Anda di halaman 1dari 178

Sloof 30/40

Lokasi
Tul. Utama

1M3
P
P
P
P

0.4
Sengkang
0.3
Selimut (m)
1. Beugel (m)
2. Beugel (m)

14
14
8
8

Total
0.030
1.192
1.192

SLOOF

Besi D
Besi P
Bekisting

Kolom 40x30
Lokasi
Tul. Utama

1M3
P
P
P
P

0.3
Sengkang
0.4
Selimut (m)
1. Beugel (m)
2. Beugel (m)

14
14
8
8

Total
0.030
1.192
1.192

KOLOM

Besi D
Besi P
Bekisting

Balok 25x40
Lokasi
Tul. Utama

1M3
P
P
P
P

0.4
Sengkang
0.25
Selimut (m)
1. Beugel (m)
2. Beugel (m)

14
14
8
8

Total
0.030
1.092
1.092

KOLOM

Besi D
Besi P
Bekisting

Balok 20x35
Lokasi
Tul. Utama
0.35
Sengkang

1M3
P
P
P
P

12
12
8
8

0.2
Selimut (m)
1. Beugel (m)
2. Beugel (m)

Total
0.030
0.892
0.892

KOLOM

Besi D
Besi P
Bekisting

RING BALOK 20/30


Lokasi
Tul. Utama

1M3
P
P
P
P

0.3
Sengkang
0.2
Selimut (m)
1. Beugel (m)
2. Beugel (m)

12
12
8
8

Total
0.030
0.792
0.792

RING
BALOK

Besi D
Besi P
Bekisting

Plat Lantai T = 12 cm
Lokasi

2.887

Tul. Utama
Arah X
Tul. Utama
Arah Y

P 10

P
P
P
P

10
10
10
10
P 10

2.887

Tebal Plat (m)


Selimut Beton (m)

Total

0.12
0.030

Besi D
Besi P

Plat Lantai

Bekisting

Plat Bordes T = 15 cm
Lokasi

2.582

Tul. Utama
Arah X
Tul. Utama
Arah Y

P 10

P
P
P
P

10
10
10
10

Tul. Utama
Arah Y

P 10

2.582

Tebal Plat (m)


Selimut Beton (m)

Total

0.15
0.030

Plat Lantai

Besi D
Besi P
Bekisting

BACK-UP VOLUME
Paket
Pekerjaan
Lokasi
Kabupaten
Tahun Anggaran

: Perencana Pengembangan Infrstruktur Wilayah Aceh Besar 10


: Pembangunan Dayah Darul Dijalal
: Gampong Limpok
: Aceh Besar
: 2014
DIMENSI

NO

URAIAN

SKETSA

Luas

Panjang

Lebar

Tinggi

Unit

VOLUME

10

Ukuran bangunan

19.00

8.50

161.50

m2

Pekerjaan Persiapan
Pengukuran dan Pemasangan Bouwplank

21.00

10.50

63.00

m'

Pekerjaan Tanah
Galian Tanah Pondasi
- Galian Tanah Pondasi Menerus Bangunan
- Galian Tanah Pondasi Menerus Teras
- Galian Tanah Pondasi Tapak
Total Galian Tanah
Urugan Kembali 1/3 Bekas Galian
Urugan Pasir Alas
- Urugan Pasir Alas Pondasi Menerus

100.50
22.00
1.30

1.06
0.88
1.25

0.80
0.80
1.67

85.22
15.49
43.42
144.13
48.04

m3
m3
m3
m3
m3

100.50

1.06

0.05

5.33

m3

100.50
100.50

1.06
0.58

0.10
0.80

10.65
46.63

m3
m3

1.30
1.30
0.40

1.20
0.85
0.30

0.30
0.10
1.30

11.75
7.49
1.77
2.50

m3
m3
m3
m3

100.50
0.40
72.00
55.00
66.00

0.30
0.30
0.25
0.20
0.20

3.00
3.00
6.88
1.34

0.20
1.50
1.34
0.30

0.40
4.00
0.40
0.35
0.30
0.12
0.35
0.15
0.15
0.20

12.06
15.36
7.20
3.85
3.96
17.26
0.21
0.68
1.38
1.61

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

252.00
252.00
19.80
10.05
10.85
48.30
454.60

m2
m2
m2
m2
m2
m2
m2

2.00

16.80

m2

2.00
2.00

909.21
33.60

m2
m2

4.00
4.00
12.00
4.00
4.00
12.00

0.23
0.31
1.30
7.78
3.43
15.44

m3
m3
m3
m2
m2
m2

2.00

119.89
97.28
217.17
138.82
112.64
251.46
65.16

m2
m2
m2
m2
m2
m2
m'

122.50
28.50

m2
m2

119.50
82.16
352.66
262.00
101.00
161.00

m2
m2
m2
m'
m'
m'

61.37
24.23
8.08

m3
m3
m3

151.00
92.00
243.00
8.04
5.36
4.50
17.90

m2
m2
m2
m2
m2
m2
m2

Pekerjaan Pondasi dan Pasangan Batu


Pasangan Batu Kosong Pondasi Menerus
Pasangan Batu Gunung 1 : 4 Pondasi Menerus
Pekerjaan Beton Bertulang
Pondasi Tapak (130x120)
Vol 1
Vol II
Vol III
Sloof 30/40 Cm
Kolom 40x30 Cm
Balok 25/40 Cm
Balok 20/35 Cm
Ring Balok 20/30 Cm
Plat Lantai t=12 cm
Balok Bordes 20x35
Plat Bordes t=15 cm
Plat Tangga t=15 cm
Anak Tangga

143.85

Pekerjaan Pasangan dan Plesteran


Pasangan Dinding Bata 1 : 4 Lantai 1
Pasangan Dinding Bata 1 : 4 Lantai 2
Pasangan Dinding Bata 1 : 4 selasar
- Pintu + Jalusi
- Jendela + Jalusi (Tipe J1)
- Jendela + Jalusi (Tipe J2)

63.00
63.00
22.00
0.92
1.55
2.30

16.00

16.00
16.00
16.00
32.00

20.00

4.00
4.00
0.90
2.73
1.75
1.75

4.00
4.00
12.00

Total Pasangan Dinding Bata 1 : 4

Pasangan Bata Top Gavel 1 : 4


Plesteran Dinding Bata 1 : 4
Plesteran Bata Top Gavel 1 : 4
6

Pekerjaan Kusen Pintu dan Jendela


Kusen Pintu Tipe P1
Kusen Jendela Tipe J1
Kusen Jendela Tipe J2
Daun Pintu Tipe P1
Daun Jendela Tipe J1
Daun Jendela Tipe J2

7.00

7.30
9.90
13.90

0.06
0.06
0.06

6.31
5.12

19.00
19.00

6.31
5.12

22.00
22.00

21.00

11.58

19.00

1.50

0.13
0.13
0.13

1.95
0.86
1.29

Pekerjaan Atap dan Plafond


Kuda-kuda Baja Ringan CT-74

Atap Seng BJLS 0,30 mm

Listplank Kayu 3/30 cm


Plafond Plywood Tebal 4 mm
- Lantai 1
- Plafond Dalam
- Plafond Luar
- Lantai 2
- Plafond Dalam
- Plafond Luar

2.40

454.60
16.80

122.50

119.50
82.16

List Profil
- Lantai 1
- Lantai 2
8

Pekerjaan Lantai
Timbunan Tanah Bawah Lantai
Timbunan Pasir Bawah Lantai
Lantai Beton Tumbuk
Lantai Keramik 40x40
- Lantai 1
- Lantai 2

19.00
19.00
19.00

Pekerjaan Pengunci dan Penggantung


Kunci Tanam Lokal
Engsel Pintu 4 Inchi
Engsel Jendela 3 Inchi
- Jendela J1
- Jendela J2

0.38
0.15
0.05

151.00
92.00

Lantai Keramik 40x40 Tangga

8.50
8.50
8.50

0.30
0.20
3.00

1.34
1.34
1.50

20.00
20.00

4.00

4.00
4.00

4.00
16.00

Bh
Bh

8.00
12.00

4.00
12.00

32.00
144.00
176.00

Bh
Bh
Bh

Grendel Jendela 2 Inchi


- Jendela J1
- Jendela J2

4.00
6.00

4.00
12.00

16.00
72.00
88.00

Bh
Bh
Bh

Hak Angin Jendela


- Jendela J1
- Jendela J2

6.00
9.00

4.00
12.00

24.00
108.00
132.00
0.84
1.47
6.61
4.06
18.27
31.26

Bh
Bh
Bh
m2
m2
m2
m2
m2
m2

Kaca Polos t=5 mm Pada Jendela dan ventilasi


2.00
3.00
2.00
3.00

0.62
0.54
0.54
0.54
0.54

0.34
0.34
0.34
0.94
0.94

4.00
4.00
12.00
4.00
12.00

DIMENSI
NO

URAIAN

SKETSA

10

Pekerjaan Pengecatan
Cat Tembok 3X (L/D)
Cat Listplank Kayu
Cat Mengkilat Seluruh Kusen + Daun Pintu

Cat Plafond
11

Pekerjaan Instalasi Listrik


Box zakering 2000Watt
Stop Kontak + Instalasi
Lampu Philips SL 18 Watt
Saklar Ganda
Kabel Listrik

Luas

Panjang

Lebar

Tinggi

Unit

942.81
65.16
4.55
2.35
4.64

VOLUME

10

0.30
4.00
4.00
12.00

942.81
19.55
18.21
9.40
55.65
83.26
352.66

m2
m2
m2
m2
m2
m2
m2

1.00
8.00
49.00
6.00
Ls

Bh
Bh
Bh
Bh
Bh

ENGINEER ESTIMATE (EE)


Paket
Pekerjaan
Lokasi
Kabupaten
Tahun Anggaran

: Perencana Pengembangan Infrstruktur Wilayah Aceh Besar 10


: Pembangunan Dayah Darul Dijalal
: Gampong Limpok
: Aceh Besar
: 2014
HARGA SATUAN

No.

URAIAN PEKERJAAN

VOL.

SAT.

ANALISA

1
I
1
2

JUMLAH HARGA

PEKERJAAN PERSIAPAN
Pembersihan Lahan
Pengukuran dan Pemasangan Bowplank

1.000
1.000

Ls
Ls

Taksir
Taksir

Rp.
Rp.

1,000,000.00
1,500,000.00
SUB TOTAL I

Rp.
Rp.
Rp.

1,000,000.00
1,500,000.00
2,500,000.00

II
1
2
3

PEKERJAAN TANAH
Galian Tanah Pondasi Menerus
Urugan Kembali 1/3 Bekas Galian
Urugan Pasir Alas Pondasi Menerus

144.132
48.044
5.327

m3
m3
m3

A.2.3.1.1.
A.2.3.1.8.
A.2.3.1.11.

Rp.
Rp.
Rp.

58,362.50
23,345.00
193,361.00
SUB TOTAL II

Rp.
Rp.
Rp.
Rp.

8,411,903.85
1,121,587.18
1,029,937.37
10,563,428.40

III
1
2

PEKERJAAN PONDASI DAN PASANGAN BATU


Pasangan Batu Kosong Pondasi Menerus
Pasangan Batu Gunung 1 : 4 Pondasi Menerus

10.653
46.632

m3
m3

A.3.2.1.9.
A.3.2.1.2.

Rp.
Rp.

394,527.51
781,074.25
SUB TOTAL III

Rp.
Rp.
Rp.

4,202,901.56
36,423,054.43
40,625,955.99

IV
1
2
3
4
5
6
7
8
9
10
11

PEKERJAAN BETON BERTULANG DENGAN MUTU K 250


Pondasi Tapak (130x120)
Sloof 30/40 Cm
Kolom 40x30 Cm
Balok 25/40 Cm
Balok 20/35 Cm
Ring Balok 20/30 Cm
Plat Lantai t=12 cm
Balok Bordes 20x35
Plat Bordes t=15 cm
Plat Tangga t=15 cm
Anak Tangga

11.752
12.060
15.360
7.200
3.850
3.960
17.262
0.210
0.675
1.383
1.608

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

SUPL I.
SUPL II.
SUPL III
SUPL IV.a
SUPL IV.b
SUPL V
SUPL VI
SUPL VIII
SUPL VII
SUPL IX
SUPL IX

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,782,558.71
4,458,777.73
6,241,015.18
7,036,583.75
7,432,005.04
7,060,808.42
7,773,839.53
7,023,040.02
6,527,125.95
9,556,101.61
9,556,101.61
SUB TOTAL IV

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

56,204,629.96
53,772,859.46
95,861,993.21
50,663,402.99
28,613,219.39
27,960,801.35
134,192,018.01
1,474,838.40
4,405,810.02
13,214,941.80
15,366,211.39
481,730,725.97

V
1
2
3
4

PEKERJAAN PASANGAN DAN PLESTERAN


Pasangan Dinding Bata 1 : 4
Pasangan Bata Top Gavel 1 : 4
Plesteran Dinding Bata 1 : 4
Plesteran Bata Top Gavel 1 : 4

454.604
16.800
909.207
33.600

m2
m2
m2
m2

A.4.4.1.9.
A.4.4.1.9.
A.4.4.2.4
A.4.4.2.4

Rp.
Rp.
Rp.
Rp.

119,582.75
119,582.75
55,014.39
55,014.39
SUB TOTAL V

Rp.
Rp.
Rp.
Rp.
Rp.

54,362,748.65
2,008,990.20
50,019,479.49
1,848,483.50
108,239,701.84

VI
1
2
3
4
5
6

PEKERJAAN KUSEN PINTU DAN JENDELA


Kusen Pintu Tipe P1
Kusen Jendela Tipe J1
Kusen Jendela Tipe J2
Daun Pintu Tipe P1
Daun Jendela Tipe J1
Daun Jendela Tipe J2

0.228
0.309
1.301
7.783
3.430
15.437

m3
m3
m3
m2
m2
m2

A.4.6.1.2
A.4.6.1.2
A.4.6.1.2
A.4.6.1.5
A.4.6.1.6
A.4.6.1.6

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,839,527.25
6,839,527.25
6,839,527.25
586,345.90
427,362.54
427,362.54
SUB TOTAL VI

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,557,770.73
2,112,593.18
8,898,498.53
4,563,647.41
1,466,024.46
6,597,110.06
25,195,644.36

VII
1
2
3
4
5

PEKERJAAN ATAP DAN PLAFOND


Kuda-kuda Baja Ringan CT-74
Atap Seng BJLS 0,3 mm
Listplank Kayu 3/30 cm
Plafond Plywood Tebal 4 mm
List Profil

217.170
251.460
65.160
352.660
262.000

m2
m2
m'
m2
m'

Taksir
A.4.5.2.38
A.4.6.1.21
A.4.5.1.5
A.4.5.1.9

Rp.
Rp.
Rp.
Rp.
Rp.

165,000.00
50,335.50
107,010.77
57,065.30
17,369.60
SUB TOTAL VII

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

35,833,050.00
12,657,364.83
6,972,821.51
20,124,648.70
4,550,835.20
80,138,720.24

VIII
1
2
3
4
5

PEKERJAAN LANTAI
Timbunan Tanah Bawah Lantai
Timbunan Pasir Bawah Lantai
Lantai Beton Tumbuk
Lantai Keramik 40x40
Lantai Keramik 40x40 Tangga

61.370
24.225
8.075
243.000
17.900

m3
m3
m3
m2
m2

A.2.3.1.10.
A.2.3.1.11.
A.4.1.1.1
A.4.4.3.35.a
A.4.4.3.35.a

41,975.00
Rp.
193,361.00
Rp.
693,000.62
Rp.
186,898.00
Rp.
186,898.00
Rp.
SUB TOTAL VIII

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,576,005.75
4,684,170.23
5,595,979.97
45,416,214.00
3,345,474.20
61,617,844.14

IX
1
2
3
4
5
6

PEKERJAAN PENGUNCI DAN PENGGANTUNG


Kunci Tanam Biasa
Engsel Pintu
Engsel Jendela
Grendel Jendela
Hak Angin Jendela
Kaca Polos t=5 mm

4.000
16.000
176.000
88.000
132.000
31.256

Bh
Bh
Bh
Bh
Bh
m2

A.4.6.2.2
A.4.6.2.5
A.4.6.2.6
A.4.6.2.8
A.4.6.2.9
A.4.6.2.17

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

191,475.00
56,826.10
42,021.00
36,213.50
39,548.50
180,262.36
SUB TOTAL IX

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

765,900.00
909,217.60
7,395,696.00
3,186,788.00
5,220,402.00
5,634,280.47
23,112,284.07

X
1
2
3
4

PEKERJAAN PENGECATAN
Cat Tembok 3X (L/D)
Cat Listplank Kayu
Cat Mengkilat Seluruh Kusen + Daun Pintu
Cat Plafond

942.807
19.548
83.255
352.660

m2
m2
m2
m2

A.4.7.1.10
A.4.7.1.1.4
A.4.7.1.1.4
A.4.7.1.1.4

Rp.
Rp.
Rp.
Rp.

23,343.28
32,676.10
32,676.10
32,676.10
SUB TOTAL X

Rp.
Rp.
Rp.
Rp.
Rp.

22,008,207.74
638,752.40
2,720,455.24
11,523,553.43
36,890,968.81

XI
1
2
3
4
5
6

PEKERJAAN INSTALASI LISTRIK


Box zakering 2000Watt
Stop Kontak + Instalasi
Lampu Philips SL 18 Watt
Titik Lampu + Instalasi
Saklar Ganda
Pemasukan Arus Listrik

1.000
8.000
49.000
49.000
6.000
1.000

Bh
Ttk
Bh
Ttk
Bh
Ls

Taksir
Taksir
Taksir
Taksir
Taksir
Taksir

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

294,900.00
168,300.00
50,000.00
151,900.00
50,000.00
1,000,000.00
SUB TOTAL XI
TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

294,900.00
1,346,400.00
2,450,000.00
7,443,100.00
300,000.00
1,000,000.00
12,834,400.00
883,449,673.83

REKAPITULASI
ENGINEER ESTIMATE (EE)
Paket
Pekerjaan
Lokasi
Kabupaten
Tahun Anggaran

NO.
I
II
III
IV
V
VI
VII
VIII
IX
XI

: Perencana Pengembangan Infrstruktur Wilayah Aceh Besar 10


: Pembangunan Dayah Darul Dijalal
: Gampong Limpok
: Aceh Besar
: 2014

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI DAN PASANGAN BATU
PEKERJAAN BETON BERTULANG DENGAN MUTU K 250
PEKERJAAN PASANGAN DAN PLESTERAN
PEKERJAAN KUSEN PINTU DAN JENDELA
PEKERJAAN ATAP DAN PLAFOND
PEKERJAAN LANTAI
PEKERJAAN PENGUNCI DAN PENGGANTUNG
PEKERJAAN INSTALASI LISTRIK
JUMLAH
PPN 10%
TOTAL
DIBULATKAN

Terbilang : Sembilan Ratus Tiga Puluh Satu Juta Dua Ratus Empat Belas Ribu Rupiah

Banda Aceh,
Maret 2014
Konsultan Perencana
CV. ATJEH CONSULTANT

(ARBEN SARAGIH, S.T.)


Team Leader

JUMLAH HARGA (Rp)


2,500,000.00
10,563,428.40
40,625,955.99
481,730,725.97
108,239,701.84
25,195,644.36
80,138,720.24
61,617,844.14
23,112,284.07
12,834,400.00
846,558,705.02
84,655,870.50
931,214,575.52
931,214,000.00

Banda Aceh,
Maret 2014
Konsultan Perencana
CV. ATJEH CONSULTANT

(ARBEN SARAGIH, S.T.)


Team Leader

ANALISA HARGA SATUAN PEKERJAAN


Pekerjaan Tanah
A.2.3.1.1.

Menggali 1 m tanah biasa sedalam 1 meter


Kebutuhan

Tenaga Kerja

Pekerja
Mandor

Satuan

Indeks

OH
OH

0.750
0.025

Overhead & Profi

Harga Satuan Pe

A.2.3.1.2.

Menggali 1 m tanah biasa sedalam 2 meter


Kebutuhan

Tenaga Kerja

Pekerja
Mandor

Satuan

Indeks

OH
OH

0.900
0.045

Overhead & Profi

Harga Satuan Pe

A.2.3.1.3.

Menggali 1 m tanah biasa sedalam 3 meter


Kebutuhan

Tenaga Kerja

Pekerja
Mandor

Satuan

Indeks

OH
OH

1.050
0.067

Overhead & Profi

Harga Satuan Pe

A.2.3.1.4.

Menggali 1 m tanah keras sedalam 1 meter


Kebutuhan

Tenaga Kerja

Pekerja
Mandor

Satuan

Indeks

OH
OH

1.000
0.032

Overhead & Profi

Harga Satuan Pe

A.2.3.1.5.

Menggali 1 m tanah cadas sedalam 1 meter


Kebutuhan

Tenaga Kerja

Pekerja
Mandor

Satuan

Indeks

OH
OH

1.500
0.060

Overhead & Profi

Harga Satuan Pe

A.2.3.1.6.

Menggali 1 m tanah lumpur sedalam 1 meter


Kebutuhan

Tenaga Kerja

Pekerja
Mandor

Satuan

Indeks

OH
OH

1.200
0.045

Overhead & Profi

Harga Satuan Pe

A.2.3.1.7.

Mengerjakan 1 m stripping tebing setinggi 1 meter


Kebutuhan

Tenaga Kerja

Pekerja
Mandor

Satuan

Indeks

OH
OH

0.050
0.005

Overhead & Profi

Harga Satuan Pe

A.2.3.1.8.

Mengurug kembali 1 m galian


Kebutuhan

Tenaga Kerja

Pekerja
Mandor

Satuan

Indeks

OH
OH

0.300
0.010

Overhead & Profi

Harga Satuan Pe
A.2.3.1.9.

A.2.3.1.10.

Mengurug kembali 1 m galian


Mengurug kembali 1 m galian tanah dihitung dari 1/3 kali indeks pekerjaan galian

Memadatkan 1 m tanah (per 20 cm)


Kebutuhan

Tenaga Kerja

Pekerja
Mandor

Satuan

Indeks

OH
OH

0.500
0.050

Overhead & Profi

Harga Satuan Pe

A.2.3.1.11.

Mengurug 1 m pasir urug


Kebutuhan

Bahan
Tenaga Kerja

Pasir Urug (PU)


Pekerja
Mandor

Satuan

Indeks

m
OH
OH

1.200
0.300
0.010

Overhead & Profi

Harga Satuan Pe

A.2.3.1.11a.

Mengurug 1 m tanah urug


Kebutuhan

Bahan
Tenaga Kerja

Tanah Urug (TU)


Pekerja
Mandor

Satuan

Indeks

m
OH
OH

1.200
0.300
0.010

Overhead & Profi

Harga Satuan Pe

A.2.3.1.12.

Memasang 1 m Lapisan pudel campuran 1 KP : 3 PP : 7 TL untuk stabilisasi tanah


Kebutuhan

Bahan

Tenaga Kerja

Kapur Padam (KP)


Pasir Pasang (PP)
Tanah Liat (TL)
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

m
m
m
OH
OH
OH
OH

0.135
0.400
0.948
0.800
0.400
0.040
0.080

Overhead & Profi

Harga Satuan Pe

A.2.3.1.12a.

Memasang 1 m Lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi tanah


Kebutuhan

Bahan

Tenaga Kerja

Kapur Padam (KP)


Tanah Liat (TL)
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

m
m
OH
OH
OH
OH

0.248
1.240
0.800
0.400
0.040
0.080

Overhead & Profi

Harga Satuan Pe

A.2.3.1.13.

Memasang 1 m lapisan ijuk tebal 10 cm, untuk bidang resapan


Kebutuhan

Bahan
Tenaga Kerja

Ijuk
Pekerja
Mandor

Satuan

Indeks

kg
OH
OH

6.000
0.150
0.015

Overhead & Profi

Harga Satuan Pe

A.2.3.1.14.

Mengurug 1 m sirtu padat untuk peninggian lantai bangunan


Kebutuhan

Bahan
Tenaga Kerja

Sirtu
Pekerja
Mandor

Satuan

Indeks

m
OH
OH

1.200
0.250
0.025

Overhead & Profi

Harga Satuan Pe

Pekerjaan Pondasi
A.3.2.1.1.

Memasang 1 m pondasi batu belah, campuran 1 PC : 3 PP


Kebutuhan

Bahan

Tenaga Kerja

Batu belah 15 cm/20 cm


Semen Portland (PC)
Pasir Pasang (PP)
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

m
Kg
m
OH
OH
OH
OH

1.200
202.000
0.485
1.500
0.750
0.075
0.075

Overhead & Profi

Harga Satuan Pe

A.3.2.1.2.

Memasang 1 m pondasi batu belah, campuran 1 PC : 4 PP


Kebutuhan

Bahan

Tenaga Kerja

Batu belah 15 cm/20 cm


PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

m
Kg
m
OH
OH
OH
OH

1.200
163.000
0.520
1.500
0.750
0.075
0.075

Overhead & Profi

Harga Satuan Pe

A.3.2.1.3.

Memasang 1 m pondasi batu belah, campuran 1 PC : 5 PP


Kebutuhan

Bahan

Tenaga Kerja

Batu belah 15 cm/20 cm


PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

m
Kg
m
OH
OH
OH
OH

1.200
136.000
0.544
1.500
0.750
0.075
0.075

Overhead & Profi

Harga Satuan Pe

A.3.2.1.4.

Memasang 1 m pondasi batu belah, campuran 1 PC : 6 PP


Kebutuhan

Bahan

Tenaga Kerja

Batu belah 15 cm/20 cm


PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

m
Kg
m
OH
OH
OH
OH

1.200
117.000
0.561
1.500
0.750
0.075
0.075

Overhead & Profi

Harga Satuan Pe

A.3.2.1.5.

Memasang 1 m pondasi batu belah, campuran 1 PC : 8 PP


Kebutuhan

Bahan

Tenaga Kerja

Batu belah 15 cm/20 cm


PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

m
Kg
m
OH
OH
OH
OH

1.200
91.000
0.584
1.500
0.750
0.075
0.075

Overhead & Profi

Harga Satuan Pe

A.3.2.1.6.

Memasang 1 m pondasi batu belah, campuran 1 KP : 1 SM : 2 PP


Kebutuhan

Bahan

Tenaga Kerja

Batu belah 15 cm/20 cm


KP
Semen Merah (SM)
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

m
m
m
m
OH
OH
OH
OH

1.200
0.170
0.170
0.340
1.500
0.750
0.075
0.075

Overhead & Profi

Harga Satuan Pe

A.3.2.1.7.

Memasang 1 m pondasi batu belah, campuran 1 PC : 3 KP : 10 PP


Kebutuhan

Bahan

Tenaga Kerja

Batu belah 15 cm/20 cm


PC
KP
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

m
Kg
m
m
OH
OH
OH
OH

1.200
61.000
0.147
0.492
1.500
0.750
0.075
0.075

Overhead & Profi

Harga Satuan Pe

A.3.2.1.8.

Memasang 1 m pondasi batu belah, campuran PC : 1 KP : 4 PP


Kebutuhan

Bahan

Tenaga Kerja

Batu belah 15 cm/20 cm


PC
KP
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

m
Kg
m
m
OH
OH
OH
OH

1.200
41.000
0.131
0.523
1.500
0.750
0.075
0.075

Overhead & Profi

Harga Satuan Pe

A.3.2.1.9.

Memasang 1 m batu kosong (aanstamping)


Kebutuhan

Bahan

Tenaga Kerja

Batu belah 15 cm/20 cm


Pasir urug
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

m
m
OH
OH
OH
OH

1.200
0.432
0.780
0.390
0.039
0.039

Overhead & Profi

Harga Satuan Pe

A.3.2.1.10.

Memasang 1 m pondasi siklop, 60% beton campuran 1 PC : 2 PB : : 3 KR dan 40% b


Kebutuhan

Bahan

Tenaga Kerja

Batu belah 15 cm/20 cm


PC
Pasir beton
KR
Besi beton
Kawat beton
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

m
Kg
m
m
Kg
Kg
OH
OH
OH
OH

0.480
194.000
0.312
0.468
126.000
1.800
3.400
0.850
0.085
0.170

Overhead & Profi

Harga Satuan Pe

A.3.2.1.11.

Memasang 1 m pondasi sumuran, diameter 100 cm


Kebutuhan

Bahan

Tenaga Kerja

Batu belah 15 cm/20 cm


PC
PB
KR
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

m
Kg
m
m
OH
OH
OH
OH

0.450
194.000
0.312
0.468
2.400
0.800
0.080
0.119

Overhead & Profi

Harga Satuan Pe

Pekerjaan Dinding
A.4.4.1.1.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

140.000
43.500
0.080
0.600
0.200
0.020
0.030

Overhead & Profi

Harga Satuan Pe

A.4.4.1.2.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

140.000
32.950
0.091
0.600
0.200
0.020
0.030

Overhead & Profi

Harga Satuan Pe

A.4.4.1.3.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

140.000
26.550
0.093
0.600
0.200
0.020
0.030

Overhead & Profi

Harga Satuan Pe

A.4.4.1.4.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

140.000
22.200
0.102
0.600
0.200
0.020
0.030

Overhead & Profi

Harga Satuan Pe

A.4.4.1.5.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

140.000
18.500
0.122
0.600
0.200
0.020
0.030

Overhead & Profi

Harga Satuan Pe

A.4.4.1.6.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
KP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
m
OH
OH
OH
OH

140.000
10.080
0.0925
0.0275
0.600
0.200
0.020
0.030

Overhead & Profi

Harga Satuan Pe

A.4.4.1.7.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

70.000
18.950
0.038
0.300
0.100
0.010
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.1.8.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

70.000
14.370
0.040
0.300
0.100
0.010
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.1.9.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

70.000
11.500
0.043
0.300
0.100
0.010
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.1.10.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

70.000
9.680
0.045
0.300
0.100
0.010
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.1.11.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

70.000
8.320
0.049
0.300
0.100
0.010
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.1.12.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

70.000
6.500
0.050
0.300
0.100
0.010
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.1.13.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
KP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
Kg
m
m
OH
OH
OH
OH

70.000
4.500
0.050
0.015
0.300
0.100
0.010
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.1.14.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
KP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
m
m
m
OH
OH
OH
OH

70.000
0.018
0.018
0.018
0.300
0.100
0.010
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.1.15.

Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal bata, campura


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
PC
PP
KP
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

Indeks

Buah
m
m
m
OH
OH
OH
OH

70.000
0.014
0.028
0.014
0.300
0.100
0.010
0.015

Overhead & Profi

Harga Satuan Pe

Pekerjaan Plesteran
A.4.4.2.1

Memasang 1 m plesteran 1 PC : 1 PP, tebal 15 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

15.500
0.016
0.300
0.150
0.015
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.2.2

Memasang 1 m plesteran 1 PC : 2 PP, tebal 15 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

10.220
0.020
0.300
0.150
0.015
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.2.3

Memasang 1 m plesteran 1 PC : 3 PP, tebal 15 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

7.770
0.023
0.300
0.150
0.015
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.2.4

Memasang 1 m plesteran 1 PC : 4 PP, tebal 15 mm

Kebutuhan
Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

6.240
0.024
0.300
0.150
0.015
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.2.5

Memasang 1 m plesteran 1 PC : 5 PP, tebal 15 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

5.180
0.026
0.300
0.150
0.015
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.2.6

Memasang 1 m plesteran 1 PC : 6 PP, tebal 15 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

4.410
0.027
0.300
0.150
0.015
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.2.7

Memasang 1 m plesteran 1 PC : 7 PP, tebal 15 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

3.930
0.028
0.300
0.150
0.015
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.2.8

Memasang 1 m plesteran 1 PC : 8 PP, tebal 15 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

3.450
0.029
0.300
0.150
0.015
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.2.9

Memasang 1 m plesteran 1 PC : KP : 3 PP, tebal 15 mm

Kebutuhan
Bahan

Tenaga Kerja

PC
KP
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
m
OH
OH
OH
OH

5.760
0.003
0.013
0.360
0.120
0.012
0.018

Overhead & Profi

Harga Satuan Pe

A.4.4.2.10

Memasang 1 m plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
KP
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
m
OH
OH
OH
OH

3.000
0.005
0.020
0.360
0.120
0.012
0.018

Overhead & Profi

Harga Satuan Pe

A.4.4.2.11

Memasang 1 m plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
KP
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

m
m
m
OH
OH
OH
OH

0.009
0.009
0.009
0.360
0.120
0.012
0.018

Overhead & Profi

Harga Satuan Pe

A.4.4.2.12

Memasang 1 m plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
KP
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

m
m
m
OH
OH
OH
OH

0.007
0.007
0.015
0.360
0.120
0.012
0.018

Overhead & Profi

Harga Satuan Pe

A.4.4.2.13

Memasang 1 m plesteran 1 PC : 2 PP, tebal 20 mm

Kebutuhan
Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

13.630
0.027
0.400
0.200
0.020
0.022

Overhead & Profi

Harga Satuan Pe

A.4.4.2.14

Memasang 1 m plesteran 1 PC : 3 PP, tebal 20 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

10.360
0.031
0.260
0.200
0.020
0.013

Overhead & Profi

Harga Satuan Pe

A.4.4.2.15

Memasang 1 m plesteran 1 PC : 4 PP, tebal 20 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

8.320
0.032
0.400
0.200
0.020
0.022

Overhead & Profi

Harga Satuan Pe

A.4.4.2.16

Memasang 1 m plesteran 1 PC : 5 PP, tebal 20 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

6.910
0.035
0.400
0.200
0.020
0.022

Overhead & Profi

Harga Satuan Pe

A.4.4.2.17

Memasang 1 m plesteran 1 PC : 6 PP, tebal 20 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

5.880
0.036
0.400
0.200
0.020
0.022

Overhead & Profi

Harga Satuan Pe

A.4.4.2.18

Memasang 1 m plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
KP
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

m
m
m
OH
OH
OH
OH

0.009
0.009
0.018
0.440
0.220
0.022
0.022

Overhead & Profi

Harga Satuan Pe

A.4.4.2.19

Memasang 1 m Berapen 1 PC : 5 PP, tebal 15 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

5.180
0.026
0.150
0.075
0.008
0.008

Overhead & Profi

Harga Satuan Pe

A.4.4.2.20

Memasang 1 m' Plesteran Skoning 1 PC : 2 PP, lebar 10 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

0.500
0.013
0.080
0.400
0.040
0.004

Overhead & Profi

Harga Satuan Pe

A.4.4.2.21

Memasang 1 m Plesteran Granit, 1 PC : 2 Granit, tebal 10 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
Batu granit
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
OH
OH
OH
OH

10.000
15.000
0.450
0.225
0.023
0.023

Overhead & Profi

Harga Satuan Pe

A.4.4.2.22

Memasang 1 m Plesteran Teraso, 1 PC : 2 Batu Teraso, tebal 10 mm


Kebutuhan

Bahan

Tenaga Kerja

PC
Batu teraso
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
OH
OH
OH
OH

10.000
15.000
0.450
0.225
0.023
0.023

Overhead & Profi

Harga Satuan Pe

A.4.4.2.23

Memasang 1 m Plesteran Ciprat 1 PC : 2 PP


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

4.320
0.006
0.300
0.100
0.010
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.2.24

Memasang 1 m Finishing siar pasangan dinding bata merah (=20 m')


Kebutuhan

Bahan
Tenaga Kerja

PC
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
OH
OH
OH
OH

3.100
0.150
0.075
0.008
0.008

Overhead & Profi

Harga Satuan Pe

A.4.4.2.25

Memasang 1 m Finishing siar pasangan dinding conblok ekspose (8 m')


Kebutuhan

Bahan
Tenaga Kerja

PC
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
OH
OH
OH
OH

1.600
0.070
0.035
0.004
0.004

Overhead & Profi

Harga Satuan Pe

A.4.4.2.26

Memasang 1 m Finishing siar pasangan batu kali adukan 1 PC : 2 PP


Kebutuhan

Bahan

Tenaga Kerja

PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
OH
OH
OH
OH

6.340
0.012
0.300
0.150
0.015
0.015

Overhead & Profi

Harga Satuan Pe

A.4.4.2.27

Memasang 1 m acian
Kebutuhan

Bahan
Tenaga Kerja

PC
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
OH
OH
OH
OH

3.250
0.200
0.100
0.010
0.010

Overhead & Profi

Harga Satuan Pe

Pekerjaan Beton
A.4.1.1.1

Membuat 1 m beton mutu f'c = 7,4 Mpa (K 100), slump (12 2) cm, w/c = 0,87
Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Liter
OH
OH
OH
OH

247.000
869
999
215
1.650
0.275
0.028
0.083

Overhead & Profi

Harga Satuan Pe

A.4.1.1.2

Membuat 1 m beton mutu f'c = 9,8 Mpa (K 125), slump (12 2) cm, w/c = 0,78
Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Liter
OH
OH
OH
OH

276.000
828
1012
215
1.650
0.275
0.028
0.083

Overhead & Profi

Harga Satuan Pe

A.4.1.1.3

Membuat 1 m beton mutu f'c = 12,2 Mpa (K 150), slump (12 2) cm, w/c = 0,72
Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Liter
OH
OH
OH
OH

299.000
799
1017
215
1.650
0.275
0.028
0.083

Overhead & Profi

Harga Satuan Pe

A.4.1.1.4

Membuat 1 m lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c =
Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Liter
OH
OH
OH
OH

230.000
893
1027
200
1.200
0.200
0.020
0.060

Overhead & Profi

Harga Satuan Pe

A.4.1.1.5

Membuat 1 m beton mutu f'c = 14,5 Mpa (K 175), slump (12 2) cm, w/c = 0,66
Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Liter
OH
OH
OH
OH

326.000
760
1029
215
1.650
0.275
0.028
0.083

Overhead & Profi

Harga Satuan Pe

A.4.1.1.6

Membuat 1 m beton mutu f'c = 16,9 Mpa (K 200), slump (12 2) cm, w/c = 0,61
Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Liter
OH
OH
OH
OH

352.000
731
1031
215
1.650
0.275
0.028
0.083

Overhead & Profi

Harga Satuan Pe

A.4.1.1.7

Membuat 1 m beton mutu f'c = 19,3 Mpa (K 225), slump (12 2) cm, w/c = 0,58

Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Liter
OH
OH
OH
OH

371.000
698
1047
215
1.650
0.275
0.028
0.083

Overhead & Profi

Harga Satuan Pe

A.4.1.1.8

Membuat 1 m beton mutu f'c = 21,7 Mpa (K 250), slump (12 2) cm, w/c = 0,56
Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Liter
OH
OH
OH
OH

384.000
692
1039
215
1.650
0.275
0.028
0.083

Overhead & Profi

Harga Satuan Pe

A.4.1.1.9

Membuat 1 m beton mutu f'c = 24,0 Mpa (K 275), slump (12 2) cm, w/c = 0,53
Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Liter
OH
OH
OH
OH

406.000
684
1026
215
1.650
0.275
0.028
0.083

Overhead & Profi

Harga Satuan Pe

A.4.1.1.10

Membuat 1 m beton mutu f'c = 26,4 Mpa (K 300), slump (12 2) cm, w/c = 0,52
Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
m
m
Liter
OH
OH
OH
OH

413.000
681
1021
215
1.650
0.275
0.028
0.083

Overhead & Profi

Harga Satuan Pe

A.4.1.1.11

Membuat 1 m beton mutu f'c = 28,8 Mpa (K 325), slump (12 2) cm, w/c = 0,49
Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Liter
OH
OH
OH
OH

439.000
670
1006
215
2.100
0.350
0.035
0.105

Overhead & Profi

Harga Satuan Pe

A.4.1.1.12

Membuat 1 m beton mutu f'c = 31,2 Mpa (K 350), slump (12 2) cm, w/c = 0,48
Kebutuhan

Bahan

Tenaga Kerja

PC
PB
KR (maksimum 30 mm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Liter
OH
OH
OH
OH

448.000
667
1000
215
2.100
0.350
0.035
0.105

Overhead & Profi

Harga Satuan Pe

A.4.1.1.17

Pembesian 10 kg dengan besi polos


Kebutuhan

Bahan

Tenaga Kerja

besi beton polos


kawat beton
Pekerja
Tukang besi
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
OH
OH
OH
OH

10.500
0.150
0.070
0.070
0.007
0.004

Overhead & Profi

Harga Satuan Pe

A.4.1.1.17A

Pembesian 10 kg dengan besi ulir

Kebutuhan
Bahan
Tenaga Kerja

Satuan

Indeks

Kg
Kg
OH
OH
OH
OH

10.500
0.150
0.070
0.070
0.007
0.004

besi beton ulir


kawat beton
Pekerja
Tukang besi
Kepala tukang
Mandor

Overhead & Profi

Harga Satuan Pe

A.4.1.1.18

Memasang 10 kg kabel presstressed polos/strands


Kebutuhan

Bahan

Tenaga Kerja

Satuan

Indeks

Kg
Kg
OH
OH
OH
OH

10.500
0.100
0.050
0.050
0.005
0.003

besi beton polos


kawat beton
Pekerja
Tukang besi
Kepala tukang
Mandor

Overhead & Profi

Harga Satuan Pe

A.4.1.1.19

Memasang 10 kg jaring kawat baja/wire mesh


Kebutuhan

Bahan

Tenaga Kerja

Jaring kawat baja dilas


kawat beton
Pekerja
Tukang besi
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
OH
OH
OH
OH

1.020
0.050
0.025
0.025
0.002
0.001

Overhead & Profi

Harga Satuan Pe

A.4.1.1.20

Memasang 1 m bekisting untuk pondasi


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 10 cm
Minyak bekisting
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
OH
OH
OH
OH

0.040
0.300
0.100
0.520
0.260
0.026
0.026

Overhead & Profi

Harga Satuan Pe

A.4.1.1.21

Memasang 1 m bekisting untuk sloof


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 10 cm
Minyak bekisting
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
OH
OH
OH
OH

0.045
0.300
0.100
0.520
0.260
0.026
0.026

Overhead & Profi

Harga Satuan Pe

A.4.1.1.22

Memasang 1 m bekisting untuk kolom


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu kelas II
plywood tebal 9 mm
Dolken kayu galam,
(8-10) cm, panjang 4 m
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
m
Lbr

0.040
0.400
0.200
0.015
0.350

Batang

2.000

OH
OH
OH
OH

0.660
0.330
0.033
0.033

Overhead & Profi

Harga Satuan Pe

A.4.1.1.23

Memasang 1 m bekisting untuk balok


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu kelas II
plywood tebal 9 mm
Dolken kayu galam,
(8-10) cm, panjang 4 m
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
m
Lbr

0.040
0.400
0.200
0.018
0.350

Batang

2.000

OH
OH
OH
OH

0.660
0.330
0.033
0.033

Overhead & Profi

Harga Satuan Pe

A.4.1.1.24

Memasang 1 m bekisting untuk plat lantai


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu kelas II
plywood tebal 9 mm
Dolken kayu galam,
(8-10) cm, panjang 4 m
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
m
Lbr

0.040
0.400
0.200
0.015
0.350

Batang

6.000

OH
OH
OH
OH

0.660
0.330
0.033
0.033

Overhead & Profi

Harga Satuan Pe

A.4.1.1.25

Memasang 1 m bekisting untuk dinding


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu kelas II
plywood tebal 9 mm
Dolken kayu galam,
(8-10) cm, panjang 4 m
Formite/penjaga jarak
bekisting/spacer
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
m
Lbr

0.030
0.400
0.200
0.020
0.350

Batang

3.000

Buah

4.000

OH
OH
OH
OH

0.660
0.330
0.033
0.033

Overhead & Profi

Harga Satuan Pe

A.4.1.1.26

Memasang 1 m bekisting untuk tangga


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu kelas II
plywood tebal 9 mm
Dolken kayu galam,
(8-10) cm, panjang 4 m
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
m
Lbr

0.030
0.400
0.150
0.015
0.350

Batang

2.000

OH
OH
OH
OH

0.660
0.330
0.033
0.033

Overhead & Profi

Harga Satuan Pe

A.4.1.1.27

Memasang 1 m bekisting untuk pengecoran beton


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III (papan)


Paku 5 cm - 12 cm
Dolken kayu galam (kaso),
(8-10) cm, panjang 4 m
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg

0.0264
0.600

Batang

0.500

OH
OH
OH
OH

0.150
0.050
0.005
0.008

Overhead & Profi

Harga Satuan Pe

A.4.1.1.28

Membuat 1 m pondasi beton bertulang (150 kg besi + bekisting)


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat beton
PC
PB
KR
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
Kg
Kg
Kg
m
m
OH
OH
OH
OH
OH
OH

0.200
1.500
0.400
157.500
2.250
336.000
0.540
0.810
5.300
0.275
1.300
1.050
0.262
0.265

Overhead & Profi

Harga Satuan Pe

A.4.1.1.29

Membuat 1 m sloof beton bertulang (200 kg besi + bekisting)


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat beton
PC
PB
KR
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
Kg
Kg
Kg
m
m
OH
OH
OH
OH
OH
OH

0.270
2.000
0.600
210.000
3.000
336.000
0.540
0.810
5.650
0.275
1.560
1.400
0.323
0.283

Overhead & Profi

Harga Satuan Pe

A.4.1.1.30

Membuat 1 m kolom beton bertulang (300 kg besi + bekisting)


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat beton
PC
PB
KR
Kayu kelas II balok
plywood 9 mm
Dolken kayu galam,
(8-10) cm, panjang 4 m
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
Kg
Kg
Kg
m
m
m
Lembar

0.400
4.000
2.000
315.000
4.500
336.000
0.540
0.810
0.150
3.500

Batang

20.000

OH
OH
OH
OH
OH
OH

7.050
0.275
1.650
2.100
0.403
0.353

Overhead & Profi

Harga Satuan Pe

A.4.1.1.31

Membuat 1 m balok beton bertulang (200 kg besi + bekisting)


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat beton
PC
PB
KR
Kayu kelas II balok
plywood 9 mm
Dolken kayu galam,
(8-10) cm, panjang 4 m
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
Kg
Kg
Kg
m
m
m
Lembar

0.320
3.200
1.600
210.000
3.000
336.000
0.540
0.810
0.140
2.800

Batang

16.000

OH
OH
OH
OH
OH
OH

6.350
0.275
1.650
1.400
0.333
0.318

Overhead & Profi

Harga Satuan Pe

A.4.1.1.32

Membuat 1 m plat beton bertulang (150 kg besi + bekisting)


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat beton
PC
PB
KR
Kayu kelas II balok
plywood 9 mm
Dolken kayu galam,
(8-10) cm, panjang 4 m
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
Kg
Kg
Kg
m
m
m
Lembar

0.320
3.200
1.600
157.000
2.250
336.000
0.540
0.810
0.120
2.800

Batang

32.000

OH
OH
OH
OH
OH
OH

5.300
0.275
1.300
1.050
0.265
0.265

Overhead & Profi

Harga Satuan Pe

A.4.1.1.33

Membuat 1 m dinding beton bertulang (150 kg besi + bekisting)


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat beton
PC
PB
KR
Kayu kelas II balok
plywood 9 mm
Dolken kayu galam,
(8-10) cm, panjang 4 m
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
Kg
Kg
Kg
m
m
m
Lembar

0.240
3.200
1.600
157.000
2.250
336.000
0.540
0.810
0.160
2.800

Batang

24.000

OH
OH
OH
OH
OH
OH

5.300
0.275
1.300
1.050
0.262
0.265

Overhead & Profi

Harga Satuan Pe

A.4.1.1.34

Membuat 1 m dinding beton bertulang (200 kg besi + bekisting)


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat beton
PC
PB
KR
Kayu kelas II balok
plywood 9 mm
Dolken kayu galam,
(8-10) cm, panjang 4 m
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Liter
Kg
Kg
Kg
m
m
m
Lembar

0.250
3.000
1.200
210.000
3.000
336.000
0.540
0.810
0.105
2.500

Batang

14.000

OH
OH
OH
OH
OH
OH

5.650
0.275
1.560
1.400
0.323
0.283

Overhead & Profi

Harga Satuan Pe

A.4.1.1.35

Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas III


Paku 5 cm - 12 cm
Besi beton polos
Kawat beton
PC
PB
KR
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Kg
Kg
Kg
m
m
OH
OH
OH
OH
OH
OH

0.002
0.010
3.000
0.045
4.000
0.006
0.009
0.180
0.020
0.020
0.020
0.006
0.009

Overhead & Profi

Harga Satuan Pe

A.4.1.1.36

Membuat 1 m' ring balok beton bertulang (10 x 15) cm


Kebutuhan

Bahan

Tenaga Kerja

Satuan

Indeks

m
Kg
Kg
Kg
Kg
m
m
OH
OH
OH
OH
OH
OH

0.003
0.020
3.600
0.050
5.500
0.009
0.015
0.297
0.033
0.033
0.033
0.010
0.015

Kayu kelas III


Paku 5 cm - 12 cm
Besi beton polos
Kawat beton
PC
PB
KR
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Overhead & Profi

Harga Satuan Pe

SUPLEMEN
SUPL I.
PEKERJAAN PONDASI 130x120
Beton dengan mutu K 250
Pekerjaan Besi Polos
Pekerjaan Besi Ulir
Cetakan Beton
Pekerjaan Lain-lain

m3
Kg
Kg
m2
Oh

1.0000
154.4992
0.0000
2.1729
1.0000

Beton dengan mutu K 250


Pekerjaan Besi Polos
Pekerjaan Besi Ulir
Cetakan Beton
Pekerjaan Lain-lain

m3
Kg
Kg
m2
Oh

1.0000
107.6481
0.0000
4.5833
1.0000

Beton dengan mutu K 250


Pekerjaan Besi Polos
Pekerjaan Besi Ulir
Cetakan Beton
Pekerjaan Lain-lain

m3
Kg
Kg
m2
Oh

1.0000
107.8409
0.0000
5.8333
1.0000

SUPL II.
PEKERJAAN SLOOF 30/40

SUPL III
PEKERJAAN KOLOM 40/30

SUPL IV.a
PEKERJAAN BALOK 25/40
Beton dengan mutu K 250
Pekerjaan Besi Polos
Pekerjaan Besi Ulir
Cetakan Beton
Pekerjaan Lain-lain

m3
Kg
Kg
m2
Oh

1.0000
125.0923
0.0000
6.5000
1.0000

Beton dengan mutu K 250


Pekerjaan Besi Polos
Pekerjaan Besi Ulir
Cetakan Beton
Pekerjaan Lain-lain

m3
Kg
Kg
m2
Oh

1.0000
110.2272
0.0000
7.8571
1.0000

Beton dengan mutu K 250


Pekerjaan Besi Polos
Pekerjaan Besi Ulir
Cetakan Beton
Pekerjaan Lain-lain

m3
Kg
Kg
m2
Oh

1.0000
122.1112
0.0000
6.6667
1.0000

SUPL VI
PEKERJAAN PLAT LANTAI T 12 CM
Beton dengan mutu K 250
Pekerjaan Besi
Cetakan Beton
Pekerjaan Lain-lain

m3
Kg
m2
Oh

1.0000
183.4815
4.1667
1.0000

SUPL VII
PEKERJAAN PLAT BORDES T 15 CM
Beton dengan mutu K 250

m3

SUPL IV.b
PEKERJAAN BALOK 20/35

SUPL V
PEKERJAAN RINGBALOK 20/30

1.0000

Pekerjaan Besi

Kg

151.8314

Cetakan Beton

m2

3.3333

Pekerjaan Lain-lain

Oh

1.0000

SUPL VIII
PEKERJAAN BALOK BORDES 20/305
Beton dengan mutu K 250
Pekerjaan Besi Polos
Pekerjaan Besi Ulir
Cetakan Beton
Pekerjaan Lain-lain

m3
Kg
Kg
m2
Oh

1.0000
80.6375
25.3661
6.4286
1.0000

SUPL IX
PEKERJAAN ANAK TANGGA DAN PLAT TANGGA
Beton dengan mutu K 250
Pekerjaan Besi
Cetakan Beton
Pekerjaan Lain-lain

m3
Kg
m2
Oh

1.0000
306.7486
4.4673
1.0000

Pekerjaan Kayu
A.4.6.1.1

Membuat dan memasang 1 m kusen pintu dan kusen jendela, kayu kelas I
Kebutuhan

Bahan

Tenaga Kerja

Balok kayu
Paku 10 cm
Lem kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Kg
OH
OH
OH
OH

1.100
1.250
1.000
7.000
21.000
2.100
0.350

Overhead & Profi

Harga Satuan Pe

A.4.6.1.2

Membuat dan memasang 1 m kusen pintu dan kusen jendela, kayu kelas II atau III
Kebutuhan

Bahan

Tenaga Kerja

Balok kayu
Paku 10 cm
Lem kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Kg
OH
OH
OH
OH

1.200
1.250
1.000
6.000
18.000
1.800
0.300

Overhead & Profi

Harga Satuan Pe

A.4.6.1.3

Membuat dan memasang 1 m pintu klamp standar, kayu kelas II


Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Paku 5 cm - 7 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.040
0.050
0.350
1.050
0.105
0.018

Overhead & Profi

Harga Satuan Pe

A.4.6.1.4

Membuat dan memasang 1 m pintu klamp sederhana, kayu kelas III untuk gudang
Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Paku 5 cm - 7 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.040
0.050
0.350
1.050
0.105
0.018

Overhead & Profi

Harga Satuan Pe

A.4.6.1.5

Membuat dan memasang 1 m daun pintu panel, kayu kelas I atau II


Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Lem kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.040
0.500
1.000
3.000
0.300
0.050

Overhead & Profi

Harga Satuan Pe

A.4.6.1.6

Membuat dan memasang 1 m pintu dan jendela kaca, kayu kelas I atau II
Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Lem kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.024
0.300
0.800
2.400
0.240
0.040

Overhead & Profi

Harga Satuan Pe

A.4.6.1.7

Membuat dan memasang 1 m pintu dan jendela jalusi kayu kelas I atau II
Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Lem kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.064
0.500
1.000
3.000
0.300
0.050

Overhead & Profi

Harga Satuan Pe

A.4.6.1.8

Membuat 1 m daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kela
Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Paku 1 cm - 2,5 cm
Lem kayu
Plywood tebal 4 mm
Ukuran (90 x 220) cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Kg

0.025
0.030
0.500

Lembar

1.000

OH
OH
OH
OH

0.700
2.100
0.210
0.035

Overhead & Profi

Harga Satuan Pe

A.4.6.1.9

Membuat 1 m pintu plywood rangkap, rangka expose kayu kelas I atau II


Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Paku 1 cm - 2,5 cm
Lem kayu
Plywood tebal 4 mm
Ukuran (90 x 220) cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Kg

0.025
0.030
0.500

Lembar

1.000

OH
OH
OH
OH

0.800
2.400
0.240
0.040

Overhead & Profi

Harga Satuan Pe

A.4.6.1.10

Memasang 1 m jalusi kusen, kayu kelas I atau II


Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Paku 1 cm - 2,5 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.060
0.150
0.670
2.000
0.200
0.335

Overhead & Profi

Harga Satuan Pe

A.4.6.1.11

Membuat 1 m teakwood rangkap, rangka expose kayu kelas I


Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Paku 1 cm - 2,5 cm
Lem kayu
Teakwood tebal 4 mm
Ukuran (90 x 220) cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Kg

0.025
0.030
0.300

Lembar

1.000

OH
OH
OH
OH

0.800
2.400
0.240
0.040

Overhead & Profi

Harga Satuan Pe

A.4.6.1.12

Membuat 1 m teakwood rangkap lapis formika, rangka expose kayu kelas II

Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Paku 1 cm - 2,5 cm
Lem kayu
Teakwood tebal 4 mm
Ukuran (90 x 220) cm
Formika
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Kg

0.025
0.030
0.800

Lembar

1.000

Lembar
OH
OH
OH
OH

0.500
0.850
2.550
0.255
0.043

Overhead & Profi

Harga Satuan Pe

A.4.6.1.13

Memasang 1 m konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang


Kebutuhan

Bahan

Tenaga Kerja

Balok kayu kelas III


Besi strip tebal 5 mm
Paku 12 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Kg
OH
OH
OH
OH

1.100
15.000
5.600
4.000
12.000
1.200
0.200

Overhead & Profi

Harga Satuan Pe

A.4.6.1.14

Memasang 1 m konstruksi kuda-kuda expose, kayu kelas I


Kebutuhan

Bahan

Tenaga Kerja

Balok kayu kelas I


Besi strip tebal 5 mm
Paku 12 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Kg
OH
OH
OH
OH

1.200
15.000
5.600
6.700
20.100
2.010
0.335

Overhead & Profi

Harga Satuan Pe

A.4.6.1.15

Memasang 1 m konstruksi gordeng, kayu kelas II


Kebutuhan

Bahan

Tenaga Kerja

Balok kayu II
Besi strip tebal 5 mm
Paku 12 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Kg
OH
OH
OH
OH

1.100
15.000
3.000
2.400
7.200
0.720
0.120

Overhead & Profi

Harga Satuan Pe

A.4.6.1.16

Memasang 1 m rangka atap genteng keramik, kayu kelas II


Kebutuhan

Bahan

Tenaga Kerja

Kaso-kaso (5 x 7) cm
Reng (3 x 4) cm
Paku 5 cm dan 10 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
m
Kg
OH
OH
OH
OH

0.014
0.0036
0.250
0.100
0.100
0.010
0.005

Overhead & Profi

Harga Satuan Pe

A.4.6.1.17

Memasang 1 m rangka atap genteng beton, kayu kelas II


Kebutuhan

Bahan

Tenaga Kerja

Kaso-kaso (5 x 7) cm
Reng (3 x 4) cm
Paku 5 cm dan 10 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
m
Kg
OH
OH
OH
OH

0.014
0.0072
0.250
0.100
0.100
0.010
0.005

Overhead & Profi

Harga Satuan Pe

A.4.6.1.18

Memasang 1 m rangka atap sirap, kayu kelas II


Kebutuhan

Bahan

Tenaga Kerja

Kayu kelas II
Paku 5 cm sampai 10 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.165
0.200
0.120
0.120
0.012
0.006

Overhead & Profi

Harga Satuan Pe

A.4.6.1.19

Memasang 1 m rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Kebutuhan

Bahan

Tenaga Kerja

Kaso-kaso (5 x 7) cm
Paku 7 cm - 10 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.0154
0.200
0.150
0.300
0.030
0.075

Overhead & Profi

Harga Satuan Pe

A.4.6.1.20

Memasang 1 m rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Kebutuhan

Bahan

Tenaga Kerja

Kaso-kaso (5 x 7) cm
Paku 7 cm - 10 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.0163
0.250
0.200
0.300
0.030
0.010

Overhead & Profi

Harga Satuan Pe

A.4.6.1.21

Memasang 1 m' listplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Paku 5 cm dan 7 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.0108
0.100
0.100
0.200
0.020
0.005

Overhead & Profi

Harga Satuan Pe

A.4.6.1.22

Memasang 1 m' listplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Kebutuhan

Bahan

Tenaga Kerja

Papan kayu
Paku 5 cm dan 7 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.011
0.050
0.100
0.200
0.020
0.005

Overhead & Profi

Harga Satuan Pe

A.4.6.1.23

Memasang 1 m rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
Kebutuhan

Bahan

Tenaga Kerja

Balok kayu
Paku 5 cm dan 7 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
OH
OH
OH
OH

0.028
0.150
0.150
0.450
0.045
0.008

Overhead & Profi

Harga Satuan Pe

A.4.6.1.24

Memasang 1 m dinding pemisah teakwood rangkap, rangka kayu kelas II


Kebutuhan

Bahan

Tenaga Kerja

Balok kayu
ukuran (6 x 12) cm
Paku 5 cm dan 10 cm
Teakwood tebal 4 mm
Ukuran (120 x 240) cm
Lem kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

0.028

Kg

0.150

Lembar

0.860

Kg
OH
OH
OH
OH

0.560
0.150
0.450
0.045
0.008

Overhead & Profi

Harga Satuan Pe

A.4.6.1.25

Memasang 1 m dinding pemisah plywood rangkap, rangka kayu kelas II


Kebutuhan

Bahan

Tenaga Kerja

Balok kayu
ukuran (6 x 12) cm
Paku 5 cm dan 10 cm
Plywood tebal 4 mm
Ukuran (120 x 240) cm
Lem kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

0.028

Kg

0.150

Lembar

0.860

Kg
OH
OH
OH
OH

0.560
0.200
0.600
0.060
0.010

Overhead & Profi

Harga Satuan Pe

A.4.6.1.26

Memasang 1 m dinding lambriziring dari papan kayu kelas I

Kebutuhan
Bahan

Tenaga Kerja

Papan kayu
Paku 5 cm dan 10 cm
Paku skrup 10 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
Kg
OH
OH
OH
OH

0.007
0.100
0.150
0.600
1.800
0.180
0.030

Overhead & Profi

Harga Satuan Pe

A.4.6.1.27

Memasang 1 m dinding lambriziring dari plywood ukuran (120 x 240) cm

Kebutuhan
Bahan

Tenaga Kerja

Plywood tebal 4 mm
Paku 1 cm dan 2,5 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

Lembar
Kg
OH
OH
OH
OH

0.400
0.050
0.025
0.075
0.008
0.001

Overhead & Profi

Harga Satuan Pe

A.4.6.1.28

Memasang 1 m dinding bilik, rangka kayu kelas III atau IV


Kebutuhan

Bahan

Tenaga Kerja

Bilik bambu
Kaso-kaso (5 x 7) cm
Paku
List kayu 2/4
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m
m
Kg
m
OH
OH
OH
OH

1.500
0.014
0.012
0.003
0.100
0.050
0.005
0.005

Overhead & Profi

Harga Satuan Pe

Pekerjaan Besi dan Aluminium


A.4.2.1.1

Memasang 1 kg besi profil


Kebutuhan

Bahan
Tenaga Kerja

Besi profil
Pekerja
Tukang Las Konstruksi
Kepala tukang
Mandor

Satuan

Indeks

Kg
OH
OH
OH
OH

1.150
0.060
0.060
0.006
0.003

Overhead & Profi

Harga Satuan Pe

A.4.2.1.2

Memasang 1 kg rangka kuda-kuda baja IWF


Kebutuhan

Bahan
Tenaga Kerja

Besi baja IWF


Pekerja
Tukang Las Konstruksi
Kepala tukang
Mandor

Satuan

Indeks

Kg
OH
OH
OH
OH

1.150
0.060
0.060
0.006
0.003

Overhead & Profi

Harga Satuan Pe

A.4.2.1.3

Mengerjakan 100 kg pekerjaan perakitan


Kebutuhan

Bahan

Tenaga Kerja
Alat

Solar
Minyak pelumas
Pekerja
Tukang besi Konstruksi
Kepala tukang
Mandor
Sewa alat

Satuan

Indeks

Liter
Liter
OH
OH
OH
OH
Jam

1.000
0.100
0.100
0.100
0.001
0.005
0.800

Overhead & Profi

Harga Satuan Pe

A.4.2.1.4

Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Kebutuhan

Bahan

Tenaga Kerja

Besi Siku L 30.30.3


Besi plat baja
Kawat las
Pekerja
Tukang las biasa
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
OH
OH
OH
OH

15.000
32.800
0.050
1.050
1.050
0.105
0.052

Overhead & Profi

Harga Satuan Pe

A.4.2.1.5

Pengerjaan 10 cm pengelasan dengan las listrik


Kebutuhan

Bahan

Tenaga Kerja

Kawat las listrik


Solar
Minyak pelumas
Pekerja
Tukang besi Konstruksi
Kepala tukang
Mandor

Sewa Alat

Satuan

Indeks

Kg
Liter
Liter
OH
OH
OH
OH
Jam

0.400
0.300
0.040
0.040
0.020
0.002
0.002
0.170

Overhead & Profi

Harga Satuan Pe

A.4.2.1.6

Pembuatan 1 m2 rangka jendela besi scuare tube (25x5) cm


Kebutuhan

Bahan

Tenaga Kerja

Besi scuare tube


Besi lis kaca (1x1) cm
Pengelasan
Pekerja
Tukang las biasa
Kepala tukang
Mandor

Satuan

Indeks

m
m
cm
OH
OH
OH
OH

4.760
4.522
20.000
0.650
0.650
0.650
0.032

Overhead & Profi

Harga Satuan Pe

A.4.2.1.7

Pemasangan 1 m2 pintu rolling door besi


Kebutuhan

Bahan
Tenaga Kerja

Pintu gulung besi


Pekerja
Tukang las biasa
Kepala tukang
Mandor

Satuan

Indeks

m2
OH
OH
OH
OH

1.000
1.200
1.200
0.120
0.006

Overhead & Profi

Harga Satuan Pe

A.4.2.1.8

Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC


Kebutuhan

Bahan
Tenaga Kerja

Pintu lipat
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

m2
OH
OH
OH
OH

1.000
0.440
0.440
0.044
0.022

Overhead & Profi

Harga Satuan Pe

A.4.2.1.9

Pemasangan 1 m2 sunscreen alumunium


Kebutuhan

Bahan
Tenaga Kerja

Sunscreen alumunium
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

m2
OH
OH
OH
OH

1.000
0.080
0.800
0.080
0.004

Overhead & Profi

Harga Satuan Pe

A.4.2.1.10

Pemasangan 1 m2 pintu rolling door alumunium


Kebutuhan

Bahan
Tenaga Kerja

Rolling door alumunium


Pekerja
Tukang khusus alumunium
Kepala tukang
Mandor

Satuan

Indeks

m2
OH
OH
OH
OH

1.000
1.000
1.000
0.100
0.050

Overhead & Profi

Harga Satuan Pe

A.4.2.1.11

Pemasangan 1 m kusen pintu alumunium


Kebutuhan

Bahan

Tenaga Kerja

Profil alumunium
Skrup fixer
Sealant
Pekerja
Tukang khusus alumunium
Kepala tukang
Mandor

Satuan

Indeks

m
buah
tube
OH
OH
OH
OH

1.100
2.000
0.060
0.043
0.043
0.004
0.0021

Overhead & Profi

Harga Satuan Pe

A.4.2.1.12

Pemasangan 1 m kusen pintu alumunium, strip lebar 8 cm


Kebutuhan

Bahan

Tenaga Kerja

Profil alumunium
Alumunium strip
Pekerja
Tukang khusus alumunium
Kepala tukang
Mandor

Satuan

Indeks

m
m
OH
OH
OH
OH

4.400
14.600
0.085
0.085
0.009
0.0042

Overhead & Profi

Harga Satuan Pe

A.4.2.1.12

Pemasangan 1 m kusen pintu alumunium, strip lebar 8 cm


Kebutuhan

Bahan

Tenaga Kerja

Profil alumunium
Alumunium strip
Pekerja
Tukang khusus alumunium
Kepala tukang
Mandor

Satuan

Indeks

m
m
OH
OH
OH
OH

4.400
14.600
0.085
0.085
0.009
0.0042

Overhead & Profi

Harga Satuan Pe

A.4.2.1.13

Pemasangan 1 m2 pintu kaca rangka alumunium


Kebutuhan

Bahan

Tenaga Kerja

Pintu alumunium
Profil kaca
Sealant
Pekerja
Tukang alumunium/kaca
Kepala tukang
Mandor

Satuan

Indeks

m
m
tube
OH
OH
OH
OH

4.400
4.500
0.270
0.085
0.085
0.0085
0.0050

Overhead & Profi

Harga Satuan Pe

A.4.2.1.14

Pemasangan 1 m2 Venoticons blinds dan Vertial blinds


Kebutuhan

Bahan
Tenaga Kerja

Venoticons blinds dan Vertial blinds (tirai)


Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

m
OH
OH
OH
OH

1.000
0.350
0.350
0.0350
0.0180

Overhead & Profi

Harga Satuan Pe

A.4.2.1.15

Pemasangan 1 m2 terali besi strip (2x3) mm


Kebutuhan

Bahan

Tenaga Kerja

Besi strip
Pengelasan
Pekerja
Tukang las
Kepala tukang
Mandor

Satuan

Indeks

kg
cm
OH
OH
OH
OH

6.177
27.080
1.670
1.670
0.1670
0.0830

Overhead & Profi

Harga Satuan Pe

A.4.2.1.16

Pemasangan 1 m2 kawat nyamuk


Kebutuhan

Bahan

Tenaga Kerja

Kawat nyamuk
Pengelasan
Baja strip (0,2x2) cm
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

m2
cm
kg
OH
OH
OH
OH

1.100
11.110
1.716
0.100
0.100
0.0100
0.0050

Overhead & Profi

Harga Satuan Pe

A.4.2.1.17

Pemasangan 1 m2 jendela nako & tralis


Kebutuhan

Bahan

Tenaga Kerja

Jendela nako (rangka + kaca 5 mm)


Paku skrup (1 cm - 2,5 cm)
Besi strip
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

m2
buah
m2
OH
OH
OH
OH

1.100
10.000
7.000
0.100
0.100
0.0100
0.0050

Overhead & Profi


Harga Satuan Pe

A.4.2.1.18

Memasang 1 m' talang datar/jurai seng bjls 28 lebar 90 cm


Kebutuhan

Bahan

Tenaga Kerja

Seng plat
Paku 1 cm - 2,5 cm
Papan kayu kelas II atau III
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

m'
Kg
m
OH
OH
OH
OH

1.050
0.015
0.019
0.200
0.200
0.020
0.001

Overhead & Profi

Harga Satuan Pe

A.4.2.1.19

Pemasangan 1 m talang 1/4 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Kebutuhan

Bahan

Tenaga Kerja

Seng plat
Paku 1 cm - 2,5 cm
Besi strip
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

m'
Kg
Kg
OH
OH
OH
OH

1.050
0.010
0.500
1.050
0.300
0.030
0.008

Overhead & Profi

Harga Satuan Pe

A.4.2.1.20

Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mmm, modul 60x120 cm, dinding p
Kebutuhan

Bahan

Tenaga Kerja

Rangka metal hollow 40.40.2 mm


Assesoris (perkuatan, las, dll)
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

m'
Ls
OH
OH
OH
OH

3.500
100%xrangka
0.250
0.250
0.025
0.013

Overhead & Profi

Harga Satuan Pe

A.4.2.1.21

Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mmm, modul 60x60 cm, plafon
Kebutuhan

Bahan

Tenaga Kerja

Rangka metal hollow 40.40.2 mm


Assesoris (perkuatan, las, dll)
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

m'
Ls
OH
OH
OH
OH

4.000
100%xrangka
0.350
0.350
0.035
0.018

Overhead & Profi

Harga Satuan Pe

Pekerjaan Langit-langit
A.4.5.1.5

Memasang 1 m langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan
Kebutuhan

Bahan

Tenaga Kerja

Tripleks
Paku tripleks
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

Lembar
Kg
OH
OH
OH
OH

0.375
0.030
0.100
0.100
0.010
0.005

Overhead & Profi

Harga Satuan Pe

A.4.5.1.7

Memasang 1 m langit-langit gypsum board ukuran (1200 x 2400 x 9) mm


Kebutuhan

Bahan

Tenaga Kerja

Gypsum board
Paku skrup
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

Lembar
Kg
OH
OH
OH
OH

0.364
0.110
0.100
0.050
0.005
0.005

Overhead & Profi

Harga Satuan Pe

A.4.5.1.7a

Memasang 1 m' list plafond gypsum profil

Kebutuhan
Bahan

Tenaga Kerja

List gypsum profil


Tepung gypsum
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m'
Kg
OH
OH
OH
OH

1.050
0.150
0.060
0.060
0.006
0.003

Overhead & Profi

Harga Satuan Pe

A.4.5.1.9

Memasang 1 m' list langit-langit kayu profil


Kebutuhan

Bahan

Tenaga Kerja

List kayu profil


Paku
Pekerja
Tukang kayu
Kepala tukang
Mandor

Satuan

Indeks

m'
Kg
OH
OH
OH
OH

1.050
0.010
0.050
0.050
0.005
0.003

Overhead & Profi

Harga Satuan Pe
A.4.5.1.10

Pemasangan 1 m2 Rangka Langit-langit besi hollow 40.40


(Lihat pada kelompok pekerjaan besi dan alumunium A.9.2.1)

Pekerjaan Penutup Lantai dan Dinding


A.4.4.3.1

Memasang 1 m lantai ubin PC abu-abu ukuran (40 x 40) cm


Kebutuhan

Bahan

Tenaga Kerja

Ubin abu-abu
PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

6.630
9.800
0.045
0.250
0.125
0.013
0.013

Overhead & Profi

Harga Satuan Pe

A.4.4.3.2

Memasang 1 m lantai ubin PC abu-abu ukuran (30 x 30) cm


Kebutuhan

Bahan

Tenaga Kerja

Ubin abu-abu
PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

11.870
10.000
0.045
0.260
0.130
0.013
0.013

Overhead & Profi

Harga Satuan Pe

A.4.4.3.3

Memasang 1 m lantai ubin PC abu-abu ukuran (20 x 20) cm


Kebutuhan

Bahan

Tenaga Kerja

Ubin abu-abu
PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
OH
OH
OH
OH

26.500
10.400
0.045
0.270
0.135
0.014
0.014

Overhead & Profi

Harga Satuan Pe

A.4.4.3.4

Memasang 1 m lantai ubin warna ukuran (40 x 40) cm


Kebutuhan

Bahan

Tenaga Kerja

Ubin warna
PC
PP
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
Kg
OH
OH
OH
OH

6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013

Overhead & Profi

Harga Satuan Pe

A.4.4.3.5

Memasang 1 m lantai ubin warna ukuran (30 x 30) cm


Kebutuhan

Bahan

Tenaga Kerja

Ubin warna
PC
PP
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
Kg
OH
OH
OH
OH

11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013

Overhead & Profi

Harga Satuan Pe

A.4.4.3.6

Memasang 1 m lantai ubin warna ukuran (20 x 20) cm


Kebutuhan

Bahan

Tenaga Kerja

Ubin warna
PC
PP
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
Kg
OH
OH
OH
OH

26.500
10.400
0.045
1.620
0.270
0.135
0.014
0.014

Overhead & Profi

Harga Satuan Pe

A.4.4.3.7

Memasang 1 m lantai ubin teraso ukuran (40 x 40) cm


Kebutuhan

Bahan

Tenaga Kerja

Ubin teraso
PC
PP
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
Kg
OH
OH
OH
OH

6.630
9.800
0.045
1.300
0.250
0.125
0.013
0.013

Overhead & Profi

Harga Satuan Pe
Keterangan : Harga Bahan sudah termasuk ongkos poles

A.4.4.3.8

Memasang 1 m lantai ubin teraso ukuran (30 x 30) cm


Kebutuhan

Bahan

Tenaga Kerja

Ubin teraso
PC
PP
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
Kg
OH
OH
OH
OH

11.870
10.000
0.045
1.500
0.260
0.130
0.013
0.013

Overhead & Profi

Harga Satuan Pe
Keterangan : Harga Bahan sudah termasuk ongkos poles

A.4.4.3.13

Memasang 1 m lantai ubin teralux marmer ukuran (60 x 60) cm


Kebutuhan

Bahan

Tenaga Kerja

Ubin teralux marmer


PC
PP
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
Kg
OH
OH
OH
OH

3.100
9.600
0.045
1.500
0.240
0.120
0.012
0.012

Overhead & Profi

Harga Satuan Pe

A.4.4.3.35

Memasang 1 m lantai keramik ukuran (30 x 30) cm


Kebutuhan

Bahan

Tenaga Kerja

Ubin keramik
PC
PP
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
Kg
OH
OH
OH
OH

11.870
10.000
0.045
1.500
0.700
0.350
0.035
0.035

Overhead & Profi

Harga Satuan Pe

A.4.4.3.35.a

Memasang 1 m lantai keramik ukuran (40 x 40) cm


Kebutuhan

Bahan

Tenaga Kerja

Keramik
PC
PP
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
Kg
OH
OH
OH
OH

6.000
10.000
0.045
1.500
0.700
0.350
0.035
0.035

Overhead & Profi

Harga Satuan Pe

A.4.4.3.36

Memasang 1 m lantai keramik ukuran (20 x 20) cm


Kebutuhan

Bahan

Tenaga Kerja

Ubin keramik
PC
PP
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
Kg
OH
OH
OH
OH

26.500
10.400
0.045
1.620
0.700
0.350
0.035
0.035

Overhead & Profi

Harga Satuan Pe

A.4.4.3.54

Memasang 1 m dinding keramik ukuran (20 x 20) cm


Kebutuhan

Bahan

Tenaga Kerja

Keramik
PC
PP
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
Kg
OH
OH
OH
OH

26.500
9.300
0.018
1.940
0.900
0.450
0.045
0.045

Overhead & Profi

Harga Satuan Pe

A.4.4.3.55

Memasang 1 m dinding keramik ukuran (20 x 25) cm


Kebutuhan

Bahan

Tenaga Kerja

Keramik
PC
PP
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
m
Kg
OH
OH
OH
OH

20.000
9.300
0.018
1.940
0.900
0.450
0.045
0.045

Overhead & Profi

Harga Satuan Pe

A.4.4.3.58

Memasang 1 m dinding batu tempel hitam


Kebutuhan

Bahan

Tenaga Kerja

Batu tempel hitam


PC
PP
Pekerja
Tukang batu
Kepala tukang
Mandor

Satuan

Indeks

m
Kg
m
OH
OH
OH
OH

1.100
11.750
0.035
0.700
0.350
0.035
0.035

Overhead & Profi

Harga Satuan Pe

A.4.4.3.59

Memasang 1 m lantai vinyl ukuran (30 x 30) cm


Kebutuhan

Bahan

Tenaga Kerja

Vinyl
Lem vinyl
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

Buah
Kg
OH
OH
OH
OH

11.870
0.350
0.150
0.150
0.015
0.008

Overhead & Profi

Harga Satuan Pe

Pekerjaan Pengecatan
A.4.7.1.1.1

1 m2 Pengikisan/pengerukan permukaan cat lama


Kebutuhan

Bahan
Tenaga Kerja

Soda Api
Pekerja
Mandor

Satuan

Indeks

Kg
OH
OH

0.0500
0.1500
0.0030

Overhead & Profi

Harga Satuan Pe

A.4.7.1.1.2

1 m2 Pencucian bidang permukaan tembok yang pernah dicat


Kebutuhan

Bahan
Tenaga Kerja

Sabun
Pekerja
Mandor

Satuan

Indeks

Kg
OH
OH

0.0500
0.1500
0.0030

Overhead & Profi

Harga Satuan Pe

A.4.7.1.1.3

1 m2 Pengerokan karat pada permukaan baja cara manual


Kebutuhan

Bahan
Tenaga Kerja

Sabun
Pekerja
Mandor

Satuan

Indeks

Kg
OH
OH

0.0500
0.1500
0.0080

Overhead & Profi

Harga Satuan Pe

A.4.7.1.1.4

1 m2 Pengecatan bidang kayu baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat pe
Kebutuhan

Bahan

Tenaga Kerja

Cat menie
Plamuur
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Kg
Bh
L
Lbr
OH
OH
OH
OH

0.2000
0.1500
0.1700
0.2600
0.0100
0.0300
0.2000
0.0700
0.0090
0.0060
0.0030

Overhead & Profi

Harga Satuan Pe

A.4.7.1.1.5

1 m2 Pengecatan bidang kayu baru ( 1 lapis plamur, 1 lapis cat dasar, 3 lapis cat pe
Kebutuhan

Bahan

Tenaga Kerja

Cat menie
Plamuur
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Kg
Kg
Kg
Lbr
OH
OH
OH
OH

0.2000
0.1500
0.1700
0.3500
0.0100
0.0300
0.2000
0.0700
0.1050
0.0040
0.0030

Overhead & Profi

Harga Satuan Pe

A.4.7.1.1.6

Pelaburan 1 m2 bidang kayu dengan teak oil


Kebutuhan

Bahan
Tenaga Kerja

Teak Oil
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Satuan

Indeks

L
OH
OH
OH
OH

0.3600
0.0400
0.0630
0.0630
0.0030

Overhead & Profi

Harga Satuan Pe

A.4.7.1.1.7

Pelaburan 1 m2 bidang kayu dengan politur


Kebutuhan

Bahan

Tenaga Kerja

Politur
Politur Jadi
Ampelas
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Satuan

Indeks

L
L
Lbr
OH
OH
OH
OH

0.1500
0.3720
2.0000
0.0400
0.0630
0.0160
0.0030

Overhead & Profi

Harga Satuan Pe

A.4.7.1.1.8

Pelaburan 1 m2 bidang kayu dengan cat residu dan ter


Kebutuhan

Bahan
Tenaga Kerja

Residu atau ter


Pekerja
Mandor

Satuan

Indeks

L
OH
OH

0.3500
0.1000
0.0060

Overhead & Profi

Harga Satuan Pe

A.4.7.1.1.9

Pelaburan 1 m2 bidang kayu dengan vernis


Kebutuhan

Bahan

Tenaga Kerja

Vernis
Dempul
Ampelas
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Satuan

Indeks

L
Kg
Lbr
OH
OH
OH
OH

0.1500
0.0500
0.1000
0.1600
0.1600
0.0160
0.0030

Overhead & Profi

Harga Satuan Pe

A.4.7.1.10

Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutu
Kebutuhan

Bahan

Tenaga Kerja

Plamur
Cat Dasar
Cat Penutup
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
OH
OH
OH
OH

0.1000
0.1000
0.2600
0.0200
0.0630
0.0063
0.0030

Overhead & Profi

Harga Satuan Pe

A.4.7.1.11

Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)


Kebutuhan

Bahan

Tenaga Kerja

Cat Dasar
Cat Penutup
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Satuan

Indeks

Kg
Kg
OH
OH
OH
OH

0.1200
0.1800
0.0280
0.0420
0.0042
0.0030

Overhead & Profi

Harga Satuan Pe

A.4.7.1.12

Pelaburan 1 m2 tembok dengan kalkarium


Kebutuhan

Bahan
Tenaga Kerja

Kalkarium
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Satuan

Indeks

Kg
OH
OH
OH
OH

0.1000
0.0280
0.0420
0.0042
0.0030

Overhead & Profi

Harga Satuan Pe

A.4.7.1.13

Pelaburan 1 m2 tembok dengan kapur sirih


Kebutuhan

Bahan

Tenaga Kerja

Kapur sirih
Ampelas
Alang-alang
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Satuan

Indeks

Kg
Lbr
Ikat
OH
OH
OH
OH

0.1500
0.1000
0.2500
0.1500
0.0010
0.0001
0.0025

Overhead & Profi

Harga Satuan Pe

A.4.7.1.14

Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)


Kebutuhan

Bahan

Tenaga Kerja

Kapur sirih
Ampelas
Alang-alang
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Satuan

Indeks

Kg
Lbr
Ikat
OH
OH
OH
OH

0.3000
0.2000
0.2500
0.0400
0.0050
0.0005
0.0025

Overhead & Profi

Harga Satuan Pe

A.4.7.1.15

Pemasangan 1 m2 wallpaper
Kebutuhan

Bahan

Tenaga Kerja

Wallpaper
Lem
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

m2
Kg
Oh
Oh
Oh
Oh

1.2000
0.2000
0.0200
0.2000
0.0200
0.0025

Harga Satuan Pek

A.4.7.1.16

Pengecatan 1 m2 permukaan baja dengan menie besi


Kebutuhan

Bahan

Tenaga Kerja

Menie besi
Kuas
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

Kg
Bh
Oh
Oh
Oh
Oh

0.1000
0.0100
0.0200
0.2000
0.0200
0.0025

Harga Satuan Pek

A.4.7.1.17

Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah


Kebutuhan

Bahan

Tenaga Kerja

Menie besi
Pengencer
Kuas
Perancah kayu
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

Kg
L
Bh
m3
Oh
Oh
Oh
Oh

0.1000
0.0100
0.0100
0.0020
0.2500
0.2250
0.0225
0.0075

Harga Satuan Pek

A.4.7.1.18

Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis


Kebutuhan

Bahan

Tenaga Kerja

Menie A
Menie B
Cat
Kuas
Pengencer
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Bh
L
Oh
Oh
Oh
Oh

0.1000
0.1000
0.0800
0.0100
0.0100
0.2500
0.2500
0.0250
0.0013

Harga Satuan Pek

A.4.7.1.19

Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutak
Kebutuhan

Bahan

Tenaga Kerja

Cat
Kuas
Pengencer
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

Kg
Bh
L
Oh
Oh
Oh
Oh

0.3000
0.0100
0.0100
0.0600
0.0600
0.0120
0.0030

Harga Satuan Pek

A.4.7.1.20

Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis


Kebutuhan

Bahan

Tenaga Kerja

Cat dasar
Cat antara
Cat penutup
Kuas
Pengencer
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

Kg
Kg
Kg
Bh
L
Oh
Oh
Oh
Oh

0.1100
0.1700
0.0800
0.0100
0.0100
0.4000
0.8000
0.0800
0.0200

Harga Satuan Pek

A.4.7.1.21

Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat muta
Kebutuhan

Bahan

Tenaga Kerja

Cat dasar
Pengencer
Pekerja
Tukang
Kepala tukang
Mandor

Satuan

Indeks

Kg
L
Oh
Oh
Oh
Oh

0.3000
0.0100
0.4000
0.7000
0.0700
0.0200

Harga Satuan Pek

Pekerjaan Atap
A.4.5.2.32

Memasang 1 m atap genteng metal


Kebutuhan

Bahan

Tenaga Kerja

Genteng Metal
Paku Biasa 2" - 5"
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Lbr
Kg
OH
OH
OH
OH

1.0200
0.2000
0.2000
0.1000
0.0100
0.0010

Overhead & Profi

Harga Satuan Pe

A.4.5.2.38

Memasang 1 m atap seng gelombang BJLS 0,30


Kebutuhan

Bahan

Tenaga Kerja

Seng Gelombang
Paku Biasa " - 1"
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Lbr
Kg
OH
OH
OH
OH

0.7000
0.0200
0.1200
0.0600
0.0060
0.0060

Overhead & Profi

Harga Satuan Pe

A.4.5.2.39

Memasang 1 m atap seng gelombang BJLS 0,20


Kebutuhan

Bahan

Tenaga Kerja

Seng Gelombang
Paku Biasa " - 1"
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Lbr
Kg
OH
OH
OH
OH

1.0200
0.2000
0.2000
0.1000
0.0100
0.0010

Overhead & Profi

Harga Satuan Pe

A.4.5.2.40

Memasang 1 m' rabung genteng metal


Kebutuhan

Bahan

Tenaga Kerja

Nok Seng Genteng


Paku Biasa " - 1"
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Lbr
Kg
OH
OH
OH
OH

1.1000
0.0500
0.2500
0.1500
0.0150
0.0130

Overhead & Profi

Harga Satuan Pe

A.4.5.2.41

Memasang 1 m' rabung Seng


Kebutuhan

Bahan

Tenaga Kerja

Satuan

Indeks

Rabung Seng
Paku Biasa " - 1"
Pekerja
Tukang

Lbr
Kg
OH
OH

0.5000
0.0500
0.2500
0.1500

Kepala Tukang

OH

0.0150

Mandor

OH

0.0130

Overhead & Profi

Harga Satuan Pe

A.4.5.2.42

Memasang 1 m2 Atap Spandek


Kebutuhan

Bahan

Tenaga Kerja

Atap spandek
Paku
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m2
Kg
OH
OH
OH
OH

1.1000
0.0200
0.1200
0.0600
0.0060
0.0060

Overhead & Profi

Harga Satuan Pe

Pekerjaan Kunci dan Kaca


A.4.6.2.1

Pemasangan 1 buah kunci tanam antik


Kebutuhan

Bahan
Tenaga Kerja

Kunci tanam antik


Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0600
0.6000
0.0600
0.0030

Profi

Harga Satuan Pe

A.4.6.2.2

Pemasangan 1 buah kunci tanam biasa


Kebutuhan

Bahan
Tenaga Kerja

Kunci tanam Biasa


Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0100
0.5000
0.0500
0.0050

Profi

Harga Satuan Pe

A.4.6.2.3

Pemasangan 1 buah kunci Kamar mandi


Kebutuhan

Bahan
Tenaga Kerja

Kunci tanam kamar mandi


Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0050
0.5000
0.0500
0.0030

Profi

Harga Satuan Pe

A.4.6.2.4

Pemasangan 1 buah kunci silinder


Kebutuhan

Bahan
Tenaga Kerja

Kunci silinder
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0150
0.1500
0.0150
0.0008

Profi

Harga Satuan Pe

A.4.6.2.5

Pemasangan 1 buah engsel pintu


Kebutuhan

Bahan
Tenaga Kerja

Engsel pintu
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0150
0.1500
0.0150
0.0008

Profi

Harga Satuan Pe

A.4.6.2.6

Pemasangan 1 buah engsel jendela


Kebutuhan

Bahan
Tenaga Kerja

Engsel jendela
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0100
0.1000
0.0100
0.0005

Profi

Harga Satuan Pe

A.4.6.2.7

Pemasangan 1 buah engsel angin


Kebutuhan

Bahan
Tenaga Kerja

Engsel angin
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0100
0.2000
0.0200
0.0005

Profi

Harga Satuan Pe

A.4.6.2.8

Pemasangan 1 buah grendel jendela


Kebutuhan

Bahan
Tenaga Kerja

Grendel jendela
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0150
0.1500
0.0150
0.0080

Profi

Harga Satuan Pe

A.4.6.2.9

Pemasangan 1 buah Kait angin


Kebutuhan

Bahan
Tenaga Kerja

Kait angin
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0150
0.1500
0.0150
0.0080

Profi

Harga Satuan Pe

A.4.6.2.10

Pemasangan 1 buah Door closer


Kebutuhan

Bahan
Tenaga Kerja

Door closer
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

set
Oh
Oh
Oh
Oh

1.0000
0.0500
0.5000
0.0500
0.0030

Profi

Harga Satuan Pe

A.4.6.2.11

Pemasangan 1 buah kunci slot


Kebutuhan

Bahan
Tenaga Kerja

kunci slot
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0200
0.2000
0.0200
0.0010

Profi

Harga Satuan Pe

A.4.6.2.12

Pemasangan 1 buah door holder


Kebutuhan

Bahan
Tenaga Kerja

Door holder
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0500
0.5000
0.0500
0.0030

Profi

Harga Satuan Pe

A.4.6.2.13

Pemasangan 1 buah door stop


Kebutuhan

Bahan
Tenaga Kerja

Door stop
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0100
0.1000
0.0100
0.0050

Profi

Harga Satuan Pe

A.4.6.2.14

Pemasangan 1 buah rel pintu sorong


Kebutuhan

Bahan
Tenaga Kerja

Rel pintu sorong


Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Set
Oh
Oh
Oh
Oh

1.0000
0.0600
0.6000
0.0600
0.0030

Profi

Harga Satuan Pe

A.4.6.2.15

Pemasangan 1 buah kunci lemari


Kebutuhan

Bahan
Tenaga Kerja

Kunci lemari
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Oh
Oh
Oh
Oh

1.0000
0.0250
0.2500
0.0250
0.0030

Profi

Harga Satuan Pe

A.4.6.2.16

Pemasangan 1 buah kaca tebal 3 mm


Kebutuhan

Bahan

Tenaga Kerja

Kaca tebal 3 mm
Sealant
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

M2
Kg
Oh
Oh
Oh
Oh

1.1000
0.0500
0.0150
0.1500
0.0150
0.0008

Profi

Harga Satuan Pe

A.4.6.2.17

Pemasangan 1 buah kaca tebal 5 mm


Kebutuhan

Bahan

Tenaga Kerja

Kaca tebal 5 mm
Sealant
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

M2
Kg
Oh
Oh
Oh
Oh

1.1000
0.0500
0.0150
0.1500
0.0150
0.0008

Profi

Harga Satuan Pe

A.4.6.2.18

Pemasangan 1 buah kaca tebal 8 mm


Kebutuhan

Bahan

Tenaga Kerja

Kaca tebal 8 mm
Sealant
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

M2
Kg
Oh
Oh
Oh
Oh

1.1000
0.0700
0.0170
0.1700
0.0170
0.0009

Profi

Harga Satuan Pe

A.4.6.2.19

Pemasangan 1 buah kaca buram 12 mm


Kebutuhan

Bahan

Tenaga Kerja

Kaca buram 12 mm
Sealant
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

M2
Kg
Oh
Oh
Oh
Oh

1.1000
0.0700
0.0250
0.2500
0.0250
0.0013

Profi

Harga Satuan Pe

A.4.6.2.20

Pemasangan 1 buah cermin tebal 5 mm


Kebutuhan

Bahan
Tenaga Kerja

Kaca cermin tebal 5 mm


Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

M2
Oh
Oh
Oh
Oh

1.1000
0.0150
0.1500
0.0150
0.0080

Profi

Harga Satuan Pe

A.4.6.2.21

Pemasangan 1 buah cermin tebal 8 mm


Kebutuhan

Bahan
Tenaga Kerja

Kaca cermin tebal 8 mm


Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

M2
Oh
Oh
Oh
Oh

1.1000
0.0170
0.1700
0.0170
0.0090

Profi

Harga Satuan Pe

A.4.6.2.22

Pemasangan 1 m2 wiredglass tebal 5 mm


Kebutuhan

Bahan
Tenaga Kerja

Kaca wiredglassed
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

M2
Oh
Oh
Oh
Oh

1.1000
0.0150
0.1500
0.0150
0.0080

Profi

Harga Satuan Pe

A.4.6.2.22

Pemasangan 1 m2 kaca patri tebal 5 mm


Kebutuhan

Bahan

Tenaga Kerja

Kaca patri tebal 5mm


Sealant
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

M2
Kg
Oh
Oh
Oh
Oh

1.1000
0.0500
0.0750
0.1500
0.0150
0.0040

Profi

Harga Satuan Pe

Pekerjaan Sanitasi Dalam Gedung


A.5.1.1.1

Pemasangan 1 buah closet duduk/monoblok


Kebutuhan

Bahan

Tenaga Kerja

Closet duduk
Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Unit
Ls
Oh
Oh
Oh
Oh

1.0000
6% x Closet
3.3000
1.1000
0.1000
0.1600

Profi

Harga Satuan Pe

A.5.1.1.2

Pemasangan 1 buah closet Jongkok keramik/porselen


Kebutuhan

Bahan

Tenaga Kerja

Closet jongkok
Semen Portland
Pasir Pasang
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Unit
Kg
M3
Oh
Oh
Oh
Oh

1.0000
6.0000
0.0100
1.0000
1.5000
0.1500
0.0500

Profi

Harga Satuan Pe

A.5.1.1.3

Pemasangan 1 buah closet Jongkok Teraso


Kebutuhan

Bahan

Tenaga Kerja

Closet jongkok
Semen Portland
Pasir Pasang
Bata Merah
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Unit
Kg
M3
Bh
Oh
Oh
Oh
Oh

1.0000
6.0000
0.0100
7.0000
1.0000
1.5000
0.1500
0.0500

Profi

Harga Satuan Pe

A.5.1.1.4

Pemasangan 1 Buah Urinoir


Kebutuhan

Bahan

Tenaga Kerja

Urinoir
Semen Portland
Pasir Pasang
Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan
Unit
Kg
M3
Ls
Oh
Oh
Oh
Oh

Indeks
1.000
6.000
0.010
30% x urinoir
1.000
1.000
0.100
0.050

Profi

Harga Satuan Pe

A.5.1.1.5

Pemasangan 1 Buah Westafel


Kebutuhan

Bahan

Tenaga Kerja

Westafel
Semen Portland
Pasir Pasang
Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Unit
Kg
M3
Ls
Oh
Oh
Oh
Oh

1.0000
6.0000
0.0100
12% x Westafel
1.2000
1.4500
0.1500
0.0600

Profi

Harga Satuan Pe

A.5.1.1.6

Pemasangan 1 Buah Bathup Porselen


Kebutuhan

Bahan

Tenaga Kerja

Bathup
Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Unit
Ls
Oh
Oh
Oh
Oh

1.0000
20% x Bathup
3.0000
4.5000
0.0500
0.9000

Profi

Harga Satuan Pe

A.5.1.1.7

Pemasangan 1 Buah bak mandi fiberglass Vol 1 m3


Kebutuhan

Bahan

Tenaga Kerja

Bak mandi fiberglass Vol 1 m3


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Unit
Ls
Oh
Oh
Oh
Oh

1.0000
12% x Bak
3.0000
4.5000
0.0500
0.9000

Profi

Harga Satuan Pe

A.5.1.1.8

Pemasangan 1 Buah bak mandi batu bata Vol 0.3 m3


Kebutuhan

Bahan

Tenaga Kerja

Bata Merah
Semen Portland
Pasir Pasang
Porselen 11x11
Semen warna
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Kg
M3
Bh
Kg
Oh
Oh
Oh
Oh

150.0000
120.0000
0.3000
360.0000
6.0000
6.0000
3.0000
0.3000
0.0300

Profi

Harga Satuan Pe

A.5.1.1.9

Pemasangan 1 Buah bak mandi Teraso


Kebutuhan

Bahan

Tenaga Kerja

Bak teraso
Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Unit
Ls
Oh
Oh
Oh
Oh

1.0000
12% x Bak
3.0000
4.5000
0.0500
0.9000

Profi

Harga Satuan Pe

A.5.1.1.10

Pemasangan 1 Buah bak mandi fibreglass


Kebutuhan

Bahan

Tenaga Kerja

Bak fiberglass
Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Unit
Ls
Oh
Oh
Oh
Oh

1.0000
12 x Bak
3.0000
4.5000
0.0500
0.9000

Profi

Harga Satuan Pe

A.5.1.1.11

Pemasangan 1 Buah bak beton vol 1 m3


Kebutuhan

Bahan

Tenaga Kerja

Beton 1:2:3
Baja Tulangan
kayu bekisting
ubin porselen
perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

M3
Kg
m2
bh
Ls
Oh
Oh
Oh
Oh

0.9000
180.0000
8.0000
500.0000
10 % x
3.5000
4.5000
0.0500
0.0180

Profi

Harga Satuan Pe

A.5.1.1.12

Pemasangan 1 Buah bak cuci piring stainlessteel


Kebutuhan

Bahan

Tenaga Kerja

Bak cuci piring


Water Drain
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Unit
Bh
Oh
Oh
Oh
Oh

1.0000
1.0000
0.0300
0.3000
0.0300
0.0150

Profi

Harga Satuan Pe

A.5.1.1.13

Pemasangan 1 Buah bak cuci piring teraso


Kebutuhan

Bahan

Tenaga Kerja

Bak cuci piring


Water Drain
Semen Portland
Pasir pasang
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Unit
Bh
Kg
M3
Oh
Oh
Oh
Oh

1.0000
1.0000
20.0000
0.0500
0.0500
0.5000
0.0500
0.0250

Profi

Harga Satuan Pe

A.5.1.1.14

Pemasangan 1 Buah floor drain


Kebutuhan

Bahan
Tenaga Kerja

Floor drain
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Unit
Oh
Oh
Oh
Oh

1.0000
0.0100
0.1000
0.0100
0.0050

Profi

Harga Satuan Pe

A.5.1.1.15

Pemasangan 1 Buah bak kontrol pasangan bata 30 x 30 t= 35 cm


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
Semen Portland
Pasir pasang
pasir beton
kerikil
baja tulangan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Kg
M3
M3
M3
Kg
Oh
Oh
Oh
Oh

40.0000
44.0000
0.0700
0.0600
0.0700
1.6000
2.1600
0.7200
0.0720
0.0110

Profi

Harga Satuan Pe

A.5.1.1.16

Pemasangan 1 Buah bak kontrol pasangan bata 45 x 45 t= 50 cm


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
Semen Portland
Pasir pasang
pasir beton
kerikil
baja tulangan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Kg
M3
M3
M3
Kg
Oh
Oh
Oh
Oh

70.0000
77.0000
0.0130
0.0900
0.0200
2.6000
3.2000
1.1500
0.0110
0.0160

Profi

Harga Satuan Pe

A.5.1.1.17

Pemasangan 1 Buah bak kontrol pasangan bata 60 x 60 t= 65 cm


Kebutuhan

Bahan

Tenaga Kerja

Bata merah
Semen Portland
Pasir pasang
pasir beton
kerikil
baja tulangan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

Bh
Kg
M3
M3
M3
Kg
Oh
Oh
Oh
Oh

123.0000
114.0000
0.1840
0.1200
0.0330
4.8500
3.2000
1.1500
0.0110
0.0160

Profi

Harga Satuan Pe

A.5.1.1.18

Pemasangan 1 Buah pipa galvanis diameter 1/2"


Kebutuhan

Bahan

Tenaga Kerja

pipa galvanis diameter 1/2"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.0540
0.0900
0.0090
0.0270

Profi

Harga Satuan Pe

A.5.1.1.19

Pemasangan 1 Buah kran air diameter 1/2" atau 3/4"


Kebutuhan

Bahan

Tenaga Kerja

Kran air
Sealtape
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
bh
Oh
Oh
Oh
Oh

1.0000
0.0250
0.0100
0.4000
0.0400
0.0050

Profi

Harga Satuan Pe

A.5.1.1.20

Pemasangan 1 Buah pipa galvanis diameter 3/4"


Kebutuhan

Bahan

Tenaga Kerja

pipa galvanis diameter 3/4"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.0540
0.0900
0.0090
0.0270

Profi

Harga Satuan Pe

A.5.1.1.21

Pemasangan 1 Buah pipa galvanis diameter 1"


Kebutuhan

Bahan

Tenaga Kerja

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.0540
0.0900
0.0090
0.0270

pipa galvanis diameter 1"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Profi

Harga Satuan Pe

A.5.1.1.22

Pemasangan 1 Buah pipa galvanis diameter 1 1/2"


Kebutuhan

Bahan

Tenaga Kerja

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.1080
0.1800
0.0180
0.0050

pipa galvanis diameter 1 1/2"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Profi

Harga Satuan Pe

A.5.1.1.23

Pemasangan 1 Buah pipa galvanis diameter 3"


Kebutuhan

Bahan

Tenaga Kerja

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.1350
0.2250
0.0225
0.0070

pipa galvanis diameter 3"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Profi

Harga Satuan Pe

A.5.1.1.24

Pemasangan 1 Buah pipa galvanis diameter 4"


Kebutuhan

Bahan

Tenaga Kerja

pipa galvanis diameter 4"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.1350
0.2250
0.0225
0.0070

Profi

Harga Satuan Pe

A.5.1.1.25

Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"


Kebutuhan

Bahan

Tenaga Kerja

pipa PVC 1/2"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.0360
0.0600
0.0060
0.0020

Profi

Harga Satuan Pe

A.5.1.1.26

Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"


Kebutuhan

Bahan

Tenaga Kerja

pipa PVC 3/4"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.0360
0.0600
0.0060
0.0020

Profi

Harga Satuan Pe

A.5.1.1.27

Pemasangan 1 m' pipa PVC tipe AW diameter 1"


Kebutuhan

Bahan

Tenaga Kerja

pipa PVC 1"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.0360
0.0600
0.0060
0.0020

Profi

Harga Satuan Pe

A.5.1.1.28

Pemasangan 1 m' pipa PVC tipe AW diameter 1 1/2"


Kebutuhan

Bahan

Tenaga Kerja

pipa PVC 1 1/2"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.0540
0.0900
0.0090
0.0030

Profi

Harga Satuan Pe

A.5.1.1.29

Pemasangan 1 m' pipa PVC tipe AW diameter 2"


Kebutuhan

Bahan

Tenaga Kerja

pipa PVC 2"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.0540
0.0900
0.0090
0.0030

Profi

Harga Satuan Pe

A.5.1.1.30

Pemasangan 1 m' pipa PVC tipe AW diameter 2 1/2"


Kebutuhan

Bahan

Tenaga Kerja

pipa PVC 2 1/2"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.0540
0.0900
0.0090
0.0030

Profi

Harga Satuan Pe

A.5.1.1.31

Pemasangan 1 m' pipa PVC tipe AW diameter 3"


Kebutuhan

Bahan

Tenaga Kerja

pipa PVC 3"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.0810
0.1350
0.0135
0.0040

Profi

Harga Satuan Pe

A.5.1.1.32

Pemasangan 1 m' pipa PVC tipe AW diameter 4"


Kebutuhan

Bahan

Tenaga Kerja

pipa PVC 4"


Perlengkapan
Pekerja
Tukang
Kepala Tukang
Mandor

Satuan

Indeks

m
Ls
Oh
Oh
Oh
Oh

1.2000
35% x Pipa
0.0810
0.1350
0.0135
0.0040

Profi

Harga Satuan Pe

HARGA SATUAN PEKERJAAN

Harga Satuan
Rp
Rp

65,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp

48,750.00
2,000.00
50,750.00
7,612.50

Harga Satuan Pekerjaan Rp

58,362.50

Harga Satuan
Rp
Rp

65,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp

58,500.00
3,600.00
62,100.00
9,315.00

Harga Satuan Pekerjaan Rp

71,415.00

Harga Satuan
Rp
Rp

65,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp

68,250.00
5,360.00
73,610.00
11,041.50

Harga Satuan Pekerjaan Rp

84,651.50

Harga Satuan
Rp
Rp

65,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp

65,000.00
2,560.00
67,560.00
10,134.00

Harga Satuan Pekerjaan Rp

77,694.00

Harga Satuan
Rp
Rp

65,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp

97,500.00
4,800.00
102,300.00
15,345.00

Harga Satuan Pekerjaan Rp

117,645.00

Harga Satuan
Rp
Rp

65,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp

78,000.00
3,600.00
81,600.00
12,240.00

Harga Satuan Pekerjaan Rp

93,840.00

Harga Satuan
Rp
Rp

65,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp

3,250.00
400.00
3,650.00
547.50

Harga Satuan Pekerjaan Rp

4,197.50

Harga Satuan
Rp
Rp

65,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp

19,500.00
800.00
20,300.00
3,045.00

Harga Satuan Pekerjaan Rp

23,345.00

ian tanah dihitung dari 1/3 kali indeks pekerjaan galian

Harga Satuan
Rp
Rp

65,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp

32,500.00
4,000.00
36,500.00
5,475.00

Harga Satuan Pekerjaan Rp

41,975.00

Harga Satuan
Rp
Rp
Rp

123,200.00
65,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp

147,840.00
19,500.00
800.00
168,140.00
25,221.00

Harga Satuan Pekerjaan Rp

193,361.00

Harga Satuan
Rp
Rp
Rp

62,100.00
65,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp

74,520.00
19,500.00
800.00
94,820.00
14,223.00

Harga Satuan Pekerjaan Rp

109,043.00

del campuran 1 KP : 3 PP : 7 TL untuk stabilisasi tanah


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,000.00
120,000.00
61,600.00
65,000.00
78,000.00
90,000.00
75,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,750.00
48,000.00
58,396.80
52,000.00
31,200.00
3,600.00
6,000.00
205,946.80
30,892.02

Harga Satuan Pekerjaan Rp

236,838.82

del campuran 1 KP : 5 TL untuk stabilisasi tanah


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

6,900.00
61,600.00
65,000.00
78,000.00
90,000.00
75,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,711.20
76,384.00
52,000.00
31,200.00
3,600.00
6,000.00
170,895.20
25,634.28

Harga Satuan Pekerjaan Rp

196,529.48

Harga Satuan
Rp
Rp
Rp

16,100.00
65,000.00
75,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp

96,600.00
9,750.00
1,125.00
107,475.00
16,121.25

Harga Satuan Pekerjaan Rp

123,596.25

Harga Satuan
Rp
Rp
Rp

130,000.00
65,000.00
75,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp

156,000.00
16,250.00
1,875.00
174,125.00
26,118.75

Harga Satuan Pekerjaan Rp

200,243.75

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

178,000.00
1,390.00
120,000.00
53,000.00
78,000.00
90,000.00
75,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

213,600.00
280,780.00
58,200.00
79,500.00
58,500.00
6,750.00
5,625.00
702,955.00
105,443.25

Harga Satuan Pekerjaan Rp

808,398.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

165,000.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
226,570.00
78,000.00
97,500.00
64,500.00
8,625.00
6,000.00
679,195.00
101,879.25

Harga Satuan Pekerjaan Rp

781,074.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

165,000.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
189,040.00
81,600.00
97,500.00
64,500.00
8,625.00
6,000.00
645,265.00
96,789.75

Harga Satuan Pekerjaan Rp

742,054.75

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

165,000.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
162,630.00
84,150.00
97,500.00
64,500.00
8,625.00
6,000.00
621,405.00
93,210.75

Harga Satuan Pekerjaan Rp

714,615.75

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

165,000.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
126,490.00
87,600.00
97,500.00
64,500.00
8,625.00
6,000.00
588,715.00
88,307.25

Harga Satuan Pekerjaan Rp

677,022.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

165,000.00
150,000.00
136,500.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
25,500.00
23,205.00
51,000.00
97,500.00
64,500.00
8,625.00
6,000.00
474,330.00
71,149.50

Harga Satuan Pekerjaan Rp

545,479.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

165,000.00
1,390.00
150,000.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
84,790.00
22,050.00
73,800.00
97,500.00
64,500.00
8,625.00
6,000.00
555,265.00
83,289.75

Harga Satuan Pekerjaan Rp

638,554.75

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

165,000.00
1,390.00
150,000.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
56,990.00
19,650.00
78,450.00
97,500.00
64,500.00
8,625.00
6,000.00
529,715.00
79,457.25

Harga Satuan Pekerjaan Rp

609,172.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

165,000.00
123,200.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
53,222.40
50,700.00
33,540.00
4,485.00
3,120.00
343,067.40
51,460.11

Harga Satuan Pekerjaan Rp

394,527.51

klop, 60% beton campuran 1 PC : 2 PB : : 3 KR dan 40% batu belah


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

178,000.00
1,390.00
130,000.00
130,000.00
14,000.00
11,400.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

85,440.00
269,660.00
40,560.00
60,840.00
1,764,000.00
20,520.00
221,000.00
73,100.00
9,775.00
13,600.00
2,558,495.00
383,774.25

Harga Satuan Pekerjaan Rp

2,942,269.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

178,000.00
1,390.00
130,000.00
130,000.00
14,000.00
11,400.00
65,000.00
86,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

80,100.00
269,660.00
40,560.00
60,840.00
33,600.00
9,120.00
5,200.00
10,234.00
509,314.00
76,397.10

Harga Satuan Pekerjaan Rp

585,711.10

ta merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

102,200.00
60,465.00
12,000.00
39,000.00
17,200.00
2,300.00
2,400.00
235,565.00
35,334.75

Harga Satuan Pekerjaan Rp

270,899.75

ta merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

102,200.00
45,800.50
13,650.00
39,000.00
17,200.00
2,300.00
2,400.00
222,550.50
33,382.58

Harga Satuan Pekerjaan Rp

255,933.08

ta merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

102,200.00
36,904.50
13,950.00
39,000.00
17,200.00
2,300.00
2,400.00
213,954.50
32,093.18

Harga Satuan Pekerjaan Rp

246,047.68

ta merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

102,200.00
30,858.00
15,300.00
39,000.00
17,200.00
2,300.00
2,400.00
209,258.00
31,388.70

Harga Satuan Pekerjaan Rp

240,646.70

ta merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

102,200.00
25,715.00
18,300.00
39,000.00
17,200.00
2,300.00
2,400.00
207,115.00
31,067.25

Harga Satuan Pekerjaan Rp

238,182.25

ta merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
6,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

102,200.00
14,011.20
13,875.00
189.75
39,000.00
17,200.00
2,300.00
2,400.00
191,175.95
28,676.39

Harga Satuan Pekerjaan Rp

219,852.34

ta merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 2 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,100.00
26,340.50
5,700.00
19,500.00
8,600.00
1,150.00
1,200.00
113,590.50
17,038.58

Harga Satuan Pekerjaan Rp

130,629.08

ta merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 3 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,100.00
19,974.30
6,000.00
19,500.00
8,600.00
1,150.00
1,200.00
107,524.30
16,128.65

Harga Satuan Pekerjaan Rp

123,652.95

ta merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 4 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,100.00
15,985.00
6,450.00
19,500.00
8,600.00
1,150.00
1,200.00
103,985.00
15,597.75

Harga Satuan Pekerjaan Rp

119,582.75

ta merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 5 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,100.00
13,455.20
6,750.00
19,500.00
8,600.00
1,150.00
1,200.00
101,755.20
15,263.28

Harga Satuan Pekerjaan Rp

117,018.48

ta merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 6 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,100.00
11,564.80
7,350.00
19,500.00
8,600.00
1,150.00
1,200.00
100,464.80
15,069.72

Harga Satuan Pekerjaan Rp

115,534.52

ta merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 8 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,100.00
9,035.00
7,500.00
19,500.00
8,600.00
1,150.00
1,200.00
98,085.00
14,712.75

Harga Satuan Pekerjaan Rp

112,797.75

ta merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 PC : 3 KP : 10 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
6,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,100.00
6,255.00
7,500.00
103.50
19,500.00
8,600.00
1,150.00
1,200.00
44,308.50
6,646.28

Harga Satuan Pekerjaan Rp

50,954.78

ta merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 KP : 1 SM : 1 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
6,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,100.00
25.02
2,700.00
124.20
19,500.00
8,600.00
1,150.00
1,200.00
33,299.22
4,994.88

Harga Satuan Pekerjaan Rp

38,294.10

ta merah ukuran (5 x 11 x 22) cm tebal bata, campuran spesi 1 KP : 1 SM : 2 PP


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,390.00
150,000.00
6,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,100.00
19.46
4,200.00
96.60
19,500.00
8,600.00
1,150.00
1,200.00
34,766.06
5,214.91

Harga Satuan Pekerjaan Rp

39,980.97

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

21,545.00
2,400.00
19,500.00
12,900.00
1,725.00
1,200.00
59,270.00
8,890.50

Harga Satuan Pekerjaan Rp

68,160.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

14,205.80
3,200.00
19,500.00
12,900.00
1,725.00
1,200.00
52,730.80
7,909.62

Harga Satuan Pekerjaan Rp

60,640.42

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,800.30
3,680.00
19,500.00
12,900.00
1,725.00
1,200.00
49,805.30
7,470.80

Harga Satuan Pekerjaan Rp

57,276.10

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,673.60
3,840.00
19,500.00
12,900.00
1,725.00
1,200.00
47,838.60
7,175.79

Harga Satuan Pekerjaan Rp

55,014.39

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,200.20
4,160.00
19,500.00
12,900.00
1,725.00
1,200.00
46,685.20
7,002.78

Harga Satuan Pekerjaan Rp

53,687.98

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,129.90
4,320.00
19,500.00
12,900.00
1,725.00
1,200.00
45,774.90
6,866.24

Harga Satuan Pekerjaan Rp

52,641.14

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,462.70
4,480.00
19,500.00
12,900.00
1,725.00
1,200.00
45,267.70
6,790.16

Harga Satuan Pekerjaan Rp

52,057.86

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,795.50
4,640.00
19,500.00
12,900.00
1,725.00
1,200.00
44,760.50
6,714.08

Harga Satuan Pekerjaan Rp

51,474.58

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
6,900.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,006.40
20.70
2,080.00
23,400.00
10,320.00
1,380.00
1,440.00
38,640.70
5,796.11

Harga Satuan Pekerjaan Rp

44,436.81

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
6,900.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,170.00
34.50
3,200.00
23,400.00
10,320.00
1,380.00
1,440.00
39,774.50
5,966.18

Harga Satuan Pekerjaan Rp

45,740.68

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
6,900.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

12.51
62.10
1,440.00
23,400.00
10,320.00
1,380.00
1,440.00
38,042.10
5,706.32

Harga Satuan Pekerjaan Rp

43,748.42

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
6,900.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9.73
48.30
2,400.00
23,400.00
10,320.00
1,380.00
1,440.00
38,988.30
5,848.25

Harga Satuan Pekerjaan Rp

44,836.55

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

18,945.70
4,320.00
26,000.00
17,200.00
2,300.00
1,760.00
70,525.70
10,578.86

Harga Satuan Pekerjaan Rp

81,104.56

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

14,400.40
4,960.00
16,900.00
17,200.00
2,300.00
1,040.00
56,800.40
8,520.06

Harga Satuan Pekerjaan Rp

65,320.46

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

11,564.80
5,120.00
26,000.00
17,200.00
2,300.00
1,760.00
63,944.80
9,591.72

Harga Satuan Pekerjaan Rp

73,536.52

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,604.90
5,600.00
26,000.00
17,200.00
2,300.00
1,760.00
62,464.90
9,369.74

Harga Satuan Pekerjaan Rp

71,834.64

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,173.20
5,760.00
26,000.00
17,200.00
2,300.00
1,760.00
61,193.20
9,178.98

Harga Satuan Pekerjaan Rp

70,372.18

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
6,900.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

12.51
62.10
2,880.00
28,600.00
18,920.00
2,530.00
1,760.00
54,752.10
8,212.82

Harga Satuan Pekerjaan Rp

62,964.92

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,200.20
4,160.00
9,750.00
6,450.00
920.00
640.00
29,120.20
4,368.03

Harga Satuan Pekerjaan Rp

33,488.23

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

695.00
2,080.00
5,200.00
34,400.00
4,600.00
320.00
47,295.00
7,094.25

Harga Satuan Pekerjaan Rp

54,389.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
160,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,900.00
2,400,000.00
29,250.00
19,350.00
2,645.00
1,840.00
2,466,985.00
370,047.75

Harga Satuan Pekerjaan Rp

2,837,032.75

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
50,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,900.00
750,000.00
29,250.00
19,350.00
2,645.00
1,840.00
816,985.00
122,547.75

Harga Satuan Pekerjaan Rp

939,532.75

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,004.80
900.00
19,500.00
8,600.00
1,150.00
1,200.00
37,354.80
5,603.22

Harga Satuan Pekerjaan Rp

42,958.02

Harga Satuan
Rp
Rp
Rp
Rp
Rp

1,390.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,309.00
9,750.00
6,450.00
920.00
640.00
22,069.00
3,310.35

Harga Satuan Pekerjaan Rp

25,379.35

iar pasangan dinding conblok ekspose (8 m')


Harga Satuan
Rp
Rp
Rp
Rp
Rp

1,390.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,224.00
4,550.00
3,010.00
460.00
320.00
10,564.00
1,584.60

Harga Satuan Pekerjaan Rp

12,148.60

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,812.60
1,800.00
19,500.00
12,900.00
1,725.00
1,200.00
45,937.60
6,890.64

Harga Satuan Pekerjaan Rp

52,828.24

Harga Satuan
Rp
Rp
Rp
Rp
Rp

1,390.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,517.50
13,000.00
8,600.00
1,150.00
800.00
28,067.50
4,210.13

Harga Satuan Pekerjaan Rp

32,277.63

f'c = 7,4 Mpa (K 100), slump (12 2) cm, w/c = 0,87


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

343,330.00
50,134.62
57,634.62
10,750.00
107,250.00
23,650.00
3,220.00
6,640.00
602,609.23
90,391.38

Harga Satuan Pekerjaan Rp

693,000.62

f'c = 9,8 Mpa (K 125), slump (12 2) cm, w/c = 0,78


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

383,640.00
47,769.23
58,384.62
10,750.00
107,250.00
23,650.00
3,220.00
6,640.00
641,303.85
96,195.58

Harga Satuan Pekerjaan Rp

737,499.42

f'c = 12,2 Mpa (K 150), slump (12 2) cm, w/c = 0,72


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

415,610.00
46,096.15
58,673.08
10,750.00
107,250.00
23,650.00
3,220.00
6,640.00
671,889.23
100,783.38

Harga Satuan Pekerjaan Rp

772,672.62

beton mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87
Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

319,700.00
51,519.23
59,250.00
10,000.00
78,000.00
17,200.00
2,300.00
4,800.00
542,769.23
81,415.38

Harga Satuan Pekerjaan Rp

624,184.62

f'c = 14,5 Mpa (K 175), slump (12 2) cm, w/c = 0,66


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

453,140.00
43,846.15
59,365.38
10,750.00
107,250.00
23,650.00
3,220.00
6,640.00
707,861.54
106,179.23

Harga Satuan Pekerjaan Rp

814,040.77

f'c = 16,9 Mpa (K 200), slump (12 2) cm, w/c = 0,61


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

489,280.00
42,173.08
59,480.77
10,750.00
107,250.00
23,650.00
3,220.00
6,640.00
742,443.85
111,366.58

Harga Satuan Pekerjaan Rp

853,810.42

f'c = 19,3 Mpa (K 225), slump (12 2) cm, w/c = 0,58


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

515,690.00
40,269.23
60,403.85
10,750.00
107,250.00
23,650.00
3,220.00
6,640.00
767,873.08
115,180.96

Harga Satuan Pekerjaan Rp

883,054.04

f'c = 21,7 Mpa (K 250), slump (12 2) cm, w/c = 0,56


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

533,760.00
39,923.08
59,942.31
10,750.00
107,250.00
23,650.00
3,220.00
6,640.00
785,135.38
117,770.31

Harga Satuan Pekerjaan Rp

902,905.69

f'c = 24,0 Mpa (K 275), slump (12 2) cm, w/c = 0,53


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

564,340.00
39,461.54
59,192.31
10,750.00
107,250.00
23,650.00
3,220.00
6,640.00
814,503.85
122,175.58

Harga Satuan Pekerjaan Rp

936,679.42

f'c = 26,4 Mpa (K 300), slump (12 2) cm, w/c = 0,52


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

574,070.00
39,288.46
58,903.85
10,750.00
107,250.00
23,650.00
3,220.00
6,640.00
823,772.31
123,565.85

Harga Satuan Pekerjaan Rp

947,338.15

f'c = 28,8 Mpa (K 325), slump (12 2) cm, w/c = 0,49


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

610,210.00
38,653.85
58,038.46
10,750.00
136,500.00
30,100.00
4,025.00
8,400.00
896,677.31
134,501.60

Harga Satuan Pekerjaan Rp

1,031,178.90

f'c = 31,2 Mpa (K 350), slump (12 2) cm, w/c = 0,48


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,390.00
57.69
57.69
50.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

622,720.00
38,480.77
57,692.31
10,750.00
136,500.00
30,100.00
4,025.00
8,400.00
908,668.08
136,300.21

Harga Satuan Pekerjaan Rp

1,044,968.29

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

16,000.00
22,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

168,000.00
3,435.00
4,550.00
6,020.00
805.00
320.00
183,130.00
27,469.50

Harga Satuan Pekerjaan Rp

210,599.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

29,900.00
22,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

313,950.00
3,435.00
4,550.00
6,020.00
805.00
320.00
329,080.00
49,362.00

Harga Satuan Pekerjaan Rp

378,442.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

16,000.00
22,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

168,000.00
2,290.00
3,250.00
4,300.00
575.00
240.00
178,655.00
26,798.25

Harga Satuan Pekerjaan Rp

205,453.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

36,800.00
22,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

37,536.00
1,145.00
1,625.00
2,150.00
230.00
80.00
42,766.00
6,414.90

Harga Satuan Pekerjaan Rp

49,180.90

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

130,788.00
5,970.00
4,870.00
39,000.00
22,360.00
2,990.00
2,080.00
208,058.00
31,208.70

Harga Satuan Pekerjaan Rp

239,266.70

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

147,136.50
5,970.00
4,870.00
39,000.00
22,360.00
2,990.00
2,080.00
224,406.50
33,660.98

Harga Satuan Pekerjaan Rp

258,067.48

Harga Satuan

Jumlah Harga

Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
4,185,400.00
182,300.00

Rp
Rp
Rp
Rp
Rp

130,788.00
7,960.00
9,740.00
62,781.00
63,805.00

Rp

41,000.00

Rp

82,000.00

Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
28,380.00
3,795.00
2,640.00
441,389.00
66,208.35

Harga Satuan Pekerjaan Rp

507,597.35

Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan

Jumlah Harga

Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
4,185,400.00
182,300.00

Rp
Rp
Rp
Rp
Rp

130,788.00
7,960.00
9,740.00
75,337.20
63,805.00

Rp

41,000.00

Rp

82,000.00

Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
28,380.00
3,795.00
2,640.00
453,945.20
68,091.78

Harga Satuan Pekerjaan Rp

522,036.98

Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan

Jumlah Harga

Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
4,185,400.00
182,300.00

Rp
Rp
Rp
Rp
Rp

130,788.00
7,960.00
9,740.00
62,781.00
63,805.00

Rp

41,000.00

Rp

246,000.00

Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
28,380.00
3,795.00
2,640.00
605,389.00
90,808.35

Harga Satuan Pekerjaan Rp

696,197.35

Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan

Jumlah Harga

Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
4,185,400.00
182,300.00

Rp
Rp
Rp
Rp
Rp

98,091.00
7,960.00
9,740.00
83,708.00
63,805.00

Rp

41,000.00

Rp

123,000.00

Rp

40,000.00

Rp

160,000.00

Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
28,380.00
3,795.00
2,640.00
630,619.00
94,592.85

Harga Satuan Pekerjaan Rp

725,211.85

Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan

Jumlah Harga

Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
4,185,400.00
182,300.00

Rp
Rp
Rp
Rp
Rp

98,091.00
7,960.00
7,305.00
62,781.00
63,805.00

Rp

41,000.00

Rp

82,000.00

Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
28,380.00
3,795.00
2,640.00
406,257.00
60,938.55

Harga Satuan Pekerjaan Rp

467,195.55

Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan

Jumlah Harga

Rp
Rp

2,572,000.00
19,900.00

Rp
Rp

67,900.80
11,940.00

Rp

41,000.00

Rp

20,500.00

Rp
Rp
Rp
Rp
Rp
Rp

11,250.00
4,300.00
575.00
640.00
117,105.80
17,565.87

Harga Satuan Pekerjaan Rp

134,671.67

Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
16,000.00
22,900.00
1,370.00
150,000.00
150,000.00
65,000.00
86,000.00
86,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

653,940.00
29,850.00
19,480.00
2,520,000.00
51,525.00
460,320.00
81,000.00
121,500.00
344,500.00
23,650.00
111,800.00
90,300.00
30,130.00
21,200.00
4,559,195.00
683,879.25

Harga Satuan Pekerjaan Rp

5,243,074.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
16,000.00
22,900.00
1,370.00
150,000.00
150,000.00
65,000.00
86,000.00
86,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

882,819.00
39,800.00
29,220.00
3,360,000.00
68,700.00
460,320.00
81,000.00
121,500.00
367,250.00
23,650.00
134,160.00
120,400.00
37,145.00
22,640.00
5,748,604.00
862,290.60

Harga Satuan Pekerjaan Rp

6,610,894.60

Harga Satuan

Jumlah Harga

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
16,000.00
22,900.00
1,370.00
150,000.00
150,000.00
4,185,400.00
50,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,307,880.00
79,600.00
97,400.00
5,040,000.00
103,050.00
460,320.00
81,000.00
121,500.00
627,810.00
175,000.00

Rp

41,000.00

Rp

820,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

458,250.00
23,650.00
141,900.00
180,600.00
46,345.00
28,240.00
9,792,545.00
1,468,881.75

Harga Satuan Pekerjaan Rp

11,261,426.75

Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
86,000.00
86,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan

Jumlah Harga

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
16,000.00
22,900.00
1,370.00
150,000.00
150,000.00
4,185,400.00
50,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,046,304.00
63,680.00
77,920.00
3,360,000.00
68,700.00
460,320.00
81,000.00
121,500.00
585,956.00
140,000.00

Rp

41,000.00

Rp

656,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

412,750.00
23,650.00
141,900.00
120,400.00
38,295.00
25,440.00
7,423,815.00
1,113,572.25

Harga Satuan Pekerjaan Rp

8,537,387.25

Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
86,000.00
86,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan

Jumlah Harga

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
16,000.00
22,900.00
1,370.00
150,000.00
150,000.00
4,185,400.00
50,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,046,304.00
63,680.00
77,920.00
2,512,000.00
51,525.00
460,320.00
81,000.00
121,500.00
502,248.00
140,000.00

Rp

41,000.00

Rp

1,312,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

344,500.00
23,650.00
111,800.00
90,300.00
30,475.00
21,200.00
6,990,422.00
1,048,563.30

Harga Satuan Pekerjaan Rp

8,038,985.30

Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
86,000.00
86,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan

Jumlah Harga

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
16,000.00
22,900.00
1,370.00
150,000.00
150,000.00
4,185,400.00
50,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

784,728.00
63,680.00
77,920.00
2,512,000.00
51,525.00
460,320.00
81,000.00
121,500.00
669,664.00
140,000.00

Rp

41,000.00

Rp

984,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

344,500.00
23,650.00
111,800.00
90,300.00
30,130.00
21,200.00
6,567,917.00
985,187.55

Harga Satuan Pekerjaan Rp

7,553,104.55

Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
86,000.00
86,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan

Jumlah Harga

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
48,700.00
16,000.00
22,900.00
1,370.00
150,000.00
150,000.00
4,185,400.00
50,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

817,425.00
59,700.00
58,440.00
3,360,000.00
68,700.00
460,320.00
81,000.00
121,500.00
439,467.00
125,000.00

Rp

41,000.00

Rp

574,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

367,250.00
23,650.00
134,160.00
120,400.00
37,145.00
22,640.00
6,870,797.00
1,030,619.55

Harga Satuan Pekerjaan Rp

7,901,416.55

Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
86,000.00
86,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
16,000.00
22,900.00
1,370.00
150,000.00
150,000.00
65,000.00
86,000.00
86,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,539.40
199.00
48,000.00
1,030.50
5,480.00
900.00
1,350.00
11,700.00
1,720.00
1,720.00
1,720.00
690.00
720.00
81,768.90
12,265.34

Harga Satuan Pekerjaan Rp

94,034.24

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
16,000.00
22,900.00
1,370.00
150,000.00
150,000.00
65,000.00
86,000.00
86,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,809.10
398.00
57,600.00
1,145.00
7,535.00
1,350.00
2,250.00
19,305.00
2,838.00
2,838.00
2,838.00
1,150.00
1,200.00
110,256.10
16,538.42

Harga Satuan Pekerjaan Rp

126,794.52

Rp
Rp
Rp
Rp
Rp

902,905.69
21,059.95
37,844.20
239,266.70
106,000.00

Rp
Rp
Rp
Rp
Rp
Rp

902,905.69
3,253,744.72
519,908.30
106,000.00
4,782,558.71

Rp
Rp
Rp
Rp
Rp

902,905.69
21,059.95
37,844.20
258,067.48
106,000.00

Rp
Rp
Rp
Rp
Rp
Rp

902,905.69
2,267,062.78
1,182,809.26
106,000.00
4,458,777.73

Rp
Rp
Rp
Rp
Rp

902,905.69
21,059.95
37,844.20
507,597.35
106,000.00

Rp
Rp
Rp
Rp
Rp
Rp

902,905.69
2,271,124.95
2,960,984.54
106,000.00
6,241,015.18

Rp
Rp
Rp
Rp
Rp

902,905.69
21,059.95
37,844.20
522,036.98
106,000.00

Rp
Rp
Rp
Rp
Rp
Rp

902,905.69
2,634,437.69
3,393,240.37
106,000.00
7,036,583.75

Rp
Rp
Rp
Rp
Rp

902,905.69
21,059.95
37,844.20
522,036.98
106,000.00

Rp
Rp
Rp
Rp
Rp
Rp

902,905.69
2,321,380.22
4,101,719.13
106,000.00
7,432,005.04

Rp
Rp
Rp
Rp
Rp

902,905.69
21,059.95
37,844.20
522,036.98
106,000.00

Rp
Rp
Rp
Rp
Rp
Rp

902,905.69
2,571,656.19
3,480,246.53
106,000.00
7,060,808.42

Rp
Rp
Rp
Rp

902,905.69
21,059.95
696,197.35
106,000.00

Rp
Rp
Rp
Rp
Rp

902,905.69
3,864,111.55
2,900,822.29
106,000.00
7,773,839.53

Rp

902,905.69

Rp

902,905.69

Rp
Rp

21,059.95
696,197.35

Rp
Rp

3,197,562.42
2,320,657.83

Rp

106,000.00

Rp
Rp

106,000.00
6,527,125.95

Rp
Rp
Rp
Rp
Rp

902,905.69
21,059.95
37,844.20
522,036.98
106,000.00

Rp
Rp
Rp
Rp
Rp
Rp

902,905.69
1,698,221.24
959,961.08
3,355,952.01
106,000.00
7,023,040.02

Rp
Rp
Rp
Rp

902,905.69
21,059.95
467,195.55
106,000.00

Rp
Rp
Rp
Rp
Rp

902,905.69
6,460,111.04
2,087,084.88
106,000.00
9,556,101.61

m kusen pintu dan kusen jendela, kayu kelas I


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,987,300.00
19,900.00
27,900.00
65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,586,030.00
24,875.00
27,900.00
455,000.00
1,575,000.00
241,500.00
28,000.00
8,938,305.00
1,340,745.75

Harga Satuan Pekerjaan Rp

10,279,050.75

m kusen pintu dan kusen jendela, kayu kelas II atau III


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
27,900.00
65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,923,640.00
24,875.00
27,900.00
390,000.00
1,350,000.00
207,000.00
24,000.00
5,947,415.00
892,112.25

Harga Satuan Pekerjaan Rp

6,839,527.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

2,572,000.00
19,900.00
65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

102,880.00
995.00
22,750.00
78,750.00
12,075.00
1,440.00
218,890.00
32,833.50

Harga Satuan Pekerjaan Rp

251,723.50

m pintu klamp sederhana, kayu kelas III untuk gudang sementara


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

2,572,000.00
19,900.00
65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

102,880.00
995.00
22,750.00
78,750.00
12,075.00
1,440.00
218,890.00
32,833.50

Harga Satuan Pekerjaan Rp

251,723.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

4,185,400.00
27,900.00
65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

167,416.00
13,950.00
65,000.00
225,000.00
34,500.00
4,000.00
509,866.00
76,479.90

Harga Satuan Pekerjaan Rp

586,345.90

m pintu dan jendela kaca, kayu kelas I atau II


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

4,185,400.00
27,900.00
65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

100,449.60
8,370.00
52,000.00
180,000.00
27,600.00
3,200.00
371,619.60
55,742.94

Harga Satuan Pekerjaan Rp

427,362.54

m pintu dan jendela jalusi kayu kelas I atau II


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

4,185,400.00
27,900.00
65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

267,865.60
13,950.00
65,000.00
225,000.00
34,500.00
4,000.00
610,315.60
91,547.34

Harga Satuan Pekerjaan Rp

701,862.94

kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm)
Harga Satuan

Jumlah Harga

Rp
Rp
Rp

4,185,400.00
19,900.00
27,900.00

Rp
Rp
Rp

104,635.00
597.00
13,950.00

Rp

63,700.00

Rp

63,700.00

Rp
Rp
Rp
Rp
Rp
Rp

45,500.00
157,500.00
24,150.00
2,800.00
412,832.00
61,924.80

Harga Satuan Pekerjaan Rp

474,756.80

Rp
Rp
Rp
Rp

65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

od rangkap, rangka expose kayu kelas I atau II


Harga Satuan

Jumlah Harga

Rp
Rp
Rp

4,185,400.00
19,900.00
27,900.00

Rp
Rp
Rp

104,635.00
597.00
13,950.00

Rp

63,700.00

Rp

63,700.00

Rp
Rp
Rp
Rp
Rp
Rp

52,000.00
180,000.00
27,600.00
3,200.00
445,682.00
66,852.30

Harga Satuan Pekerjaan Rp

512,534.30

Rp
Rp
Rp
Rp

65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

4,185,400.00
19,900.00
65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

251,124.00
2,985.00
43,550.00
150,000.00
23,000.00
26,800.00
497,459.00
74,618.85

Harga Satuan Pekerjaan Rp

572,077.85

Harga Satuan

Jumlah Harga

Rp
Rp
Rp

5,569,400.00
19,900.00
27,900.00

Rp
Rp
Rp

139,235.00
597.00
8,370.00

Rp

63,700.00

Rp

63,700.00

Rp
Rp
Rp
Rp
Rp
Rp

52,000.00
180,000.00
27,600.00
3,200.00
474,702.00
71,205.30

Harga Satuan Pekerjaan Rp

545,907.30

Rp
Rp
Rp
Rp

65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

angkap lapis formika, rangka expose kayu kelas II


Harga Satuan

Jumlah Harga

Rp
Rp
Rp

4,185,400.00
19,900.00
27,900.00

Rp
Rp
Rp

104,635.00
597.00
22,320.00

Rp

63,700.00

Rp

63,700.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

32,500.00
55,250.00
191,250.00
29,325.00
3,440.00
503,017.00
75,452.55

Harga Satuan Pekerjaan Rp

578,469.55

Rp
Rp
Rp
Rp
Rp

65,000.00
65,000.00
75,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
5,000.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,596,670.00
75,000.00
111,440.00
260,000.00
1,032,000.00
138,000.00
16,000.00
5,229,110.00
784,366.50

Harga Satuan Pekerjaan Rp

6,013,476.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,569,400.00
5,000.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,683,280.00
75,000.00
111,440.00
435,500.00
1,728,600.00
231,150.00
26,800.00
9,291,770.00
1,393,765.50

Harga Satuan Pekerjaan Rp

10,685,535.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,185,400.00
5,000.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,603,940.00
75,000.00
59,700.00
156,000.00
619,200.00
82,800.00
9,600.00
5,606,240.00
840,936.00

Harga Satuan Pekerjaan Rp

6,447,176.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,050,400.00
3,000,000.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

42,705.60
10,800.00
4,975.00
6,500.00
8,600.00
1,150.00
400.00
75,130.60
11,269.59

Harga Satuan Pekerjaan Rp

86,400.19

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,050,400.00
3,000,000.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

42,705.60
21,600.00
4,975.00
6,500.00
8,600.00
1,150.00
400.00
85,930.60
12,889.59

Harga Satuan Pekerjaan Rp

98,820.19

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

4,185,400.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

690,591.00
3,980.00
7,800.00
10,320.00
1,380.00
480.00
714,551.00
107,182.65

Harga Satuan Pekerjaan Rp

821,733.65

git-langit (50 x 100) cm, kayu kelas II atau III


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

3,050,400.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

46,976.16
3,980.00
9,750.00
25,800.00
3,450.00
6,000.00
95,956.16
14,393.42

Harga Satuan Pekerjaan Rp

110,349.58

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

4,100,000.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

66,830.00
4,975.00
13,000.00
25,800.00
3,450.00
800.00
114,855.00
17,228.25

Harga Satuan Pekerjaan Rp

132,083.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

5,987,300.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

64,662.84
1,990.00
6,500.00
17,200.00
2,300.00
400.00
93,052.84
13,957.93

Harga Satuan Pekerjaan Rp

107,010.77

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

4,185,400.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

46,039.40
995.00
6,500.00
17,200.00
2,300.00
400.00
73,434.40
11,015.16

Harga Satuan Pekerjaan Rp

84,449.56

ding pemisah (60 x 120) cm kayu kelas II atau III


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

3,269,700.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

91,551.60
2,985.00
9,750.00
38,700.00
5,175.00
640.00
148,801.60
22,320.24

Harga Satuan Pekerjaan Rp

171,121.84

misah teakwood rangkap, rangka kayu kelas II


Harga Satuan

Jumlah Harga

Rp

4,185,400.00

Rp

117,191.20

Rp

19,900.00

Rp

2,985.00

Rp

63,700.00

Rp

54,782.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

11,312.00
9,750.00
38,700.00
5,175.00
640.00
240,535.20
36,080.28

Harga Satuan Pekerjaan Rp

276,615.48

Rp
Rp
Rp
Rp
Rp

20,200.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

misah plywood rangkap, rangka kayu kelas II


Harga Satuan

Jumlah Harga

Rp

4,185,400.00

Rp

117,191.20

Rp

19,900.00

Rp

63,700.00

Rp
Rp

2,985.00
54,782.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

11,312.00
13,000.00
51,600.00
6,900.00
800.00
258,570.20
38,785.53

Harga Satuan Pekerjaan Rp

297,355.73

Rp
Rp
Rp
Rp
Rp

20,200.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,185,400.00
19,900.00
13,500.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

29,297.80
1,990.00
2,025.00
39,000.00
154,800.00
20,700.00
2,400.00
250,212.80
37,531.92

Harga Satuan Pekerjaan Rp

287,744.72

mbriziring dari plywood ukuran (120 x 240) cm


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

63,700.00
19,900.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

25,480.00
995.00
1,625.00
6,450.00
920.00
80.00
35,550.00
5,332.50

Harga Satuan Pekerjaan Rp

40,882.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

100,000.00
3,050,400.00
19,900.00
1,000,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

150,000.00
42,705.60
238.80
3,000.00
6,500.00
4,300.00
575.00
400.00
207,719.40
31,157.91

Harga Satuan Pekerjaan Rp

238,877.31

Harga Satuan
Rp
Rp
Rp
Rp
Rp

5,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,750.00
3,900.00
5,160.00
690.00
240.00
15,740.00
2,361.00

Harga Satuan Pekerjaan Rp

18,101.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

200,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

230,000.00
3,900.00
5,160.00
690.00
240.00
239,990.00
35,998.50

Harga Satuan Pekerjaan Rp

275,988.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,900.00
39,200.00
65,000.00
86,000.00
115,000.00
80,000.00
50,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,900.00
3,920.00
6,500.00
8,600.00
115.00
400.00
40,000.00
68,435.00
10,265.25

Harga Satuan Pekerjaan Rp

78,700.25

i plat baja tebal 2 mm rangkap, rangka baja siku


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

120,000.00
95,000.00
50,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,800,000.00
3,116,000.00
2,500.00
68,250.00
90,300.00
12,075.00
4,160.00
5,093,285.00
763,992.75

Harga Satuan Pekerjaan Rp

5,857,277.75

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,000.00
8,900.00
39,200.00
65,000.00
86,000.00
115,000.00
80,000.00
50,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

20,000.00
2,670.00
1,568.00
2,600.00
1,720.00
230.00
160.00
8,500.00
37,448.00
5,617.20

Harga Satuan Pekerjaan Rp

43,065.20

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,000.00
50,000.00
5,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

71,400.00
226,100.00
100,000.00
42,250.00
55,900.00
74,750.00
2,560.00
572,960.00
85,944.00

Harga Satuan Pekerjaan Rp

658,904.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

380,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

380,000.00
78,000.00
103,200.00
13,800.00
480.00
575,480.00
86,322.00

Harga Satuan Pekerjaan Rp

661,802.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

1,850,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,850,000.00
28,600.00
37,840.00
5,060.00
1,760.00
1,923,260.00
288,489.00

Harga Satuan Pekerjaan Rp

2,211,749.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

50,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,000.00
5,200.00
68,800.00
9,200.00
320.00
133,520.00
20,028.00

Harga Satuan Pekerjaan Rp

153,548.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

450,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

450,000.00
65,000.00
86,000.00
11,500.00
4,000.00
616,500.00
92,475.00

Harga Satuan Pekerjaan Rp

708,975.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

45,000.00
80,000.00
350,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
160,000.00
21,000.00
2,795.00
3,698.00
494.50
168.00
237,655.50
35,648.33

Harga Satuan Pekerjaan Rp

273,303.83

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

45,000.00
8,500.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
124,100.00
5,525.00
7,310.00
977.50
336.00
336,248.50
50,437.28

Harga Satuan Pekerjaan Rp

386,685.78

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

45,000.00
8,500.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
124,100.00
5,525.00
7,310.00
977.50
336.00
336,248.50
50,437.28

Harga Satuan Pekerjaan Rp

386,685.78

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

45,000.00
10,000.00
195,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
45,000.00
52,650.00
5,525.00
7,310.00
977.50
400.00
309,862.50
46,479.38

Harga Satuan Pekerjaan Rp

356,341.88

Harga Satuan
Rp
Rp
Rp
Rp
Rp

350,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

350,000.00
22,750.00
30,100.00
4,025.00
1,440.00
408,315.00
61,247.25

Harga Satuan Pekerjaan Rp

469,562.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

5,000.00
5,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

30,885.00
135,400.00
108,550.00
143,620.00
19,205.00
6,640.00
444,300.00
66,645.00

Harga Satuan Pekerjaan Rp

510,945.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,700.00
5,000.00
12,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

17,270.00
55,550.00
20,592.00
6,500.00
8,600.00
1,150.00
400.00
110,062.00
16,509.30

Harga Satuan Pekerjaan Rp

126,571.30

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

430,000.00
4,500.00
5,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)
Harga Satuan Pekerjaan

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,900.00
19,900.00
3,269,700.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

473,000.00
45,000.00
35,000.00
6,500.00
8,600.00
1,150.00
400.00
569,650.00
85,447.50
655,097.50

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

53,445.00
298.50
62,124.30
13,000.00
17,200.00
2,300.00
80.00
148,447.80
22,267.17

Harga Satuan Pekerjaan Rp

170,714.97

4 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,900.00
19,900.00
5,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

53,445.00
199.00
2,500.00
68,250.00
25,800.00
3,450.00
640.00
154,284.00
23,142.60

Harga Satuan Pekerjaan Rp

177,426.60

besi hollow 1x40.40.2 mmm, modul 60x120 cm, dinding partisi


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

50,000.00
175,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

175,000.00
175,000.00
16,250.00
21,500.00
2,875.00
1,040.00
391,665.00
58,749.75

Harga Satuan Pekerjaan Rp

450,414.75

besi hollow 1x40.40.2 mmm, modul 60x60 cm, plafon


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

50,000.00
175,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

200,000.00
175,000.00
22,750.00
30,100.00
4,025.00
1,440.00
433,315.00
64,997.25

Harga Satuan Pekerjaan Rp

498,312.25

it tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

88,400.00
19,900.00
65,000.00
80,000.00
100,000.00
75,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

33,150.00
597.00
6,500.00
8,000.00
1,000.00
375.00
49,622.00
7,443.30

Harga Satuan Pekerjaan Rp

57,065.30

it gypsum board ukuran (1200 x 2400 x 9) mm


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
19,900.00
65,000.00
80,000.00
100,000.00
75,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

23,660.00
2,189.00
6,500.00
4,000.00
500.00
375.00
37,224.00
5,583.60

Harga Satuan Pekerjaan Rp

42,807.60

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

6,600.00
20,000.00
65,000.00
80,000.00
100,000.00
75,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,930.00
3,000.00
3,900.00
4,800.00
600.00
225.00
19,455.00
2,918.25

Harga Satuan Pekerjaan Rp

22,373.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

6,600.00
19,900.00
65,000.00
80,000.00
100,000.00
75,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,930.00
199.00
3,250.00
4,000.00
500.00
225.00
15,104.00
2,265.60

Harga Satuan Pekerjaan Rp

17,369.60

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

60,000.00
1,370.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

397,800.00
13,426.00
6,750.00
16,250.00
10,750.00
1,495.00
1,040.00
447,511.00
67,126.65

Harga Satuan Pekerjaan Rp

514,637.65

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

53,000.00
1,370.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

629,110.00
13,700.00
6,750.00
16,900.00
11,180.00
1,495.00
1,040.00
680,175.00
102,026.25

Harga Satuan Pekerjaan Rp

782,201.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

48,600.00
1,370.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,287,900.00
14,248.00
6,750.00
17,550.00
11,610.00
1,610.00
1,120.00
1,340,788.00
201,118.20

Harga Satuan Pekerjaan Rp

1,541,906.20

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,944.00
1,390.00
150,000.00
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

12,888.72
13,622.00
6,750.00
3,549.00
16,250.00
10,750.00
1,495.00
1,040.00
66,344.72
9,951.71

Harga Satuan Pekerjaan Rp

76,296.43

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

53,000.00
1,390.00
150,000.00
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

629,110.00
13,900.00
6,750.00
4,095.00
16,900.00
11,180.00
1,495.00
1,040.00
684,470.00
102,670.50

Harga Satuan Pekerjaan Rp

787,140.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

48,600.00
1,390.00
150,000.00
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,287,900.00
14,456.00
6,750.00
4,422.60
17,550.00
11,610.00
1,610.00
1,120.00
1,345,418.60
201,812.79

Harga Satuan Pekerjaan Rp

1,547,231.39

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

60,000.00
1,390.00
150,000.00
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

397,800.00
13,622.00
6,750.00
3,549.00
16,250.00
10,750.00
1,495.00
1,040.00
451,256.00
67,688.40

Harga Satuan Pekerjaan Rp

518,944.40

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

53,000.00
1,390.00
150,000.00
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

629,110.00
13,900.00
6,750.00
4,095.00
16,900.00
11,180.00
1,495.00
1,040.00
684,470.00
102,670.50

Harga Satuan Pekerjaan Rp

787,140.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

55,000.00
1,390.00
150,000.00
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

170,500.00
13,344.00
6,750.00
4,095.00
15,600.00
10,320.00
1,380.00
960.00
222,949.00
33,442.35

Harga Satuan Pekerjaan Rp

256,391.35

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,581.82
1,390.00
120,000.00
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

54,386.18
13,900.00
5,400.00
4,095.00
45,500.00
30,100.00
4,025.00
2,800.00
160,206.18
24,030.93

Harga Satuan Pekerjaan Rp

184,237.11

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,450.00
1,390.00
120,000.00
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

56,700.00
13,900.00
5,400.00
4,095.00
45,500.00
30,100.00
4,025.00
2,800.00
162,520.00
24,378.00

Harga Satuan Pekerjaan Rp

186,898.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,944.00
1,390.00
120,000.00
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,516.00
14,456.00
5,400.00
4,422.60
45,500.00
30,100.00
4,025.00
2,800.00
158,219.60
23,732.94

Harga Satuan Pekerjaan Rp

181,952.54

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,184.00
1,390.00
120,000.00
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

57,876.00
12,927.00
2,160.00
5,296.20
58,500.00
38,700.00
5,175.00
3,600.00
184,234.20
27,635.13

Harga Satuan Pekerjaan Rp

211,869.33

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,137.50
1,390.00
120,000.00
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

42,750.00
12,927.00
2,160.00
5,296.20
58,500.00
38,700.00
5,175.00
3,600.00
169,108.20
25,366.23

Harga Satuan Pekerjaan Rp

194,474.43

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
1,390.00
120,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

71,500.00
16,332.50
4,200.00
45,500.00
30,100.00
4,025.00
2,800.00
174,457.50
26,168.63

Harga Satuan Pekerjaan Rp

200,626.13

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

18,000.00
20,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

213,660.00
7,000.00
9,750.00
12,900.00
1,725.00
640.00
245,675.00
36,851.25

Harga Satuan Pekerjaan Rp

282,526.25

Harga Satuan
Rp
Rp
Rp

15,000.00
75,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp

750.00
11,250.00
240.00
12,240.00
1,836.00

Harga Satuan Pekerjaan Rp

14,076.00

Harga Satuan
Rp
Rp
Rp

5,000.00
75,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp

250.00
11,250.00
240.00
11,740.00
1,761.00

Harga Satuan Pekerjaan Rp

13,501.00

Harga Satuan
Rp
Rp
Rp

5,000.00
75,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp

250.00
11,250.00
640.00
12,140.00
1,821.00

Harga Satuan Pekerjaan Rp

13,961.00

ayu baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

17,000.00
15,800.00
31,000.00
36,500.00
8,000.00
5,000.00
3,500.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,400.00
2,370.00
5,270.00
9,490.00
80.00
150.00
700.00
5,250.00
774.00
690.00
240.00
28,414.00
4,262.10

Harga Satuan Pekerjaan Rp

32,676.10

ayu baru ( 1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

17,000.00
15,800.00
31,000.00
36,500.00
8,000.00
5,000.00
3,500.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,400.00
2,370.00
5,270.00
12,775.00
80.00
150.00
700.00
5,250.00
9,030.00
460.00
240.00
39,725.00
5,958.75

Harga Satuan Pekerjaan Rp

45,683.75

Harga Satuan
Rp
Rp
Rp
Rp
Rp

28,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,080.00
3,000.00
5,418.00
7,245.00
240.00
25,983.00
3,897.45

Harga Satuan Pekerjaan Rp

29,880.45

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

30,000.00
34,000.00
3,500.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,500.00
12,648.00
7,000.00
3,000.00
5,418.00
1,840.00
240.00
34,646.00
5,196.90

Harga Satuan Pekerjaan Rp

39,842.90

Harga Satuan
Rp
Rp
Rp

6,000.00
75,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp

2,100.00
7,500.00
480.00
10,080.00
1,512.00

Harga Satuan Pekerjaan Rp

11,592.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

35,000.00
12,000.00
3,500.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,250.00
600.00
350.00
12,000.00
13,760.00
1,840.00
240.00
34,040.00
5,106.00

Harga Satuan Pekerjaan Rp

39,146.00

aru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,800.00
23,600.00
32,600.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,580.00
2,360.00
8,476.00
1,500.00
5,418.00
724.50
240.00
20,298.50
3,044.78

Harga Satuan Pekerjaan Rp

23,343.28

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

23,600.00
32,600.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,832.00
5,868.00
2,100.00
3,612.00
483.00
240.00
15,135.00
2,270.25

Harga Satuan Pekerjaan Rp

17,405.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp

7,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

700.00
2,100.00
3,612.00
483.00
240.00
7,135.00
1,070.25

Harga Satuan Pekerjaan Rp

8,205.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,300.00
3,500.00
30,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

645.00
350.00
7,500.00
11,250.00
86.00
11.50
200.00
20,042.50
3,006.38

Harga Satuan Pekerjaan Rp

23,048.88

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,300.00
3,500.00
30,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,290.00
700.00
7,500.00
3,000.00
430.00
57.50
200.00
13,177.50
1,976.63

Harga Satuan Pekerjaan Rp

15,154.13

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

Jumlah Harga

25,000.00
15,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,000.00
3,000.00
5,250.00
774.00
690.00
200.00
32,734.00
4,910.10

Harga Satuan Pekerjaan

Rp

37,644.10

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

Jumlah Harga

22,500.00
8,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,000.00
3,000.00
5,250.00
774.00
690.00
200.00
17,914.00
2,687.10

Harga Satuan Pekerjaan

Rp

20,601.10

an baja dengan menie besi dengan perancah


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Jumlah Harga

22,500.00
5,000.00
8,000.00
2,572,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,250.00
50.00
80.00
5,144.00
18,750.00
19,350.00
2,587.50
600.00
48,811.50
4,910.10

Harga Satuan Pekerjaan

Rp

53,721.60

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Jumlah Harga

19,000.00
22,900.00
45,000.00
8,000.00
5,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,900.00
2,290.00
3,600.00
80.00
50.00
18,750.00
21,500.00
2,875.00
104.00
51,149.00
4,910.10

Harga Satuan Pekerjaan

Rp

56,059.10

an baja galvanis secara manual sistem 1 lapis cat mutakhir


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Jumlah Harga

45,000.00
8,000.00
5,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,500.00
80.00
50.00
4,500.00
5,160.00
1,380.00
240.00
24,910.00
4,910.10

Harga Satuan Pekerjaan

Rp

29,820.10

an baja galvanis secara manual sistem 3 lapis


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Jumlah Harga

31,000.00
27,000.00
29,000.00
8,000.00
5,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,410.00
4,590.00
2,320.00
80.00
50.00
30,000.00
68,800.00
9,200.00
1,600.00
120,050.00
18,007.50

Harga Satuan Pekerjaan

Rp

138,057.50

an baja galvanis secara semprot sistem 3 lapis cat mutakhir


Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

Jumlah Harga

31,000.00
5,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,300.00
50.00
30,000.00
60,200.00
8,050.00
1,600.00
109,200.00
16,380.00

Harga Satuan Pekerjaan

Rp

125,580.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

62,000.00
12,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

63,240.00
2,400.00
13,000.00
8,600.00
1,150.00
80.00
88,470.00
13,270.50

Harga Satuan Pekerjaan Rp

101,740.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

42,000.00
12,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

29,400.00
240.00
7,800.00
5,160.00
690.00
480.00
43,770.00
6,565.50

Harga Satuan Pekerjaan Rp

50,335.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

39,000.00
12,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

39,780.00
2,400.00
13,000.00
8,600.00
1,150.00
80.00
65,010.00
9,751.50

Harga Satuan Pekerjaan Rp

74,761.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

53,000.00
12,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

58,300.00
600.00
16,250.00
12,900.00
1,725.00
1,040.00
90,815.00
13,622.25

Harga Satuan Pekerjaan Rp

104,437.25

Harga Satuan

Jumlah Harga

Rp
Rp
Rp
Rp

23,000.00
12,000.00
65,000.00
86,000.00

Rp
Rp
Rp
Rp

11,500.00
600.00
16,250.00
12,900.00

Rp

115,000.00

Rp

1,725.00

80,000.00 Rp
Jumlah Rp
Overhead & Profit (15%) Rp

1,040.00
44,015.00
6,602.25

Harga Satuan Pekerjaan Rp

50,617.25

Rp

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

45,000.00
12,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Overhead & Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
240.00
7,800.00
5,160.00
690.00
480.00
63,870.00
9,580.50

Harga Satuan Pekerjaan Rp

73,450.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp

155,100.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

155,100.00
4,500.00
51,600.00
6,900.00
240.00
218,340.00
32,751.00

Harga Satuan Pekerjaan Rp

251,091.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

116,600.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

116,600.00
750.00
43,000.00
5,750.00
400.00
166,500.00
24,975.00

Harga Satuan Pekerjaan Rp

191,475.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

155,100.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

155,100.00
375.00
43,000.00
5,750.00
240.00
204,465.00
30,669.75

Harga Satuan Pekerjaan Rp

235,134.75

Harga Satuan
Rp
Rp
Rp
Rp
Rp

155,100.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

155,100.00
1,125.00
12,900.00
1,725.00
64.00
170,914.00
25,637.10

Harga Satuan Pekerjaan Rp

196,551.10

Harga Satuan
Rp
Rp
Rp
Rp
Rp

33,600.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

33,600.00
1,125.00
12,900.00
1,725.00
64.00
49,414.00
7,412.10

Harga Satuan Pekerjaan Rp

56,826.10

Harga Satuan
Rp
Rp
Rp
Rp
Rp

26,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

26,000.00
750.00
8,600.00
1,150.00
40.00
36,540.00
5,481.00

Harga Satuan Pekerjaan Rp

42,021.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

18,900.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

18,900.00
750.00
17,200.00
2,300.00
40.00
39,190.00
5,878.50

Harga Satuan Pekerjaan Rp

45,068.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp

15,100.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,100.00
1,125.00
12,900.00
1,725.00
640.00
31,490.00
4,723.50

Harga Satuan Pekerjaan Rp

36,213.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp

18,000.00
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

18,000.00
1,125.00
12,900.00
1,725.00
640.00
34,390.00
5,158.50

Harga Satuan Pekerjaan Rp

39,548.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,750.00
43,000.00
5,750.00
240.00
52,740.00
7,911.00

Harga Satuan Pekerjaan Rp

60,651.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,500.00
17,200.00
2,300.00
80.00
21,080.00
3,162.00

Harga Satuan Pekerjaan Rp

24,242.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,750.00
43,000.00
5,750.00
240.00
52,740.00
7,911.00

Harga Satuan Pekerjaan Rp

60,651.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

750.00
8,600.00
1,150.00
400.00
10,900.00
1,635.00

Harga Satuan Pekerjaan Rp

12,535.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,500.00
51,600.00
6,900.00
240.00
63,240.00
9,486.00

Harga Satuan Pekerjaan Rp

72,726.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,875.00
21,500.00
2,875.00
240.00
26,490.00
3,973.50

Harga Satuan Pekerjaan Rp

30,463.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

106,600.00
194,117.65
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

117,260.00
9,705.88
1,125.00
12,900.00
1,725.00
64.00
142,779.88
21,416.98

Harga Satuan Pekerjaan Rp

164,196.86

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

119,300.00
194,117.65
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

131,230.00
9,705.88
1,125.00
12,900.00
1,725.00
64.00
156,749.88
23,512.48

Harga Satuan Pekerjaan Rp

180,262.36

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

194,117.65
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,588.24
1,275.00
14,620.00
1,955.00
72.00
31,510.24
4,726.54

Harga Satuan Pekerjaan Rp

36,236.77

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

194,117.65
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,588.24
1,875.00
21,500.00
2,875.00
104.00
39,942.24
5,991.34

Harga Satuan Pekerjaan Rp

45,933.57

Harga Satuan
Rp
Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,125.00
12,900.00
1,725.00
640.00
16,390.00
2,458.50

Harga Satuan Pekerjaan Rp

18,848.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,275.00
14,620.00
1,955.00
720.00
18,570.00
2,785.50

Harga Satuan Pekerjaan Rp

21,355.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp

75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,125.00
12,900.00
1,725.00
640.00
16,390.00
2,458.50

Harga Satuan Pekerjaan Rp

18,848.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

194,117.65
75,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,705.88
5,625.00
12,900.00
1,725.00
320.00
30,275.88
4,541.38

Harga Satuan Pekerjaan Rp

34,817.26

g
Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,754,400.00
1,052,640.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,754,400.00
1,052,640.00
214,500.00
94,600.00
11,500.00
12,800.00
3,140,440.00
471,066.00

Harga Satuan Pekerjaan Rp

3,611,506.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp

210,000.00
1,370.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

210,000.00
8,220.00
1,500.00
65,000.00
129,000.00
17,250.00
4,000.00
434,970.00
65,245.50

Harga Satuan Pekerjaan Rp

500,215.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

137,000.00
1,370.00
150,000.00
730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

137,000.00
8,220.00
1,500.00
5,110.00
65,000.00
129,000.00
17,250.00
4,000.00
367,080.00
55,062.00

Harga Satuan Pekerjaan Rp

422,142.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,188,900.00
1,370.00
150,000.00
45,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,188,900.00
8,220.00
1,500.00
45,000.00
65,000.00
86,000.00
11,500.00
4,000.00
1,410,120.00
211,518.00

Harga Satuan Pekerjaan Rp

1,621,638.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

649,100.00
1,370.00
150,000.00
77,892.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

649,100.00
8,220.00
1,500.00
77,892.00
78,000.00
124,700.00
17,250.00
4,800.00
961,462.00
144,219.30

Harga Satuan Pekerjaan Rp

1,105,681.30

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

2,500,000.00
500,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,500,000.00
500,000.00
195,000.00
387,000.00
5,750.00
72,000.00
3,659,750.00
548,962.50

Harga Satuan Pekerjaan Rp

4,208,712.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

2,336,000.00
280,320.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,336,000.00
280,320.00
195,000.00
387,000.00
5,750.00
72,000.00
3,276,070.00
491,410.50

Harga Satuan Pekerjaan Rp

3,767,480.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,370.00
150,000.00
1,915.29
2,730.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

109,500.00
164,400.00
45,000.00
689,505.88
16,380.00
390,000.00
258,000.00
34,500.00
2,400.00
1,709,685.88
256,452.88

Harga Satuan Pekerjaan Rp

1,966,138.76

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

1,100,000.00
132,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,100,000.00
132,000.00
195,000.00
387,000.00
5,750.00
72,000.00
1,891,750.00
283,762.50

Harga Satuan Pekerjaan Rp

2,175,512.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

2,336,000.00
280,320.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,336,000.00
280,320.00
195,000.00
387,000.00
5,750.00
72,000.00
3,276,070.00
491,410.50

Harga Satuan Pekerjaan Rp

3,767,480.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

693,000.62
82,508.18
39,000.00
1,944.00
81,102.04
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

623,700.55
14,851,472.95
312,000.00
972,000.00
81,102.04
227,500.00
387,000.00
5,750.00
1,440.00
17,461,965.55
2,619,294.83

Harga Satuan Pekerjaan Rp

20,081,260.38

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

777,600.00
50,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

777,600.00
50,000.00
1,950.00
25,800.00
3,450.00
1,200.00
860,000.00
129,000.00

Harga Satuan Pekerjaan Rp

989,000.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

896,000.00
50,000.00
1,370.00
150,000.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

896,000.00
50,000.00
27,400.00
7,500.00
3,250.00
43,000.00
5,750.00
2,000.00
1,034,900.00
155,235.00

Harga Satuan Pekerjaan Rp

1,190,135.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp

25,500.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp

25,500.00
650.00
8,600.00
1,150.00
400.00
36,300.00
5,445.00

Harga Satuan Pekerjaan Rp

41,745.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,370.00
150,000.00
150,000.00
150,000.00
82,508.18
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

29,200.00
60,280.00
10,500.00
9,000.00
10,500.00
132,013.09
140,400.00
61,920.00
8,280.00
880.00
462,973.09
69,445.96

Harga Satuan Pekerjaan Rp

532,419.06

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,370.00
150,000.00
150,000.00
150,000.00
82,508.18
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,100.00
105,490.00
1,950.00
13,500.00
3,000.00
214,521.28
208,000.00
98,900.00
1,265.00
1,280.00
699,006.28
104,850.94

Harga Satuan Pekerjaan Rp

803,857.22

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

730.00
1,370.00
150,000.00
150,000.00
150,000.00
82,508.18
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

89,790.00
156,180.00
27,600.00
18,000.00
4,950.00
400,164.69
208,000.00
98,900.00
1,265.00
1,280.00
1,006,129.69
150,919.45

Harga Satuan Pekerjaan Rp

1,157,049.14

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

92,500.00
32,375.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

111,000.00
32,375.00
3,510.00
7,740.00
1,035.00
2,160.00
157,820.00
23,673.00

Harga Satuan Pekerjaan Rp

181,493.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

15,000.00
3,500.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,000.00
3,500.00
650.00
34,400.00
4,600.00
400.00
58,550.00
8,782.50

Harga Satuan Pekerjaan Rp

67,332.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

25,000.00
8,750.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

30,000.00
8,750.00
3,510.00
7,740.00
1,035.00
2,160.00
53,195.00
7,979.25

Harga Satuan Pekerjaan Rp

61,174.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

165,500.00
57,925.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,600.00
57,925.00
3,510.00
7,740.00
1,035.00
2,160.00
270,970.00
40,645.50

Harga Satuan Pekerjaan Rp

311,615.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

220,600.00
77,210.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

264,720.00
77,210.00
7,020.00
15,480.00
2,070.00
400.00
366,900.00
55,035.00

Harga Satuan Pekerjaan Rp

421,935.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

626,600.00
219,310.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

751,920.00
219,310.00
8,775.00
19,350.00
2,587.50
560.00
1,002,502.50
150,375.38

Harga Satuan Pekerjaan Rp

1,152,877.88

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

985,000.00
344,750.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,182,000.00
344,750.00
8,775.00
19,350.00
2,587.50
560.00
1,558,022.50
233,703.38

Harga Satuan Pekerjaan Rp

1,791,725.88

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

47,200.00
16,520.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

56,640.00
16,520.00
2,340.00
5,160.00
690.00
160.00
81,510.00
12,226.50

Harga Satuan Pekerjaan Rp

93,736.50

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

35,700.00
3,228.75
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

42,840.00
3,228.75
2,340.00
5,160.00
690.00
160.00
54,418.75
8,162.81

Harga Satuan Pekerjaan Rp

62,581.56

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

90,100.00
31,535.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

108,120.00
31,535.00
2,340.00
5,160.00
690.00
160.00
148,005.00
22,200.75

Harga Satuan Pekerjaan Rp

170,205.75

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

114,100.00
39,935.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

136,920.00
39,935.00
3,510.00
7,740.00
1,035.00
240.00
189,380.00
28,407.00

Harga Satuan Pekerjaan Rp

217,787.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

143,700.00
50,295.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

172,440.00
50,295.00
3,510.00
7,740.00
1,035.00
240.00
235,260.00
35,289.00

Harga Satuan Pekerjaan Rp

270,549.00

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

175,000.00
61,250.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

210,000.00
61,250.00
3,510.00
7,740.00
1,035.00
240.00
283,775.00
42,566.25

Harga Satuan Pekerjaan Rp

326,341.25

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

164,000.00
57,400.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

49,200.00
57,400.00
5,265.00
11,610.00
1,552.50
320.00
125,347.50
18,802.13

Harga Satuan Pekerjaan Rp

144,149.63

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

337,300.00
118,055.00
65,000.00
86,000.00
115,000.00
80,000.00
Jumlah
Profit (15%)

Jumlah Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

404,760.00
118,055.00
5,265.00
11,610.00
1,552.50
320.00
541,562.50
81,234.38

Harga Satuan Pekerjaan Rp

622,796.88

DAFTAR HARGA SATUAN


BAHAN BANGUNAN
KABUPATEN ACEH BESAR

NO.
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53

NAMA JENIS BARANG


2
Acustic 30 x 60
Agregate Halus (pasir)
Agregate Kasar (Kerikil)
Pasir (Quary)
Kerikil (Quary)
Arang
Asbes Gelombang Besar
Asbes Gelombang kecil
Asbes Quality 1 x 1 m
Asphalt
Asphalt Semen Pen. 60/70 atau Pen 80/100
Atap Harflek
Atap Multroof / Elmiral
Baja Profil
Bak Cuci Piring Logam
Bak Cuci Piring Teraso
Bak Cuci Tangan / Wastafel Keramik
Bak Mandi Fibre
Bak Mandi Plastik
Bak Mandi Porselin
Bak mandi Teraso
Bambu
Bataco
Batang Kelapa
Batu ( >1000 ) Kg - Material Water Break
Batu ( 250 - 1000) Kg - Material Water Break
Batu (< 250) Kg - Material Water Break
Batu Bata
Batu Kali / Batu Belah (Sungai / Gunung)
Batu Pakhlag (Batu 5 - 7 cm)
Batu Pecah 2-3 cm
Batu Tempel
Batu Kap 1/2 - 8
Bensin (Industri)
Besi Beton Polos
Besi Beton Ulir
Besi Bout (Kuda-Kuda) 5/8 - 10 "
Besi Strip
Beton Rooster / Kerawang
Bed Matress (Terrafix)
Bubungan Genteng
Bubungan Seng
Buis Beton 10 cm
Buis Beton 20 cm
Buis Beton 30 cm
Buis Tanah 10 cm
Buis Tanah 20 cm
Cat Kayu Dasar
Cat Kayu Mengkilat
Cat Menie Besi
Cat Tembok
Dempul Kayu
Engsel Jendela

LAMPIRAN - KEPUTUSAN GUBERNUR


PROVINSI NANGGROE
ACEH DARUSSALAM
NOMOR : 028 / 659 / 2014
TANGGAL : 14 AGUSTUS 2013 M

SATUAN

HARGA

3
Lembar
M3
M3
M3
M3
Kg
Lembar
Lembar
Lembar
Kg
Kg
Lembar
M2
Kg
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Batang
Buah
Batang
M3
M3
M3
Buah
M3
M3
M3
M3
Buah
Ltr
Kg
Kg
Buah
Kg
Buah
M3
M'
M'
Buah
Buah
Buah
Buah
Buah
Kg
Kg
Kg
Kg
Kg
Pasang

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(Rp.)
4
193,400
100,000
112,000
74,000
118,750
4,800
79,800
82,500
22,000
16,600
13,500
88,800
93,400
32,900
777,600
896,000
649,100
2,336,000
1,986,900
2,906,000
1,100,000
37,300
5,200
280,000
270,000
245,000
220,000
500
165,000
175,800
477,500
224,700
4,200
9,900
16,000
29,900
12,100
5,000
8,800
95,500
67,500
29,700
37,100
40,300
72,400
33,600
49,100
33,000
47,800
31,500
32,600
29,200
26,000

NO.

NAMA JENIS BARANG

SATUAN

1
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

2
Engsel Pintu
Espagnolet
Floor Drain
Filler
Fitting Plafond
Geosand Bag (2.4 m x 1.45 m)
Geotube (P + 20 m, T + 1.5 m, L + 1.8 m)
Genteng Beton
Genteng Keramik
Genteng Kodok
Gip Sum (120 x 240 cm) Tebal 1,2 cm
Grendel Jendela / Pintu
Gravel
Hak Angin
Ijuk
Kaca Bening Uk. 2 mm
Kaca Bening Uk. 3 mm
Kaca Bening Uk. 5 mm
Kaca Rayband Uk. 3 mm
Kaca Rayband Uk. 5 mm
Kapur Batu
Kapur Sirih
Karpus Asbes Gelombang Besar
Karpus Asbes Gelombang Kecil
Karpus Genteng Beton
Karpus Genteng Keramik
Kawat Beton
Kawat Bronjong 3 mm
Kawat Bronjong 4 mm

3
Pasang
Buah
Buah
Kg
Buah
Bag
Tube
Keping
Keping
M2
Lembar
Buah
M3
Buah
Kg
M2
M2
M2
M2
M2
Kg
Kg
M'
M'
M'
M'
Kg
Kg
Kg

83
84
85
86
87
88
89
90
91
92
93
94
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117

Kawat Bronjong 5 mm
Kawat Bronjong Pabrikan Uk. (1,5 x 1 x 1) Dia 3 mm
Kawat Bronjong Pabrikan Uk. (2 x 1 x 1) Dia 3 mm
Kawat Bronjong Pabrikan Uk. (3 x 1 x 0,5) Dia 3 mm
Kawat Bronjong Pabrikan Uk. (2 x 1 x 0,5) Dia 3 mm
Kawat Bronjong Pabrikan Uk. (4 x 1 x 0,5) Dia 3 mm
Kawat Bronjong Pabrikan Uk. (3 x 1,5 x 0,5) Dia 3 mm
Kawat Bronjong Pabrikan Uk. (3 x 1 x 1) Dia 3 mm
Kawat Bronjong Pabrikan Uk. (4 x 1 x 0,5) Dia 3 mm
Kawat Bronjong Pabrikan Uk. (4 x 2 x 0,5) Dia 3 mm
Kawat Bronjong Pabrikan Uk. (4 x 2 x 2,5) Dia 3 mm
Kawat Bronjong Pabrikan Uk. (3 x 1,5 x 1) Dia 3 mm
Kawat Duri
Kawat Harmonika
Kawat Nyamuk / Kasa Logam
Kawat Nyamuk / Kasa Plastik
Kayu Bahan Pintu
Kayu Bakar
Kayu Bakau 10 cm
Kayu Tiang Perancah
Kayu Papan Perancah / Papan Bekisting
Kayu Borneo
Kayu Bekisting Kelas III
Kayu Dolken / Tiang Perancah
kayu Gelagar Uk. 8/15 - 4 m
Kayu Kelas I (Seumantok / Ulin / dll)
Kayu Kelas II (Kamper / Kruing / dll)
Kayu Kelas III (Borneo / dll)
Kayu kelas IV (Sengo / dll)
Keramik Sisi Kulit Jeruk 20 x 20
Keramik Uk. 30 x 30 cm
Keramik Uk. 40 x 40 cm
Kertas Amplas
Kloset Duduk keramik
Kloset Jongkok Keramik
Kloset Monoblok Lokal
Korosen / Minyak Tanah (Industri)
Korosen / Minyak Tanah (Subsidi)
Koral Beton
Kosen Kayu Klas I (Seumantok / Ulin / dll)
Kosen Kayu Klas II (Kamper / Kruing / dll)
Kunci Pintu
Kran Air

Kg
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Kg
M2
M2
M2
M2
M2
Batang
M3
M3
M3
M3
Batang
Batang
M3
M3
M3
M3
M2
M2
M2
M'
Buah
Buah
Buah
Ltr
Ltr
Buah
M3
M3
Buah
Buah

HARGA

(Rp.)
4

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

33,600
168,400
25,500
1,400
15,000
525,500
75,000,000
8,100
16,900
53,000
80,400
15,100
140,200
18,000
16,100
71,100
106,600
117,700
108,300
140,000
6,900
4,300
101,000
86,900
61,600
101,000
22,900

Rp
Rp

20,700
23,100

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

26,300
515,000
623,500
553,000
485,000
791,500
809,500
894,500
1,172,000
1,171,500
1,167,000
1,171,500
11,500
19,300
19,100
15,700
3,150,000
630,600
57,400
3,250,000
2,572,000
2,800,000
1,950,000
57,000
95,000
5,569,400
4,185,400
3,769,700
3,432,300
54,600
50,400
56,700
3,600
1,754,400
210,000
137,000
7,900
3,400
87,000
4,663,000
3,755,800
150,700
15,000

NO.
1
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159

NAMA JENIS BARANG


2
Kosen Kayu Klas III (Borneo / dll)
Kuda-Kuda Kayu
Kunci Tanam Pintu
Lampu Pijar 40 Watt
Lampu TL 20 Watt
Lampu TL 40 Watt
Lem Aibon
Lempengan Rumput
List Eternit Kayu
Marmer
Minyak Cat
Minyak Pelumas
Multipleks 3 mm
Multipleks 4 mm
Multipleks 6 mm
Multipleks 9 mm
N a c o (Kerangka + Daun)
Nok / Rabung Seng 0.35 Cat Pabrik
Nok / Rabung Seng 0.35 Tidak Dicat
Oksigen
Paku Asbes
Paku Beton 8 inchi
Paku Kait
Paku Kayu
Paku Reng
Paku Seng
Paku Sumbat
Paku Ulir Primadek
Pasir Batu (Sirtu) - Material Jalan
Pasir Beton / Kerikil
Pasir Pasang
Pasir Urug
Paving Block
Pelumas / Oli
Pipa Leiding 1" Galvanis Tebal 3,2 mm
Pipa Leiding " Galvanis Tebal 3,2 mm
Pipa Leiding 1" Galvanis Tebal 3,2 mm
Pipa Leiding 2" Galvanis Tebal 3,2 mm
Pipa Leiding 3" Galvanis Tebal 3,2 mm
Pipa Leiding 4" Galvanis Tebal 3,2 mm

SATUAN
3
M3
M3
Buah
Buah
Buah
Buah
Buah
M2
M'
M2
Liter
Liter
Lembar
Lembar
Lembar
Lembar
M2
Lembar
Lembar
M3
Kg
Kotak
Buah
Kg
Kg
Kg
Buah
Buah
M3
M3
M3
M3
M2
Liter
Batang
Batang
Batang
Batang
Batang

HARGA

(Rp.)
4

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,553,400
3,700,000
116,600
6,600
94,600
128,100
27,900
33,100
6,600
609,800
24,900
39,200
68,300
88,500
116,800
182,300
341,200
82,700
55,900
429,900
14,700
16,800
1,200
19,900
13,500
19,900
1,200
4,200
259,200
150,000
150,000
123,200
98,100
48,700
165,500
92,500

Rp
Rp

220,600
361,400

Rp
Rp

626,600
985,000

Rp
Rp

1,613,900
90,100

Pipa Leiding 6" Galvanis Tebal 3,2 mm


Pipa PVC 1"

Batang
Batang
Batang

160
161

Pipa PVC " Kualitas A WE (United)


Pipa PVC 1"

Batang
Batang

Rp
Rp

47,200
114,100

162
163

Pipa PVC 2"


Pipa PVC 3"

Batang
Batang

Rp
Rp

143,700
164,000

164
165
166
167
168
169
170
171
172
173

Pipa PVC "


Pipa PVC 4"
Plamur Tembok
Plin Keramik 15 x 30
Plin Ubin Abu-Abu 15 x 20
Plin Ubin Berwarna 15 x 20
Plin Ubin Teraso 10 x 30
Porselin 10 x 15
Porselin 11 x 11
Porselin 15 x 15

Batang
Batang
Kg
Buah
Buah
Buah
Buah
M2
M2
M2

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

35,700
337,300
15,800
16,600
1,200
4,200
6,600
160,100
160,100

Rp

160,100

NO.
1
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210

NAMA JENIS BARANG

SATUAN

2
Porselin 20 x 20
Residu
Reservoir Air 0,5 m3 Fibre
Reservoir Air 1 m3 Fibre
Reservoir Air 0,5 m3 Stainless Steel
Reservoir Air 1 m3 Stainless Steel
Schakelar
Semen @ 40 Kg
Semen @ 50 Kg
Semen Putih @ 50 Kg
Seng BJLS 0,20
Seng BJLS 0,20 Cat Pabrik
Seng Plat BJLS 20
Seng Plat BJLS 30
Solar (Industri)
Stop Kontak + Instalasi
Stut Werk (Ska Folding)
Sumur + Pompa Tangan Terpasang
Tanah Timbun
Tanah Timbun Pilihan - Material Jalan
Teralis Besi
Titik Lampu + Instalasi
Ubin Abu-Abu 20 x 20
Ubin Berwarna 20 x 20
Ubin Teraso 20 x 20
Ubin Wafel 20 x 20
Urinoir Keramik
Vinyl
Wayer Mess (Ulir) Dia 5,0
Wayer Mess (Ulir) Dia 6,0
Zekering (Kast Lokal 1 Zekering)
Zekering (Kast Lokal 2 Zekering)
Zekering (Kast Lokal 3 Zekering)
Geotekstil Non Woven

3
M2
liter
Buah
Buah
Buah
Buah
Buah
Zak
Zak
Zak
M2
M2
M2
M2
Ltr
Titik
M3
Buah
M3
M3
M2
Titik
M2
M2
M2
M2
Buah
M2
M
M
Buah
Buah
Buah
M2

HARGA

(Rp.)
4

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

157,000
4,600
1,789,300
2,765,500
2,114,500
3,416,100
27,900
54,700
69,500
136,500
57,700
81,300

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

57,700
81,300
8,900
168,300
2,347,400
3,083,000
61,600
139,700
442,300
151,900
48,600
48,600
48,600
48,600
1,188,900
197,900
36,800
41,800
157,100
199,300
294,900

Rp

47,900

DAFTAR UPAH KERJA


DALAM DAERAH KABUPATEN ACEH BESAR
NO.
1

URAIAN TENAGA
Mandor

SATUAN
Orang

2
3

Kepala Tukang Kayu / Cat


Tukang Kayu / Cat

Orang
Orang

4
5

Laden Tukang Kayu / Cat


Kepala Tukang Batu / Besi

Orang
Orang

6
7

Tukang Batu / Besi


Laden Tukang Batu / Besi

Orang
Orang

8
9
10

Pekerja Galian Tanah


Penjaga Malam / Satpam
Penyelam

Orang
Orang
Orang

11

Supir

Orang

12

Operator

Orang

HARGA (Rp.)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

80,000.00
115,000.00
86,000.00
75,000.00
115,000.00
86,000.00
65,000.00
65,000.00
65,000.00
150,000.00
100,000.00
150,000.00

PONDA
Plat Pondasi

g
d

c
f'

Perhitungan Volume Pondasi


1. Kolom Pondasi
2. Plat Trapesium
3. Plat Persegi
Total Volume Pondasi

=
=
=
=

0.156
0.255
0.468
0.879

M3
M3
M3
M3

Perhitungan Kolom Pondasi


Lokasi

Tinggi Kolom
P
P
P
P

Tul. Utama

0.300

Sengkang
0.400

Selimut (m)
1.Beugel (m)
2.Beugel (m)

Total

0.030
1.192
1.192

KOLOM
PONDASI

Besi D
Besi P
Bekisting

Perhitungan Plat Pondasi

Selimut (m)

Lokasi
Tul. Utama
Arah X
Tul. Utama
Arah Y

0.050

P
P
P
P
Total

Plat
Pondasi

Besi D
Besi P
Bekisting

Rekapitulasi Perhitungan Pondasi


PONDASI

1 M3 = 1.138 Bh

Besi D
Besi P
Bekisting

PONDASI

f
e

Tinggi Kolom
14
14
8
8

14
14
14
14

150
150

1.300
1.200
0.400
0.300
0.300
0.100
1.300
1.700
0.461
0.461

m
m
m
m
m
m
m
m
m
m

=
=
=
=
=
=

1.300
6.284
6.284
2.352
2.352
17.271

=
=
=

0.000 Kg
17.271 Kg
1.820 M2

M'
Kg
Kg
Kg
Kg
Kg

=
=
=
=
=

47.766
10.404
48.604
11.760
118.534

esi D
esi P
ekisting

=
=
=

0.000 Kg
118.534 Kg
2.000 M2

esi D
esi P
ekisting

=
=
=

0.000 Kg
154.499 Kg
4.346 M2

Total

100
100
100
100

a
b
c
d
e
f
g
h
f'
f''

Kg
Kg
Kg
Kg
Kg

Lebar Tapak
Panjang Tapak
Lebar Kolom
panjang kolom
Tebal Tapak
Tebal Tapak
Tinggi Kolom Pondasi
Tinggi Total Pondasi
Panjang Bidang Miring arah x
Panjang Bidang Miring arah y

nggi Kolom Pondasi


nggi Total Pondasi
njang Bidang Miring arah x
njang Bidang Miring arah y

n
4
4
5
5

n
12
5
13
6

DAFTAR ANALISA
SNI DT-91-0006-2007-6.1
1 M3 Galian tanah biasa sedalam 1 m
0.750 #REF! Pekerja
0.025 #REF! Mandor

SNI DT-91-0006-2007-6.9
1 M3 Urugan Tanah Kembali 1/3 kali indek galian
0.250 #REF! Pekerja
0.008 #REF! Mandor

SNI DT-91-0006-2007-6.11
1 M3 Urugan Pasir
1.200 #REF! Pasir Urug
0.300 #REF! Pekerja
0.010 #REF! Mandor

#REF!
1 M3 Pasangan Batu Kosong (aanstamping)
1.200 #REF! Batu Gunung/Kali
0.432 #REF! Pasir Urug
0.780 #REF! Pekerja
0.039 #REF! Kepala Tukang
0.039 #REF! Mandor
0.390 #REF! Tukang

#REF!
1 M3 Pasangan Batu Gunung 1 Pc : 4 Pp
0.520 #REF! Pasir Pasang
1.200 #REF! Batu Gunung/Kali
Kg
163.000
Semen PC
0.075 #REF! Kepala Tukang
0.750 #REF! Tukang
1.500 #REF! Pekerja
0.075 #REF! Mandor

#REF!
Memasang 1 Kg Besi Polos atau Besi Ulir
10.5000 #REF! Besi Beton Polos
0.0150 #REF! Kawat Beton
#REF! #REF! Kepala Tukang
#REF! #REF! Tukang
0.0700 #REF! Pekerja
0.0040 #REF! Mandor

#REF!
Memasang 1 m2 Bekisting untuk Pondasi
#REF! Kayu Kelas III
0.040
#REF! Paku Kayu
0.300
#REF! Minyak Bekisting
0.100
#REF! Pekerja
0.520
#REF! Tukang
0.260
#REF! Kepala Tukang
0.026
#REF! Mandor
0.026

Rp
@
Rp
@
Jumlah
Dibulatkan

65,000
80,000

Rp
@
Rp
@
Jumlah
Dibulatkan

65,000
80,000

Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

123,200
65,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

165,000
123,200
65,000
115,000
80,000
86,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

150,000
165,000
1,368
115,000
86,000
65,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah/10 Kg
Jumlah/1 Kg
Dibulatkan

16,000
22,900
115,000
86,000
65,000
80,000

Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,769,700
19,900
48,700
75,000
86,000
115,000
80,000

@
@
@
@
@
@
@
Jumlah

Dibulatkan

#REF!
Memasang 1 m2 Bekisting untuk Sloof
M3
0.045
Kayu Kelas III
#REF! Paku Kayu
0.300
#REF! Minyak Bekisting
0.100
#REF! Pekerja
0.520
#REF! Tukang
0.260
#REF! Kepala Tukang
0.026
#REF! Mandor
0.026

#REF!
Memasang 1 m2 Bekisting Untuk Kolom
0.040
#REF! Kayu Kelas III
0.400
#REF! Paku Kayu
0.200
#REF! Minyak Bekisting
0.015
#REF! Kayu Balok Kelas II
0.350
#REF! Plywood Tebal 9 mm
#REF!
2.000
Dolken Kayu Galam (8-10)cm, Panjang 4,00 m
0.660
0.330
0.033
0.033

OH
OH
OH
OH

Pekerja
Tukang kayu
Kepala tukang
Mandor

#REF!
Memasang 1 m2 Bekisting Untuk Balok
0.040
#REF! Kayu Kelas III
0.400
#REF! Paku Kayu
0.200
#REF! Minyak Bekisting
0.018
#REF! Kayu Balok Kelas II
0.350
#REF! Plywood Tebal 9 mm
2.000
#REF!
Dolken Kayu Galam (8-10)cm, Panjang 4,00 m
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

Kepala Tukang
Tukang
Pekerja
Mandor

BETON BERTULANG
#REF!
1 M3 Membuat Beton Dengan Mutu K225
Kg
1,047.000
Kerikil Beton
Kg
698.000
Pasir Pasang
Kg
371.000
Semen PC
215.000 #REF! Air
0.028 #REF! Kepala Tukang
0.275 #REF! Tukang
1.650 #REF! Pekerja
0.083 #REF! Mandor

REKAPITULASI BETON BERTULANG


1 M3 Membuat Beton Dengan Mutu K225
Memasang 1 Kg Besi Polos atau Besi Ulir
Memasang 1 m2 Bekisting untuk Pondasi
Memasang 1 m2 Bekisting untuk Sloof
Memasang 1 m2 Bekisting Untuk Kolom
Memasang 1 m2 Bekisting Untuk Balok

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

3,769,700
19,900
48,700
75,000
86,000
115,000
80,000

Rp
Rp
Rp
Rp
Rp

3,769,700
19,900
48,700
4,185,400
182,300

Rp
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

41,000
75,000
86,000
115,000
80,000

Rp
Rp
Rp
Rp
Rp

3,769,700
19,900
48,700
4,185,400
182,300

Rp
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

41,000
75,000
86,000
115,000
80,000

Rp
@
Rp
@
Rp
@
@
@
@
@
@
Jumlah
Dibulatkan

97
104
1,368
#REF!
#REF!
#REF!
#REF!
#REF!

@
@
@
@
@
@

@
@
@
@
@
@

=
=
=
=
=
=

Rp
Rp
Rp

#REF!
#REF!
228,000
246,900
461,300
#REF!

Suplemen A
1 M3 Pekerjaan Sloof 15/20
1
M3
1 M3 Membuat Beton Dengan Mutu K225
250
Kg
Memasang 1 Kg Besi Polos atau Besi Ulir
3
M2
Memasang 1 m2 Bekisting untuk Sloof

@
@
@

Suplemen B
1 M3 Pekerjaan Kolom 25/25
1
M3
1 M3 Membuat Beton Dengan Mutu K225
250
Kg
Memasang 1 Kg Besi Polos atau Besi Ulir
5
M2
Memasang 1 m2 Bekisting Untuk Kolom

@
@
@

Suplemen C
1 M3 Pekerjaan Ring Balk Atap 13/20
1
M3
1 M3 Membuat Beton Dengan Mutu K225
220
Kg
Memasang 1 Kg Besi Polos atau Besi Ulir
4
M2
Memasang 1 m2 Bekisting Untuk Balok

@
@
@

#REF!
#REF!
#REF!

Suplemen D
1 M3 Pekerjaan Balok 13/13
1
M3
1 M3 Membuat Beton Dengan Mutu K225
280
Kg
Memasang 1 Kg Besi Polos atau Besi Ulir
4
M2
Memasang 1 m2 Bekisting Untuk Balok

@
@
@

#REF!
#REF!
#REF!

#REF!
Memasang 1 m2 Dinding Batu Bata Tebal 1/2 bata, camp spesi 1 PC : 2 Pp
0.038 #REF! Pasir Pasang
70.000 #REF! Batu Bata
18.950
Kg
Semen PC
0.010 #REF! Kepala Tukang
0.100 #REF! Tukang
0.300 #REF! Pekerja
0.015 #REF! Mandor

#REF!
Memasang 1 m2 Dinding Batu Bata Tebal 1/2 bata, camp spesi 1 PC : 4 Pp
0.043 #REF! Pasir Pasang
70.000 #REF! Batu Bata
11.500
Kg
Semen PC
0.010 #REF! Kepala Tukang
0.100 #REF! Tukang
0.300 #REF! Pekerja
0.015 #REF! Mandor

#REF!
1 M2 Plesteran 1 Pc : 2 Pp : tebal 15 mm
0.020 #REF! Pasir Pasang
10.220
Kg
Semen PC
0.015 #REF! Kepala Tukang
0.150 #REF! Tukang
0.300 #REF! Pekerja
0.015 #REF! Mandor

Rp

#REF!
#REF!
246,900

Rp

#REF!
#REF!
461,300

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

150,000
500
1,368
115,000
86,000
65,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

150,000
500
1,368
115,000
86,000
65,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

150,000
1,368
115,000
86,000
65,000
80,000

#REF!
1 M2 Plesteran 1 Pc : 4 Pp : tebal 15 mm
0.024 #REF! Pasir Pasang
6.240
Kg
Semen PC
0.015 #REF! Kepala Tukang
0.150 #REF! Tukang
0.300 #REF! Pekerja
0.015 #REF! Mandor

SNI DT 91-0011-2007-6.13
1 M3 Konstruksi Kuda-Kuda Kayu Klas I
1.100
M3
Kayu Balok Kelas I
15.000
Kg
Besi Strip tebal 5 mm
5.600
Kg
Paku Kayu
4.000
OH
Kepala Tukang
12.000
OH
Tukang
1.200
OH
Pekerja
0.200
OH
Mandor

SNI DT 91-0011-2007-6.15
1 M3 Konstruksi Gording
1.100
M3
Kayu Balok Kelas I
15.000
Kg
Besi Strip tebal 5 mm
3.000
Kg
Paku Kayu
2.400
OH
Pekerja
7.200
OH
Tukang
0.720
OH
Kepala Tukang
0.120
OH
Mandor

SNI 03-3436-2002 6.32


1 M2 Pasang atap ikatan paku
1.0200 #REF! Seng Genteng Metal
0.2000 #REF! Paku Kayu
0.2000 #REF! Pekerja
0.1000 #REF! Tukang
0.0100 #REF! Kepala Tukang
0.0010 #REF! Mandor

SNI 03-3436-2002 6.36


1 M' Pasang bubungan ikatan paku
1.1000
M'
Bubungan Seng Genteng Metal
0.0500 #REF! Paku Kayu
0.2500 #REF! Pekerja
0.1500 #REF! Tukang
0.0150 #REF! Kepala Tukang
0.0130 #REF! Mandor

SNI 3434:2008- 6.21


1 M' Listplank ukuran (3 x 20 ) cm, kayu kelas II
0.0108 #REF! Papan Kayu Kelas II
0.1000 #REF! Paku Kayu
0.1000 #REF! Pekerja
0.2000 #REF! Tukang
0.0200 #REF! Kepala tukang
0.0050 #REF! Mandor

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

150,000
1,368
115,000
86,000
65,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

5,569,400
5,000
19,900
115,000
86,000
65,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

5,569,400
5,000
19,900
65,000
86,000
115,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

16,900
19,900
65,000
86,000
115,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

67,500
19,900
65,000
86,000
115,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

4,185,400
19,900
75,000
86,000
115,000
80,000

SNI 3434:2008- 6.20


1 M2 Memasang rangka langit-langit (50 x 100) Cm, kayu kelas II atau kelas III
0.0154 #REF! Kaso-kaso (5 x 5) Cm
0.2000 #REF! Paku Kayu
0.1500 #REF! Pekerja
0.2500 #REF! Tukang
0.0250 #REF! Kepala tukang
0.0750 #REF! Mandor

SNI 2839:2008. 6.5


1 M2 Langit-langit tripleks ukuran (120 X 240) Cm, tebal 3 mm, 4 mm dan 6 mm
0.3750 #REF! Plywood Tebal 4 mm
0.0300 #REF! Paku Plywood
0.0700 #REF! Pekerja
0.1000 #REF! Tukang
0.0100 #REF! Kepala tukang
0.0040 #REF! Mandor

Analisa Plafon
1 M2 Plafon Tripleks 4 mm
1.0000
M2
Rangka Langit-langit
1.0000
M2
Langit-langit Triplek

SNI 2839:2008. 6.10


1 M' Profil plafond
1.0500 #REF!
0.0100 #REF!
0.0500 #REF!
0.0500 #REF!
0.0050 #REF!
0.0030 #REF!

List Kayu Profil


Paku Kayu
Pekerja
Tukang
Kepala tukang
Mandor

SNI DT-91-0006-2007-6.11-A
1 M3 Timbunan Tanah Urug
1.200 #REF! Tanah Urug/Tanah Timbun
0.300 #REF! Pekerja
0.010 #REF! Mandor

#REF!
1 M3 Lantai kerja Beton Cor 1 : 3 : 5 (K 100)
#REF!
Kg
Kerikil Beton
#REF!
Kg
Semen PC
#REF!
Kg
Pasir Pasang
#REF!
Ltr
Air
#REF! #REF! Kepala Tukang
#REF! #REF! Tukang
#REF! #REF! Pekerja
#REF! #REF! Mandor

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

3,769,700
19,900
75,000
86,000
115,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

88,500
19,900
75,000
86,000
115,000
80,000

Rp
@
Rp
@
Jumlah
Dibulatkan

103,600
49,105

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

6,600
19,900
75,000
86,000
115,000
80,000

Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

61,600
65,000
80,000

Rp
@
Rp
@
Rp
@
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

97
1,368
104
#REF!
115,000
86,000
65,000
80,000

#REF!
1 M2 Lantai Keramik 30 x 30 cm
11.870
Bh
Keramik Lantai 30 x 30 cm
10.000
Kg
Semen PC
0.045
#REF! Pasir Pasang
1.500
Kg
Semen Putih
0.700
#REF! Pekerja
0.350
OH
Tukang
0.035
#REF! Kepala tukang
0.035
#REF! Mandor

#REF!
1 M2 Lantai Keramik 40 x 40 cm
6.000
Bh
Keramik Lantai 40 x 40 cm
10.000
Kg
Semen PC
0.045
#REF! Pasir Pasang
1.500
Kg
Semen Putih
0.700
#REF! Pekerja
0.350
#REF! Tukang
0.035
#REF! Kepala tukang
0.035
#REF! Mandor

#REF!
1 M3 Pekerjaan Memasang Kusen Pintu dan Jendela Kelas I
1.200 #REF! Kayu Balok Kelas I
1.250 #REF! Paku Kayu
1.000
Bh
Lem Kayu
2.100 #REF! Kepala Tukang
21.000 #REF! Tukang
7.000 #REF! Pekerja
0.350 #REF! Mandor

SNI DT 91-0011-2007-6.5
1 M2 Pasang Pintu Panel Kayu Kelas I atau II
0.040 #REF! Papan Kayu Kelas II
0.500 #REF! Lem Kayu
0.300 #REF! Kepala Tukang
3.000 #REF! Tukang
1.000 #REF! Pekerja
0.050 #REF! Mandor

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

4,246
1,368
150,000
2,730
115,000
86,000
65,000
80,000

Rp
@
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

9,450
#REF!
150,000
2,730
115,000
86,000
65,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

5,569,400
19,900
27,900
115,000
86,000
75,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

4,185,400
27,900
115,000
86,000
75,000
80,000

SNI DT 91-0011-2007-6.10
1 M2 Jalusi Ventilasi Kayu
0.060
0.150
0.500
2.000
0.200
0.025

M3
Kg
OH
OH
OH
OH

Papan Kayu Kelas II


Paku Kayu
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 03-3436-2002-6.5
1 Bh Pasang Engsel Pintu
1.000
Bh
Engsel Pintu
0.015 #REF! Kepala Tukang
0.150 #REF! Tukang
0.015 #REF! Pekerja
0.00075 #REF! Mandor

Rp
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

4,185,400
19,900
75,000
86,000
115,000
80,000

Rp
Rp
Rp
Rp
Rp

16,800
115,000
86,000
75,000
80,000

@
@
@
@
@
Jumlah

Dibulatkan

SNI 03-3436-2002-6.2
1 Bh Pasang Kunci Tanam Biasa
1.000 #REF! Kunci Tanam Biasa
0.010 #REF! Kepala Tukang
0.500 #REF! Tukang
0.010 #REF! Pekerja
0.005 #REF! Mandor

SNI DT 91-0011-2007-6.6
1 M2 Pasang Pintu dan Jendela Kaca Kayu Kelas I atau II
0.024 #REF! Papan Kayu Kelas II
0.300 #REF! Lem Kayu
0.240 #REF! Kepala Tukang
2.400 #REF! Tukang
0.800 #REF! Pekerja
0.040 #REF! Mandor

SNI 03-3436-2002-6.6
1 Bh Pasang Engsel Jendela
1.000
Bh
Engsel Jendela
0.010 #REF! Kepala Tukang
0.100 #REF! Tukang
0.010 #REF! Pekerja
0.0005 #REF! Mandor

SNI 03-3436-2002-6.4
1 Bh Pasang Kunci Silinder/Grendel
1.000 #REF! Kunci Silinder/Grendel
0.005 #REF! Kepala Tukang
0.100 #REF! Tukang
0.005 #REF! Pekerja
0.00025 #REF! Mandor

SNI 03-3436-2002-6.9
1 Bh Pasang Kait/Hak Angin
1.000
Bh
Kait/Hak Angin
0.005 #REF! Kepala Tukang
0.100 #REF! Tukang
0.005 #REF! Pekerja
0.00025 #REF! Mandor

RSNI T-30-200-B.26
1 Buah Hak Tarikan Jendela
1.000
Bh
Tarikan Jendela
0.015
OH
Pekerja
0.150
OH
Tukang
0.015
OH
Kepala Tukang
0.00075
OH
Mandor

RSNI T-30-200-B.17
1 M2 Pasang Kaca tebal 5 mm
1.100
M2
Kaca 5 mm
0.015
OH
Pekerja
0.150
OH
Tukang
0.015
OH
Kepala Tukang
0.00075
OH
Mandor

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

150,700
115,000
86,000
75,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

4,185,400
27,900
115,000
86,000
75,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

26,000
115,000
86,000
75,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

15,100
115,000
86,000
75,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

18,000
115,000
86,000
75,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

15,100
75,000
86,000
115,000
80,000

Rp
Rp
Rp
Rp
Rp

117,700
75,000
86,000
115,000
80,000

@
@
@
@
@
Jumlah

Dibulatkan

SNI Cat-03-2835-2002-6.14
1 M2 Cat Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar dan 2 Lapis Cat Penutup)
0.100 #REF! Plamir Tembok
0.100 #REF! Cat Dasar Tembok
0.260 #REF! Cat Tembok
0.020 #REF! Pekerja
0.063 #REF! Tukang
0.0063 #REF! Kepala Tukang
0.0025 #REF! Mandor

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

15,800
32,600
32,600
75,000
86,000
115,000
80,000

SNI Cat-03-2835-2002-6.8
1 M2 Cat Kayu, (1 x Cat Menie + Dempul + 2 x Cat Penutup)
Kg
0.200
Cat Menie Besi
Kg
0.150
Dempul Kayu
Kg
0.200
Cat Kayu Mengkilat
Kg
0.170
Cat Kayu Dasar
Ltr
0.100
Minyak Cat
Lbr
0.200
Amplas
0.006 #REF! Kepala Tukang
0.009 #REF! Tukang
0.070 #REF! Pekerja
0.025 #REF! Mandor

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

31,500
29,200
47,800
33,000
24,900
4,000
115,000
86,000
75,000
80,000

Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Rp
@
Jumlah
Dibulatkan

115,000
86,000
75,000
80,000
29,200
32,600
4,000

SNI Cat-03-2835-2002-6.14-A
1 M2 Cat Plafond, (Dempul + 2 x Cat Penutup)
0.006 #REF! Kepala Tukang
0.063 #REF! Tukang
0.020 #REF! Pekerja
0.003 #REF! Mandor
0.080 #REF! Dempul Kayu
0.250 #REF! Cat Tembok
0.200 #REF! Amplas

Rp
Rp
Rp
Rp

48,750.00
2,000.00
50,750.00
50,700.00

Rp
Rp
Rp
Rp

16,250.00
666.67
16,916.67
16,900.00

Rp
Rp
Rp
Rp
Rp

147,840.00
19,500.00
800.00
168,140.00
168,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
53,222.40
50,700.00
4,485.00
3,120.00
33,540.00
343,067.40
343,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

78,000.00
198,000.00
222,902.50
8,625.00
64,500.00
97,500.00
6,000.00
675,527.50
675,500.00

Rp
Rp

168,000.00
343.50
#REF!
#REF!
4,550.00
320.00
#REF!
#REF!
#REF!

Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

150,788.00
5,970.00
4,870.00
39,000.00
22,360.00
2,990.00
2,080.00
228,058.00

Rp

228,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

169,636.50
5,970.00
4,870.00
39,000.00
22,360.00
2,990.00
2,080.00
246,906.50
246,900.00

Rp
Rp
Rp
Rp
Rp

150,788.00
7,960.00
9,740.00
62,781.00
63,805.00

Rp

82,000.00

Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
28,380.00
3,795.00
2,640.00
461,389.00
461,300.00

Rp
Rp
Rp
Rp
Rp

150,788.00
7,960.00
9,740.00
75,337.20
63,805.00

Rp

82,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rp
Rp
Rp

101,584.36
72,456.75
507,342.50
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rp

#REF!
#REF!
740,700.00
#REF!
#REF!

Rp

#REF!
#REF!
2,306,500.00
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,700.00
35,000.00
25,914.13
1,150.00
8,600.00
19,500.00
1,200.00
97,064.13
97,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,450.00
35,000.00
15,726.25
1,150.00
8,600.00
19,500.00
1,200.00
87,626.25
87,600.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,000.00
13,975.85
1,725.00
12,900.00
19,500.00
1,200.00
52,300.85
52,300.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,600.00
8,533.20
1,725.00
12,900.00
19,500.00
1,200.00
47,458.20
47,400.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,126,340.00
75,000.00
111,440.00
460,000.00
1,032,000.00
78,000.00
16,000.00
7,898,780.00
7,898,700.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,126,340.00
75,000.00
59,700.00
156,000.00
619,200.00
82,800.00
9,600.00
7,128,640.00
7,128,600.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

17,238.00
3,980.00
13,000.00
8,600.00
1,150.00
80.00
44,048.00
44,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

74,250.00
995.00
16,250.00
12,900.00
1,725.00
1,040.00
107,160.00
107,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

45,202.32
1,990.00
7,500.00
17,200.00
2,300.00
400.00
74,592.32
74,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

58,053.38
3,980.00
11,250.00
21,500.00
2,875.00
6,000.00
103,658.38
103,600.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

33,187.50
597.00
5,250.00
8,600.00
1,150.00
320.00
49,104.50
49,100.00

Rp
Rp
Rp
Rp

103,600.00
49,104.50
152,704.50
152,700.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,930.00
199.00
3,750.00
4,300.00
575.00
240.00
15,994.00
15,900.00

Rp
Rp
Rp
Rp
Rp

73,920.00
19,500.00
800.00
94,220.00
94,200.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,400.00
13,675.00
6,750.00
4,095.00
80,500.00
30,100.00
2,275.00
2,800.00
190,595.00
190,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

56,700.00
#REF!
6,750.00
4,095.00
80,500.00
30,100.00
2,275.00
2,800.00
#REF!
#REF!

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,683,280.00
24,875.00
27,900.00
241,500.00
1,806,000.00
525,000.00
28,000.00
9,336,555.00
9,336,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

167,416.00
13,950.00
34,500.00
258,000.00
75,000.00
4,000.00
552,866.00
552,800.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

251,124.00
2,985.00
37,500.00
172,000.00
23,000.00
2,000.00
488,609.00
488,600.00

Rp
Rp
Rp
Rp
Rp
Rp

16,800.00
1,725.00
12,900.00
1,125.00
60.00
32,610.00

Rp

32,600.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

150,700.00
1,150.00
43,000.00
750.00
400.00
196,000.00
196,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

100,449.60
8,370.00
27,600.00
206,400.00
60,000.00
3,200.00
406,019.60
406,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

26,000.00
1,150.00
8,600.00
750.00
40.00
36,540.00
36,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,100.00
575.00
8,600.00
375.00
20.00
24,670.00
24,600.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

18,000.00
575.00
8,600.00
375.00
20.00
27,570.00
27,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,100.00
1,125.00
12,900.00
1,725.00
60.00
30,910.00
30,900.00

Rp
Rp
Rp
Rp
Rp
Rp

129,470.00
1,125.00
12,900.00
1,725.00
60.00
145,280.00

Rp

145,200.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,580.00
3,260.00
8,476.00
1,500.00
5,418.00
724.50
200.00
21,158.50
21,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,300.00
4,380.00
9,560.00
5,610.00
2,490.00
800.00
690.00
774.00
5,250.00
2,000.00
37,854.00
37,800.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

724.50
5,418.00
1,500.00
200.00
2,336.00
8,150.00
800.00
19,128.50
19,100.00

Anda mungkin juga menyukai