Anda di halaman 1dari 11

Hydraulic Analysis Report

For

(Project Name)

The Hydraulic Analysis Report for (Project name) dated (Date); has been completed by (Engineers
Name) for (Owner/Developers Name). This report is prepared in compliance with existing City Code,
Utility Tariffs, and the latest revision of the Colorado Springs Utilities Water Line Extension and
Service Standards.
This Report does not reserve capacity in the water system until a building permit is obtained.
Significant changes to the development plan will require an addendum to this Report.

Submitting Engineer

______________________________
Colorado P.E. #

Date: ________________

Submitting Engineer P.E. Stamp

Accepted for (Owner/Developer)

Accepted for Colorado Springs Utilities

______________________________

________________________________

Date: ________________

7/5/2016

Date: __________________

Page 1 of 12

HGL Request Form


Date:
Project Name:
Project Number (City Planning Assigned):
Location (Street Intersection indicate corner):
Contact Name:
Company:
Phone Number:
Mailing Address:
Email Address:
Fax Number:
Developer (Name and Email Address):
Development Type:
Single Family Residential
Residential (Duplex and Triplex)
Apartments, Condominiums, and Townhomes
Mobile Home Parks
Hotels
Golf Courses, Parks, and Open Spaces
Industrial
Commercial
Other
Requested Max Fire Flow:
Proposed Max Day Demand:

Number of Units:
Number of Units:
Number of Units:
Number of Units:
Number of Units:
Acres:
Acres:
Acres:
Acres:

Acres:
Acres:
Acres:
Acres:
Acres:

GPM@ 20 psi
GPD

Comments:

Attach a site map with water main alignment and proposed connection points and email map and form to:
waterplanning@csu.org or fax to (719)668-2729.

7/5/2016

Page 2 of 12

HGL Response Form HAR Needed


Date:
Project Name:
Project Location:
Map Page(s):
Project Number:
Contact Name:
Phone:
Fax:

Company:
Email:
Developer:

Date WPD Data Request Form received:


Is Hydraulic Analysis Report (HAR) Required?
Per the HAR Review Process flow diagram, please verify fire flow requirements w/ CSFD; Complete and
submit HAR to UDS. At the time the HAR is submitted to UDS, please also submit UDCF through DDS, and
notify WPD of UDCF Receipt number.
Information required for Hydraulic Analysis Report (HAR):
Pressure Zone(s):
HGL at Max Day Demand (lowest system pressure):
HGL at Min Day Demand (maximum system pressure):
Max Day to Average Day (MD/AD) peaking factor:
Offsite Demand:
Looping Requirements: A minimum of 2 connections are needed for looping, for redundancy and water
quality purposes. The location of the proposed connections, source HGL, are shown in the screenshot attached.
If you would like to connect in other locations, please let me know.
For model positioning, please use the following FIMS Coordinates (not intended for design purposes), for
the proposed connections points:

Existing System Notes: Please note that for pressures 170 psi or greater, DIP is required.
Water Quality Notes:

7/5/2016

Page 3 of 12

Site
Site map showing potential connection points

Available Fire Flow at Existing Hydrant near Site as Reference


Hydrant Number:
Hydrant Flange Elevation:
Hydrant Location:
Hydrant FIMS Reference Coordinate*: N=
E=
Theoretical Available Fire Flow at 20 psi residual**:
Pressure at max day demands:
*The Hydrant FIMS Reference Coordinate is to be used as a reference point for modeling purposes only. These coordinates must not
be used for design purposes. Colorado Springs Utilities accepts no liability if the provided coordinate is used for design purposes.
**The Fire Flow information above is provided solely as a reference. An official Fire Flow report must be requested by the engineer
and provided by Colorado Springs Utilities Water Planning prior to sign off of construction plans by Colorado Springs Utilities and
Colorado Springs Fire Department.

Please verify fire flow requirements w/ CSFD prior to Construction Drawing submittal. At the time the
Construction Drawings are submitted to UDS, please also submit UDCF through DDS, and notify WPD of
UDCF Receipt number, along with hydrant flange elevations and required fire flows.

Melissa Wetzig, P.E.


719.668.8741
Water Planning & Design

mwetzig@csu.org | www.csu.org

cc: Matthew Williams, Keta Donegan


Water Planning and Design
7/5/2016

Page 4 of 12

1521 Hancock Expressway


PO Box 1103, Mail Code 1821
Colorado Springs, CO 80947

HGL Response Form NO HAR Needed


Date:
Project Name:
Project Location:
Engineers Name:
Phone:
Fax:

Project Number:
Map Page(s):
Company:
Email:
Developer:

Date HGL Request Form received:


Is Hydraulic Analysis Report (HAR) Required? No
Because the site is more an infill project, an HAR will be not required. Colorado Springs Utilities will calculate available fire flow
upon Construction Drawing submittal.
Please verify fire flow requirements w/ CSFD prior to Construction Drawing submittal. At the time the Construction Drawings are
submitted to UDS, please also submit UDCF through DDS, and notify WPD of UDCF Receipt number, along with hydrant flange
elevations and required fire flows.
Developer/Engineer can model available fire flow prior to Construction Drawing submittal using the following HGL information. See
HAR Modeling Requirements on requirements for fire flow modeling.

HGL Information
Pressure Zone(s):
HGL at Max Day Demand (lowest system pressure):
HGL at Min Day Demand (maximum system pressure):
Max Day to Average Day (MD/AD) peaking factor:
Available Fire Flow at Existing Hydrant near Site as Reference
Hydrant Number:
Hydrant Flange elevation:
Hydrant Location:
Theoretical Available Fire Flow at 20 psi residual:
Pressure at max day demands:
*The Fire Flow information above is provided solely as a reference. An official Fire Flow report must be requested by the engineer
and provided by Colorado Springs Utilities Water Planning prior to sign off of construction plans by Colorado Springs Utilities and
Colorado Springs Fire Department.

Looping Requirements: A minimum of 2 connections are needed for looping, for redundancy and water
quality purposes.
Existing System Notes: Please note that for pressures 170 psi or greater, DIP is required.
Melissa Wetzig, P.E.
719.668.8741
Water Planning & Design

mwetzig@csu.org | www.csu.org

cc: Matthew Williams, Keta Donegan

7/5/2016

Page 5 of 12

Demand Table

Planni
ng
Area

Bld
#

Use

Units

Acre
s

Bld Sq
Ft

Construc
tion Type

Sprink
led

Fire
Flow
(gpm
)

Avg
Deman
d
Factor
(gpd)

Totals
Note: Fire flow demands should be verified by CSFD or a conservative
estimate should be used

7/5/2016

Page 6 of 12

Avg
Deman
d
(mgd)

Peaki
ng
Facto
r

Max
Day
Dema
nd
(mgd)

Max
Day
Dema
nd
(gpm)

Node Table

Node

7/5/2016

Elevati
on
(feet)

Max
Day
Dema
nd
(gpm)

Page 7 of 12

Pipe Table

Pipe
ID

Lengt
h

Diame
ter

Roughn
ess

Site Map

7/5/2016

Page 8 of 12

Network Map

7/5/2016

Page 9 of 12

7/5/2016

Page 10 of 12

Summary Table

Planni
ng
Area

Phas
e

Range of
Max Day
Demand
(gpm)

Range of
Required
Fire Flow
(gpm)

Range of Max
Fire Flow (gpm)

Recover
y
Applica
ble?

Output File

7/5/2016

Page 11 of 12

Oversi
zed
Main?

Anda mungkin juga menyukai