Notes:

See sheet 38 of 38 for Sections C-C & D-D.


Order a(E), a (E),
b(E) and b (E)
bars full length. Cut
1
1
in field to fit Type C Inlet Box, Hwy. Standard 609006.
10
pro

ach

7-

a(E), a (E),
a (E)
and a (E)
bar spacings measured
1
2
3

-0

Ap

along ~ Roadway.

Fo

oti

ng

3-

10-#4 a(E) bars at

15-#4 a 2(E) bars at 15 cts.,

Top of slab

15 cts., typ. ea. stage

typ. ea. stage, cut to fit

Bottom slab

19-#5 a 1(E) bars at

27-#5 a 3
(E) bars at 8 cts.,

8 cts., typ. each stage

typ. each stage, cut to fit

See Hwy. Std. 420401


for pavement connector

1/4

~ Joint

Type C Inlet Box,


See Roadway plans for

for #5 w(E) bars

Sta. 106+01.00 (E. Appr.)

~ Joint Sta. 102+51.00 (W. Appr.)

Stage II Construction

25-Bar splicers (E) for #4 a(E) & a 2(E) bars

46-Bar splicers (E) for #5 a 1


(E) & a 3(E) bars

20-#5 w(E) bars at 6 cts.


Top and bottom of Approach

End of
Appr. slab

FLEXIBLE PAVEMENT

DETAIL A

Footing. See Sec. C-C


(Typical each stage)

25-0

2-6

**

typ.

typ.

3
-

~ Joint Sta. 106+31.00 (E. Appr.)

& P.G.

Sta. 102+81.00 (W. Appr.)

typ.

11

~ Rdwy.

37-10 o. to o. Approach Footing

20-Bar splicers (E)

HMA
Pavement

(Top and bottom of approach footing)

Skew

2-6

typ.

~ Joint

20^

40-#4 t(E) bars at 12 cts. (20-Stage I, 20-Stage II)

Stage I Construction

18-0

details and quantities.

(43-Stage I, 43-Stage II)

* Stagger 86-#9 b 1
(E) bars at 5 cts. (Bottom of slab), cut to fit.

(15-Stage I, 15-Stage II)

36-0 o. to o. Approach Slab

30-#4 b(E) bars at 15 cts. (Top of slab), cut to fit.

Hwy. Std. 609006, typ.

3-#4 b 2
(E) bars (See

15-0

Sec. D-D) typ. each end


29-8
~ Joint

D
PLAN
(E) bars as required to maintain clearance.
* Tilt #9 b 1

**

Closed cell joint filler according to Article 1051.08 of


the Std. Specifications; full depth of slab, full length
of parapet. Typ. each parapet.

(Sheet 1 of 2)
FILE NAME

USER NAME

DESIGNED

REVISED

CHECKED

REVISED

STATE OF ILLINOIS
DEPARTMENT OF TRANSPORTATION

PLOT SCALE

DRAWN

REVISED

PLOT DATE

CHECKED

REVISED

BRIDGE APPROACH SLAB DETAILS

F.A.
RTE.

SECTION

COUNTY

TOTAL
SHEETS

SHEET
NO.

STRUCTURE NO.
CONTRACT NO.
SHEET NO. 37 OF 38 SHEETS

ILLINOIS

FED. AID PROJECT

Notes:
See sheet 37 of 38 for Detail A.

30-0

a 1(E)

Approach Footing concrete shall be paid for as Concrete Structures.

b(E)

* b1
(E)

Reinforcement shall be paid for as Reinforcement Bars, Epoxy Coated.

(See Hwy. Std. 420401)

For v(E) bar details, see sheet 17 of 38.

Slab

Bar splicers (E)

Approach Slab shall be paid for as Concrete Superstructure.

HMA Pavement
1-3

a(E)

cl.

2 1/4 (| 1/4 )

~ Joint

See Detail A

a3(E)

a2(E)

The Approach Footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.
For Bar Splicer details, see sheet 36 of 38.
Cost of excavation for Approach Footing included with Concrete Structures.

*** Subbase Granular


Matl. Type B, 4

v(E)

t(E)

Approach Footing
Porous Granular

cl.

10

cl.

For Porous Granular Embankment (Special) and drainage treatment details see sheet 2 of 38.

Embankment (Special)

1-0

3 cl.
typ.

w(E)
7-5 1/2

3-2 3/8
along ~ Roadway
~ Joint

SECTION C-C

*** 10 mil. Polyethylene bond


breaker on steel trowel finish

Varies 36-0 near abutment to 37-10 at Approach Footing

6-0

24-0

6-5

Shoulder width

Roadway width

Shoulder width

12-0

12-0

***

Cost included with Concrete Superstructure.

typ.
5

Slope 1/4 /ft.

typ.

Slope 3/16 /ft.

a2(E)

b(E)

PG
a(E)

min. & varies

~ Rdwy.

Slope 3/16 /ft.

Tilt #9 b 1
(E) bars as required to maintain clearance.

Stage II Construction

1-3 Slab

Stage I Construction

Slope 1/4 /ft.

typ.
b2(E)

Closed cell joint filler

b1(E)

TWO APPROACHES

See Plan on sheet


b2(E)

10

37 of 38.
Bar splicers

a 1(E)

BILL OF MATERIAL

a3(E)

(Level out to out)

NEAR ABUTMENT

t(E)

w(E)

Elev. 485.02
AT APPROACH FOOTING

SECTION D-D

Bar

No.

Size

Length

a(E)

40

#4

19-1

a 1(E)

76

#5

19-1

a 2(E)

60

#4

20-2

a 3(E)

108

#5

19-10

Shape

(See Plan for dimensions not shown)


60

#4

29-8

172

#9

29-9

b2(E)

12

#4

14-4

t(E)

160

#4

10-3

w(E)

160

#5

20-5

Concrete Superstructure

Cu. Yd.

Concrete Structures

Cu. Yd.

23.4

Pound

28,270

4 5/8

b(E)
b1(E)

1 1/8

19-9

BAR a2(E)

Reinforcement Bars,
11 3/4

Epoxy Coated

1-3

27-3

106.6

1-3

29-9

BAR b 1(E)

(Sheet 2 of 2)
FILE NAME

USER NAME

DESIGNED

REVISED

CHECKED

REVISED

STATE OF ILLINOIS
DEPARTMENT OF TRANSPORTATION

PLOT SCALE

DRAWN

REVISED

PLOT DATE

CHECKED

REVISED

BRIDGE APPROACH SLAB DETAILS

F.A.
RTE.

SECTION

COUNTY

TOTAL
SHEETS

SHEET
NO.

STRUCTURE NO.
CONTRACT NO.
SHEET NO. 38 OF 38 SHEETS

ILLINOIS

FED. AID PROJECT