Unud-119-1134825194-Lampiran 2 CSM PDF
Unud-119-1134825194-Lampiran 2 CSM PDF
PROGRAM
KEGIATAN
SUMBER DANA
PEKERJAAN
TAHUN ANGGARAN
: 2008
HARGA
JUMLAH
NO.
URAIAN PEKERJAAN
VOLUME
SATUAN
( Rp. )
HARGA
( Rp. )
3.700
Km
Rp.
212,500.00
Rp.
786,250.00
3,237.500
M2
Rp.
37,325.36
Rp.
120,840,843.75
- Lapis Perekat
13,100.000
M2
Rp.
6,121.00
Rp.
80,185,100.00
- HRS
13,100.000
M2
Rp.
53,699.98
Rp.
703,469,734.07
428.000
M3
Rp.
309,200.00
Rp.
132,337,600.00
7.000
M'
Rp.
993,748.78
Rp.
6,956,241.44
500.000
M3
Rp.
18,125.00
Rp.
9,062,500.00
- Timbunan dipadatkan
195.000
M3
Rp.
69,366.67
Rp.
13,526,500.00
419.000
M3
Rp.
16,100.00
Rp.
6,745,900.00
Real Cost
Rp.
1,073,910,669.26
PPn 10 %
Rp.
107,391,066.93
Total Cost
Rp.
1,181,301,736.19
Dibulatkan
Rp.
1,181,301,000.00
Rp.
1,181,301,000.00
T O T A L PAKET I
Lanjutan Lampiran 2
TAHUN
2008
Anggapan
PEKERJA
JML
JML
JML
UPAH
BIAYA
JUMLAH
ORANG
HARI
OH
RP./OH
(RP)
(RP)
Mandor
2.00
3.00
6.00
40,000.00
240,000.00
Operator
2.00
3.00
6.00
32,500.00
195,000.00
Sopir
40,000.00
Tukang
32,500.00
Pekerja
66.00
3.00
198.00
22,500.00
4,455,000.00
JUMLAH I
BAHAN
SATUAN
VOLUME
HARGA
BIAYA
JUMLAH
SATUAN
SATUAN
(RP)
(RP)
Batu Pecah 3 - 5 cm
M3
56.00
70,000.00
3,920,000.00
Batu Pecah 2 - 3 cm
M3
31.00
110,000.00
3,410,000.00
Batu Pecah 1 - 2 cm
M3
15.50
115,000.00
1,782,500.00
M3
7.50
120,000.00
900,000.00
Pasir Pasang
M3
3.50
90,000.00
315,000.00
Aspal bitumen
Kg
6,258.00
5,500.00
34,419,000.00
Minyak Tanah
Liter
450.00
3,000.00
1,350,000.00
Alat-alat bantu
Set
8.10
60,000.00
486,000.00
JUMLAH II
PERA LATAN
JAM
JML
UPAH
BIAYA
JUMLAH
ALAT
KERJA
KERJA
RP./JAM
(RP)
(RP)
1.00
15.00
15.00
52,200.00
JUMLAH ( I + II + III )
Rp.
46,582,500.000
JML
783,000.00
JUMLAH I
VOLUME
HARGA SATUAN
4,890,000.00
1,400.00 M2
37,325.36 Per M2
Rp.
783,000.00
52,255,500.00
Lanjutan Lampiran 2
TAHUN
2008
Anggapan
1 Wheel loader memuat agr. dan asphalt ke dlm Cold Bin AMP
2 Agr. Dan aspal dicampur dan dipanaskan dgn AMP utk dimuat
PEKERJA
dan asphalt
6 Berat jenis bahan padat : 2,20 ton/m3
JML
JML
JML
UPAH
BIAYA
JUMLAH
ORANG
HARI
OH
RP./OH
(RP)
(RP)
Mandor
2.00
1.00
2.00
40,000.00
80,000.00
Operator
5.00
1.00
5.00
32,500.00
162,500.00
Sopir
2.00
1.00
2.00
40,000.00
80,000.00
32,500.00
12.00
22,500.00
270,000.00
Tukang
Pekerja
12.00
1.00
JUMLAH I
BAHAN
SATUAN
VOLUME
HARGA
BIAYA
JUMLAH
SATUAN
SATUAN
(RP)
(RP)
Agregat Kasar
M3
12.30
130,000.00
1,599,000.00
Agregat Halus
M3
2.10
135,000.00
283,500.00
Filler
Kg
5,691.80
2,441.50
13,896,529.70
Aspal bitumen
Kg
5,150.90
5,500.00
28,329,950.00
Alat-alat bantu
Set
1.50
60,000.00
90,000.00
JUMLAH II
PERA LATAN
JAM
JML
UPAH
BIAYA
JUMLAH
ALAT
KERJA
KERJA
RP./JAM
(RP)
(RP)
1.00
5.00
5.0000
250,000.00
1,250,000.00
1.00
5.00
5.0000
550,000.00
2,750,000.00
Generator Set
1.00
5.00
5.0000
108,500.00
542,500.00
2.00
5.00
10.0000
85,500.00
855,000.00
Asphalt Finisher
1.00
5.00
5.0000
400,000.00
2,000,000.00
1.00
5.00
5.0000
250,000.00
1,250,000.00
1.00
5.00
5.0000
52,200.00
261,000.00
JUMLAH I
JUMLAH ( I + II + III )
Rp.
44,198,979.700
JML
Whell Loader
VOLUME
HARGA SATUAN
592,500.00
1,000.00 M2
53,699.98 Per M2
Rp.
8,908,500.00
53,699,979.70
Lanjutan Lampiran 2
TAHUN
2008
Anggapan
PEKERJA
Mandor
JML
JML
JML
UPAH
BIAYA
JUMLAH
ORANG
HARI
OH
RP./OH
(RP)
(RP)
1.00
1.00
1.00
40,000.00
40,000.00
Operator
32,500.00
Sopir
40,000.00
Tukang
32,500.00
Pekerja
5.00
1.00
5.00
22,500.00
112,500.00
JUMLAH I
BAHAN
SATUAN
VOLUME
HARGA
BIAYA
JUMLAH
SATUAN
SATUAN
(RP)
(RP)
Minyak Tanah
Liter
480.00
3,000.00
1,440,000.00
Aspal bitumen
Kg
252.00
5,500.00
1,386,000.00
Alat-alat bantu
Set
1.00
60,000.00
60,000.00
JUMLAH II
PERA LATAN
JAM
JML
UPAH
BIAYA
JUMLAH
ALAT
KERJA
KERJA
RP./JAM
(RP)
(RP)
1.00
2.00
2.00
1,000.00
2,000.00
Asphalt Sprayer
1.00
1.00
1.00
20,000.00
20,000.00
JUMLAH I
JUMLAH ( I + II + III )
Rp.
2,886,000.000
JML
Kompresor
VOLUME
HARGA SATUAN
152,500.00
500.00 M2
6,121.00 Per M2
Rp.
22,000.00
3,060,500.00