ESP


Staircase pressure fan
Supply, Installation, testing & Commissioning of staircase pressurization fans complete
in all respect as per drawings and specifications.

233600

6000 cfm & 1.2" ESP


Air Terminal Units

233613

VAV and CAV Units

a.

Supply, Installation, testing & Commissioning of Variable-Air Volume Units complete in


all respect as per drawings and specifications.

b.

Nos
10,000 cfm & 0.5" ESP
Smoke Exhaust Fans
Supply, Installation, testing & Commissioning of smoke exhaust fans complete in
all respect as per drawings and specifications.

Supply, Installation, testing & Commissioning of Constant-Air Volume Units complete in


all respect as per drawings and specifications.

233700

Air Outlets and inlets

233713

Diffusers, Registers, and Grilles


Supply, Installation, testing & Commissioning of Diffusers, Registers and Grilles
complete in all respect as per drawings and specifications.

Nos

Nos

Lot

1
Imperialine linear air diffuser 3/4" slot with volume control damper with link to adjust the
damper blades from the face of linear air diffuser complete in all respect as per
drawings and specification.
Lot

1
f.

Fresh air intake louver

Lot

g.

Exhaust air louver

Lot

233800

Ventilation Hoods

233813

Commerical-Kitchen Hoods

a.

Supply, Installation, testing & Commissioning of Commerical-Kitchen Hoods complete


in all respect as per drawings and specifications.

234100

Particulate Air Filters

234133

Air Filters

a.

Panel Air Filters

Lot

Supply, Installation, testing & Commissioning of Viscous oil type 2 inch (50 mm) thick
cleanable type Air Filters complete in all respect as per drawings and specifications.
Lot
b.

Midium Efficiency Air Filters

Supply, Installation, testing & Commissioning of 65%


efficiency Dust Spot Test, ASHRAE Standard 52.11992 Air Filters complete in all respect as per drawings and specifications.

24"x24"x24" (600mmx600mmx600mm)

Nos

Supply, Installation, testing & Commissioning of 95%


efficiency Dust Spot Test, ASHRAE Standard 52.11992 Air Filters complete in all respect as per drawings and specifications.

24"x24"x24" (600mmx600mmx600mm)

Nos

Installation, testing & Commissioning of Owner Supplied 99.997% efficiency HEPA Air
Filters with SS terminal housing and SS grill complete in all respect as per drawings
and specifications.

24"x24"x12" (600mmx600mmx300mm)

Nos

PARKING BUILDING
(Basement -2 & Baseme
Item #

Description

Unit
Quantity

235200

Heating Boiler

235236

Hot Water Generator

a.

Supply, Installation, testing & Commissioning of Hot water generator complete in all
respect as per drawings and specifications.

236400

Chillers

236413.13

Direct-Fired Absorption Type Water Chiller

a.

Lifting, installation & Commissioning of Owner Supplied Direct-Fired Absorption


Type Water Chillers complete in all respect as per drawings and specifications.

236416.16

Water-Cooled Centrifgual Water Chillers

a.

Lifting, installation & Commissioning of Owner Supplied Water-Cooled Centrifgual


Water Chillers complete in all respect as per drawings and specifications.

236500

Cooling Tower

236523

Cooling Tower

a.

Lifting, installation & Commissioning of Owner Supplied Cooling Towers complete in


all respect as per drawings and specifications.

237300

Air handling Units

237313.13

Hygienic Air handling units

a.

Installation, lifting, testing & Commissioning of Owner Supplied hygienic air handling
units complete in all respect as per drawings and specifications.

237313.16

Air handling units

a.

Installation, lifting, testing & Commissioning of Owner Supplied air handling units
complete in all respect as per drawings and specifications.

238123

Computer-Room Air-Conditioners (CRAC)

a.

Supply, testing & Commissioning of Computer-Room Air-Conditioners (CRAC)


complete in all respect as per drawings and specifications.

b.

Installation & Commissioning of Computer-Room Air- conditioners complete in all


respect as per drawings and specifications.

238200

Convection Heating and Cooling Units

238219

Fan Coil Units

a.

Installation, testing & Commissioning of Owner Supplied Fan Coil Units complete in all
respect as per drawings and specifications.

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

otal Cost Pak Rupees

Updated BOQ (Addendum#1) 29-Feb-2016

PARKING BUILDING
(Basement -2 & Basement 1)

Rate Rs.

Amount Rs.

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. Hospital Street &
Ground to 9th Floor)
Quantity

Rate Rs.

Amount Rs.

(Block 10)
ENERGY CENTRE

(U.G Tank
Hospital Street/Sub Station, Grou
Quantity

30

PARKING BUILDING
(Basement -2 & Basement 1)

Rate Rs.

Amount Rs.

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. Hospital Street &
Ground to 9th Floor)
Quantity

Rate Rs.

Amount Rs.

(Block 10)
ENERGY CENTRE

(U.G Tank
Hospital Street/Sub Station, Grou
Quantity

42800

PARKING BUILDING
(Basement -2 & Basement 1)

Rate Rs.

Amount Rs.

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. Hospital Street &
Ground to 9th Floor)
Quantity

Rate Rs.

Amount Rs.

(Block 10)
ENERGY CENTRE

(U.G Tank
Hospital Street/Sub Station, Grou
Quantity

7400

23

148

6800

1200

PARKING BUILDING
(Basement -2 & Basement 1)

Rate Rs.

Amount Rs.

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. Hospital Street &
Ground to 9th Floor)
Quantity

Rate Rs.

Amount Rs.

(Block 10)
ENERGY CENTRE

(U.G Tank
Hospital Street/Sub Station, Grou
Quantity

66

13

PARKING BUILDING
(Basement -2 & Basement 1)

Rate Rs.

Amount Rs.

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. Hospital Street &
Ground to 9th Floor)
Quantity

Rate Rs.

Amount Rs.

(Block 10)
ENERGY CENTRE

(U.G Tank
Hospital Street/Sub Station, Grou
Quantity

1575
240
675
585
345
510
750
465
150
345
128
210
210

75

600

75
45
350

430
260
24
16
12
16
30
30

PARKING BUILDING
(Basement -2 & Basement 1)

186
62
175
48
78
600

100

1
1

2
3

2
3

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. Hospital Street &
Ground to 9th Floor)

3
(Block 10)
ENERGY CENTRE

(U.G Tank
Hospital Street/Sub Station, Grou

Rate Rs.

Amount Rs.

Quantity

Rate Rs.

Amount Rs.

Quantity

18000
22900
9400
3400

40

PARKING BUILDING
(Basement -2 & Basement 1)

Rate Rs.

Amount Rs.

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. Hospital Street &
Ground to 9th Floor)
Quantity

Rate Rs.

Amount Rs.

(Block 10)
ENERGY CENTRE

(U.G Tank
Hospital Street/Sub Station, Grou
Quantity

81

59

1
1

692

692

692

PARKING BUILDING
(Basement -2 & Basement 1)

Rate Rs.

Amount Rs.

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. Hospital Street &
Ground to 9th Floor)
Quantity

Rate Rs.

Amount Rs.

(Block 10)
ENERGY CENTRE

(U.G Tank
Hospital Street/Sub Station, Grou
Quantity

15

56

100

10)
RGY CENTRE

(U.G Tank, Lower Ground i.c


spital Street/Sub Station, Ground & 1st Floor)
Rate Rs.

Amount Rs.

10)
RGY CENTRE

(U.G Tank, Lower Ground i.c


spital Street/Sub Station, Ground & 1st Floor)
Rate Rs.

Amount Rs.

10)
RGY CENTRE

(U.G Tank, Lower Ground i.c


spital Street/Sub Station, Ground & 1st Floor)
Rate Rs.

Amount Rs.

10)
RGY CENTRE

(U.G Tank, Lower Ground i.c


spital Street/Sub Station, Ground & 1st Floor)
Rate Rs.

Amount Rs.

10)
RGY CENTRE

(U.G Tank, Lower Ground i.c


spital Street/Sub Station, Ground & 1st Floor)
Rate Rs.

Amount Rs.

10)
RGY CENTRE

(U.G Tank, Lower Ground i.c


spital Street/Sub Station, Ground & 1st Floor)

Rate Rs.

Amount Rs.

10)
RGY CENTRE

(U.G Tank, Lower Ground i.c


spital Street/Sub Station, Ground & 1st Floor)
Rate Rs.

Amount Rs.

10)
RGY CENTRE

(U.G Tank, Lower Ground i.c


spital Street/Sub Station, Ground & 1st Floor)
Rate Rs.

Amount Rs.

Anda mungkin juga menyukai