Anda di halaman 1dari 4

HOJA DE METRADOS

ESTRUCTURAS : CERCO PERIMTRICO + INGRESO


PROYECTO:

MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL C.E.I N130 DEL C.P INSCULAS, DISTRITO DE OLMOS LAMBAYEQUE - LAMBAYEQUE

UBICACIN: Centro Poblado de Insculas

ITEM

DESCRIPCION

UND

CANT.
REP.

N
ELEM.

DIMENSIONES
LARGO

ANCHO

SUB

ALTURA

AREA

TOTAL

TOTAL

5.01.00 MOVIMIENTO DE TIERRAS


5.01.01 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZAPATAS

15.73

M3

ZAPATA N1

3.00

2.00

0.80

0.80

1.10

4.22

ZAPATA N2

2.00

1.00

1.20

1.00

1.10

2.64

ZAPATA N3

2.00

2.00

0.80

0.80

1.10

2.82

EXCAVACION CIMIENTO CORRIDO (CORTE X-X)

2.00

1.00

9.30

0.50

0.65

6.05

1.00

0.40

5.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO

4.78

M3
DESCUENTO DE AREAS

5.01.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA DIST. APROX. 1KM.

5.97

4.78

17.50

M3
vol

1.30

Volumen excavado

1.00

15.73

Volumen rellenado

1.00

4.78

2.00

1.00

9.30

0.50

0.60

5.58

2.00

1.00

3.43

0.50

0.40

1.37

ZAPATA N1

3.00

2.00

0.80

0.80

0.10

0.38

ZAPATA N2

2.00

1.00

1.20

1.00

0.10

0.24

ZAPATA N3

2.00

2.00

0.80

0.80

0.10

0.26

2.00

1.00

9.30

0.20

0.30

1.12

2.00

1.00

3.43

0.20

0.30

0.41

2.00

2.00

9.30

0.30

11.16

2.00

2.00

3.43

0.30

4.12

5.02.00 OBRAS DE CONCRETO SIMPLE


5.02.01 CIMIENTOS CORRIDOS 1:10 + 30% DE PIEDRA GRANDE

z
5.02.02 SOLADOS

5.02.03 SOBRECIMIENTOS

2.41

M3

1.53

M3

z
5.02.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO

6.95

M3

CERCO PERIMETRICO (CORTE X-X)

15.28

M2

HOJA DE METRADOS
ESTRUCTURAS : CERCO PERIMTRICO + INGRESO
PROYECTO:

MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL C.E.I N130 DEL C.P INSCULAS, DISTRITO DE OLMOS LAMBAYEQUE - LAMBAYEQUE

UBICACIN: Centro Poblado de Insculas

ITEM

DESCRIPCION

UND

CANT.
REP.

N
ELEM.

DIMENSIONES
LARGO

ANCHO

SUB

ALTURA

AREA

TOTAL

TOTAL

5.03.00 OBRAS DE CONCRETO ARMADO


5.03.01 ZAPATAS
5.03.01.01 CONCRETO F'C=210 KG/CM2.

4.40

M3

ZAPATA N1

3.00

2.00

0.80

0.80

0.50

1.92

ZAPATA N2

2.00

1.00

1.20

1.00

0.50

1.20

ZAPATA N3

2.00

2.00

0.80

0.80

0.50

1.28

5.03.01.01 ACERO F'y= 4200 KG/CM2

78.49

KG

CANT

N ELEM

LONG

PARC

KG/ML

KG

ZAPATA N1

1/2"

6.00

8.00

0.70

33.60

0.991

33.30

ZAPATA N2

1/2"

2.00

6.00

1.10

13.20

0.991

13.08

1/2"

2.00

5.00

1.00

10.00

0.991

9.91

1/2"

4.00

8.00

0.70

22.40

0.991

22.20

2.00

1.00

14.50

0.20

0.20

1.16

2.00

2.00

14.50

0.20

11.60

ZAPATA N3

5.03.02 VIGA DE CIMENTACION


5.03.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C=210 KG/CM2.

5.03.02.02 ENCOFRADO Y DESENCOFRADO

1.16

M3

VIGA

11.60

M2
VIGA

5.03.02.03 ACERO F'y= 4200 KG/CM2

97.51

KG

CANT

N ELEM

LONG

PARC

KG/ML

KG

VARILLA 4 3/8"

3/8"

2.00

4.00

14.40

115.20

0.560

64.51

ESTRIBO 1/4": 2@0.05,3@0.10, 4@0.15, Rto. @0.25 c/e

1/4"

2.00

8.00

0.75

12.00

0.250

3.00

1/4"

2.00

20.00

0.75

30.00

0.250

7.50

1/4"

2.00

20.00

0.75

30.00

0.250

7.50

1/4"

2.00

20.00

0.75

30.00

0.250

7.50

1/4"

2.00

20.00

0.75

30.00

0.250

7.50

2.00

7.00

0.25

0.30

3.25

5.03.02 COLUMNAS
5.03.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2.

5.03.02.02 ACERO F'y= 4200 KG/CM2, EN COLUMNAS


COLUMNA N1

3.41

M3

COLUMNA N1

3.41

418.93

KG

CANT

N ELEM

LONG.

PARC.

KG/ML

KG

41/2"

1/2"

14.00

4.00

4.39

245.84

0.991

23/8"

3/8"

14.00

2.00

4.39

122.92

0.560

68.84

ESTRIBOS 1/4": 2@0.05,3@0.10, 3@0.15, Rto. @0.25 c/e

1/4"

14.00

26.00

1.17

425.88

0.250

106.47

2.00

7.00

1.10

2.00

1.00

14.50

5.03.02.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS

M2

COLUMNA N1

243.63

43.89

PERIM
2.85

43.89

5.03.03 VIGAS
5.03.03.01 CONCRETO F'C=210 KG/CM2.

1.09

M3
VIGA

5.03.03.02 ACERO F'y= 4200 KG/CM2, EN VIGAS

0.04

81.28

KG
VIGA

VARILLA 33/8''

3/8"

2.00

3.00

14.50

87.00

0.560

48.72

1/4"

2.00

88.00

0.74

130.24

0.25

32.56

2.00

1.00

14.50

ESTRIBO 1/4": 2@0.05,3@0.10, 4@0.15, Rto. @0.25 c/e


5.03.03.03 ENCOFRADO Y DESENCOFRADO

1.09

CANT

N ELEM

LONG

PARC

KG/ML

KG

11.60

M2
0.40

11.60

HOJA DE METRADOS
PROYECTO:

ARQUITECTURA : CERCO PERIMTRICO + INGRESO


MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL C.E.I N130 DEL C.P INSCULAS, DISTRITO DE OLMOS - LAMBAYEQUE LAMBAYEQUE

UBICACIN: Centro Poblado de Insculas

ITEM

DESCRIPCION

UND

CANT.
REP.

N
ELEM.

DIMENSIONES
LARGO

ANCHO

ALTURA

AREA

SUB
TOTAL

TOTAL

5.05.00 MUROS Y TABIQUES DE ALBAILERA


5.05.01 MURO DE LADRILLO 9 x 12 x 24 cm. MAQUINADO DE SOGA

41.15

M2
2.00

7.22

2.85

41.15

1.10

2.85

43.89

5.06.00 REVOQUES Y ENLUCIDOS


5.06.01 TARRAJEO EN COLUMNAS C/MORTERO 1:4 x 1.5 cm.

M2

5.06.02 TARRAJEO EN VIGAS C/MORTERO 1:4 x 1.5 cm.

43.89

Perim
2.00

7.00

M2

11.60

Perimetro
2.00

1.00

14.50

0.40

11.60

HOJA DE METRADOS
PROYECTO:

ARQUITECTURA : CERCO PERIMTRICO + INGRESO


MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL C.E.I N130 DEL C.P INSCULAS, DISTRITO DE OLMOS - LAMBAYEQUE LAMBAYEQUE

UBICACIN: Centro Poblado de Insculas

ITEM

DESCRIPCION

5.06.03 JUNTAS DE DILATACION EN MUROS, TECNOPORT E=1"


Entre paos

UND

CANT.
REP.

N
ELEM.

DIMENSIONES
LARGO

ANCHO

ALTURA

AREA

SUB
TOTAL

TOTAL

6.00

M
2.00

3.00

6.00

5.07.03 VARIOS
5.07.04 Tubera PVC 3"con relleno de CA
(Ver Detalle)
5.07.05 LIMPIEZA DE OBRA

UND
GLB

2.00

28.00

56.00

1.00

1.00