COMPUTOS METRICOS
OBRA:
PARTIDA N
1
DESCRIPCION
E-323.000.121
CONCRETO DE Fc 210 Kgf/CM2 A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE COLUMNAS.
COLUMNAS NIVEL PB
COLUMNAS NIVEL 1
COLUMNAS NIVEL 2
E-323.000.122
CONCRETO DE Fc 210 Kgf/CM2 A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE VIGAS DE AMARRE.
VIGA B-C
VIGA C-D
VIGA D-E
VIGA E-F
VIGA F-G
VIGA G-H
VIGA H-I
VIGA I-VOLADO (EJE 1, EJE 2)
E-323.000.123
CONCRETO DE Fc 210 Kgf/CM2 A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE VIGAS DE CARGA
VIGA 1-2
VIGA 1-2 (EJE H, EJE I)
VIGA 2-3
VIGA 1-VOLADO (EJE D, EJE E, EJE F)
E-333.120.130
LOSA NERVADA EN UNA DIRECCIN, E=20
LN-1, LN-6, LN-11
LN-2, LN-7, LN-12
E-351.110.210
SUMUNISTRO Y TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO
ESTRIBOS (VIGA 25X30)
ESTRIBOS (VIGA 25X35)
ESTRIBOS (VIGA 30X40)
E-351.110.211
SUMUNISTRO Y TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO
BARRA N#4 ACERO LONGITUDINAL 1
BARRA N#4 ACERO LONGITUDINAL 2
BARRA N#4 ACERO LONGITUDINAL 3
BARRA N#4 ACERO LONGITUDINAL 4
BARRA N#4 ACERO LONGITUDINAL 5
BARRA N#4 ACERO LONGITUDINAL 6
BARRA N#4 ACERO LONGITUDINAL 7
BARRA N#4 ACERO DE REFUERZO 1
BARRA N#4 ACERO DE REFUERZO 2
BARRA N#4 ACERO DE REFUERZO 3
BARRA N#5 ACERO DE REFUERZO 1
BARRA N#5 ACERO DE REFUERZO 2
E-351.110.212
SUMUNISTRO Y TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO
ESTRIBOS (COLUMNA 35X35) 1
ESTRIBOS (COLUMNA 35X35) 2
E-351.110.213
SUMUNISTRO Y TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO FY 4200 KGF/CM2, UTILIZANDO
BARRA N#6 ACERO LONGITUDINAL 1
ING. RESIDENTE/CONTRATISTA
FISCAL
ING. RESIDENTE/CONTRATISTA
FISCAL
CONTRATO N 0004758368
BOLIVARIANA DE VENEZUELA
NICIPIO DIEGO BAUTISTA URBANEJA
ION DE OBRAS PUBLICAS
MPUTOS METRICOS
ERCIAL ALTO RO
FECHA:
MEDIDAS
LARGO
14-1-15
ELEMET IGUALES
UND
CANT.
TOTAL
3.00
24.00
M3
8.82
0.35
2.80
24.00
M3
8.23
0.35
2.80
24.00
M3
8.23
TOTAL EJECUTADO
M3
25.28
ANCHO
ALTO
0.35
0.35
0.35
0.35
CONSTRUCCION DE COLUMNAS.
0.25
0.30
9.00
M3
1.45
2.15
0.25
0.30
9.00
M3
1.45
2.15
0.25
0.30
9.00
M3
1.45
2.15
0.25
0.30
9.00
M3
1.45
3.15
0.25
0.30
9.00
M3
2.13
3.15
0.25
0.30
9.00
M3
2.13
2.65
0.25
0.30
9.00
M3
1.79
0.93
0.25
0.25
4.00
M3
0.23
TOTAL EJECUTADO
M3
12.08
0.25
0.35
18.00
M3
7.32
4.65
0.30
0.40
6.00
M3
3.35
4.65
0.25
0.35
24.00
M3
9.77
1.03
0.25
0.25
9.00
M3
0.58
TOTAL EJECUTADO
M3
21.01
20.00
5.00
3.00
M2
300.00
17.00
5.00
3.00
M2
255.00
3.00
1.50
3.00
M2
13.50
1.10
5.00
2.00
M2
11.00
5.00
1.20
3.00
M2
18.00
TOTAL EJECUTADO
M2
597.50
EFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLA IGUAL O MENOR DEL N#3 PARA VIGAS.
1.02
0.559
1818.00
KG
1,036.59
1.12
0.559
1722.00
KG
1,078.11
1.32
0.559
204.00
KG
150.53
TOTAL EJECUTADO
KG
2,265.22
0.994
27.00
KG
319.37
10.30
0.994
27.00
KG
276.43
9.70
0.994
27.00
KG
260.33
11.50
0.994
27.00
KG
308.64
1.90
0.994
8.00
KG
15.11
10.60
0.994
182.00
KG
1,917.62
1.90
0.994
18.00
KG
33.99
2.70
0.994
105.00
KG
281.80
4.75
0.994
55.00
KG
259.68
2.80
0.994
16.00
KG
44.53
2.70
1.554
3.00
KG
12.59
4.75
1.554
13.00
KG
95.96
TOTAL EJECUTADO
KG
3,826.06
KG
1,915.00
5616.00
KG
3,139.34
TOTAL EJECUTADO
KG
5,054.34
EFUERZO FY 4200 KGF/CM2, UTILIZANDO CABILLA IGUAL O MENOR DEL N#3 PARA COLUMNAS.
1.22
0.559
1.00
0.559
2808.00
FISCAL
2.237
576.00
KG
6,829.11
TOTAL EJECUTADO
KG
6,829.11
ING. INSPECTOR