BRENNER BASE TUNNEL


PROSPECTING LOT E51 WOLF 1

Project
Brenner Base Tunnel
prospecting lot E51 Wolf 1
(A)
Buyer, Customer
BBT SE
Amount
approximately 27 million
Service
Working management
(in temporary association
with BWB Engineering office
Limited Company)
Work description
The prospecting lot E51
Wolf 1, a part of the Wolf
prospecting works, covers
the tunnels which were dug
through traditional techniques
like
primary
strengthening and bituminous lane, including every
secondary
works
(yard
connection, creation and
equipment of the yard areas
with all necessary systems,
realization of water conditioners including drain-pipes
to the river, building of
support works, roads, hydraulic works, mining material drift, etc.) necessary to
realize the tunnels.
The prospecting lot E51
includes the realization of
the following tunnels:
- Padastertal tunnel drift
(length=approximately 700
m)
- Saxen tunnel yard access
(length = approximately
1.000 m)
- Southern access to Wolf
up to km 0+200 (length =
approximately 200 m)
- Wolf-Padastertal branchtunnel (length = approximately 90 m)

Every tunnel stretch to


be realized within the
E51 lot are dug with a
cyclic technique. Transversal sections were
drawn up in order to
grant, even in the logistics of the future lots.
room enough for material
transport and selling off,
ventilation, etc.
The prospecting lot E51
includes as well following
works on the surface:
- Mining material drift in
the Padastertal (approximately 250.000
m)
- Wolf yard area (including a temporary mining
material drift)
- Padastertal yard area
- Access road from Wolf
yard area to Padastertal
- Additional Plon yard area
(reduced)
- Bulkheads in Padastertal
(Wolf and Saxen)
Period of execution:
April 2011 / approximately
Autumn 2012