BARANGAY:
DATE:
Environme
ntal
Organizat
Engineering
Education
Directory
Score
Functional/Operational
a. Updated BESWMC
(13pts) Material
(Barangay Ecological Solid Waste
Recovery Facility (MRF)/
Management Committee)
2
10
Proper Segregation
b. Updated BDRRMC
Labeled
(Barangay Disaster Risk
Covered
Reduction Management
Presence/Existence
Committee)
2
(per Household) of:
c. Evacuation Camp
5
Garbage Receptacles
5
(Community DRRM
Map, List
of families including
members, List of
vulnerable families
per hazards)
Organizational Structure
a. BESWMC
BDRRMC
SWMb.Three
Year Action Plan 2
Years inclusive:_
4
Score
Attendance
House to House
Campaign
4
(with Photo/Caption)
PTA Meeting
Score
(10pts) With attendance
/minutes
Score
(5pts)
Temporary
1
(Tarpaulin, Plywood without cover and the
like)
No signage
0
Note: All purok have
permanent
signages plus 5 PTS.
91%-100%=
Note:
Target 60% of HH
0-90 % =
0
91%-99% =
100%
10
Score
(5pts)
Services :
SW generation report
91%-100%
10 pots
(vegetables)
Additional Points
Each
SCHOOL, other
Barangay Communal
Garden
10-30 = 3 pts.
31-50= 5 pts.
51-70= 7 pts.
Score
(5pts)
Documentation
of
Activities/Accomplishment
Report (w/documents)
4PS,
POs
Public Toilet:
NOT FUNCTIONAL & CLEAN
Reportorial
Entrepreneurship
Green/Grow
(Organic)
Gardening (10points)
Score
Score
4 (10pts) (per Household)
(10pts) Policies passed
Barangay ordinance
Target= 60% of HH
Responsible Dog Owner
% with veggies =
% with 5 pots =_
Registration
3
of dogs
Clean & Functional
Drainage system for
Roving/
3
Poblacion & Tinago
Apprehension (Based
Poblacion-Clean
on
Bagsakan Area &
Records/Logbook/Pictu
Baywalk park (10pts
res)
or 0)
Note:
Segregation at
90 % below without
Source
Score
0
%
(10pts) Veggies =
(Household
Level)
the like)
Barangay assembly
Enforcement
Score
(5pts)
Total Score
Less: Open Burning Daub 5pts
Sub-Total Score
Add: BONUS points
Grand Total Score
Comments & Recommendations
:_
:_
:_
:_
:_
Evaluators
Signature
Score
(10pts)