DETAIL BILL OF QUANTITY

SITE ID
: RAP 406
SITE NAME
: SEI MERDEKA
TYPE TOWER
: SST-72

No

II
a
b

ITEM MATERIAL

Koefisien

BJ

Berat

PEKERJAAN SIPIL
PEKERJAAN PONDASI TOWER
Lantai Kerja 1:3 tebal 5 cm
1 Semen
Beton bertulang pondasi K 225/ Besi KS D 1
1 Semen
2 Batu Pecah
3 Besi Beton
Beton bertulang borepile (dia 40 cm)
1 Semen
3 Batu Pecah
4 Besi Beton
Pekerjaan Beton

III
a

Volume

Satuan
Sebelum
Konversi

6.73
4.60

m3
zak
m3

50.00

1,547.90

7.15
0.69

zak
m3

50.00
1,350.00

25,236.51
65,677.89
5,245.64

7.15
0.69

m3
zak
m3

50.00
1,350.00

18,181.29
47,316.73
5,831.66
169,037.62

70.61

5,245.64
50.87

5,831.66

PEKERJAAN PONDASI DAN OUT DOOR CAGE (PONDASI RBS)


Beton Bertulang pondasi KS dia 12 mm
1.66
1 Semen
2 Batu Pecah
3 Besi Beton
222.50
Plesteran dan Acian pondasi Shelter
11.10
1 Semen

Sub Total

5.98
0.75

0.22

m3
zak
m3
kg
m2
zak

50.00
1,350.00

497.09
1,690.76
222.50

50.00

122.39

No

ITEM MATERIAL

Volume

Koefisien

Satuan
Sebelum
Konversi

Pekerjaan Pondasi dan Out Door Cage (RBS)


IV
a
b

c
d

V
A
I

PEKERJAAN PAGAR DAN HALAMAN 15 X 20 M2


PONDASI BATU KALI
1 Semen
SLOOF
1 Semen
2 Batu Pecah
3 Besi Beton
Plesteran dan Acian Balok Sloof
1 Semen
PAGAR BRC
1 Panel BRC
2 Pintu Pagar BRC
3 Tiang Pagar BRC
HALAMAN
1 Hamparan Gravel
Batu Pecah
Beton Pondasi Tangga
1 Semen
2 Batu Pecah
Pagar Pagar & Halaman 15 x 20 M2
PEKERJAAN AKSES JALAN DAN JEMBATAN
Akses Jalan (see drawing detail)
Rabat Beton tebal 15 cm akses jalan

23.63

6.52
0.76
200.00

m3
zak
m3
zak
m3
kg

0.22

m2
zak

35.87
87.67
5.31

kg
kg
kg

30.00

m3
m3

6.52
0.76

m3
zak
m3

2.72
2.80

42.00

28.00
1.00
37.00

30.00

0.25

5.40

m3

BJ

Berat

Sub Total

2,532.74

50.00

3,213.68

50.00
1,350.00

912.80
2,881.20
560.00

50.00

463.09
1,004.36
87.67
196.47

1,350.00

40,500.00

50.00
1,350.00
Sub Total

81.50
257.25
50,158.02

No

II

VI

ITEM MATERIAL

Volume

0.35

Koefisien

1 Semen
2 Batu Pecah
Gravel 10 cm
1 Batu Pecah
Import Soil
1 Tanah Timbun

5.98
0.75

Satuan
Sebelum
Konversi
zak
m3

135.02
GRAND TOTAL VOLUME MATERIAL

BJ

Berat

50.00
1,350.00

1,614.60
5,491.80

m3

1,350.00
Sub Total

472.50
7,578.90

m3

1,500.00

202,530.00
431,837.28

PT. Medcomm Solution


Dibuat Oleh

Diperiksa Oleh

Togar Simbolon
Project Manager

Derry Efrizal
CME Field Officer

Medan,
Tower Bersama Group
Disetujui Oleh

M. Ramos Pangaribuan
Project Manager

Satuan
Konversi

Sumber Material
dan Jarak ke
lokasi

Remark

Lantai Kerja

kg

(6.73*4.60*50)

230.00 kg/m3
Sesuai dengan Job Mix Design

kg
kg
kg

(70.61*7.15*50)
(70.61*0.69*1350)

kg
kg
kg

(50.87*7.15*50)
(50.87*0.69*1350)

kg
kg
kg

(1.66*5.98*50)
(1.66*0.75*1350)

kg

(11.1*0.22*50)

357.41 kg/m3
930.15 kg/m3
Sesuai dengan APD
Sesuai dengan Job Mix Design

357.41 kg/m3
930.15 kg/m3

299.00 kg/m3
1,017.00 kg/m3
Sesuai dengan APD
11.03 kg/m2

Satuan
Konversi

Sumber Material
dan Jarak ke
lokasi

Remark

kg

kg

(23.63*2.72*50)

136.00 kg/m3
Mutu Beton K-175

kg
kg
kg

(2.80*6.52*50)
(2.80*0.76*1350)

kg

(42*0.22*50)

kg
kg
kg

(28*35.87)
(1*87.67)
(37*5.31)

kg

(30*1350)

kg
kg
kg

(0.25*50*50)
(0.25*0.76*1350)

326.00 kg/m3
1,029.00 kg/m3

11.03 kg/m2

326.00 kg/m3
1,029.00 kg/m3

Satuan
Konversi

Sumber Material
dan Jarak ke
lokasi

Remark

kg
kg

(5.4*5.98*50)
(5.4*0.75(1350)

kg
kg

(0.35*1350)

kg
kg

(135.02*1500)

299.00 kg/m3
1,017.00 kg/m3

Disetujui Oleh

M. Ramos Pangaribuan
Project Manager

M. Darman
Lead Project Manager