UNIT-9

Planning Meeting Defects (Frm Dt. 23.05.16)


S.N.

Description

TDBFP-A gear box NDE(Booster Pump


side) brg temp increased, BFP tripped.

OPC communication failure U-9 (BMS


to OPC).

Coal Mill-C accumulator leakage work


attended.

Work of setting of Wall soot blower is to


be taken after 02:00 p.m.(10/68 already
completed.

OWS Sump pump no. 1 gland leakage.

TDBFP A & B oil leakage.

Left side flame scanner camera is not


working properly.

U-9 DCS & BMS screen


problem(shadow effect showing).

Coal Feeder B communication error


problem not solved.

10

Fidibility of taking auxiliary steam from


PSH, L & T is to be checked.

C11 AHP Hopper heavy ash leakage

OPC communication failure(BMS to OPC)

Premansoon preparedness

Cleaning of drains

Lifting of scrap from U-9

MRHS Demonstartive Test(PG Test) is to be


conducted(U-9) by L&T

Ash to be lifted by L&T

Max. CW outlet temp on dt. 23/05/16 was 44


deg cel(at load 600MW), max. inlet temp 35
deg cel.

Coal Mill C Feeder communication error.

HPH 6A & 6B (3 way valve problem) and LPH


4 level rising problem.

Dated

Status

05/23/16
Attended

Attended(20/68)

Attended

05/24/16
Hot air gates forced

05/25/16

AFT quenching valve passing.

All four vacuum pumps are passing-vacuum


leak is to detected.

HP bypass valve down stream temp. more.

Drain oil tank O/F (connected to OWS pit), pit


choked up.

Stand by CEP not in auto mode.

WDC valve(switchgear side), gland leakage.

MOT vacuum problem.

10

Lub oil cooler(water pr.)DP high(1.5 kg/sq.cm)

11

Left side HPH drain-TFT line is having 2


isolating valves and AFT line is having only 1
isolating valve.

12

TD BFP suction line drain and funnel


misalignment.

13

MDBFP booster pump side NDE mecha seal


water heavy leakage.

OLTC trial of condenser to be witnessed.

Condensate line drain at inlet to CPU-drain


valve spindle has broken

SCCW supply temp. High(49..9 deg )

Seal oil pressure(H2 side) across filter is high.

Seal oil temp of H2 side is high-43 dec.

Flash tank of TDBFP-A level transmitter not


working.

At 660MW load hunting in GV and load


variation is about 50MW.

Coal Mill E not available- Choke up-reject gate,


plate removed from chute.

Coal mill F not available-oil leakage- hydra.


Accumulator.

TDBFP-A under permit for attending leakage.

HPH B steam bypass.

Cycle makeup pump shouls be on auto.


Coal Mill C-not available-tripped on reject
chokeup
Coal Mill C-not available-tripped on reject
chokeup

CEP 1 & 2 tripped on set pt.22 kgper sq.cm

Shutdown defect

05/26/16

05/27/16

hence force header pr. Set point to 26 kg per


sq.cm with timing reduced from 20 sec to 10
sec, hence 2nd CEP pick up on Auto.

05/28/16
1

EH oil leakage.

Safety valve(HPH) setting is required.

Cycle makeup transmitter.

Cycle make up pump status U-8,U-9 & U-10


combine.
29/05/16 W/Off

IP top/bottom casing temp difference is


56C(Top- 435.4C / bottom-380.9C). As per
L&T the difference should be 42C max.)

EH oil in U-8 & U-9 are different(for main


turbine). Mr Dhakate Sir asked wether the oil is
compatible or not)

Seal oil filters in U-8, U-9 & U-10 are


different(Size & elements) H2 side & air side.

TDBFP governing oil filters, before assembling,


nuts were req. To be cut.9by maint. section)

HPH-7A press relief valve continuously


passing-Work will be taken after stream B taken
in service.

Vacuum pumps both HP & IP are in service.


Work in progress.

27/05/16,
Monday