Document No. :
APD302
Issue No. :
Effective date :
15.05.10
08
Responsibility :
Plant in Charge (for overall control).
Shift - in -Charges (for implementation).
Use PPEs Helmet,handgloves,Goggals,safety shoes,Belts,Gas mask (whichever
required)
Use appropriate PPEs While handling of chemicals & gases.
In process material Spec define in SOP are for guidelines &corrective action only Material
rejection criteria is not applicable for the deviations.
A)
Batch Nitration:
Records maintained in APDR 31 for Cumene , APDR33 for M-Xylene .& ARDR 33 A for
p-Xylene
Measurement of R.M.
Sulfuric acid Measurement.
1.Check the initial level of outdoor storage tank of Sulfuric acid.
2.Ensure that the measuring tank (MT)of sulfuric acid is empty.
3.Check the bottom valve of sulfuric acid measuring tank and close it , if it is open.
4.Open suction and discharge valve of sulfuric acid storage tank pump and receive sulfuric
acid into the measuring tank, till overflow start overflow nozzle at 2400 kg provided for
measured qty.
5.as soon as the overflow is observed , Switch off the pump and close both valve at
suction and discharge.
Nitric acid Measurement.
1.Check the initial level of outdoor storage tank of Nitric acid.
2.Ensure that the measuring tank (MT)of Nitric acid is empty.
3.Check the bottom valve of Nitric acid measuring tank and close it , if it is open.
4.Open suction and discharge valve of Nitric acid storage tank pump and receive Nitric
acid into the measuring tank, till overflow start till overflow start overflow nozzle at 1580 kg
provided for measured qty
Reviewed by:
Plant in charge:
Approved by:
Head -Production:
Page 1 of 12
Document No. :
APD302
Issue No. :
Effective date :
15.05.10
08
5.As soon as the overflow is observed , Switch off the pump and close both valve at
suction and discharge.
Reviewed by:
Plant in charge:
Approved by:
Head -Production:
Page 2 of 12
Document No. :
APD302
Issue No. :
Effective date :
15.05.10
08
11
12
13
14
15
Reviewed by:
Plant in charge:
Approved by:
Head -Production:
Page 3 of 12
Document No. :
APD302
Issue No. :
Effective date :
15.05.10
08
Reviewed by:
Plant in charge:
Approved by:
Head -Production:
Page 4 of 12
Document No. :
APD302
Issue No. :
Effective date :
15.05.10
B)
08
CONTINUOUS NITRATION
Reviewed by:
Plant in charge:
Approved by:
Head -Production:
Page 5 of 12
Document No. :
APD302
Issue No. :
Effective date :
15.05.10
08
10. If analysis of spent acid is ok then fill the nitrater with spent acid
R1,R2,R3,F1&also B8 level % is 40%
11. Ensure that the reactor R4,R5,R6 &F2,F3,F4 is empty
12. Ensure that bottom valve of R4, F2, R5, F3, R6, F4 is closed. Insure that
interphase valve is closed.then fill the whole washing section with water up to
interphage level.when spent acid preparation completed in nitration, then fill the
water in washing section. Now plant is ready for nitration start up.
Stage II NITRATION Process Start up
Start blower & scrubber
1. Start agitator of R1&R2.
2. Ensure that all raw material line up should be ok.
STARTING OF NITRATION
1. Press the nitration start push button provided on mimic panel
2. This will start the by pass timer ON
3. Timer will initially by pass the high \low flow trip during the start up.
4. Provision for setting this time should be available on DCS alarm\trip set page.
5. This timer will start all the nitration related pumps & control valves.
6. If the feed back of pump & flow are ok. Then nitration will start smoothly.
Reviewed by:
Plant in charge:
Approved by:
Head -Production:
Page 6 of 12
Document No. :
APD302
Issue No. :
Effective date :
15.05.10
08
For N-Xylene
Raw material
Sulphuric Acid (98%)
Nitric Acid (98%)
Meta Xylene
Spent Acid
80
310
354
600
1200
85
330
376
637
1250
% age
90
350
398
675
1300
95
370
420
712
1350
100
390
443
750
1400
Note: (i) If the Dinitro / M-Xylene contents are higher than 2% , change the flow
rates as per
the results of analysis.
(ii)The temperature range of R1 & R2 chilled water is 30-45C and if the
temperature
goes above 45C then plant will be tripped.
(iii)The temp range of R1&R2 with Cooling tower is 30-50C and if the
temperature
goes above 50C then plant will be tripped.
For N-Cumene
Raw material
Sulphuric Acid (98%)
Nitric Acid (98%)
Cumene
Spent Acid
Reviewed by:
Plant in charge:
80
280
320
500
1100
85
298
340
531
1150
% age
90
315
360
562
1200
Approved by:
Head -Production:
Page 7 of 12
95
332
380
593
1300
100
350
400
625
1300
Document No. :
APD302
Issue No. :
Effective date :
15.05.10
08
Note: (i) If the di-nitro contents/Cumene are higher than 2%, change the flow rates
as per
the results of analysis.
(ii)The temperature range of R1 & R2 chilled water is 25-35C and if the
temperature goes above 35C then plant will be tripped
. CONTINUOUS NITRATION
Measurement of R.M. For o-Xylene nitration
Check all interlockings before start the process
Sulfuric acid Measurement.
1.Check the Initial level of sulfuric acid (B-6) storage tank on DCS system.
2.Open suction and Discharge valve of sulfuric acid storage pump.
Nitric acid Measurement.
1.Check the Initial level of Nitric (B-7) storage tank on DCS system.
2.Open suction and Discharge valve of Nitric acid storage pump.
Spent acid Measurement.
1.Check the Initial level of Spent acid (B-8) storage tank on DCS system.
2.Open suction and Discharge valve of Spent acid storage pump.
O-Xylene Measurement.
1.Check the Initial level of O-Xylene (B-502 A) storage tank on DCS system.
2.Open suction and Discharge valve of sulfuric acid storage pump.
Stage I Preparation of Spent acid. Whenever process requirement.
1 Ensure that the R1, R2, F1 are empty.
2 Check the Bottom valve of R1, R2,are closed and inter phasevalve F1
separator is open.to highspeed separator
3 Before starting spent acid preparation start chilling plant for temp. Maintaining.
Write hourly Temp & pressure of chilling water supply line.
Reviewed by:
Plant in charge:
Approved by:
Head -Production:
Page 8 of 12
Document No. :
APD302
Issue No. :
Effective date :
15.05.10
08
4
5
6
7
8
Reviewed by:
Plant in charge:
Approved by:
Head -Production:
Page 9 of 12
Document No. :
APD302
Issue No. :
Effective date :
15.05.10
08
In kgs
185
211
300
1300
215
246
350
1550
230
263
375
1600
245
281
400
1660
260
299
425
1700
I) Unreacted O-Xylene in R-2 3% min & 7 % Max. & Dinitro range in R2 1.0%
ii)The temperature range of R1 (20-23 degC)& R2 -23C Max on chilling plant and
if the temperature goes above 24C then plant will be tripped
Approved by:
Head -Production:
Page 10 of 12
Document No. :
APD302
Issue No. :
Effective date :
15.05.10
08
Reviewed by:
Plant in charge:
Approved by:
Head -Production:
Page 11 of 12
Document No. :
APD302
Issue No. :
Effective date :
15.05.10
S.R.
1
08
Frequency of use
If required
Daily in each shift
If required
If required
If required
Purpose
GC & Spent Analysis
GC & Spent Analysis
GC & Spent Analysis
Acidity
N-Cresols
if required
GC
GC,PH,N-Cresols
Strength of solution
6
7
B-502A
B-502B
8
9
10
11
B-8
B-14
B-1014
B-11/12
2
3
Steps
Nitration
Reviewed by:
Plant in charge:
Decontamination
Decontamination
Decontamination
Decontamination
Approved by:
Head -Production:
Page 12 of 12