Anda di halaman 1dari 30

BILL NO.

3
Item

TNB SUB STATION


Description

Qty

Unit

Rate

Amount

Element 1A : Work Below Lowest Floor Finish ( All Provisional )


A

Excavate oversite to reduce level average 200mm


deep commencing from formation level, get out,
load and cart away from site including levelling
grading and ramming bottom of excavation

73

4.00

292.00

Excavate pit for footing not exceeding 1.50m deep,


commencing from formation level, get out, part
return, fill in, well rammed and remainder load and
cart away from site

66

13.20

871.20

Excavate trench for ground beam not exceeding


1.50m deep, commencing from formation level, get
out, part return, fill in, well rammed and remainder
load and cart away from site

13.20

105.60

Excavate trench for cable trench not exceeding


1.50m deep, commencing from formation level, get
out, part return, fill in, well rammed and remainder
load and cart away from site

86

13.20

1,135.20

Excavate trench for cable trough not exceeding


1.50m deep, commencing from formation level, get
out, part return, fill in, well rammed and remainder
load and cart away from site

13.20

13.20

Hardcore bed as specified


F

150mm Thick under floor slab

73

12.54

915.42

150mm Thick under cable trench

58

12.54

727.32

150mm Thick under cable trough

12.54

25.08

Lean concrete (Grade 15) blinding as specified


J

50mm Thick under footing

34

13.86

471.24

50mm Thick under ground beam

12

13.86

166.32

50mm Thick under floor slab

73

13.86

1,011.78

50mm Thick under cable trench

58

13.86

803.88

50mm Thick under cable trough

13.86

27.72

To Collection

RM

B3/1A/1

6,565.96

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

Unit

Rate

Amount

Element 1A : Work Below Lowest Floor Finish (All Provisional) (Cont'd)


Vibrated reinforced concrete as specified :A

Footing (Grade 30)

11

239.80

2,637.80

Column stump (Grade 30)

239.80

239.80

Ground beam (Grade 25)

228.80

1,372.80

125mm Thick floor slab (Grade 25)

73

28.60

2,087.80

125mm Thick ramp (Grade 25)

12

28.60

343.20

150mm Thick cable trench wall (Grade 25)

125

34.32

4,290.00

150mm Thick cable trench slab (Grade 25)

58

34.32

1,990.56

150mm Thick cable trough wall (Grade 25)

34.32

68.64

150mm Thick cable trough slab (Grade 25)

34.32

68.64

144

Kg

3.50

504.00

91

Kg

3.50

318.50

136

Kg

3.50

476.00

401

Kg

3.50

1,403.50

367

Kg

3.50

1,284.50

Mild steel bar reinforcement as specified :Footing


K

10mm Diameter bar


Column Stump

10mm Diameter bar


Ground Beam

10mm Diameter bar as links


High tensile bar reinforcement as specified :Footing

12mm Diameter bar


Column Stump

25mm Diameter bar


Ground Beam

16mm Diameter bar

73

Kg

3.50

255.50

20mm Diameter bar

330

Kg

3.50

1,155.00

25mm Diameter bar

178

Kg

3.50

623.00

B3/1A/2

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

Unit

To Collection

Rate
RM

Amount
19,119.24

Element 1A : Work Below Lowest Floor Finish (All Provisional) (Cont'd)


High tensile bar reinforcement as specified :- (Cont'd)
Cable Trench
A

10mm Diameter bar to wall

1,665

Kg

3.50

5,827.50

10mm Diameter bar to slab

1,508

Kg

3.50

5,278.00

Cable Trough
C

10mm Diameter bar to wall

77

Kg

3.50

269.50

10mm Diameter bar to slab

68

Kg

3.50

238.00

One layer of fabric reinforcement as described well


lapped at joints and embedded ( measured nett - no
allowance for laps ) to ground slab type
E

Reference No. BRC A6 to ground slab

73

12.32

899.36

Reference No. BRC A6 to ramp

12

12.32

147.84

Sawn formwork as specified : D

Sides of footing

25

45.00

1,125.00

Sides of column stump

13

45.00

585.00

Sides of ground beam

49

45.00

2,205.00

Sides of cable trench wall

63

45.00

2,835.00

Sides of cable trough wall

45.00

45.00

Edge of floor slab exceeding 100mm but not exceeding 2

107

10.00

1,070.00

Edge of cable trench slab ditto

100

10.00

1,000.00

Edge of cable trough slab ditto


---------------------------------

10.00

50.00

Layer of polythene or other equal and approved


damp proof membrane, well lapped at joints and
laid on lean concrete (measured nett-no allowance
made for laps) to ground slab

73

2.75

200.75

Ditto; to ramp

12

2.75

33.00

B3/1A/3

BILL NO. 3

TNB SUB STATION

Item

Description

Qty

Unit

To Collection

Rate
RM

Amount
21,808.95

Element 1A : Work Below Lowest Floor Finish (All Provisional) (Cont'd)


A

70mm Thick reinforced concrete cover to trenches


including lifting hook, 50mm x 75mm x 6mm thick
mild steel angle and 10mm diameter x 75mm long
fishtailed mild steel bar to cable trenches

16

77.00

1,232.00

Ditto; to cable trough

77.00

154.00

Chequered plate cover including all necessary


lifting hook and accessories

320.00

1,600.00

Compacted sand filling to trenches

60

55.00

3,300.00

Laying 'Flinkote' waterproofing to be lay to surfaces


as described

186

33.00

6,138.00

Anti termite soil treatment to be sprayed to


surfaces as described and to be executed by soil
treatment specialist
230mm Diameter precast concrete pipe, including
all excavation, get out and part returned,150mm
haunching, laying of pipes, temporary works and
other accessories as required for the completion of
the works to S.O.'s approval

179

2.75

492.25

110.00

880.00

10

No

165.00

1,650.00

----------------------------------------------Soil Investigation
H

Allow for mackintosh probe for soil investigation


including preparing test report and endorsed by
certified specialist all to Engineer's approval and
Client's satisfaction

B3/1A/4

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

To Collection

Unit

Rate

RM

Amount

15,446.25

Element 1A : Work Below Lowest Floor Finish (All Provisional) (Cont'd)

COLLECTION
B3/1A/1

6,565.96

B3/1A/2

19,119.24

B3/1A/3

21,808.95

B3/1A/4

15,446.25

B3/1A/5

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

To Summary

Unit

Rate

RM

B3/1A/6

Amount

62,940.40

BILL NO. 3

TNB SUB STATION

Item

Description

Qty

Unit

Rate

Amount

Element 1B : Apron And Perimeter Drain


A

Excavate oversite to reduce level average 200mm


deep commencing from formation level, get out,
load and cart away from site including levelling
grading and ramming bottom of excavation

25

4.00

100.00

25

6.05

151.25

25

13.86

346.50

25

28.60

715.00

Hardcore as specified
B

100mm Thick under apron slab


Lean concrete (Grade 15) blinding as specified

50mm Thick under apron slab


Vibrated reinforced concrete (Grade 25) as specified

125mm Thick apron slab, laid to fall


---------------------------------------

Layer of steel fabric reinforcement reference No.


A6 (M.S. 193) well lapped at joints and embedded
in apron slab (measured nett-no allowance made
for laps)
Mild steel bar reinforcement as specified :-

25

12.32

308.00

8mm Diameter bar

55

Kg

3.50

192.50

8mm Diameter bar as starter bar

21

Kg

3.50

73.50

94

Kg

3.50

329.00

69

10.00

690.00

38

110.00

4,180.00

110.00

770.00

25

2.75

68.75

High tensile bar reinforcement as specified


F

10mm Diameter bar


Sawn formwork as specified

To edge of apron slab, exceeding 100mm and not


exceeding 200mm high
----------------------------------------------

230mm Diameter half round cast inside concrete


drain cast in 600mm length, laid to fall, bedded,
jointed and pointed in cement and sand (1:3) on
and including 50mm thick lean concrete as blinding,
150mm thick reinforced concrete (Grade 20) as
specified bed reinforced with one layer of BRC
A7(M.S. 193) including all necessary excavation,
formwork, junctions and ends and disposal of
surplus excavated materials from sites

230mm Diameter precast concrete pipe with


150mm haunching under ramp

Layer of polythene or other equal and approved


damp proof membrane, well lapped at joints and
laid on lean concrete (measured nett-no allowance
made for laps) to ground slab

To Collection

RM
B3/1B/7

7,924.50

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

Unit

Rate

Amount

Element 1B : Apron And Perimeter Drain


(Cont'd)
Ramp
A

Excavate oversite to reduce level average 300mm


deep commencing from formation level, get out,
load and cart away from site including levelling
grading and ramming bottom of excavation

12

4.40

52.80

12

6.05

72.60

12

13.86

166.32

12

68.64

823.68

25

Kg

3.50

87.50

Hardcore as specified
B

100mm Thick under ramp slab


Lean concrete (Grade 15) blinding as specified

50mm Thick under ramp slab


Vibrated reinforced concrete (Grade 25) as specified

300mm Thick ramp slab, laid to fall


High tensile bar reinforcement as specified

10mm Diameter bars


Sawn formwork as specified

Edges of ramp slab excceding 200mm and not


exceeding 300mm high

17

10.00

170.00

Extra For 15mm x 20mm fillet to form groove line

73

5.50

401.50

12

2.75

33.00

---------------------------H

Layer of polythene or other equal and approved


damp proof membrane, well lapped at joints and
laid on lean concrete (measured nett-no allowance
made for laps) to ground slab

B3/1B/8

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

To Collection

Unit

Rate
RM

Amount
1,807.40

Element 1B : Apron And Perimeter Drain


(Cont'd)

COLLECTION
B3/1B/1

7,924.50

B3/1B/2

1,807.40

B3/1B/9

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

To Summary

Unit

Rate

RM

B3/1B/10

Amount

9,731.90

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

Unit

Rate

Amount

228.80

457.60

0.18

228.80

41.18

228.80

1,830.40

117

Kg

3.50

409.50

10

Kg

3.50

35.00

47

Kg

3.50

164.50

680

Kg

3.50

2,380.00

57

Kg

3.50

199.50

Element 2A : Frame
Vibrated reinforced concrete (Grade 25) as specified
A

Column

Stiffener

Roof beam
Mild steel bar reinforcement as specified
Column

10mm Diameter bar


Stiffener

10mm Diameter bar


Roof beam

6mm Diameter bar


High tensile bar reinforcement as specified
Column

25mm Diameter bar


Stiffener

25mm Diameter bar


Roof beam

12mm Diameter bar

91

Kg

3.50

318.50

16mm Diameter bar

69

Kg

3.50

241.50

20mm Diameter bar

212

Kg

3.50

742.00

25mm Diameter bar

169

Kg

3.50

591.50

37

40.00

1,480.00

40.00

120.00

81

40.00

3,240.00

Sawn formwork as specified


O

Sides of column

Sides of stiffener

Sides and soffit of roof beam

B3/2A/11

To Summary

RM

B3/2A/12

12,251.18

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

Unit

Rate

Amount

Element 2B : Roof
Vibrated reinforced concrete (Grade 25) as specified
A

115mm Thick Overall size 400mm x 700mm gutter

22

60.00

1,320.00

115mm Thick roof slab, laid to fall

81

26.62

2,156.22

19

Kg

3.50

66.50

Mild steel bar reinforcement as specified


C

6mm Diameter bar to gutter


High tensile bar reinforcement as specified

10mm Diameter bar to roof slab

900

Kg

3.50

3,150.00

10mm Diameter bar to gutter

362

Kg

3.50

1,267.00

84

40.00

3,360.00

107

40.00

4,280.00

81

33.00

2,673.00

104

33.00

3,432.00

11

27.50

302.50

Sawn formwork as specified


F

Sides and soffit of roof slab

Sides and soffit of gutter


-------------------------------------

Supply and lay 'Flinkote' waterproofing membrane


system with and including 50mm thick concrete
topping and Durafiber at 1.5 lb/cu. td. of concrete
and 45 degree angle mortar coving, all in
accordance
to
Engineer's
instructions
and
manufacturer's recommendation, laid to fall to roof

Ditto to gutter
Unplasticised P.V.C. rainwater downpipe with
solvent cement joints in the running lengths
elbows, bend, diminishing piece, plugs and the like

75mm Diameter pipe, fixed to brickwall

75mm Diameter rainwater outlet

NO

16.50

66.00

Extra For bend

NO

16.50

66.00

Extra For shoe

NO

16.50

66.00

B3/2B/13

To Summary

RM

B3/2B/14

22,205.22

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

Unit

Rate

Amount

Element 2C : External Wall

Precast reinforced concrete (Grade 20) lintol,


reinforced with and including 4 Nos. 10mm
Diameter high tensile bar reinforcement and 6mm
diameter mild steel stirrups at 150mm centres
including all moulds and finished fair on all
exposed surfaces
150mm x 250mm lintol

44.00

220.00

90

59.40

5,346.00

41

1.65

67.65

12

55.00

660.00

250

NO

1.10

275.00

Brickwork in common clay bricks in cement and


sand (1:3) mortar with an approved plasticiser
reinforced with and including `EXMET' or approved
equivalent expanded fabric reinforcement at every
fourth course as described :B

115mm Thick brickwall


Damp proof course as described (measured nett-no
allowance made for laps) laid on brickwall

115mm wide
---------------------------

Air vest Brick ( Batu Angin ) with and vermin wire


netting fixed on the outside of windows including all
necessary
fixing
as
per
drawing
no
RB/1389/ENS/1A-17/SL-06
6mm Diameter mild steel wall bonding tie, 450mm
long, one end cast in concrete and other end built
into joint of brickwall (provisional)

B3/2C/15

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

To Summary

Unit

Rate
RM

B3/2C/16

Amount
6,568.65

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

Unit

Rate

Amount

Element 2D : External Door


External Door
Supply and install the following FRP composite
doors with and including anti vermin wire netting
type SWG 23 mesh 10 fixed inside the doors with
100mm x 50mm x 0.5mm mild steel hot dip
composite frames, and including ironmongery and
other accessories for the proper installation of the
works all as per manufacturer's instruction and
recommendation
A

FRP composite door overall size 1830mm x


2743mm high consisting of two equally sized leaves

NO

###

2,200.00

Ditto overall size 2433mm x 2743mm high ditto

NO

###

5,500.00

To Summary

RM
B3/2D/17

7,700.00

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

B3/2D/18

Unit

Rate

Amount

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

Unit

Rate

Amount

Element 2E : Internal Wall


Brickwork in common clay bricks in cement and
sand (1:3) mortar with an approved plasticiser
reinforced with and including `EXMET' or approved
equivalent expanded fabric reinforcement at every
fourth course as described :A

115mm Thick brickwall

22

59.40

1,306.80

115mm Wide horizontal damp proof course as


described (measured nett-no allowance made for
laps) laid on brickwall
----------------------------

12

1.65

19.80

80

NO

1.10

88.00

6mm Diameter mild steel wall bonding tie, 450mm


long, one end cast in concrete and other end built
into joint of brickwall (provisional)

B3/2E/19

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

To Summary

Unit

Rate
RM

B3/2E/20

Amount
1,414.60

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

Unit

Rate

Amount

Element 3A : Wall Finishes


The quantities in these Bills for different
types of colours and finishes are measured
nett from the Drawings in accordance with
the Standard Method of Measurement. The
Contractor is to conform to the specified
colours as instructed by the S.O.
INTERNAL WALL FINISHES
Cement and sand (1:6) mixed with an approved
plasticiser internally as described:A

19mm Thick plaster to wall and column

171

16.50

2,821.50

171

11.00

1,881.00

102

M
m

16.50

1,683.00

102

20.00

2,040.00

Prepare and apply three coats of distemper and two


coats of 'ICI' or approved equivalent paint as
described internally on:B

Plastered wall and column


EXTERNAL WALL FINISHES
Cement and sand (1:6) mixed with an approved
plasticiser internally as described:-

19mm Thick plaster to wall and column


Extraover for grooveline
Prepare and apply three coats of snowcem, one
coat of driwal and two coats of 'ICI' or approved
equivalent paint as described externally on:-

Plastered wall and column


----------------------------------------------

Painting of Tenaga Nasional Berhad's logo as per


drawing no. PAF174/M&E/PE-010

B3/3A/21

LS

500.00

To Summary

RM

B3/3A/22

8,925.50

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

Unit

Rate

Amount

Element 3B : Floor Finishes


INTERNAL FLOOR FINISHES
Cement and sand (1:3) screed trowelled hard and
smooth as described:A

25mm Thick paving to floor

57

13.20

752.40

52

13.20

686.40

EXTERNAL FLOOR FINISHES


Cement and sand (1:3) screed trowelled hard and
smooth as described:B

25mm Thick to floor laid to fall

B3/3B/23

To Summary

RM

B3/3B/24

1,438.80

BILL NO. 3
Item

TNB SUB STATION


Description

Qty

Unit

Rate

Amount

Element 3A : Ceiling Finishes


INTERNAL CEILING FINISHES
Cement based skim coat plaster system, trowelled
smooth
internally
all
accordance
with
manufacturer's specifications and instructions :A

6mm Thick to soffit of roof slab

94

6.50

611.00

94

11.00

1,034.00

20

6.50

130.00

20

11.00

220.00

Prepare and apply three coats of distemper and two


coats of 'ICI' or approved equivalent paint as
described internally on:B

Plastered of roof slab


EXTERNAL CEILING FINISHES
Cement based skim coat plaster system, trowelled
smooth
internally
all
accordance
with
manufacturer's specifications and instructions :-

6mm Thick to soffit of gutter


Prepare and apply three coats of snowcem, one
coat of driwal and two coats of 'ICI' or approved
equivalent paint as described externally on:-

Plastered gutter

B3/3C/25

To Summary

RM

B3/3C/26

1,995.00

BILL NO. 3

ITEM

TNB SUB STATION

DESCRIPTION

QTY

UNIT

RATE

AMOUNT (RM)

ELEMENT 4 - EXTERNAL WORKS (WITHIN BOUNDARY)


ROADWORKS
A

Excavate for road commencing from formation level oversite


approximately 425mm deep get out, part return fill in and
ram, deposit and spread in making up levels where directed
and remainder load and cart away

228

m2

5.00

1,140.00

Trim, grade level and consolidate sub-base of tarmac surface


with an 8 ton roller

228

m2

6.50

1,482.00

50mm Thick sand blinding well spread, levelled


consolidated with an 8 ton roller to receive crusher run

228

m2

3.00

684.00

300mm Thick (consolidated) crusher run aggregate spread,


levelled and consolidated as described

228

m2

17.00

3,876.00

Apply one tack coat of approved bituminious emulsion spread


evenly as described to receive premix macadam surfacing

228

m2

6.50

1,482.00

75 mm Thick (consolidated) layer of bituminious macadam


premix comprising of 35mm thick binder course and 40mm
thick wearing course spread and levelled to an even gradient
and fall well rammed and consolidated as described

228

m2

30.00

6,840.00

and

FENCING AND GATES


G

PVC coated chain fencing 1950mm high comprising of 50mm


x 50mm x 6mm mild steel angle post at 3000mm centres
(maximum) or at shorter spacing to suit site condition with
bottom end embedded in and including 230mm x 230mm x
305mm deep mass concrete (Grade 20) footing, 50mm
diamond mesh (No. 10 SWG) galvanized chain link fence,
three strand of No. 10 SWG galvanized straining wire at top
and bottom, 50mm x 50mm x 6mm mild steel angle corner
struts with bottom end embedded in and including 230mm x
230mm x 305mm deep mass concrete (Grade 20) footing,
split pins, 150mm x 100mm high concrete curb with cement
plastered on both sides, including all excavation, disposal,
formwork and painting posts and struts with one coat metallic
primer and two coats aluminium paint all as per Engineer's
Drawing no. RB1389/ENS/1A-17/E/02

76

71.50

5,434.00

Pair mild steel gate overall size 3600mm x 1850mm high in 2


equal leaves each size 1800mm x 1850mm high, constructed
of 100mm x 40mm square hollow mild steel framing to sides
and bottom infilled with 15mm x 30mm square hollow mild
steel welded to steel frame including painting the whole gate
with one coat metallic primer and three coat alkyd resin
based paint

no

2,200.00

2,200.00

B3/4/1

Total Carried To Summary

RM

B3/4/1

23,138.00
#REF!

BILL NO. 3
Item

TNB SUB STATION

Summary
Description

Qty

Unit

Rate

Amount

Summary

1A

Work Below Lowest Floor Finish

B3/1A/4

62,940.40

1B

Apron And Perimeter Drain

B3/1B/3

9,731.90

2A

Frame

B3/2A/1

12,251.18

2B

Roof

B3/2B/1

22,205.22

2C

External Wall

B3/2C/1

6,568.65

2D

Window And External Door

B3/2D/1

7,700.00

2E

Internal Wall

B3/2A/1

1,414.60

3A

Wall Finishes

B3/3A/1

8,925.50

3B

Floor Finishes

B3/3B/1

1,438.80

3C

Ceiling Finishes

B3/3C/1

1,995.00

External Works (Within Boundary)

B3/4/1

B3/29

23,138.00

TOTAL CARRIED TO FINAL SUMMARY


Summary

B3/30

RM

158,309.25