DIAS
POSTOR:
PLAZO DE EJECUCION DE VALIDACION INGENIERIA:
12
TOTAL PLAZO
23
ACTIVIDAD A EJECUTARSE
ITEM
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
UND
INCIDENCIA
METRADO
P.UNIT
PARCIAL
EXAMENES MEDICOS
GLB
392.00
1,176.00
PREVENCIONISTA DE OBRA
GLB
1,533.33
1,533.33
RESPONSABLE DE OBRA
GLB
3,082.00
3,082.00
RESPONSABLE DE CALIDAD
GLB
2,300.00
2,300.00
SOLDADURA
SIKADURE
PINTURA KIT
KG
LATA
GALONES
1
1
1
14
1
1
13.00
110.00
272.00
182.00
110.00
272.00
2.0
p. unit x kg=
13.04
2.1
KG
0.01
1,160.99
13.04
2.2
KG
0.01
1,160.99
13.04
151.43
2.3
2.4
MATERIALES
HABILITADO, ARMADO, SOLDADO Y PERFORADO
GRANALLADO (ARENADO), PINTURA (BASE EPOXICA 3.5MILS,
ACABADO POLIURETANO EPOXICO 3MIL)
MATERIAL TRANSPORTADO A OBRA
MONTAJE
KG
KG
0.24
0.25
1,160.99
1,160.99
13.04
13.04
3,634.32
3,785.75
KG
0.10
1,160.99
13.04
1,514.30
KG
KG
0.05
0.24
1,160.99
1,160.99
13.04
13.04
757.15
3,634.32
KG
0.10
1,160.99
13.04
1,514.30
2.5
2.6
2.7
2.8
TOTAL
PARTIDA VARIAS
12.49
14500.7488450144
8,655.33
151.43
15,143.00
23,798.33
1,189.92
24,988.25
4,497.88
29,486.13
EMCOM SAC
MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL HOSPITAL REGIONAL MIGUEL ANGEL MARISCAL LLERENA DE AYACUCHO
DEPARTAMENTO DE AYACUCHO, PROVINCIA DE HUAMANGA, DISTRITO DE AYACUCHO, ZONA CANAN BAJO
1.1
UNIDAD ITEM:
HOJA No.:
CAPITULO No. :
FECHA:
7/20/2016
DESCRIPCION ITEM:
MATERIALES
CANTIDAD
UNIDAD
DESCRIPCION
VALOR
VALOR
UNITARIO
PARCIAL
UNIDAD
372.80 KG
5.00
1,864.00 S/.
366.57 KG
5.00
1,832.85 S/.
6.35 KG
5.00
31.75 S/.
273.38 KG
5.00
1,366.90 S/.
71.59 KG
5.00
357.95 S/.
17.58 KG
5.00
52.72 KG
6.00
Vigueta V2
87.90 S/.
316.31 S/.
SUBTOTAL
5,857.66
DESPERDICIO
5.00%
292.88
SUB-TOTAL MATERIALES
HERRAMIENTA Y EQUIPO
RENDIMIENTO
6,150.54
UNIDAD
VALOR
VALOR
UNITARIO
PARCIAL
EQUIPO DE SOLDAR
24.00
DIA
80.00
1,920.00 S/.
ESMERIL
12.00
DIA
10.00
120.00 S/.
TRONZADORA
12.00
DIA
10.00
120.00 S/.
TALADRO
12.00
DIA
10.00
120.00 S/.
COMPRESORA
12.00
DIA
20.00
240.00 S/.
4.00
DIA
4.00
TECLE
16.00 S/.
S/.
TRANSPORTE
RENDIMIENTO
UNIDAD
2,536.00
VALOR
VALOR
UNITARIO
LIMA - AYACUCHO
1,160.99
KG
PARCIAL
1.00
1,160.99 S/.
SUB-TOTAL TRANSPORTE
RENDIMIENTO
1,160.99
UNIDAD
VALOR
VALOR
UNITARIO
PARCIAL
OPERARIO
24.00
DIA
110.00
2,640.00 S/.
OFICIAL
12.00
DIA
65.00
780.00 S/.
AYUDANTE
12.00
DIA
50.00
600.00 S/.
3.00
DIA
110.00
12.00
DIA
65.00
OPERARIO PINTOR
OFICIAL PINTOR
330.00 S/.
780.00 S/.
TRATAMIENTO DE MATERIAL
Arenado
RENDIMIENTO
15.00
SUB-TOTAL TRANSPORTE
5,130.00
UNIDAD
m2
VALOR
VALOR
UNITARIO
PARCIAL
11.00
165.00 S/.
165.00
OBSERVACIONES :
15,143.00
1,160.99
13.04