Anda di halaman 1dari 164

DAFTAR HARGA SATUAN UPAH TENAGA KERJA

UNIVERSITAS JEMBER TAHUN ANGGARAN 2014

NO.

PEKERJA

KODE UPAH

( Rp / hari )

Mandor lapangan

L03

55,000.00

Kepala tukang

L10

52,500.00

Tukang kayu

L11

50,000.00

Tukang batu

L02

47,500.00

Tukang besi

L02

47,500.00

Tukang pipa air

L02

47,500.00

Tukang listrik

L02

47,500.00

Tukang aluminium

L02

47,500.00

Tukang cat

L02

47,500.00

10

Tukang las

L02

47,500.00

11

Tukang masak aspal

L12

47,500.00

12

Pekerja

L01

37,500.00

13

Buruh

L13

37,500.00

14

Mekanik

L08

98,550.00

15

Pembantu Mekanik

L09

65,450.00

16

Operator

L04

98,000.00

17

Pembantu operator

L05

65,000.00

18

Sopir

L06

98,550.00

19

Pembantu sopir

L07

65,450.00

20

Penjaga Malam

L14

26,500.00

NO.

JENIS PEKERJAAN

KODE UPAH

( Rp / hari )

NO.
1

JENIS PEKERJAAN

KODE UPAH

Biaya langsiran bahan kelokasi sulit per 100 m`


a yang satuan M3

10,000.00

b Yang satuan M2

250.00

c Semen PC yang satuan Zak

1,500.00

d Yang satuan Kg
2

( Rp / hari )

85.00

Pengeboran Darat Wilayah Kecamatan


a Kaliwates, Ajung, Rambipuji, Bangsalsari

M'

260,000.00

b Tanggul, Semboro, Umbulsari, Sumberbaru

M'

325,000.00

c Jenggawah, Ambulu, Wuluhan, Balung

M'

292,500.00

d Panti, Sukorambi, Patrang

M'

325,000.00

e Arjasa, Jelbuk, Kalisat, Ledokombo, Sukowo

M'

351,000.00

f Sempolan, Mayang, Mumbulsari, Tempurejo,

M'

338,000.00

g Puger, Gumukmas, Kencong, Jombang

M'

351,000.00

h Sumbersari

M'

390,000.00

DAFTAR HARGA SATUAN DASAR BAHAN


UNIVERSITAS JEMBER TAHUN ANGGARAN 2014
No

JENIS BAHAN

SATUAN
VOLUME

HARGA
SATUAN

JENIS BAHAN BANGUNAN BAHAN PENUTUP ATAP & PLAFON

Asbes Gelombang Besar tebal 5 mm (3.00 x 1.0

lbr

110,000.00

Asbes gelombang kecil tebal 5 mm (2.40 x 1.05

lbr

98,000.00

Asbes gelombang kecil tebal 5 mm (1.80 x 0.92

lbr

90,500.00

Asbes gelombang kecil tebal 4 mm (3.00 x 1.05

lbr

98,500.00

Asbes wuwung stel gelombang 0.92 mm

set

45,500.00

Eternit 100x100 cm " Kerang"

lbr

11,100.00

Genteng Palentong /vlampress

bj

1,200.00

Genteng palentong super

bh

11,200.00

Genteng Nok Palentong /vlampress

bj

5,800.00

10

Genteng bubung kodok / karangpilang

bj

10,100.00

11

Genteng Beton

bj

3,000.00

12

Genteng Metal setara Vierco

m2

210,000.00

13

Nok genteng beton

bj

3,000.00

14

Genteng kodok / karang pilang

bj

3,500.00

15

Seng datar BJLS 30 lebar 60

m'

26,400.00

16

Teakwood tebal 4 mm (1.22 x 2.44)

lbr

150,000.00

17

Teakwood tebal 4 mm (1.10 x 2.10)

lbr

125,000.00

18

Plywood tebal 4 mm (1.22 x 2.44)

lbr

150,000.00

19

Plywood kayu meranti tebal 9 mm (1.22 x 2.44)

lbr

121,000.00

20

Plywood kayu sengon tebal 9 mm (1.22 x 2.44)

lbr

93,500.00

21

Triplek tebal 4 mm (0.90 x 2.00)

lbr

72,000.00

22

Triplek tebal 4 mm (1.22 x 2.44)

lbr

86,000.00

23

Formite penjaga jarak bekisting / spacer

bh

20,000.00

24

Gypsum board 12 mm (120x240) "Jayaboard"

lbr

95,000.00

25

Gypsum board 9 mm (120x240) "Jayaboard"

lbr

75,000.00

26

Kalsiboard tebal 6 mm

m2

65,000.00

27

Profil allumunium " T " Indal / kusen aluminium

55,000.00

28

Fiberglass gelombang (180 x 90) cm

lbr

55,900.00

29

List gypsum profil

m'

21,500.00

30

Talang karet

m'

17,700.00

II

BAHAN MENGGUNAKAN KAYU

No

JENIS BAHAN

SATUAN
VOLUME

HARGA
SATUAN

Dolken kayu O 8 - 10 / 400 cm

700,000.00

Kayu kelas I (Balok)

m3

10,400,000.00

Kayu kelas I (Papan)

m3

11,817,000.00

Kayu kelas II (Balok)

m3

5,200,000.00

Kayu kelas II (Papan)

m3

6,500,000.00

Kayu kelas III (Balok)

m3

3,480,000.00

Kayu kelas III (Papan)

m3

3,480,000.00

Kayu 5/7

2,376,000.00

Kayu cetakan / Bekisting

2,500,000.00

10

Perancah kayu

1,925,000.00

11

Bambu 6 - 10/600 cm

btg

12,500.00

III

BAHAN MENGGUNAKAN BATU / PASIR & SEMEN

Batu bata merah

bh

500.00

Batu kali pecah 15/20

108,000.00

Batu pecah 5/7

143,000.00

Batu pecah 2/3

175,000.00

Batu pecah 1/2

175,000.00

Batu kali pecah 3/5

143,000.00

Batu gunung pecah 15/20

108,000.00

Batu tempel

66,650.00

Batu kerikil beton

175,000.00

10

Batu bobos uk. (10x 20 x 1,5) cm

bh

3,400.00

11

Batu Candi uk. (20 x 40 x 1,5) cm

bh

10,000.00

12

Pasir cor / beton (Pasir Kali)

85,000.00

13

Pasir pasang (Pasir Kali)

85,000.00

14

pasir urug / Timbunan

58,500.00

15

Pasir Pasang Ex. Lumajang

200,000.00

16

Semen berwarna yiyitan

kg

4,000.00

17

Semen PC (Portland Cement) / Semen Gresik (50

kg

1,500.00

18

Semen tiga roda (50 Kg)

kg

1,500.00

19

Semen PC (Portland Cement) / Semen Gresik (40

kg

1,500.00

20

Semen putih

kg

3,200.00

21

Semen merah

169,400.00

22

Kapur pasang

364,500.00

23

Tanah urug

40,000.00

24

Tanah sirtu / Urung

42,500.00

25

Tanah liat

42,500.00

IV

BAHAN MENGGUNAKAN BESI / LOGAM

Besi begel / baut

kg

12,400.00

Besi beton polos

kg

14,000.00

No

JENIS BAHAN

SATUAN
VOLUME

HARGA
SATUAN

Besi beton ulir

kg

15,000.00

Besi beton diameter 12 mm, 12 m

ljr

115,000.00

Besi beton diameter 10 mm, 12 m

ljr

110,000.00

Besi beton diaeter 8 mm, 12 m

ljr

58,000.00

Besi beton diameter 6 mm, 12 m

ljr

35,000.00

Pipa besi GI diameter 0,50" Medium B

m`

18,000.00

Pipa besi GI diameter 0,75" Medium B

m`

23,300.00

10

Pipa besi GI diameter 1" Medium B

m`

33,600.00

11

Pipa besi GI diameter 1,5" Medium B

m`

48,500.00

12

Pipa besi GI diameter 2" Medium B

m`

63,500.00

13

Pipa besi GI diameter 2,5" Medium B

m`

93,400.00

14

Pipa besi GI diameter 3" Medium B

m`

110,800.00

15

Pipa besi GI diameter 4" Medium B

m`

161,900.00

16

Pipa besi GI diameter 6" Medium B

m`

436,000.00

17

Pipa besi GI diameter 0,50"

m`

28,600.00

18

Pipa besi GI diameter 0,75"

m`

36,100.00

19

Pipa besi GI diameter 1"

m`

44,850.00

20

Pipa besi GI diameter 1,5"

m`

68,520.00

21

Pipa besi GI diameter 2"

m`

93,400.00

22

Pipa besi GI diameter 2,5"

m`

118,300.00

23

Pipa besi GI diameter 3"

m`

193,100.00

24

Pipa besi GI diameter 4"

m`

223,000.00

25

Pipa besi GI diameter 6"

m`

361,200.00

26

Pipa hollow profil 70 x 70 x 1.6 mm

m`

55,000.00

27

Pipa hollow profil 40 x 40 x 1.4 mm

m`

30,000.00

28

Pipa hollow profil 20 x 40 x 1.4 mm

m`

23,125.00

29

Besi plat 4 x 8 tebal 2 mm

Kg

1,750.00

30

Besi plat bordes 4" x 8" tebal 3 mm

kg

1,750.00

31

Besi strip tebal 5 mm

kg

12,400.00

32

Kawat ikat beton

kg

17,250.00

33

Jendela nako lengkap

daun

28,400.00

34

Pintu lipat / harmonika

bh

879,400.00

35

Skrup fixer

bh

900.00

36

Metal stud 3"

m'

11,500.00

37

Metal furring

m2

94,800.00

38

Runner U

m'

11,000.00

39

Curtain wall

m'

36,000.00

40

Tutup curtain wall

m'

17,000.00

41

Profil H

m'

35,500.00

No

JENIS BAHAN

SATUAN
VOLUME

HARGA
SATUAN

m'

32,500.00

Conblock Paving persegi abu - abu tebal 6 cm ka

m2

56,500.00

Conblock Paving persegi abu - abu tebal 8 cm ka

m2

67,000.00

Lantai keramik 30 x 30 cm setara Roman/Milan

bh

8,272.73

Lantai keramik 40 x 40 cm setara Roman/Milan

bh

20,000.00

Lantai keramik 60 x 60 cm setara Roman/Milan

bh

43,333.33

Keramik Dinding 25 x 40 cm setara Roman/Milan

bh

9,000.00

Lantai keramik Kasar 30 x 30 cm setara Roman/M

bh

8,272.73

Granit tile 40 x 40 cm ( polos )

bh

33,333.33

10

Granit tile 60 x 60 cm ( polos )

bh

93,333.33

11

Kanstin beton 15x30x50

bh

17,500.00

12

Terawang (Roster)

bh

6,600.00

13

Perquet kayu kelas I

140,000.00

14

Lantai Batu Alam

115,000.00

VI

BAHAN UNTUK PENGECATAN

Cat kayu 'EMCo"

kg

56,800.00

Cat meni (besi / kayu) 'PEDANG"

kg

24,200.00

Cat tembok interior Setara Catylac

kg

23,040.00

Politur

ltr

42,000.00

Politur jadi

ltr

42,000.00

Lem kayu "Fox"

kg

15,000.00

Thinner A / minyak cat

ltr

27,000.00

Thinner B / minyak cat

ltr

5,000.00

Sabun

kg

9,800.00

10

Teak oil

ltr

4,500.00

11

Cat tembok eksterior Setara Movilex

kg

110,000.00

VII

BAHAN PENGGANTUNG DAN PENGUNCI

42

Profil 1/2 H

BAHAN UNTUK LANTAI

Engsel jendela "Nylon"

ps

35,000.00

Engsel pintu "Nylon"

bh

40,000.00

Grendel tanam

bh

44,500.00

Kunci selot setara Totti

bh

115,500.00

Hak angin 4 mm (terkait)

bj

16,000.00

Kait angin lurus setel maju mundur

bh

19,600.00

No
VIII

JENIS BAHAN

SATUAN
VOLUME

HARGA
SATUAN

BAHAN UNTUK KM / WC / URINOIR

Closet duduk putih porselin komplit setara KIA

bh

1,518,000.00

Closet jongkok porselin warna setara KIA

bh

187,000.00

Steal tape

bh

3,400.00

Wastafel setara KIA

bh

300,000.00

Kran air

bh

20,500.00

Water drain + assesories

set

17,825.00

Floor drain

bh

35,400.00

Air

ltr

40.00

Pintu PVC lengkap

bh

275,000.00

IX

BAHAN JENIS KACA

Kaca polos tb. 5 mm

89,400.00

Kaca polos tb. 8 mm

170,000.00

Kaca polos tb. 12 mm

615,000.00

Kaca one way ( Top Soel ) tb. 5 mm

330,000.00

Sealant

tube

33,000.00

Glass Block

bh

21,700.00

BAHAN BETON CETAKAN

Buis beton diameter 40 cm

bh

39,000.00

Buis beton diameter 50 cm

bh

69,000.00

Buis beton U 20 cm

bh

14,500.00

Buis beton U 30 cm

bh

23,000.00

XI

BAHAN PLASTIK PIPA PVC

Pipa PVC 3/4" type AW

m'

5,863.00

Pipa PVC 1/2" type AW

m'

4,375.00

Pipa PVC 1" type AW

m'

8,125.00

Pipa PVC 1 1/2" type AW

m'

13,825.00

Pipa PVC 2" type AW

m'

17,650.00

Pipa PVC 2 1/2" type AW

m'

25,775.00

Pipa PVC 3" type AW

m'

34,775.00

Pipa PVC 4" type AW

m'

57,613.00

No

JENIS BAHAN

SATUAN
VOLUME

HARGA
SATUAN

Keni PVC 2"

bh

10,000.00

10

Klem PVC

bh

1,500.00

11

Lem PVC

bh

10,000.00

12

Sambungan Knee AW 1/2"

bh

1,500.00

13

Sambungan Knee AW 3/4"

bh

2,000.00

14

Sambungan Knee AW 1"

bh

3,000.00

15

Sambungan Knee AW 1 1/4"

bh

5,000.00

16

Sambungan Knee AW 1 1/2"

bh

7,000.00

17

Sambungan Knee AW 2"

bh

10,000.00

18

Sambungan Knee D 1 1/4"

bh

3,000.00

19

Talang Kotak PVC

m`

9,500.00

20

Hak penggantung talang

bh

3,500.00

21

Tutup samping talang

bh

8,800.00

22

Sambungan pipa tanpa lobang

bh

8,800.00

23

Sambungan pipa dengan lobang

bh

26,700.00

24

Pipa paralon 5/8"

ljr

6,500.00

XII

BAHAN JENIS PAKU

Paku asbes

kg

20,000.00

Paku reng

kg

18,000.00

Paku triplek

kg

20,000.00

Paku usuk

kg

18,000.00

Paku pancing

kg

20,000.00

Baut dynabolt diameter 10 mm panjang 3"

bh

12,000.00

Paku sekrup 3.5"

bh

880.00

Paku sekrup 2"

kg

76,000.00

Paku sekrup 1"

kg

89,760.00

10

Paku Gypsum

kg

22,800.00

XIII

BAHAN PERALATAN LISTRIK

Stop kontak setara "Broco"

bh

20,000.00

Skakelar setara Tunggal "Broco"

bh

19,000.00

Skakelar Ganda setara "Broco"

bh

20,000.00

Sekering kas MCM 10 Amp

bh

53,500.00

Lampu pijar 25, 40, 75 / 220 V

bh

13,200.00

Lampu TL 20 W / 220 V Komplit "Philips"

bh

89,400.00

Lampu TL 40 W / 220 V Komplit "Philips"

bh

95,400.00

Lampu TL 2 x 20 W / 220 V Komplit setara "SAKA

bh

338,000.00

No

JENIS BAHAN

SATUAN
VOLUME

HARGA
SATUAN

Kabel NYA 1 x 2,5 mm

m'

2,500.00

10

Isolator

bh

4,000.00

11

Las Dop

bh

240.00

12

Fiting Plafond "Broco"

bh

21,700.00

13

T.Dos PVC

bh

1,200.00

14

Panel Box

set

150,000.00

15

MCB 10 Amp

bh

53,500.00

16

Miniswitch 32 Amp

set

250,600.00

17

Armatur lampu pijar 25Watt Kwalitas I

Bh

13,200.00

18

AC. Window 2 PK

Bh

13,435,500.00

19

AC. Window 1,5 PK

Bh

7,166,100.00

20

AC. Window 1 PK

Bh

6,269,000.00

21

Exhaust Fan Ex Jepang

Bh

984,100.00

22

Kipas angin Gantung Ex Jepang

Bh

805,700.00

Pekerjaan Pengecatan
NO.

JENIS PEKERJAAN

BAHAN

Analisa SNI DPU Cipta Karya dan Tata Ruang


Mengikis/mengerok 1 m2 permukaan cat tembok lama
Upah
0.150 Oh Pekerja
Rp
0.000 Oh Tukang
Rp
0.000 Oh Kepala Tukang
Rp
0.0025 Oh Mandor
Rp

37,500.00
47,500.00
52,500.00
55,000.00
-

Analisa SNI DPU Cipta Karya dan Tata Ruang


Mengecat 1 m2 bidang kayu lama
Bahan
0.150 Kg Plamir
Rp
0.170 Kg Cat dasar
Rp
0.170 Kg Cat penutup
Rp
Upah
0.070 Oh Pekerja
Rp
0.075 Oh Tukang
Rp
0.0075 Oh Kepala Tukang
Rp
0.0025 Oh Mandor
Rp

20,000.00
56,800.00
56,800.00

3,000.00
9,656.00
9,656.00

37,500.00
47,500.00
52,500.00
55,000.00
22,312.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Bahan
0.200 Kg Meni kayu
Rp
24,200.00
4,840.00
0.150 Kg Plamir kayu
Rp
24,200.00
3,630.00
0.170 Kg Cat dasar
Rp
56,800.00
9,656.00
0.260 Kg Cat penutup 2x
Rp
56,800.00
14,768.00
Upah
0.070 Oh Pekerja
Rp
37,500.00
0.009 Oh Tukang Cat
Rp
47,500.00
0.006 Oh Kepala Tukang
Rp
52,500.00
0.0025 Oh Mandor
Rp
55,000.00
32,894.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
Bahan
0.200 Kg Meni kayu
Rp
24,200.00
4,840.00
0.150 Kg Plamir kayu
Rp
24,200.00
3,630.00
0.170 Kg Cat dasar
Rp
56,800.00
9,656.00
0.350 Kg Cat penutup 3x
Rp
56,800.00
19,880.00
Upah
0.070 Oh Pekerja
Rp
37,500.00
0.105 Oh Tukang Cat
Rp
47,500.00
0.004 Oh Kepala Tukang
Rp
52,500.00
0.0025 Oh Mandor
Rp
55,000.00
38,006.00

12

1
5

2
Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m2 Pelaburan bidang kayu dengan teak oil
Bahan
0.360 Ltr Teak oil
Rp
Upah
0.040 Oh Pekerja
Rp
0.063 Oh Tukang Cat
Rp
0.063 Oh Kepala Tukang
Rp
0.0025 Oh Mandor
Rp

4,500.00

1,620.00

37,500.00
47,500.00
52,500.00
55,000.00
1,620.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m2 Pelaburan bidang kayu dengan politur
Bahan
0.150 Ltr Politur
Rp
0.372 Ltr Politur jadi
Rp
2.000 Lbr Ampelas
Rp
Upah
0.060 Oh Tukang Cat
Rp
0.016 Oh Kepala Tukang
Rp
0.0025 Oh Mandor
Rp

42,000.00
42,000.00
2,400.00

6,300.00
15,624.00
4,800.00

47,500.00
52,500.00
55,000.00
26,724.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m2 Pengecatan Tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Bahan
0.100 Kg Plamir tembok
Rp
10,000.00
1,000.00
0.100 Kg Cat dasar
Rp
23,040.00
2,304.00
0.260 Kg Cat penutup 2x
Rp
23,040.00
5,990.40
Upah
0.020 Oh Pekerja
Rp
37,500.00
0.063 Oh Tukang Cat
Rp
47,500.00
0.0063 Oh Kepala Tukang
Rp
52,500.00
0.0025 Oh Mandor
Rp
55,000.00
9,294.40
Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m2 Pengecatan Tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Bahan
0.120 Kg Cat dasar
Rp
23,040.00
2,764.80
0.180 Kg Cat penutup 2x
Rp
23,040.00
4,147.20
Upah
0.028 Oh Pekerja
Rp
37,500.00
0.042 Oh Tukang Cat
Rp
47,500.00
0.0042 Oh Kepala Tukang
Rp
52,500.00
0.0025 Oh Mandor
Rp
55,000.00
6,912.00
Analisa SNI DPU Cipta Karya dan Tata Ruang

13

2
1 m2 Pengecatan permukaan baja dengan meni besi
Bahan
0.100 Kg Meni besi
Rp
0.010 Bh Kuas
Rp
Upah
0.020 Oh Pekerja
Rp
0.200 Oh Tukang Cat
Rp
0.020 Oh Kepala Tukang
Rp
0.010 Oh Mandor
Rp

24,200.00
20,000.00

2,420.00
200.00

37,500.00
47,500.00
52,500.00
55,000.00

2,620.00
10 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m2 Pengecatan Eternit baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Bahan
0.100 Kg Plamir tembok
Rp
20,000.00
2,000.00
0.100 Kg Cat dasar
Rp
23,040.00
2,304.00
0.260 Kg Cat penutup 2x
Rp
23,040.00
5,990.40
Upah
0.025 Oh Pekerja
Rp
37,500.00
0.100 Oh Tukang Cat
Rp
47,500.00
0.0100 Oh Kepala Tukang
Rp
52,500.00
0.0030 Oh Mandor
Rp
55,000.00
10,294.40

14

UPAH

JUMLAH

BULAT

5,625.00
137.50
5,762.50

5,762.50

5,700.00

2,625.00
3,562.50
393.75
137.50
6,718.75

29,030.75

29,000.00

2,625.00
427.50
315.00
137.50
3,505.00

36,399.00

36,300.00

2,625.00
4,987.50
210.00
137.50
7,960.00

45,966.00

45,900.00

mir, 1 lapis cat dasar, 2 lapis cat penutup)

mir, 1 lapis cat dasar, 3 lapis cat penutup)

15

1,500.00
2,992.50
3,307.50
137.50
7,937.50

9,557.50

9,500.00

2,850.00
840.00
137.50
3,827.50

30,551.50

30,500.00

750.00
2,992.50
330.75
137.50
4,210.75

13,505.15

13,500.00

1,050.00
1,995.00
220.50
137.50
3,403.00

10,315.00

10,300.00

1 lapis cat dasar, 2 lapis cat penutup)

16

750.00
9,500.00
1,050.00
550.00
11,850.00

14,470.00

14,400.00

937.50
4,750.00
525.00
165.00
6,377.50

16,671.90

16,600.00

17

DAFTAR ANALISA SATUAN PEKERJAAN


UNIVERSITAS JEMBER TAHUN ANGGARAN 2014
Pekerjaaan Persiapan
NO.

JENIS PEKERJAAN

BAHAN

UPAH

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


1 m' pagar sementara dari seng gelombang tinggi 2 meter
Bahan
1.250 Btg Dolken kayu 8-10/400 cm
Rp
22,000.00
2.500 Kg Semen Portland
Rp
1,500.00
1.200 Lbr Seng gelombang 3" - 6" BJLS 28Rp
40,000.00
0.005 m3 Pasir beton (Pasir Kali)
Rp
85,000.00
3
0.009 m Koral beton
Rp
175,000.00
3
0.072 m Kayu 5/7
Rp
2,376,000.00
0.060 Kg Paku biasa 2" - 5"
Rp
18,000.00
0.450 Kg Meni besi
Rp
24,200.00
Upah
0.400 Oh Pekerja
Rp
37,500.00
0.200 Oh Tukang kayu
Rp
50,000.00
0.020 Oh Kepala tukang
Rp
52,500.00
0.020 Oh Mandor
Rp
55,000.00

27,500.00
3,750.00
48,000.00
68,750.00
100,000.00
2,376,000.00
1,080.00
10,890.00

2,635,970.00
2

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


1 m' Pengukuran dan Pas. Bouwplank
Bahan
0.012 Btg Kayu 5/7
Rp
0.020 Kg Paku biasa 2" - 5"
Rp
3
0.007 m Papan Kayu 3/20 kayu kl. III
Rp
Upah
0.100 Oh Pekerja
Rp
0.100 Oh Tukang kayu
Rp
0.010 Oh Kepala tukang
Rp
0.005 Oh Mandor
Rp

2,376,000.00
18,000.00
3,480,000.00

28,512.00
360.00
24,360.00

37,500.00
50,000.00
52,500.00
55,000.00
53,232.00

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


1 m2 pembuatan kantor sementara dengan lantai plesteran
Bahan
1.250 Btg Dolken kayu 8-10/400 cm
Rp
22,000.00
0.180 m3 Kayu
Rp
5,200,000.00
0.850 Kg Paku biasa
Rp
18,000.00
1.100 Kg Besi strip
Rp
12,400.00
35.000 Kg Semen portland
Rp
1,500.00
0.150 m3 Pasir pasang
Rp
85,000.00
0.100 m3 Pasir beton (Pasir Kali)
Rp
85,000.00

15,000.00
10,000.00
1,050.00
1,100.00
27,150.00

3,750.00
5,000.00
525.00
275.00
9,550.00

27,500.00
936,000.00
15,300.00
13,640.00
52,500.00
12,750.00
8,500.00

18

0.150 m3
30.000 Bh
0.250 Lbr
2.000 Bh
0.080 m2
0.150 Bh
0.060 Lbr
Upah
2.000 Oh
2.000 Oh
1.000 Oh
0.300 Oh
0.050 Oh

Koral beton
Bata merah
Seng plat
Jendela nako
Kaca polos
Kunci Tanam
Plywood 4mm

Rp
Rp
Rp
Rp
Rp
Rp
Rp

175,000.00
500.00
40,000.00
28,400.00
89,400.00
250,000.00
150,000.00

Pekerja
Tukang kayu
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp
Rp

37,500.00
50,000.00
47,500.00
52,500.00
55,000.00

26,250.00
15,000.00
10,000.00
56,800.00
7,152.00
37,500.00
9,000.00

1,227,892.00
4

75,000.00
100,000.00
47,500.00
15,750.00
2,750.00
241,000.00

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


1 m2 membersihkan lapangan dan perataan
Upah
0.100 Oh Pekerja
Rp
0.050 Oh Mandor
Rp

37,500.00
52,800.00

3,750.00
2,640.00
6,390.00

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


1 m3 bongkaran beton bertulang
Upah
6.667 Oh Pekerja
Rp
0.333 Oh Mandor
Rp

37,500.00
52,800.00

250,012.50
17,582.40
267,594.90

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


1 m3 bongkaran dinding tembok bata merah
Upah
6.667 Oh Pekerja
Rp
0.033 Oh Mandor
Rp

37,500.00
52,800.00

250,012.50
1,742.40
251,754.90

19

SA SATUAN PEKERJAAN
BER TAHUN ANGGARAN 2014
JUMLAH

BULAT

2,663,120.00

2,663,100.00

62,782.00

62,700.00

20

1,468,892.00

1,468,800.00

6,390.00

267,594.90

267,500.00

251,754.90

251,700.00

21

22

23

Pekerjaaan Tanah
NO.

JENIS PEKERJAAN

BAHAN

UPAH

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Menggali 1 m3 tanah biasa sedalam 1 m
Upah
0.750 Oh Pekerja
Rp
37,500.00
0.025 Oh Mandor
Rp
55,000.00

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Menggali 1 m3 tanah biasa sedalam 2 m
Upah
0.900 Oh Pekerja
Rp
37,500.00
0.045 Oh Mandor
Rp
55,000.00
Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Menggali 1 m3 tanah biasa sedalam 3 m
Upah
1.050 Oh Pekerja
Rp
37,500.00
0.067 Oh Mandor
Rp
55,000.00
Bor Strous 1 m1
Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Menggali 1 m3 tanah Keras sedalam 1 m
Upah
1.000 Oh Pekerja
Rp
37,500.00
0.032 Oh Mandor
Rp
55,000.00
Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Mengerjakan 1 m2 stripping tebing setinggi 1 m
Upah
0.050 Oh Pekerja
Rp
37,500.00
0.005 Oh Mandor
Rp
55,000.00
Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Membuang 1 m3 tanah sejauh 15 m
Upah
0.330 Oh Pekerja
Rp
37,500.00
0.010 Oh Mandor
Rp
55,000.00
Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Mengurug kembali 1 m3 galian
Upah
Untuk Gedung 1/3 Pek.
Galian An SNI 6.9
Rp
29,500.00
Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Mengurug 1 m3 pasir urug
Bahan

28,125.00
1,375.00
29,500.00

33,750.00
2,475.00
36,225.00

39,375.00
3,685.00
43,060.00

37,500.00
1,760.00
39,260.00

1,875.00
275.00
2,150.00

12,375.00
550.00
12,925.00

9,833.33

24

1.200 m3 Pasir urug


Upah
0.300 Oh Pekerja
0.010 Oh Mandor

Rp

58,500.00

Rp
Rp

37,500.00
55,000.00

70,200.00

70,200.00
9

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m2 lapisan ijuk tebal 10 cm, untuk bidang resapan
Bahan
6.000 Kg Ijuk
Rp
20,000.00
Upah
0.150 Oh Pekerja
Rp
37,500.00
0.015 Oh Mandor
Rp
55,000.00

5,625.00
825.00
6,450.00

51,000.00

51,000.00
11 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Mengurug 1 m3 tanah dengan pemadatan
Bahan
1.200 m3 Tanah Urug
Rp
40,000.00
Upah
0.250 Oh Pekerja
Rp
37,500.00
0.010 Oh Mandor
Rp
55,000.00

11,250.00
550.00
11,800.00

120,000.00

120,000.00
10 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
Bahan
1.200 m3 Sirtu
Rp
42,500.00
Upah
0.250 Oh Pekerja
Rp
37,500.00
0.025 Oh Mandor
Rp
55,000.00

9,375.00
1,375.00
10,750.00

48,000.00

48,000.00

9,375.00
550.00
9,925.00

25

JUMLAH

BULAT

29,500.00

29,500.00

36,225.00

36,200.00

43,060.00
13,500.00

43,000.00
13,500.00

39,260.00

39,200.00

2,150.00

2,100.00

12,925.00

12,900.00

9,800.00

26

82,000.00

82,000.00

126,450.00

126,400.00

61,750.00

61,700.00

57,925.00

57,900.00

27

Pekerjaan Pondasi
NO.
1

JENIS PEKERJAAN
2

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m3 pondasi batu belah, camp. 1 PC : 3 PP
Bahan
1.200 m3 Batu belah 15/20 cm
Rp
108,000.00
202.000 Kg PC
Rp
1,500.00
0.485 m3 Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
1.500 Oh Pekerja
Rp
37,500.00
0.750 Oh Tukang batu
Rp
47,500.00
0.075 Oh Kepala tukang
Rp
52,500.00
0.075 Oh Mandor
Rp
55,000.00

BAHAN
3

129,600.00
303,000.00
41,225.00

473,825.00
2

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m3 pondasi batu belah, camp. 1 PC : 4 PP
Bahan
1.200 m3 Batu belah 15/20 cm
Rp
108,000.00
163.000 Kg PC
Rp
1,500.00
0.520 m3 Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
1.500 Oh Pekerja
Rp
37,500.00
0.750 Oh Tukang batu
Rp
47,500.00
0.075 Oh Kepala tukang
Rp
52,500.00
0.075 Oh Mandor
Rp
55,000.00

129,600.00
244,500.00
44,200.00

418,300.00
3

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m3 pondasi batu belah, camp. 1 PC : 5 PP
Bahan
1.200 m3 Batu belah 15/20 cm
Rp
108,000.00
136.000 Kg PC
Rp
1,500.00
3
0.544 m Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
1.500 Oh Pekerja
Rp
37,500.00
0.750 Oh Tukang batu
Rp
47,500.00
0.075 Oh Kepala tukang
Rp
52,500.00
0.075 Oh Mandor
Rp
55,000.00

129,600.00
204,000.00
46,240.00

379,840.00
4

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m3 pondasi batu belah, camp. 1 PC : 6 PP
Bahan
1.200 m3 Batu belah 15/20 cm
Rp
108,000.00
117.000 Kg PC
Rp
1,500.00
3
0.561 m Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
1.500 Oh Pekerja
Rp
37,500.00

129,600.00
175,500.00
47,685.00

28

0.750 Oh Tukang batu


0.075 Oh Kepala tukang
0.075 Oh Mandor

Rp
Rp
Rp

47,500.00
52,500.00
55,000.00
352,785.00

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m3 pondasi batu belah, camp. 1 PC : 8 PP
Bahan
1.200 m3 Batu belah 15/20 cm
Rp
108,000.00
91.000 Kg PC
Rp
1,500.00
3
0.584 m Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
1.500 Oh Pekerja
Rp
37,500.00
0.750 Oh Tukang batu
Rp
47,500.00
0.075 Oh Kepala tukang
Rp
52,500.00
0.075 Oh Mandor
Rp
55,000.00

129,600.00
136,500.00
49,640.00

315,740.00
6

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m3 batu belah, camp. 1 KP : 1 Sm': 2 PP
Bahan
1.200 m3 Batu belah 15/20 cm
Rp
108,000.00
3
0.170 m Kapur
Rp
364,500.00
0.170 m3 Semen Merah
Rp
169,400.00
3
0.340 m Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
1.500 Oh Pekerja
Rp
37,500.00
0.750 Oh Tukang batu
Rp
47,500.00
0.075 Oh Kepala tukang
Rp
52,500.00
0.075 Oh Mandor
Rp
55,000.00

129,600.00
61,965.00
28,798.00
28,900.00

249,263.00
7

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m3 batu belah, camp. 1PC : 3KP : 10PP
Bahan
1.200 m3 Batu belah 15/20 cm
Rp
108,000.00
61.000 Kg PC
Rp
1,500.00
0.147 m3 Kapur
Rp
364,500.00
0.492 m3 Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
1.500 Oh Pekerja
Rp
37,500.00
0.750 Oh Tukang batu
Rp
47,500.00
0.075 Oh Kepala tukang
Rp
52,500.00
0.075 Oh Mandor
Rp
55,000.00

129,600.00
91,500.00
53,581.50
41,820.00

316,501.50
8

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m3 batu belah, camp. 1/2PC : 1KP : 4PP
Bahan
1.200 m3 Batu belah 15/20 cm
Rp
108,000.00
41.000 Kg PC
Rp
1,500.00

129,600.00
61,500.00

29

0.131 m3
0.523 m3

Kapur
Pasir pasang (Pasir Kali)

Rp
Rp

364,500.00
85,000.00

1.500 Oh
0.750 Oh
0.075 Oh
0.075 Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

47,749.50
44,455.00

Upah

283,304.50
9

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m3 batu kosong (anstamping)
Bahan
1.200 m3 Batu belah 15/20 cm
Rp
3
0.432 m Pasir Urug
Rp
Upah
0.780 Oh Pekerja
Rp
0.390 Oh Tukang batu
Rp
0.039 Oh Kepala tukang
Rp
0.039 Oh Mandor
Rp

108,000.00
58,500.00

129,600.00
25,272.00

37,500.00
47,500.00
52,500.00
55,000.00
154,872.00

10 Analisa
SNI1 Dinas
PU. Cipta
Karya dan
Tata
Ruang 1PC : 2PS :
Memasang
m3 pondasi
siklop,80%
beton
campuran
3KR dan 40% batu belah
Bahan
0.480 m3 Batu belah 15/20 cm
Rp
108,000.00
194.000 Kg PC
Rp
1,500.00
3
0.312 m Pasir beton (Pasir Kali)
Rp
85,000.00
3
0.468 m Kerikil
Rp
175,000.00
126.000 Kg Besi Beton
Rp
15,000.00
1.800 Kg Kawat beton
Rp
17,250.00
Upah
3.400 Oh Pekerja
Rp
37,500.00
0.850 Oh Tukang batu
Rp
47,500.00
0.085 Oh Kepala tukang
Rp
52,500.00
0.170 Oh Mandor
Rp
55,000.00

51,840.00
291,000.00
26,520.00
81,900.00
1,890,000.00
31,050.00

2,372,310.00
11 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Memasang 1 m3 pondasi sumuran diameter 100 cm
Bahan
0.450 m3 Batu belah 15/20 cm
Rp
194.000 Kg PC
Rp
0.468 m3 Kerikil
Rp
3
0.312 m Pasir beton (Pasir Kali)
Rp
Upah
2.400 Oh Pekerja
Rp
0.800 Oh Tukang batu
Rp
0.080 Oh Kepala tukang
Rp
0.119 Oh Mandor
Rp

108,000.00
1,500.00
175,000.00
85,000.00

48,600.00
291,000.00
81,900.00
26,520.00

37,500.00
47,500.00
52,500.00
55,000.00

30

448,020.00

31

UPAH
4

JUMLAH
5

BULAT
6

56,250.00
35,625.00
3,937.50
4,125.00
99,937.50

573,762.50

573,700.00

56,250.00
35,625.00
3,937.50
4,125.00
99,937.50

518,237.50

518,200.00

56,250.00
35,625.00
3,937.50
4,125.00
99,937.50

479,777.50

479,700.00

56,250.00

32

35,625.00
3,937.50
4,125.00
99,937.50

452,722.50

452,700.00

56,250.00
35,625.00
3,937.50
4,125.00
99,937.50

415,677.50

415,600.00

56,250.00
35,625.00
3,937.50
4,125.00
99,937.50

349,200.50

349,200.00

56,250.00
35,625.00
3,937.50
4,125.00
99,937.50

416,439.00

416,400.00

33

56,250.00
35,625.00
3,937.50
4,125.00
99,937.50

383,242.00

383,200.00

29,250.00
18,525.00
2,047.50
2,145.00
51,967.50

206,839.50

206,800.00

127,500.00
40,375.00
4,462.50
9,350.00
181,687.50

2,553,997.50

2,553,900.00

90,000.00
38,000.00
4,200.00
6,545.00

34

138,745.00

586,765.00

586,700.00

35

Pekerjaan Dinding
NO.

JENIS PEKERJAAN

BAHAN

UPAH

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 3 PP
Bahan
140.00 Bh Bh Batu merah
Rp
500.00
70,000.00
32.950 Kg PC
Rp
1,500.00
49,425.00
3
0.091 m Pasir pasang (Pasir Kali)
Rp
85,000.00
7,735.00
Upah
0.600 Oh Pekerja
Rp
37,500.00
22,500.00
0.200 Oh Tukang batu
Rp
47,500.00
9,500.00
0.020 Oh Kepala tukang
Rp
52,500.00
1,050.00
0.030 Oh Mandor
Rp
55,000.00
1,650.00
127,160.00
34,700.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 6 PP
Bahan
140.00 Bh Batu merah
Rp
500.00
70,000.00
18.500 Kg PC
Rp
1,500.00
27,750.00
3
0.122 m Pasir pasang (Pasir Kali)
Rp
85,000.00
10,370.00
Upah
0.600 Oh Pekerja
Rp
37,500.00
22,500.00
0.200 Oh Tukang batu
Rp
47,500.00
9,500.00
0.020 Oh Kepala tukang
Rp
52,500.00
1,050.00
0.030 Oh Mandor
Rp
55,000.00
1,650.00
108,120.00
34,700.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1 bata , camp. 1PC : 3 KP : 10 PP
Bahan
140.00 Bh Batu merah
Rp
500.00
70,000.00
10.080 Kg PC
Rp
1,500.00
15,120.00
0.093 m3 Pasir pasang (Pasir Kali)
Rp
85,000.00
7,862.50
3
0.028 m Kapur
Rp
364,500.00
10,023.75
Upah
0.600 Oh Pekerja
Rp
37,500.00
22,500.00
0.200 Oh Tukang batu
Rp
47,500.00
9,500.00
0.020 Oh Kepala tukang
Rp
52,500.00
1,050.00
0.030 Oh Mandor
Rp
55,000.00
1,650.00
103,006.25
34,700.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 3 PP
Bahan
70.00 Bh Batu merah
Rp
500.00
35,000.00

36

14.370 Kg
0.040 m3
Upah
0.300 Oh
0.100 Oh
0.010 Oh
0.015 Oh

PC
Pasir pasang (Pasir Kali)

Rp
Rp

1,500.00
85,000.00

Pekerja
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

21,555.00
3,400.00

59,955.00
5

11,250.00
4,750.00
525.00
825.00
17,350.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 5 PP
Bahan
70.00 Bh Batu merah
Rp
500.00
35,000.00
9.680 Kg PC
Rp
1,500.00
14,520.00
3
0.045 m Pasir pasang (Pasir Kali)
Rp
85,000.00
3,825.00
Upah
0.300 Oh Pekerja
Rp
37,500.00
11,250.00
0.100 Oh Tukang batu
Rp
47,500.00
4,750.00
0.010 Oh Kepala tukang
Rp
52,500.00
525.00
0.015 Oh Mandor
Rp
55,000.00
825.00
53,345.00
17,350.00

37

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 6 PP
Bahan
70.00 Bh Batu merah
Rp
500.00
35,000.00
8.320 Kg PC
Rp
1,500.00
12,480.00
3
0.049 m Pasir pasang (Pasir Kali)
Rp
85,000.00
4,165.00
Upah
0.300 Oh Pekerja
Rp
37,500.00
11,250.00
0.100 Oh Tukang batu
Rp
47,500.00
4,750.00
0.010 Oh Kepala tukang
Rp
52,500.00
525.00
0.015 Oh Mandor
Rp
55,000.00
825.00
51,645.00
17,350.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 8 PP
Bahan
70.00 Bh Batu merah
Rp
500.00
35,000.00
6.500 Kg PC
Rp
1,500.00
9,750.00
3
0.050 m Pasir pasang (Pasir Kali)
Rp
85,000.00
4,250.00
Upah
0.300 Oh Pekerja
Rp
37,500.00
11,250.00
0.100 Oh Tukang batu
Rp
47,500.00
4,750.00
0.010 Oh Kepala tukang
Rp
52,500.00
525.00
0.015 Oh Mandor
Rp
55,000.00
825.00
49,000.00
17,350.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 dinding bata merah Uk. (5x11x22) cm tb. 1/2 bata , camp. 1PC : 3 KP : 10 PP
Bahan
70.00 Bh Batu merah
Rp
500.00
35,000.00
4.500 Kg PC
Rp
1,500.00
6,750.00
3
0.050 m Pasir pasang (Pasir Kali)
Rp
85,000.00
4,250.00
3
0.015 m Kapur Pasang
Rp
364,500.00
5,467.50
Upah
0.300 Oh Pekerja
Rp
37,500.00
11,250.00
0.100 Oh Tukang batu
Rp
47,500.00
4,750.00
0.010 Oh Kepala tukang
Rp
52,500.00
525.00
0.015 Oh Mandor
Rp
55,000.00
825.00
51,467.50
17,350.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 dinding terawang (ROSTER) Uk. (12x11x24) cm, camp. 1PC : 4 PP
Bahan
30.00 Bh Terawang roster
Rp
6,600.00
198,000.00
11.000 Kg PC
Rp
1,500.00
16,500.00
3
0.035 m Pasir pasang (Pasir Kali)
Rp
85,000.00
2,975.00

38

Upah
0.300 Oh
0.100 Oh
0.010 Oh
0.015 Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00
217,475.00

10 Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 Batu Candi Uk. (10x20x1.5) cm, camp. 1PC : 4 PP
Bahan
12.50 Bh Batu Candi
Rp
10,000.00
6.480 Kg PC
Rp
1,500.00
3
0.021 m Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
0.400 Oh Pekerja
Rp
37,500.00
0.200 Oh Tukang batu
Rp
47,500.00
0.020 Oh Kepala tukang
Rp
52,500.00
0.020 Oh Mandor
Rp
55,000.00

11,250.00
4,750.00
525.00
825.00
17,350.00

125,000.00
9,720.00
1,785.00

136,505.00

15,000.00
9,500.00
1,050.00
1,100.00
26,650.00

39

JUMLAH

BULAT

161,860.00

161,800.00

142,820.00

142,800.00

137,706.25

137,700.00

40

77,305.00

77,300.00

70,695.00

70,600.00

41

68,995.00

68,900.00

66,350.00

66,300.00

68,817.50

68,800.00

42

234,825.00

234,800.00

163,155.00

163,100.00

43

Pekerjaan Plesteran
NO.

JENIS PEKERJAAN

BAHAN

UPAH

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 Plesteran camp. 1 Pc : 3 Ps tebal 15mm
Bahan
7.776 Kg PC
Rp
1,500.00
3
0.023 m
Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
0.300 Oh Pekerja
Rp
37,500.00
0.150 Oh Tukang batu
Rp
47,500.00
0.015 Oh Kepala tukang
Rp
52,500.00
0.015 Oh Mandor
Rp
55,000.00

11,664.00
1,955.00

13,619.00
2

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 Plesteran camp. 1 Pc : 5 Ps tebal 15mm
Bahan
5.184 Kg PC
Rp
1,500.00
3
0.026 m
Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
0.300 Oh Pekerja
Rp
37,500.00
0.150 Oh Tukang batu
Rp
47,500.00
0.015 Oh Kepala tukang
Rp
52,500.00
0.015 Oh Mandor
Rp
55,000.00

7,776.00
2,210.00

9,986.00
3

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 Plesteran camp. 1 Pc : 6 Ps tebal 15mm
Bahan
4.416 Kg PC
Rp
1,500.00
0.027 m3 Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
0.300 Oh Pekerja
Rp
37,500.00
0.150 Oh Tukang batu
Rp
47,500.00
0.015 Oh Kepala tukang
Rp
52,500.00
0.015 Oh Mandor
Rp
55,000.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 Plesteran camp. 1 Pc : 8 Ps tebal 15mm
Bahan
3.456 Kg PC
Rp
1,500.00
3
0.029 m
Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
0.300 Oh Pekerja
Rp
37,500.00
0.150 Oh Tukang batu
Rp
47,500.00
0.015 Oh Kepala tukang
Rp
52,500.00
0.015 Oh Mandor
Rp
55,000.00

11,250.00
7,125.00
787.50
825.00
19,987.50

5,184.00
2,465.00

7,649.00
5

11,250.00
7,125.00
787.50
825.00
19,987.50

6,624.00
2,295.00

8,919.00
4

11,250.00
7,125.00
787.50
825.00
19,987.50

11,250.00
7,125.00
787.50
825.00
19,987.50

Analisa SNI DPU Cipta Karya dan Tata Ruang

44

Memasang 1 m2 Plesteran camp. 1 Pc : KP : 3 Ps tebal 15mm


Bahan
5.760 Kg PC
Rp
1,500.00
3
0.003 m
Kapur Pasang
Rp
364,500.00
3
0.013 m
Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
0.360 Oh Pekerja
Rp
37,500.00
0.120 Oh Tukang batu
Rp
47,500.00
0.012 Oh Kepala tukang
Rp
52,500.00
0.018 Oh Mandor
Rp
55,000.00

8,640.00
1,093.50
1,105.00

10,838.50
6

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 Plesteran camp. 1 Pc : 2 KP : 8 Ps tebal 15mm
Bahan
3.000 Kg PC
Rp
1,500.00
3
0.005 m
Kapur Pasang
Rp
364,500.00
3
0.020 m
Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
0.360 Oh Pekerja
Rp
37,500.00
0.120 Oh Tukang batu
Rp
47,500.00
0.012 Oh Kepala tukang
Rp
52,500.00
0.018 Oh Mandor
Rp
55,000.00

13,500.00
5,700.00
630.00
990.00
20,820.00

4,500.00
1,822.50
1,700.00

8,022.50

13,500.00
5,700.00
630.00
990.00
20,820.00

45

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 Plesteran camp. 1 PC : 3 Ps tebal 20mm
Bahan
10.368 Kg PC
Rp
1,500.00
3
0.031 m
Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
0.400 Oh Pekerja
Rp
37,500.00
0.200 Oh Tukang batu
Rp
47,500.00
0.020 Oh Kepala tukang
Rp
52,500.00
0.022 Oh Mandor
Rp
55,000.00

15,552.00
2,635.00

18,187.00
8

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 Plesteran camp. 1 PC : 5 Ps tebal 20mm
Bahan
6.912 Kg PC
Rp
1,500.00
3
0.035 m
Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
0.400 Oh Pekerja
Rp
37,500.00
0.200 Oh Tukang batu
Rp
47,500.00
0.020 Oh Kepala tukang
Rp
52,500.00
0.022 Oh Mandor
Rp
55,000.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 Berapen camp. 1 PC : 5 Ps tebal 15mm
Bahan
5.184 Kg PC
Rp
1,500.00
3
0.026 m
Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
0.150 Oh Pekerja
Rp
37,500.00
0.075 Oh Tukang batu
Rp
47,500.00
0.008 Oh Kepala tukang
Rp
52,500.00
0.008 Oh Mandor
Rp
55,000.00

5,625.00
3,562.50
420.00
440.00
10,047.50

4,662.00

4,662.00
11 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 finishing siar pas. batu kali adukan 1 PC : 2 Ps.
Bahan
6.340 Kg PC
Rp
1,500.00

15,000.00
9,500.00
1,050.00
1,210.00
26,760.00

7,776.00
2,210.00

9,986.00
10 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 finishing siar pas. dinding bata merah (=20m')
Bahan
3.108 Kg PC
Rp
1,500.00
Upah
0.150 Oh Pekerja
Rp
37,500.00
0.075 Oh Tukang batu
Rp
47,500.00
0.008 Oh Kepala tukang
Rp
52,500.00
0.008 Oh Mandor
Rp
55,000.00

15,000.00
9,500.00
1,050.00
1,210.00
26,760.00

10,368.00
2,975.00

13,343.00
9

5,625.00
3,562.50
420.00
440.00
10,047.50

9,510.00

46

0.012 m3
Upah
0.300 Oh
0.150 Oh
0.015 Oh
0.015 Oh

Pasir pasang (Pasir Kali)

Rp

85,000.00

Pekerja
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

1,020.00

10,530.00
12 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 Acian
Bahan
3.250 Kg PC
Rp
Upah
0.200 Oh Pekerja
Rp
0.100 Oh Tukang batu
Rp
0.010 Oh Kepala tukang
Rp
0.010 Oh Mandor
Rp

1,500.00
37,500.00
47,500.00
52,500.00
55,000.00

1,500.00
85,000.00

11,250.00
7,125.00
787.50
825.00
19,987.50

4,875.00

4,875.00
13 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m' Benangan 1 PC : 2 PP
Bahan
0.344 Kg PC
Rp
0.001 m3 Pasir pasang (Pasir Kali)
Rp
Upah
0.133 Oh Pekerja
Rp
0.067 Oh Tukang batu
Rp
0.007 Oh Kepala tukang
Rp
0.007 Oh Mandor
Rp

7,500.00
4,750.00
525.00
550.00
13,325.00

516.00
85.00

37,500.00
47,500.00
52,500.00
55,000.00
601.00

4,998.75
3,163.50
346.50
363.00
8,871.75

47

JUMLAH

BULAT

33,606.50

33,600.00

29,973.50

29,900.00

28,906.50

28,900.00

27,636.50

27,600.00

48

31,658.50

31,600.00

28,842.50

28,800.00

49

44,947.00

44,900.00

40,103.00

40,100.00

20,033.50

20,000.00

14,709.50

14,700.00

50

30,517.50

30,500.00

18,200.00

18,200.00

9,472.75

9,400.00

51

Pekerjaan Kayu
NO.
1

JENIS PEKERJAAN
2

BAHAN
3

Analisa SNI DPU Cipta Karya dan Tata Ruang


Membuat dan Memasang 1 m3 Kusen Pintu dan Jusen Jendela, Kayu Kl. I
Bahan
1.100 m3 Balok Kayu kelas I
Rp
10,400,000.00
11,440,000.00
1.250 Kg Paku 10 cm
Rp
18,000.00
22,500.00
1.000 Kg Lem Kayu
Rp
15,000.00
15,000.00
Upah
7.000 Oh Pekerja
Rp
37,500.00
21.000 Oh Tukang kayu
Rp
50,000.00
2.100 Oh Kepala tukang
Rp
52,500.00
0.350 Oh Mandor
Rp
55,000.00
11,477,500.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Membuat dan Memasang 1 m3 Kusen Pintu dan Jusen Jendela, Kayu Kl. II atau Kl. III
Bahan
1.200 m3 Balok Kayu Kelas II
Rp
5,200,000.00
6,240,000.00
3
1.200 m Balok Kayu Kelas III
Rp
3,480,000.00
4,176,000.00
1.250 Kg Paku 10 cm
Rp
18,000.00
22,500.00
1.000 Kg Lem Kayu
Rp
15,000.00
15,000.00
Upah
6.000 Oh Pekerja
Rp
37,500.00
18.000 Oh Tukang kayu
Rp
50,000.00
1.800 Oh Kepala tukang
Rp
52,500.00
0.300 Oh Mandor
Rp
55,000.00
Membuat & Memasang Kusen Pintu dan Jusen Jendela Kayu Kl. II
6,277,500.00
Membuat & Memasang Kusen Pintu dan Jusen Jendela Kayu Kl. III
4,213,500.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Membuat dan Memasang 1 m2 Pintu klamp standar, Kayu Kl. II
Bahan
0.040 m3 Papan kayu kelas II
Rp
6,500,000.00
260,000.00
0.050 Kg Paku 5cm - 7cm
Rp
18,000.00
900.00
Upah
0.350 Oh Pekerja
Rp
37,500.00
1.050 Oh Tukang kayu
Rp
50,000.00
0.105 Oh Kepala tukang
Rp
52,500.00
0.018 Oh Mandor
Rp
55,000.00
260,900.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Membuat dan Memasang 1 m2 Pintu klamp Sederhana, Kayu Kl. III untuk gudang sementara
Bahan
0.040 m3 Papan kayu kelas III
Rp
3,480,000.00
139,200.00
0.050 Kg Paku 5cm - 7cm
Rp
18,000.00
900.00
Upah
0.350 Oh Pekerja
Rp
37,500.00

52

1.050 Oh Tukang kayu


0.105 Oh Kepala tukang
0.018 Oh Mandor

Rp
Rp
Rp

50,000.00
52,500.00
55,000.00
140,100.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


Membuat dan Memasang 1 m2 Daun Pintu Panel,Kayu Kl. I atau II
Bahan
0.040 m3 Papan kayu kelas I
Rp
11,817,000.00
3
0.040 m Papan kayu kelas II
Rp
6,500,000.00
0.500 Kg Lem kayu
Rp
15,000.00
Upah
1.000 Oh Pekerja
Rp
37,500.00
3.000 Oh Tukang kayu
Rp
50,000.00
0.300 Oh Kepala tukang
Rp
52,500.00
0.050 Oh Mandor
Rp
55,000.00
Membuat dan Memasang Daun Pintu Panel Kayu Kl. I
Membuat dan Memasang Daun Pintu Panel Kayu Kl. II

Analisa SNI DPU Cipta Karya dan Tata Ruang


Membuat dan Memasang 1 m2 Pintu dan Jendela Kaca,Kayu Kl. I atau II
Bahan
0.024 m3 Papan kayu kelas I
Rp
11,817,000.00
3
0.024 m Papan kayu kelas II
Rp
6,500,000.00
0.300 Kg Lem kayu
Rp
15,000.00
Upah
0.800 Oh Pekerja
Rp
37,500.00
2.400 Oh Tukang kayu
Rp
50,000.00
0.240 Oh Kepala tukang
Rp
52,500.00
0.040 Oh Mandor
Rp
55,000.00
Membuat dan Memasang Daun Pintu & Jendela Kaca Kayu Kl. I
Membuat dan Memasang Daun Pintu & Jendela Kaca Kayu Kl. II
Analisa SNI DPU Cipta Karya dan Tata Ruang
Membuat dan Memasang 1 m2 Pintu dan Jendela Jalusi,Kayu Kl. I atau II
Bahan
0.064 m3 Papan kayu kelas I
Rp
11,817,000.00
3
0.064 m Papan kayu kelas II
Rp
6,500,000.00
0.500 Kg Lem kayu
Rp
15,000.00

472,680.00
260,000.00
7,500.00

480,180.00
267,500.00

283,608.00
156,000.00
4,500.00

288,108.00
160,500.00

756,288.00
416,000.00
7,500.00

53

Upah
1.000 Oh Pekerja
Rp
37,500.00
3.000 Oh Tukang kayu
Rp
50,000.00
0.300 Oh Kepala tukang
Rp
52,500.00
0.050 Oh Mandor
Rp
55,000.00
Membuat dan Memasang Daun Pintu & Jendela Jalusi Kayu Kl. I
763,788.00
Membuat dan Memasang Daun Pintu & Jendela Jalusi Kayu Kl. II
423,500.00
8 Analisa SNI DPU Cipta Karya dan Tata Ruang
Membuat 1 m2 Daun Pintu Lapis (plywood) rangkap, rangka tertutup kayu Kl. I (lebar sampai 90cm)
Bahan
0.025 m3 Papan kayu Kelas I
Rp
11,817,000.00
295,425.00
0.030 Kg Paku 1 - 2.5 cm
Rp
18,000.00
540.00
0.500 Kg Lem kayu
Rp
15,000.00
7,500.00
1.000 Lbr Plywood tebal 4mm (90x220)cm
Rp
150,000.00
150,000.00
Upah
0.700 Oh Pekerja
Rp
37,500.00
2.100 Oh Tukang kayu
Rp
50,000.00
0.210 Oh Kepala tukang
Rp
52,500.00
0.035 Oh Mandor
Rp
55,000.00
453,465.00
9 Analisa SNI DPU Cipta Karya dan Tata Ruang
Membuat 1 m2 Pintu plywood rangkap, rangka expose kayu Kl. I atau II
Bahan
0.0256 m3 Papan kayu kelas I
Rp
11,817,000.00
302,515.20
3
0.0256 m Papan kayu kelas II
Rp
6,500,000.00
166,400.00
0.030 Kg Paku 1 - 2.5 cm
Rp
18,000.00
540.00
0.500 Kg Lem kayu
Rp
15,000.00
7,500.00
1.000 Lbr Plywood tebal 4mm (90x220)cm
Rp
150,000.00
150,000.00
Upah
0.800 Oh Pekerja
Rp
37,500.00
2.400 Oh Tukang kayu
Rp
50,000.00
0.240 Oh Kepala tukang
Rp
52,500.00
0.040 Oh Mandor
Rp
55,000.00
Membuat Pintu Plywood rangkap rangka expose kayu kl. I
460,555.20
Membuat Pintu Plywood rangkap rangka expose kayu kl. II
324,440.00
10 Analisa SNI DPU Cipta Karya dan Tata Ruang
Membuat 1 m2 jalusi kusen, kayu Kl. I atau II
Bahan
0.0600 m3 Papan kayu kelas I
Rp
11,817,000.00
709,020.00
3
0.0600 m Papan kayu kelas II
Rp
6,500,000.00
390,000.00
0.150 Kg Paku 1 - 2.5 cm
Rp
18,000.00
2,700.00
Upah
0.670 Oh Pekerja
Rp
37,500.00
2.000 Oh Tukang kayu
Rp
50,000.00
0.200 Oh Kepala tukang
Rp
52,500.00
0.335 Oh Mandor
Rp
55,000.00
Membuat jalusi kusen kayu kl. I
711,720.00

54

Membuat jalusi kusen kayu kl. II

11 Analisa SNI DPU Cipta Karya dan Tata Ruang


Membuat 1 m2 taekwood rangkap, rangka expose kayu Kl. I
Bahan
0.0250 m3 Papan kayu kelas I
Rp
11,817,000.00
0.030 Kg Paku 1 - 2.5 cm
Rp
18,000.00
0.300 Kg Lem kayu
Rp
15,000.00
1.000 Lbr Teakwood tebal 4mm (90x220)cm
Rp
150,000.00
Upah
0.800 Oh Pekerja
Rp
37,500.00
2.400 Oh Tukang kayu
Rp
50,000.00
0.240 Oh Kepala tukang
Rp
52,500.00
0.040 Oh Mandor
Rp
55,000.00

392,700.00

295,425.00
540.00
4,500.00
150,000.00

450,465.00
12 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m3 Konstruksi Kuda kuda Konvensional, kayu klas I, II, dan III bentang 6 meter
Bahan
1.100 m3 Balok Kayu Kelas I
Rp
10,400,000.00
11,440,000.00
1.100 m3 Balok Kayu Kelas II
Rp
5,200,000.00
5,720,000.00
3
1.100 m Balok Kayu Kelas III
Rp
3,480,000.00
3,828,000.00
15.000 Kg Besi strip tb = 5 mm /kawel Rp
12,400.00
186,000.00
5.600 Kg Paku 12 cm
Rp
18,000.00
100,800.00
Upah
4.000 Oh Pekerja
Rp
37,500.00
12.000 Oh Tukang kayu
Rp
50,000.00
1.200 Oh Kepala Tukang
Rp
52,500.00
0.200 Oh Mandor
Rp
55,000.00
- Memasang 1 m3 Kuda kuda Kayu Kelas I
11,726,800.00
3
- Memasang 1 m Kuda kuda Kayu Kelas II
6,006,800.00
- Memasang 1 m3 Kuda kuda Kayu Kelas III
4,114,800.00
13 Analisa SNI DPU Cipta Karya dan Tata Ruang
Upah Membongkar 1 m3 Konstruksi Kuda kuda Konvensional, kayu klas I, II, dan III bentang 6 meter
Bahan
1.100 m3 Balok Kayu Kelas I
Rp
3
1.100 m Balok Kayu Kelas II
Rp
1.100 m3 Balok Kayu Kelas III
Rp
15.000 Kg Besi strip tb = 5 mm /kawel Rp
5.600 Kg Paku 12 cm
Rp
Upah
4.000 Oh Pekerja
Rp
37,500.00

55

12.000 Oh Tukang kayu


Rp
50,000.00
1.200 Oh Kepala Tukang
Rp
52,500.00
0.200 Oh Mandor
Rp
55,000.00
- Memasang 1 m3 Kuda kuda Kayu Kelas I
- Memasang 1 m3 Kuda kuda Kayu Kelas II
- Memasang 1 m3 Kuda kuda Kayu Kelas III
14 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m3 Konstruksi Kuda kuda Ekspose kayu klas I
Bahan
1.200 m3 Balok Kayu Kelas I
Rp
10,400,000.00
15.000 Kg Besi strip tb = 5 mm /kawel Rp
12,400.00
5.600 Kg Paku 12 cm
Rp
18,000.00
Upah
6.700 Oh Pekerja
Rp
37,500.00
20.100 Oh Tukang kayu
Rp
50,000.00
2.010 Oh Kepala Tukang
Rp
52,500.00
0.335 Oh Mandor
Rp
55,000.00

12,480,000.00
186,000.00
100,800.00

12,766,800.00
15 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m3 Konstruksi Gording kayu klas III
Bahan
1.100 m3 Balok Kayu Kelas III
Rp
15.000 Kg Besi strip tb = 5 mm /kawel Rp
3.000 Kg Paku 12 cm
Rp
Upah
2.400 Oh Pekerja
Rp
7.200 Oh Tukang kayu
Rp
0.720 Oh Kepala Tukang
Rp
0.120 Oh Mandor
Rp

3,480,000.00
12,400.00
18,000.00

3,828,000.00
186,000.00
54,000.00

37,500.00
50,000.00
52,500.00
55,000.00
4,068,000.00

16 Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 rangka atap genteng keramik, kayu kl. II
Bahan
0.014 m3 Kaso-kaso (5x7) cm kelas II Rp
5,200,000.00
0.0036 m3 Reng (2x3) cm
Rp
5,200,000.00
0.250 Kg Paku 5 dan 10 cm
Rp
18,000.00
Upah
0.100 Oh Pekerja
Rp
37,500.00
0.100 Oh Tukang kayu
Rp
50,000.00
0.010 Oh Kepala Tukang
Rp
52,500.00

72,800.00
18,720.00
4,500.00

56

0.005 Oh Mandor

Rp

55,000.00
96,020.00

17 Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 rangka atap genteng beton, kayu kl. II
Bahan
0.014 m3 Kaso-kaso (5x7) cm
Rp
5,200,000.00
0.0072 m3 Reng (3x4) cm
Rp
5,200,000.00
0.250 Kg Paku 5 dan 10 cm
Rp
18,000.00
Upah
0.100 Oh Pekerja
Rp
37,500.00
0.100 Oh Tukang kayu
Rp
50,000.00
0.010 Oh Kepala Tukang
Rp
52,500.00
0.005 Oh Mandor
Rp
55,000.00

72,800.00
37,440.00
4,500.00

114,740.00
18 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 rangka atap sirap, kayu kelas II
Bahan
0.165 m3 Kayu kelas II
Rp
0.200 Kg Paku 5 dan 10 cm
Rp
Upah
0.120 Oh Pekerja
Rp
0.120 Oh Tukang kayu
Rp
0.012 Oh Kepala Tukang
Rp
0.006 Oh Mandor
Rp

6,500,000.00
18,000.00

1,072,500.00
3,600.00

37,500.00
50,000.00
52,500.00
55,000.00
1,076,100.00

19 Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 rangka langit-langit (50x100)cm, kayu kelas II
Bahan
0.0154 m3 Kaso-kaso (5x7) cm
Rp
5,200,000.00
0.200 Kg Paku 7 dan 10 cm
Rp
18,000.00
Upah
0.150 Oh Pekerja
Rp
37,500.00
0.300 Oh Tukang kayu
Rp
50,000.00
0.030 Oh Kepala Tukang
Rp
52,500.00
0.075 Oh Mandor
Rp
55,000.00

80,080.00
3,600.00

83,680.00
20 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 rangka langit-langit (60 x 60)cm, kayu kelas II
Bahan
0.0163 m3 Kaso-kaso (5x7) cm
Rp
5,200,000.00
0.250 Kg Paku 7 dan 10 cm
Rp
18,000.00
Upah
0.200 Oh Pekerja
Rp
37,500.00
0.300 Oh Tukang kayu
Rp
50,000.00
0.030 Oh Kepala Tukang
Rp
52,500.00
0.010 Oh Mandor
Rp
55,000.00

84,760.00
4,500.00

89,260.00
21 Analisa SNI DPU Cipta Karya dan Tata Ruang

57

Memasang 1 m' lisplank ukuran (3 x 20)cm, kayu kelas I atau II


Bahan
0.0108 m3 Papan kayu Kelas I
Rp
11,817,000.00
0.0108 m3 Papan kayu Kelas II
Rp
6,500,000.00
0.100 Kg Paku 5 dan 7 cm
Rp
18,000.00
Upah
0.100 Oh Pekerja
Rp
37,500.00
0.200 Oh Tukang kayu
Rp
50,000.00
0.020 Oh Kepala Tukang
Rp
52,500.00
0.005 Oh Mandor
Rp
55,000.00
- Memasang lisplank uk (3 x 20)cmkayu kelas I
- Memasang lisplank uk (3 x 20)cmkayu kelas II

127,623.60
70,200.00
1,800.00

129,423.60
72,000.00

22 Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m' lisplank ukuran (3 x 30)cm, kayu kelas I atau II
Bahan
0.011 m3 Papan kayu Kelas I
Rp
11,817,000.00
129,987.00
3
0.011 m Papan kayu Kelas II
Rp
6,500,000.00
71,500.00
0.050 Kg Paku 5 dan 7 cm
Rp
18,000.00
900.00
Upah
0.100 Oh Pekerja
Rp
37,500.00
0.200 Oh Tukang kayu
Rp
50,000.00
0.020 Oh Kepala Tukang
Rp
52,500.00
0.005 Oh Mandor
Rp
55,000.00
- Memasang lisplank uk (3 x 30)cmkayu kelas I
130,887.00
- Memasang lisplank uk (3 x 30)cmkayu kelas II
72,400.00
23 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 rangka dinding pemisah teakwood rangkap, rangka kayu kelas II
Bahan
0.028 m3 Balok Kayu
Rp
3,480,000.00
97,440.00
0.150 Kg Paku 5 dan 7 cm
Rp
18,000.00
2,700.00
0.860 Lbr Teakwood
Rp
150,000.00
129,000.00
0.560 Kg Lem kayu
Rp
15,000.00
8,400.00
Upah
0.150 Oh Pekerja
Rp
37,500.00
0.450 Oh Tukang kayu
Rp
50,000.00
0.045 Oh Kepala Tukang
Rp
52,500.00
0.008 Oh Mandor
Rp
55,000.00
237,540.00
24 Analisa SNI DPU Cipta Karya dan Tata Ruang

58

Memasang 1 m rangka dinding pemisah plywood rangkap, rangka kayu kelas II


Bahan
0.028 m3 Balok Kayu
Rp
3,480,000.00
97,440.00
0.150 Kg Paku 5 dan 7 cm
Rp
18,000.00
2,700.00
0.860 Lbr Plywood tebal 4mm (90x220) Rp
150,000.00
129,000.00
0.560 Kg Lem kayu
Rp
15,000.00
8,400.00
Upah
0.200 Oh Pekerja
Rp
37,500.00
0.600 Oh Tukang kayu
Rp
50,000.00
0.060 Oh Kepala Tukang
Rp
52,500.00
0.010 Oh Mandor
Rp
55,000.00
237,540.00
25 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 dinding Lambriziring dari papan kayu kelas I
Bahan
0.007 m3 Papan kayu
Rp
11,817,000.00
82,719.00
0.100 Kg Paku 5 dan 10 cm
Rp
18,000.00
1,800.00
0.150 Kg Paku skrup 10 cm
Rp
880.00
132.00
Upah
0.600 Oh Pekerja
Rp
37,500.00
1.800 Oh Tukang kayu
Rp
50,000.00
0.180 Oh Kepala Tukang
Rp
52,500.00
0.030 Oh Mandor
Rp
55,000.00
84,651.00
26 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 Pasang Papan Kompres tebal 2,5 cm, kayu papan kls. I
Bahan
0.0275 m3 Papan kayu Kelas I
Rp
11,817,000.00
324,967.50
3
0.100 m Paku 5 cm dan 10 cm
Rp
18,000.00
1,800.00
Upah
0.080 Oh Pekerja
Rp
37,500.00
0.800 Oh Tukang kayu
Rp
50,000.00
0.280 Oh Kepala Tukang
Rp
52,500.00
0.014 Oh Mandor
Rp
55,000.00
326,767.50
2

59

27 Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 Papan reuter 2/20 cm kayu meranti Kelas II
Bahan
0.0040 m3 Papan kayu Kelas II
Rp
6,500,000.00
3
0.020 m Paku 5 cm dan 10 cm
Rp
18,000.00
Upah
0.008 Oh Pekerja
Rp
37,500.00
0.080 Oh Tukang kayu
Rp
50,000.00
0.028 Oh Kepala Tukang
Rp
52,500.00
0.001 Oh Mandor
Rp
55,000.00

26,000.00
360.00

26,360.00
28 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 rangka langit-langit (100 x 100) cm
Bahan
0.0120 m3 Balok 5/7 kayu kelas II
Rp
5,200,000.00
3
0.020 m Paku 5 cm dan 10 cm
Rp
18,000.00
Upah
0.008 Oh Pekerja
Rp
37,500.00
0.080 Oh Tukang kayu
Rp
50,000.00
0.028 Oh Kepala Tukang
Rp
52,500.00
0.001 Oh Mandor
Rp
55,000.00

62,400.00
360.00

62,760.00

60

UPAH
4

JUMLAH
5

BULAT
6

262,500.00
1,050,000.00
110,250.00
19,250.00
1,442,000.00

12,919,500.00

12,919,500.00

225,000.00
900,000.00
94,500.00
16,500.00
1,236,000.00
1,236,000.00

7,513,500.00
5,449,500.00

7,513,500.00
5,449,500.00

13,125.00
52,500.00
5,512.50
990.00
72,127.50

333,027.50

333,000.00

en Jendela, Kayu Kl. II atau Kl. III

na, Kayu Kl. III untuk gudang sementara

13,125.00

61

52,500.00
5,512.50
990.00
72,127.50

212,227.50

212,200.00

37,500.00
150,000.00
15,750.00
2,750.00
206,000.00
206,000.00

686,180.00
473,500.00

686,100.00
473,500.00

30,000.00
120,000.00
12,600.00
2,200.00
164,800.00
164,800.00

452,908.00
325,300.00

452,900.00
325,300.00

62

37,500.00
150,000.00
15,750.00
2,750.00
206,000.00
206,000.00

969,788.00
629,500.00

969,700.00
629,500.00

26,250.00
105,000.00
11,025.00
1,925.00
144,200.00

597,665.00

597,600.00

30,000.00
120,000.00
12,600.00
2,200.00
164,800.00
164,800.00

625,355.20
489,240.00

625,300.00
489,200.00

25,125.00
100,000.00
10,500.00
18,425.00
154,050.00

865,770.00

865,700.00

rangka tertutup kayu Kl. I (lebar sampai 90cm)

63

154,050.00

546,750.00

546,700.00

30,000.00
120,000.00
12,600.00
2,200.00
164,800.00

615,265.00

615,200.00

150,000.00
600,000.00
63,000.00
11,000.00
824,000.00
824,000.00
824,000.00

12,550,800.00
6,830,800.00
4,938,800.00

12,550,800.00
6,830,800.00
4,938,800.00

, kayu klas I, II, dan III bentang 6 meter

ensional, kayu klas I, II, dan III bentang 6 meter

150,000.00

64

600,000.00
63,000.00
11,000.00
824,000.00
824,000.00
824,000.00

824,000.00
824,000.00
824,000.00

824,000.00
824,000.00
824,000.00

251,250.00
1,005,000.00
105,525.00
18,425.00
1,380,200.00

14,147,000.00

14,147,000.00

90,000.00
360,000.00
37,800.00
6,600.00
494,400.00

4,562,400.00

4,562,400.00

3,750.00
5,000.00
525.00

65

275.00
9,550.00

105,570.00

105,500.00

3,750.00
5,000.00
525.00
275.00
9,550.00

124,290.00

124,200.00

4,500.00
6,000.00
630.00
330.00
11,460.00

1,087,560.00

1,087,500.00

5,625.00
15,000.00
1,575.00
4,125.00
26,325.00

110,005.00

110,000.00

7,500.00
15,000.00
1,575.00
550.00
24,625.00

113,885.00

113,800.00

66

3,750.00
10,000.00
1,050.00
275.00
15,075.00
15,075.00

144,498.60
87,075.00

144,400.00
87,000.00

3,750.00
10,000.00
1,050.00
275.00
15,075.00
15,075.00

145,962.00
87,475.00

145,900.00
87,400.00

5,625.00
22,500.00
2,362.50
440.00
30,927.50

268,467.50

268,400.00

67

7,500.00
30,000.00
3,150.00
550.00
41,200.00

278,740.00

278,700.00

22,500.00
90,000.00
9,450.00
1,650.00
123,600.00

208,251.00

208,200.00

3,000.00
40,000.00
14,700.00
770.00
58,470.00

385,237.50

385,200.00

68

300.00
4,000.00
1,470.00
77.00
5,847.00

32,207.00

32,200.00

300.00
4,000.00
1,470.00
77.00
5,847.00

68,607.00

68,600.00

69

Pekerjaan Beton
NO.

JENIS PEKERJAAN

BAHAN

HARGA UNTUK 1 M3 BETON BERTULANG STRUKTUR (Bahan + Upah)


Analisa 1 m3 Beton Bertulang Struktur (SLOOF) K.175
Spesifikasi pembesian SNI (Utama 10 mm - Beugel 6 mm)
Pasang SLOOF 15/20 K. 175 ( 10 mm - Beugel 6 mm)
1.00 M3 Mengecor beton K-175
Rp
754,600.00
105.00 Kg Pembesian besi beton polos
Rp
16,660.00
13.33 M2 Bekisting untuk sloof
Rp
140,300.00

Analisa 1 m3 Beton Bertulang Struktur (KOLOM) K.175


Spesifikasi pembesian SNI (Utama 10-12 mm - Beugel 6-8 mm)
Pasang KOLOM 15/15 K. 175 ( 10 mm - Beugel 6 mm)
1.00 M3 Mengecor beton K-175
Rp
754,600.00
135.00 Kg Pembesian besi beton polos
Rp
16,660.00
13.33 M2 Bekisting untuk kolom
Rp
107,100.00

Pasang KOLOM 15/30 K. 175 ( 12 mm - Beugel 8 mm)


1.00 M3 Mengecor beton K-175
Rp
754,600.00
166.00 Kg Pembesian besi beton polos
Rp
16,660.00
16.67 M2 Bekisting untuk kolom
Rp
107,100.00

Analisa 1 m3 Beton Bertulang Struktur (BALOK LATAI) K.175


Spesifikasi pembesian SNI (Utama 12 mm - Beugel 6 mm)
Pasang BALOK LATAI 12/15 K. 175
1.00 M3 Mengecor beton K-175
235.00 Kg Pembesian besi beton polos
16.50 M2 Bekisting untuk kolom

A
1

( 12 mm - Beugel 6 mm)
Rp
754,600.00
Rp
16,660.00
Rp
107,100.00

MEMBUAT BETON 1 M3
Analisa 1 M3 BETON K.100
Membuat 1 m3 Beton mutu f'c = 7,4 Mpa (K100), slump (12 2) cm, W/C = 0.87
Bahan
247.00 Kg PC
Rp
1,500.00
869.00 Kg Pasir beton (Pasir Kali)
Rp
80.00
999.00 Kg Kerikil (max. 30 mm)
Rp
112.00
215.00 ltr Air
Rp
40.00
Upah

370,500.00
69,520.00
111,888.00
8,600.00

70

1.650 Oh
0.275 Oh
0.028 Oh
0.083 Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00
560,508.00

Analisa 1 M3 BETON K.125


Membuat 1 m3 Beton mutu f'c = 9,8 Mpa (K125), slump (12 2) cm, W/C = 0.78
Bahan
276.00 Kg PC
Rp
1,500.00
828.000 Kg Pasir beton (Pasir Kali)
Rp
80.00
1012.00 Kg Kerikil (max. 30 mm)
Rp
112.00
215.000 ltr Air
Rp
40.00
Upah
1.650 Oh Pekerja
Rp
37,500.00
0.275 Oh Tukang batu
Rp
47,500.00
0.028 Oh Kepala tukang
Rp
52,500.00
0.083 Oh Mandor
Rp
55,000.00

414,000.00
66,240.00
113,344.00
8,600.00

602,184.00
3

Analisa 1 M3 BETON K.150


Membuat 1 m3 Beton mutu f'c = 12,2 Mpa (K150), slump (12 2) cm, W/C = 0.72
Bahan
299.00 Kg PC
Rp
1,500.00
799.000 Kg Pasir beton (Pasir Kali)
Rp
80.00
1017.00 Kg Kerikil (max. 30 mm)
Rp
112.00
215.000 ltr Air
Rp
40.00
Upah
1.650 Oh Pekerja
Rp
37,500.00
0.275 Oh Tukang batu
Rp
47,500.00
0.028 Oh Kepala tukang
Rp
52,500.00
0.083 Oh Mandor
Rp
55,000.00

448,500.00
63,920.00
113,904.00
8,600.00

634,924.00
4

Analisa 1 M3 BETON K.175


Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 2) cm, W/C = 0.66
Bahan
326.000 Kg PC
Rp
1,500.00
760.000 Kg Pasir beton (Pasir Kali)
Rp
80.00
1029.00 Kg Kerikil (max. 30 mm)
Rp
112.00
215.000 ltr Air
Rp
40.00
Upah
1.650 Oh Pekerja
Rp
37,500.00
0.275 Oh Tukang batu
Rp
47,500.00
0.028 Oh Kepala tukang
Rp
52,500.00
0.083 Oh Mandor
Rp
55,000.00

489,000.00
60,800.00
115,248.00
8,600.00

673,648.00
5

Analisa 1 M3 BETON K.200


Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 2) cm, W/C = 0.61
Bahan
352.000 Kg PC
Rp
1,500.00
731.000 Kg Pasir beton (Pasir Kali)
Rp
80.00
1031.00 Kg Kerikil (max. 30 mm)
Rp
112.00
215.000 ltr Air
Rp
40.00

528,000.00
58,480.00
115,472.00
8,600.00

71

Upah
1.650 Oh
0.275 Oh
0.028 Oh
0.083 Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00
710,552.00

Analisa 1 M3 BETON K.225


Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, W/C = 0.58
Bahan
371.000 Kg PC
Rp
1,500.00
698.000 Kg Pasir beton (Pasir Kali)
Rp
80.00
1047.00 Kg Kerikil (max. 30 mm)
Rp
112.00
215.000 ltr Air
Rp
40.00
Upah
1.650 Oh Pekerja
Rp
37,500.00
0.275 Oh Tukang batu
Rp
47,500.00
0.028 Oh Kepala tukang
Rp
52,500.00
0.083 Oh Mandor
Rp
55,000.00

556,500.00
55,840.00
117,264.00
8,600.00

738,204.00
7

Analisa 1 M3 BETON K.250


Membuat 1 m3 beton mutu f'c = 21.7 Mpa (K250), slump (12 2) cm, W/C = 0.56
Bahan
384.000 Kg PC
Rp
1,500.00
692.000 Kg Pasir beton (Pasir Kali)
Rp
80.00
1039.00 Kg Kerikil (max. 30 mm)
Rp
112.00
215.000 ltr Air
Rp
40.00
Upah
1.650 Oh Pekerja
Rp
37,500.00
0.275 Oh Tukang batu
Rp
47,500.00
0.028 Oh Kepala tukang
Rp
52,500.00
0.083 Oh Mandor
Rp
55,000.00

576,000.00
55,360.00
116,368.00
8,600.00

756,328.00
8

Analisa 1 M3 BETON K.275


Membuat 1 m3 beton mutu f'c = 24.0 Mpa (K275), slump (12 2) cm, W/C = 0.53
Bahan
406.000 Kg PC
Rp
1,500.00
684.000 Kg Pasir beton (Pasir Kali)
Rp
80.00
1026.00 Kg Kerikil (max. 30 mm)
Rp
112.00
215.000 ltr Air
Rp
40.00
Upah
1.650 Oh Pekerja
Rp
37,500.00
0.275 Oh Tukang batu
Rp
47,500.00
0.028 Oh Kepala tukang
Rp
52,500.00
0.083 Oh Mandor
Rp
55,000.00

609,000.00
54,720.00
114,912.00
8,600.00

787,232.00
9

Analisa 1 M3 BETON K.300


Membuat 1 m3 beton mutu f'c = 26.4 Mpa (K300), slump (12 2) cm, W/C = 0.52
Bahan
413.000 Kg PC
Rp
1,500.00
681.000 Kg Pasir beton (Pasir Kali)
Rp
80.00

619,500.00
54,480.00

72

1021.00 Kg
215.000 ltr

Kerikil (max. 30 mm)


Air

Rp
Rp

112.00
40.00

Pekerja
Tukang batu
Kepala tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

114,352.00
8,600.00

Upah
1.650 Oh
0.275 Oh
0.028 Oh
0.083 Oh

796,932.00

10 Analisa 1 M3 BETON K.350


Membuat 1 m3 beton mutu f'c = 31.2 Mpa (K350), slump (12 2) cm, W/C = 0.48
Bahan
448.000 Kg PC
Rp
1,500.00
667.000 Kg Pasir beton (Pasir Kali)
Rp
80.00
1000.00 Kg Kerikil (max. 30 mm)
Rp
112.00
215.000 ltr Air
Rp
40.00
Upah
2.100 Oh Pekerja
Rp
37,500.00
0.350 Oh Tukang batu
Rp
47,500.00
0.035 Oh Kepala tukang
Rp
52,500.00
0.105 Oh Mandor
Rp
55,000.00

672,000.00
53,360.00
112,000.00
8,600.00

845,960.00
B

Pembesian per 10 Kg Besi polos atau besi ulir


Bahan
10.50 Kg Besi Beton Polos
0.15 Kg Kawat Bendrat
Upah
0.070 Oh Pekerja
0.070 Oh Tukang batu
0.007 Oh Kepala tukang
0.004 Oh Mandor
Pembesian per 10 Kg Besi polos atau besi ulir
0.1 Pembesian per 1 Kg Besi polos
C Memasang 1 m2 Bekisting
1 Memasang 1 m2 bekisting untuk pondasi
Bahan
0.040 M3 Kayu sengon / bekisting
0.300 Kg Paku
0.100 Liter Minyak Olie
Upah
0.520 Oh Pekerja
0.260 Oh Tukang batu
0.026 Oh Kepala tukang
0.026 Oh Mandor

Rp
Rp

15,000.00
17,250.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

157,500.00
2,587.50

160,087.50
16,008.75

Rp
Rp
Rp

2,500,000.00
18,000.00
2,750.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

100,000.00
5,400.00
275.00

73

Memasang 1 m2 bekisting untuk pondasi


Memasang 1 m2 Bekisting untuk Sloof
Bahan
0.040 M3 Kayu sengon / bekisting
0.300 Kg Paku
0.100 Liter Minyak Olie
Upah
0.520 Oh Pekerja
0.260 Oh Tukang batu
0.026 Oh Kepala tukang
0.026 Oh Mandor
Memasang 1 m2 Bekisting untuk Sloof
Memasang 1 m2 Bekisting untuk Kolom
Bahan
0.040 M3 Kayu sengon / bekisting
0.400 Kg Paku
0.200 Liter Minyak Olie
0.015 M3 Kayu sengon / bekisting
2.000 Btg Bambu dim 6-10 cm
Upah
0.660 Oh Pekerja
0.330 Oh Tukang batu
0.033 Oh Kepala tukang
0.033 Oh Mandor
Memasang 1 m2 Bekisting untuk Kolom
Memasang 1 m2 Bekisting untuk Kolom 2X PAKAI

Memasang 1 m2 Bekisting untuk Balok


Bahan
0.040 M3 Kayu sengon / bekisting
0.400 Kg Paku
0.200 Liter Minyak Olie
0.018 M3 Kayu sengon / bekisting

105,675.00

Rp
Rp
Rp

2,500,000.00
18,000.00
2,750.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

100,000.00
5,400.00
275.00

105,675.00

Rp
Rp
Rp
Rp
Rp

2,500,000.00
18,000.00
2,750.00
2,500,000.00
12,500.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

100,000.00
7,200.00
550.00
37,500.00
25,000.00

170,250.00

Rp
Rp
Rp
Rp

2,500,000.00
18,000.00
2,750.00
2,500,000.00

100,000.00
7,200.00
550.00
45,000.00

74

2.000 Btg Bambu dim 6-10 cm

Rp

12,500.00

25,000.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00
115,300.00

177,750.00

Rp
Rp
Rp
Rp
Rp

2,500,000.00
18,000.00
2,750.00
2,500,000.00
12,500.00

100,000.00
7,200.00
550.00
37,500.00
75,000.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

Upah

0.660 Oh Pekerja
0.330 Oh Tukang batu
0.033 Oh Kepala tukang
0.033 Oh Mandor
Memasang 1 m2 Bekisting untuk Balok
Memasang 1 m2 bekisting untuk Lantai
Bahan
0.040 M3 Kayu sengon / bekisting
0.400 Kg Paku
0.200 Liter Minyak Olie
0.015 M3 Kayu sengon / bekisting
6.000 Btg Bambu dim 6-10 cm
Upah
0.660 Oh Pekerja
0.330 Oh Tukang Kayu
0.033 Oh Kepala Tukang
0.033 Oh Mandor
Memasang 1 m2 bekisting untuk Lantai

220,250.00

75

UPAH

JUMLAH

BULAT

754,600.00
1,749,300.00
1,870,199.00
4,374,099.00

4,374,099.00

4,374,100.00

754,600.00
2,249,100.00
1,427,643.00
4,431,343.00

4,431,343.00

4,431,400.00

754,600.00
2,765,560.00
1,785,000.00
5,305,160.00

5,305,160.00

5,305,200.00

754,600.00
3,915,100.00
1,767,150.00
6,436,850.00

6,436,850.00

6,436,900.00

76

61,875.00
13,062.50
1,470.00
4,565.00
80,972.50

641,480.50

641,400.00

61,875.00
13,062.50
1,470.00
4,565.00
80,972.50

683,156.50

683,100.00

61,875.00
13,062.50
1,470.00
4,565.00
80,972.50

715,896.50

715,800.00

61,875.00
13,062.50
1,470.00
4,565.00
80,972.50

754,620.50

754,600.00

77

61,875.00
13,062.50
1,470.00
4,565.00
80,972.50

791,524.50

791,500.00

61,875.00
13,062.50
1,470.00
4,565.00
80,972.50

819,176.50

819,100.00

61,875.00
13,062.50
1,470.00
4,565.00
80,972.50

837,300.50

837,300.00

61,875.00
13,062.50
1,470.00
4,565.00
80,972.50

868,204.50

868,200.00

78

61,875.00
13,062.50
1,470.00
4,565.00
80,972.50

877,904.50

877,900.00

78,750.00
16,625.00
1,837.50
5,775.00
102,987.50

948,947.50

948,900.00

2,625.00
3,325.00
367.50
220.00
6,537.50
653.75

166,625.00
16,662.50

166,600.00
16,660.00

19,500.00
12,350.00
1,365.00
1,430.00

79

34,645.00

140,320.00

140,300.00

19,500.00
12,350.00
1,365.00
1,430.00
34,645.00

140,320.00

140,300.00

24,750.00
15,675.00
1,732.50
1,815.00
43,972.50

214,222.50

214,200.00
107,100.00

80

24,750.00
15,675.00
1,732.50
1,815.00
43,972.50

221,722.50

221,700.00

24,750.00
15,675.00
1,732.50
1,815.00
43,972.50

264,222.50

264,200.00

81

Pekerjaan Penutup Atap


NO.

BAHAN

JENIS PEKERJAAN

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m2 pasang atap genteng pelentong kecil
Bahan
25.000 Bh Genteng pelentong/vlampress
Upah
0.150 Oh Pekerja
0.075 Oh Tukang kayu
0.008 Oh Kepala Tukang
0.008 Oh Mandor

Rp

1,200.00

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00

30,000.00

30,000.00
2

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m2 pasang atap genteng kodok / glazzur
Bahan
25.000 Bh Genteng kodok
Upah
0.150 Oh Pekerja
0.075 Oh Tukang kayu
0.008 Oh Kepala Tukang
0.008 Oh Mandor

Rp

3,500.00

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00

87,500.00

87,500.00
3

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m' pasang atap genteng bubung pelentong
Bahan
5.000 Bh Genteng bubung pelentong
8.000 Kg PC
0.032 m3 Pasir pasang (Pasir Kali)
Upah
0.400 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala Tukang
0.002 Oh Mandor

Rp
Rp
Rp

5,800.00
1,500.00
85,000.00

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00

29,000.00
12,000.00
2,720.00

43,720.00
4

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m' pasang bubung genteng kodok glazuur
Bahan
5.000 Bh Genteng bubung kodok
8.000 Kg PC
0.032 m3 Pasir pasang (Pasir Kali)
Upah
0.400 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala Tukang

Rp
Rp
Rp

10,100.00
1,500.00
85,000.00

Rp
Rp
Rp

37,500.00
50,000.00
52,500.00

50,500.00
12,000.00
2,720.00

82

0.002 Oh Mandor

Rp

55,000.00
65,220.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m' pasang bubung genteng pelentong besar
Bahan
4.000 Bh Genteng bubung pelentong besar
8.000 Kg PC
0.032 m3 Pasir pasang (Pasir Kali)
Upah
0.400 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala Tukang
0.002 Oh Mandor

Rp
Rp
Rp

5,800.00
1,500.00
85,000.00

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00

23,200.00
12,000.00
2,720.00

37,920.00
6

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m2 pasang atap Asbes Gelombang Besar (3.00 x 1.05 m) tebal 5 mm
Bahan
0.500 Lbr Asbes gelombang
Rp
110,000.00
0.120 Kg Paku pancing 60 x 230
Rp
20,000.00
Upah
0.140 Oh Pekerja
Rp
37,500.00
0.075 Oh Tukang kayu
Rp
50,000.00
0.008 Oh Kepala Tukang
Rp
52,500.00
0.008 Oh Mandor
Rp
55,000.00

55,000.00
2,400.00

57,400.00
7

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m2 pasang atap Asbes Gelombang Kecil (2.40 x 1.05 m) tebal 5 mm
Bahan
0.600 Lbr Asbes gelombang
Rp
98,000.00
0.120 Kg Paku pancing 60 x 230
Rp
20,000.00
Upah
0.140 Oh Pekerja
Rp
37,500.00
0.075 Oh Tukang kayu
Rp
50,000.00
0.008 Oh Kepala Tukang
Rp
52,500.00
0.008 Oh Mandor
Rp
55,000.00

58,800.00
2,400.00

61,200.00

83

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m2 pasang atap asbes gelombang (1.80 x 0.92) m x 5 mm
Bahan
0.750 Lbr Asbes gelombang
Rp
0.120 Kg Paku pancing 60 x 230
Rp
Upah
0.140 Oh Pekerja
Rp
0.070 Oh Tukang kayu
Rp
0.007 Oh Kepala Tukang
Rp
0.007 Oh Mandor
Rp

90,500.00
20,000.00

67,875.00
2,400.00

37,500.00
50,000.00
52,500.00
55,000.00
70,275.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m2 pasang atap asbes gelombang (3.00 x 1.05 m) x 4 mm
Bahan
0.510 Lbr Asbes gelombang
Rp
0.120 Kg Paku pancing 60 x 230
Rp
Upah
0.140 Oh Pekerja
Rp
0.067 Oh Tukang kayu
Rp
0.007 Oh Kepala Tukang
Rp
0.007 Oh Mandor
Rp

98,500.00
20,000.00

50,235.00
2,400.00

37,500.00
50,000.00
52,500.00
55,000.00
52,635.00

10 Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m' pasang bubung stel gelombang 0.92 m
Bahan
2.400 Lbr Bubung stel gelombang
6.000 Bh Paku sekrup 3.5"
Upah
0.084 Oh Pekerja
0.125 Oh Tukang kayu
0.013 Oh Kepala Tukang
0.004 Oh Mandor

Rp
Rp

45,500.00
900.00

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00

109,200.00
5,400.00

114,600.00
11 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m' pasang nok stel gelombang 1.05 m
Bahan
2.100 Lbr Nok stel gelombang
6.000 Kg Paku sekrup 3.5"
Upah
0.084 Oh Pekerja
0.125 Oh Tukang kayu
0.013 Oh Kepala Tukang
0.004 Oh Mandor

Rp
Rp

52,000.00
900.00

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00

109,200.00
5,400.00

114,600.00
12 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m' pasang nok stel gelombang 1.08 m

84

Bahan
2.050 Lbr
6.000 Kg
Upah
0.084 Oh
0.125 Oh
0.013 Oh
0.004 Oh

Nok stel gelombang


Paku sekrup 3.5"

Rp
Rp

52,000.00
900.00

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00

106,600.00
5,400.00

112,000.00
13 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m2 pasang atap genteng beton
Bahan
11.000 Bh Genteng beton
0.030 Kg Paku biasa 2" - 5"
Upah
0.200 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala Tukang
0.010 Oh Mandor

Rp
Rp

3,000.00
76,000.00

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00

33,000.00
2,280.00

35,280.00
15 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m2 pasang atap genteng metal
Bahan
1.020 Lbr Genteng metal
0.200 Kg Paku biasa 2" - 5"
Upah
0.200 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala Tukang
0.001 Oh Mandor

Rp
Rp

210,000.00
76,000.00

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00

214,200.00
15,200.00

229,400.00

85

16 Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m' pasang nok genteng beton
Bahan
3.500 Bh Nok genteng beton
0.050 Kg Paku biasa 2" - 5
10.800 Kg Semen abu-abu
0.032 m3 Pasir pasang (Pasir Kali)
1.000 Kg Semen warna
Upah
0.400 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala Tukang
0.020 Oh Mandor

Rp
Rp
Rp
Rp
Rp

3,000.00
18,000.00
1,500.00
85,000.00
4,000.00

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00

10,500.00
900.00
16,200.00
2,720.00
4,000.00

34,320.00
17 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m2 Pekerjaan Pasang Talang pembuluh pipa PVC 3" dan 4 "
Bahan
1.000 m' Pipa PVC AW dia. 3"
Rp
1.000 m' Pipa PVC AW dia. 4"
Rp
1.000 bh Klem PVC
Rp
0.050 bh Lem PVC
Rp
Upah
Rp
0.25 Oh Pekerja
Pekerjaan Pasang Talang pembuluh pipa PVC 3"
Pekerjaan Pasang Talang pembuluh pipa PVC 4 "
18 Analisa SNI DPU Cipta Karya dan Tata Ruang
10 m' Pekerjaan pasang talang Kotak PVC
Bahan
10.000 m' Talang kotak PVC
Rp
11.000 bh Hak Pengantung Talang
Rp
2.000 bh Keni PVC 2 "
Rp
2.000 bh Tutup samping talang
Rp
2.000 bh Lem PVC
Rp
1.000 m' Pipa PVC AW dia 2 "
Rp
0.200 Kg Paku biasa
Rp
2.000 bh Samb. Pipa PVC tanpa lubang
Rp
2.000 bh Samb. Pipa PVC ada lubang
Rp
Upah
Rp
0.1 Oh Pekerja
Oh
Tukang
kayu
Rp
0.2
Rp
0.02 Oh Kepala Tukang
Rp
0.005 Oh Mandor

5,795.83
9,602.17
1,500.00
10,000.00

5,795.83
9,602.17
1,500.00
500.00

37,500.00
7,795.83
11,602.17

9,500.00
3,500.00
10,000.00
8,800.00
10,000.00
2,941.67
18,000.00
8,800.00
26,700.00

95,000.00
38,500.00
20,000.00
17,600.00
20,000.00
2,941.67
3,600.00
17,600.00
53,400.00

37,500.00
50,000.00
52,500.00
55,000.00
268,641.67

1 m' pekerjaan pasang talang kotak PVC

86

UPAH

JUMLAH

BULAT

5,625.00
3,750.00
420.00
440.00
10,235.00

40,235.00

40,200.00

5,625.00
3,750.00
420.00
440.00
10,235.00

97,735.00

97,700.00

15,000.00
10,000.00
1,050.00
110.00
26,160.00

69,880.00

69,800.00

15,000.00
10,000.00
1,050.00

87

110.00
26,160.00

91,380.00

91,300.00

15,000.00
10,000.00
1,050.00
110.00
26,160.00

64,080.00

64,000.00

5,250.00
3,750.00
420.00
440.00
9,860.00

67,260.00

67,200.00

5,250.00
3,750.00
420.00
440.00
9,860.00

71,060.00

71,000.00

88

5,250.00
3,500.00
367.50
385.00
9,502.50

79,777.50

79,700.00

5,250.00
3,350.00
367.50
385.00
9,352.50

61,987.50

61,900.00

3,150.00
6,250.00
682.50
220.00
10,302.50

124,902.50

124,900.00

3,150.00
6,250.00
682.50
220.00
10,302.50

124,902.50

124,900.00

89

3,150.00
6,250.00
682.50
220.00
10,302.50

122,302.50

122,300.00

7,500.00
5,000.00
525.00
550.00
13,575.00

48,855.00

48,800.00

7,500.00
5,000.00
525.00
55.00
13,080.00

242,480.00

242,400.00

90

15,000.00
10,000.00
1,050.00
1,100.00
27,150.00

61,470.00

61,400.00

9,375.00
9,375.00
9,375.00

17,170.83
20,977.17

17,100.00
20,900.00

3,750.00
10,000.00
1,050.00
275.00
15,075.00

283,716.67

283,700.00
28,370.00

91

Pekerjaan Plafon + Partisi


NO.

JENIS PEKERJAAN

BAHAN

Analisa Harga Satuan PLAFON


1 M2 pasang plafond (Gypsum tebal 12 mm) rangka METAL FURING
Bahan
0.375 Lmb Gypsum Tebal 12 mm
95,000.00
1.000 M2 Rangka Metal Furring
94,800.00
0.020 Kg Paku Gypsum
22,800.00
0.317 Kg Jointing
14,150.00
0.087 Roll Cotton Tape
20,750.00
Upah
0.310 Org Pekerja
37,500.00
0.800 Org Tukang Kayu
50,000.00
0.080 Org Kepala Tukang
52,500.00
0.021 Org Mandor
55,000.00
Jumlah
1 M2 pasang plafond (Gypsum tebal 9 mm) rangka METAL FURING
Bahan
0.375 Lmb Gypsum Tebal 9 mm
75,000.00
1.000 M2 Rangka Metal Furring
94,800.00
0.020 Kg Paku Gypsum
22,800.00
0.317 Kg Jointing
14,150.00
0.087 Roll Cotton Tape
20,750.00
Upah
0.310 Org Pekerja
37,500.00
0.800 Org Tukang Kayu
50,000.00
0.080 Org Kepala Tukang
52,500.00
0.021 Org Mandor
55,000.00
Jumlah
1 M2 pasang plafond (Gypsum tebal 12 mm) rangka HOLLOW 20/40
Bahan
95,000.00
0.336 Lbr Gypsum Tebal 12 mm
23,125.00
0.688 Lnjr Besi galvanis hollow 20/40 4m
30,000.00
0.388 Lnjr Besi galvanis hollow 40/40 4m
89,760.00
0.043 Kg Sekrup 1 "
76,000.00
0.029 Kg Paku Cor 2"
17,250.00
0.560 Kg Kawat Ikat Beton
Upah
37,500.00
0.178 Org Pekerja
50,000.00
0.200 Org Tukang Kayu
52,500.00
0.040 Org Kepala Tukang
55,000.00
0.014 Org Mandor

35,625.00
94,800.00
456.00
4,485.55
1,805.25

137,171.80

28,125.00
94,800.00
456.00
4,485.55
1,805.25

129,671.80

31,913.46
15,910.00
11,640.00
3,859.68
2,173.60
9,660.00

92

Jumlah
4

1 M2 pasang plafond (Gypsum tebal 9 mm) rangka HOLLOW 20/40


Bahan
75,000.00
0.336 Lbr Gypsum Tebal 9 mm
23,125.00
0.688 Lnjr Besi galvanis hollow 20/40 4m
Besi
galvanis
hollow
40/40
4m
30,000.00
0.388 Lnjr
89,760.00
0.043 Kg Sekrup 1 "
76,000.00
0.029 Kg Paku Cor 2"
17,250.00
0.560 Kg Kawat Ikat Beton
Upah
37,500.00
0.178 Org Pekerja
50,000.00
0.200 Org Tukang Kayu
52,500.00
0.040 Org Kepala Tukang
Org
Mandor
55,000.00
0.014
Jumlah

75,156.74

25,194.84
15,910.00
11,640.00
3,859.68
2,173.60
9,660.00

68,438.12

93

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 langit-langit Kalsiboard uk. (1200 x 2400 x 6)mm
Bahan
0.347 Lbr Kalsiboard
Rp
65,000.00
0.110 Kg Paku skrup
Rp
89,760.00
Upah
0.100 Oh Pekerja
Rp
37,500.00
0.050 Oh Tukang kayu
Rp
50,000.00
0.005 Oh Kepala Tukang
Rp
52,500.00
0.005 Oh Mandor
Rp
55,000.00

22,569.44
9,873.60

32,443.04
6

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m' list plafond gypsum profil
Bahan
1.050 m' List gypsum profil
Rp
0.150 Kg Tepung gypsum/semen putih Rp
Upah
0.060 Oh Pekerja
Rp
0.060 Oh Tukang kayu
Rp
0.006 Oh Kepala Tukang
Rp
0.003 Oh Mandor
Rp

21,500.00
3,200.00

22,575.00
480.00

37,500.00
50,000.00
52,500.00
55,000.00
23,055.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m' list langit-langit kayu profil
Bahan
1.050 m' List kayu profil
Rp
0.010 Kg Paku
Rp
Upah
0.050 Oh Pekerja
Rp
0.050 Oh Tukang kayu
Rp
0.005 Oh Kepala tukang
Rp
0.003 Oh Mandor
Rp

11,500.00
18,000.00

12,075.00
180.00

37,500.00
50,000.00
52,500.00
55,000.00
12,255.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 rangka langit-langit (50x100)cm, kayu kelas II
Bahan
0.0154 m3 Kaso-kaso (5x7) cm
Rp
5,200,000.00
0.200 Kg Paku 7 dan 10 cm
Rp
18,000.00
Upah
0.150 Oh Pekerja
Rp
37,500.00
0.300 Oh Tukang kayu
Rp
50,000.00
0.030 Oh Kepala Tukang
Rp
52,500.00
0.075 Oh Mandor
Rp
55,000.00

80,080.00
3,600.00

83,680.00

94

UPAH

JUMLAH

BULAT

11,625.00
40,000.00
4,200.00
1,127.50
56,952.50

194,124.30

194,100.00

11,625.00
40,000.00
4,200.00
1,127.50
56,952.50

186,624.30

186,600.00

6,675.00
10,000.00
2,100.00
742.50

95

19,517.50

94,674.24

94,600.00

6,675.00
10,000.00
2,100.00
742.50
19,517.50

87,955.62

87,900.00

96

3,750.00
2,500.00
262.50
275.00
6,787.50

39,230.54

39,200.00

2,250.00
3,000.00
315.00
165.00
5,730.00

28,785.00

28,700.00

1,875.00
2,500.00
262.50
165.00
4,802.50

17,057.50

17,000.00

5,625.00
15,000.00
1,575.00
4,125.00
26,325.00

110,005.00

110,000.00

97

Pekerjaaan Sanitasi
NO.

JENIS PEKERJAAN

BAHAN

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 buah KLOSET DUDUK / monoblok lengkap Setara KIA
Bahan
1.000 Bh Kloset duduk/monoblok
Rp
1,518,000.00 1,518,000.00
Upah
3.300 Oh
1.100 Oh
0.001 Oh
0.160 Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00
1,518,000.00

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 buah Kloset Jongkok porselen Setara KIA
Bahan
1.000 Bh Kloset jongkok porselen
Rp
187,000.00
6.000 Kg PC
Rp
1,500.00
3
0.010 m Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
1.000 Oh Pekerja
Rp
37,500.00
1.500 Oh Tukang batu
Rp
47,500.00
1.500 Oh Kepala Tukang
Rp
52,500.00
0.160 Oh Mandor
Rp
55,000.00

187,000.00
9,000.00
850.00

196,850.00
3

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 buah Urinoir
Bahan
1.000 Bh Urinoir setara ina
Rp
1,350,000.00
1.000 set Perlengkapan
Rp
300,000.00
6.000 Kg PC
Rp
1,500.00
3
0.010 m Pasir pasang (Pasir Kali)
Rp
85,000.00
Upah
1.000 Oh Pekerja
Rp
37,500.00
1.000 Oh Tukang batu
Rp
47,500.00
0.100 Oh Kepala Tukang
Rp
52,500.00
0.100 Oh Mandor
Rp
55,000.00

1,350,000.00
300,000.00
9,000.00
850.00

1,659,850.00
4

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 buah wastafel
Bahan
1.000 Bh Wastafel
Rp
6.000 Kg Semen abu-abu
Rp
3
0.010 m Pasir pasang (Pasir Kali)
Rp
Upah
1.200 Oh Pekerja
Rp
1.450 Oh Tukang batu
Rp
0.150 Oh Kepala Tukang
Rp

300,000.00
1,500.00
85,000.00

300,000.00
9,000.00
850.00

37,500.00
47,500.00
52,500.00

98

0.100 Oh Mandor

Rp

55,000.00
309,850.00

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 buah Bak Kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35cm
Bahan
84.000 bh Batu bata
Rp
500.00
42,000.00
44.000 Kg PC
Rp
1,500.00
66,000.00
3
0.070 m Pasir pasang (Pasir Kali)
Rp
85,000.00
5,950.00
3
0.070 m Batu kerikil
Rp
175,000.00
12,250.00
1.600 Kg Besi beton
Rp
14,000.00
22,400.00
3
0.060 m Pasir beton (Pasir Kali)
Rp
85,000.00
5,100.00
Upah
3.200 Oh Pekerja
Rp
37,500.00
1.015 Oh Tukang batu
Rp
47,500.00
0.0015 Oh Kepala Tukang
Rp
52,500.00
0.016 Oh Mandor
Rp
55,000.00
153,700.00

99

Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 buah Bak Kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50cm
Bahan
145.000 bh Batu bata
Rp
500.00
72,500.00
77.000 Kg PC
Rp
1,500.00
115,500.00
0.130 m3 Pasir pasang (Pasir Kali)
Rp
85,000.00
11,050.00
3
0.020 m Batu kerikil
Rp
175,000.00
3,500.00
2.600 Kg Besi beton
Rp
14,000.00
36,400.00
3
0.090 m Pasir beton (Pasir Kali)
Rp
85,000.00
7,650.00
Upah
1.420 Oh Pekerja
Rp
37,500.00
0.473 Oh Tukang batu
Rp
47,500.00
0.047 Oh Kepala Tukang
Rp
52,500.00
0.071 Oh Mandor
Rp
55,000.00
246,600.00
Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Memasang 1 buah bak kontrol pasangan batu bata ukuran (60 x 60) cm, tinggi 50cm
Bahan
215.000 bh Batu bata
Rp
500.00
107,500.00
114.000 Kg PC
Rp
1,500.00
171,000.00
3
0.184 m Pasir pasang (Pasir Kali)
Rp
85,000.00
15,640.00
0.033 m3 Batu koral
Rp
175,000.00
5,775.00
4.850 Kg Besi beton
Rp
14,000.00
67,900.00
3
0.120 m Pasir beton (Pasir Kali)
Rp
85,000.00
10,200.00
Upah
2.160 Oh Pekerja
Rp
37,500.00
0.720 Oh Tukang batu
Rp
47,500.00
0.072 Oh Kepala Tukang
Rp
52,500.00
0.108 Oh Mandor
Rp
55,000.00
0.100 Oh Tukang gali
Rp
37,500.00
378,015.00
Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Memasang 1 m' pipa PVC tipe AW diameter "
Bahan
1.000 m' Pipa PVC
Rp
4,375.00
4,375.00
1.000 set Perlengkapan
Rp
1,531.25
1,531.25
Upah
0.036 Oh Pekerja
Rp
37,500.00
0.060 Oh Tukang batu
Rp
47,500.00
0.006 Oh Kepala Tukang
Rp
52,500.00
0.0018 Oh Mandor
Rp
55,000.00
5,906.25
Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang
Memasang 1 m' pipa PVC tipe AW diameter "
Bahan
1.000 m' Pipa PVC
Rp
5,863.00
5,863.00
1.000 set Perlengkapan
Rp
2,052.05
2,052.05
Upah
0.036 Oh Pekerja
Rp
37,500.00
0.060 Oh Tukang batu
Rp
47,500.00
100

0.006 Oh Kepala Tukang


0.0018 Oh Mandor

Rp
Rp

52,500.00
55,000.00
7,915.05

10 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m' pipa PVC tipe AW diameter 1"
Bahan
1.200 m' Pipa PVC
Rp
1.000 set Perlengkapan
Rp
Upah
0.036 Oh Pekerja
Rp
0.060 Oh Tukang batu
Rp
0.006 Oh Kepala Tukang
Rp
0.0018 Oh Mandor
Rp

8,125.00
2,843.75

9,750.00
2,843.75

37,500.00
47,500.00
52,500.00
55,000.00
12,593.75

11 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m' pipa PVC tipe AW diameter 1"
Bahan
1.200 m' Pipa PVC
Rp
1.000 set Perlengkapan
Rp
Upah
0.036 Oh Pekerja
Rp
0.060 Oh Tukang batu
Rp
0.006 Oh Kepala Tukang
Rp
0.0018 Oh Mandor
Rp

13,825.00
4,838.75

16,590.00
4,838.75

37,500.00
47,500.00
52,500.00
55,000.00
21,428.75

101

12 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m' pipa PVC tipe AW diameter 2"
Bahan
1.200 m' Pipa PVC
Rp
1.000 set Perlengkapan
Rp
Upah
0.054 Oh Pekerja
Rp
0.090 Oh Tukang batu
Rp
0.009 Oh Kepala Tukang
Rp
0.0027 Oh Mandor
Rp

17,650.00
6,177.50

21,180.00
6,177.50

37,500.00
47,500.00
52,500.00
55,000.00
27,357.50

13 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m' pipa PVC tipe AW diameter 2"
Bahan
1.200 m' Pipa PVC
Rp
1.000 set Perlengkapan
Rp
Upah
0.036 Oh Pekerja
Rp
0.060 Oh Tukang batu
Rp
0.006 Oh Kepala Tukang
Rp
0.0018 Oh Mandor
Rp

25,775.00
9,021.25

30,930.00
9,021.25

37,500.00
47,500.00
52,500.00
55,000.00
39,951.25

14 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m' pipa PVC tipe AW diameter 3"
Bahan
1.200 m' Pipa PVC
Rp
1.000 set Perlengkapan
Rp
Upah
0.081 Oh Pekerja
Rp
0.135 Oh Tukang batu
Rp
0.0135 Oh Kepala Tukang
Rp
0.0041 Oh Mandor
Rp

34,775.00
12,171.25

41,730.00
12,171.25

37,500.00
47,500.00
52,500.00
55,000.00
53,901.25

15 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m' pipa PVC tipe AW diameter 4"
Bahan
1.200 m' Pipa PVC
Rp
1.000 set Perlengkapan
Rp
Upah
0.081 Oh Pekerja
Rp
0.135 Oh Tukang batu
Rp
0.0135 Oh Kepala Tukang
Rp
0.0041 Oh Mandor
Rp

57,613.00
20,164.55

69,135.60
20,164.55

37,500.00
47,500.00
52,500.00
55,000.00
89,300.15

16 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 buah kran diameter " atau "
Bahan
1.000 Bh Kran air
Rp
0.025 Bh Seal tape
Rp

20,500.00
3,400.00

20,500.00
85.00
102

Upah
0.010 Oh
0.100 Oh
0.010 Oh
0.005 Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00
20,585.00

17 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 buah floor drain
Bahan
1.000 Bh Floor drain
Rp
Upah
0.010 Oh Pekerja
Rp
0.100 Oh Tukang batu
Rp
0.010 Oh Kepala Tukang
Rp
0.005 Oh Mandor
Rp

35,400.00

35,400.00

37,500.00
47,500.00
52,500.00
55,000.00
35,400.00

18 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m' Pipa GI 4"
Bahan
1.200 m' Pipa GI 4"
Rp
1.000 set Perlengkapan
Rp
Upah
0.135 Oh Pekerja
Rp
0.2250 Oh Tukang batu
Rp
0.0225 Oh Kepala Tukang
Rp
0.0070 Oh Mandor
Rp

161,900.00
16,190.00

194,280.00
16,190.00

37,500.00
47,500.00
52,500.00
55,000.00
210,470.00

103

19 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m' Pipa GI 3"
Bahan
1.200 m' Pipa GI 3"
Rp
1.000 set Perlengkapan
Rp
Upah
0.108 Oh Pekerja
Rp
0.1800 Oh Tukang batu
Rp
0.0180 Oh Kepala Tukang
Rp
0.0050 Oh Mandor
Rp

110,800.00
11,080.00

132,960.00
11,080.00

37,500.00
47,500.00
52,500.00
55,000.00
144,040.00

20 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m' Pipa GI 1.5"
Bahan
1.200 m' Pipa GI 1.5"
Rp
1.000 set Perlengkapan
Rp
Upah
0.108 Oh Pekerja
Rp
0.1800 Oh Tukang batu
Rp
0.0180 Oh Kepala Tukang
Rp
0.0050 Oh Mandor
Rp

48,500.00
4,850.00

58,200.00
4,850.00

37,500.00
47,500.00
52,500.00
55,000.00
63,050.00

21 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Memasang 1 m' Pipa GI 1"
Bahan
1.200 m' Pipa GI 1"
Rp
1.000 set Perlengkapan
Rp
Upah
0.108 Oh Pekerja
Rp
0.1800 Oh Tukang batu
Rp
0.0180 Oh Kepala Tukang
Rp
0.0050 Oh Mandor
Rp

33,600.00
3,360.00

40,320.00
3,360.00

37,500.00
47,500.00
52,500.00
55,000.00
43,680.00

22 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Membuat 1 Unit Septictank Uk. 200 x 100 x 125 cm
Bahan dan Upah
4.000 m3 Galian tanah
Rp
2
16.833 m Pas. Bata merah 1:5
Rp
13.650 m2 Plesteran 1:3
Rp
3
0.210 m Plat beton bertulang
Rp
8.000 m' Pipa PVC AW 4 "
Rp
2.000 m' Pipa Hawa PVC AW 2 "
Rp

29,500.00
70,600.00
33,600.00
683,100.00
9,602.17
2,941.67

118,000.00
1,188,433.33
458,640.00
143,451.00
76,817.33
5,883.33
1,991,225.00

23 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


Membuat 1 bh Sumur Resapan diameter 80 cm (rong), tinggi 2,5 m
Bahan dan Upah
6.750 m3 Galian tanah
Rp
29,500.00
199,125.00
2
12.750 m Pas. Bata merah 1:5
Rp
70,600.00
900,150.00
3
1.300 m Urugan Pasir
Rp
9,800.00
12,740.00

104

1.300 m3
0.140 m3
4.000 m'
2.000 m'

Urugan Sirtu
Plat beton bertulang
Pipa PVC AW dia 3 "
Pipa Hawa PVC AW 2 "

Rp
Rp
Rp
Rp

24 Analisa SNI Dinas PU. Cipta Karya dan Tata Ruang


1 M' Pemasangan Saluran terbuka Buis Beton U 20 cm
Bahan dan Upah
0.420 m3 Galian tanah
Rp
0.060 m3 Urugan pasir
Rp
2
1.200 m Pas.Bt.merah 1:6
Rp
1.000 m' Buis beton U 20 cm
Rp
2
1.000 m Plesteran 1:3
Rp
4.000 m' Benangan 1:2
Rp

82,000.00
683,100.00
5,795.83
2,941.67

106,600.00
95,634.00
23,183.33
5,883.33
1,343,315.67

29,500.00
9,800.00
68,900.00
23,000.00
33,600.00
9,400.00

12,390.00
588.00
82,680.00
23,000.00
33,600.00
37,600.00
189,858.00

105

UPAH

JUMLAH

BULAT

123,750.00
52,250.00
52.50
8,800.00
184,852.50

1,702,852.50

1,702,800.00

37,500.00
71,250.00
78,750.00
8,800.00
196,300.00

393,150.00

393,100.00

37,500.00
47,500.00
5,250.00
5,500.00
95,750.00

1,755,600.00

1,755,600.00

45,000.00
68,875.00
7,875.00

106

5,500.00
127,250.00

437,100.00

437,100.00

120,000.00
48,212.50
78.75
880.00
169,171.25

322,871.25

322,800.00

bata ukuran (30 x 30) cm, tinggi 35cm

107

bata ukuran (45 x 45) cm, tinggi 50cm

53,250.00
22,467.50
2,467.50
3,905.00
82,090.00

328,690.00

328,600.00

81,000.00
34,200.00
3,780.00
5,940.00
3,750.00
128,670.00

506,685.00

506,600.00

1,350.00
2,850.00
315.00
99.00
4,614.00

10,520.25

10,500.00

bata ukuran (60 x 60) cm, tinggi 50cm

1,350.00
2,850.00
108

315.00
99.00
4,614.00

12,529.05

12,500.00

1,350.00
2,850.00
315.00
99.00
4,614.00

17,207.75

17,200.00

1,350.00
2,850.00
315.00
99.00
4,614.00

26,042.75

26,000.00

109

2,025.00
4,275.00
472.50
148.50
6,921.00

34,278.50

34,200.00

1,350.00
2,850.00
315.00
99.00
4,614.00

44,565.25

44,500.00

3,037.50
6,412.50
708.75
225.50
10,384.25

64,285.50

64,200.00

3,037.50
6,412.50
708.75
225.50
10,384.25

99,684.40

99,600.00

110

375.00
4,750.00
525.00
275.00
5,925.00

26,510.00

26,500.00

375.00
4,750.00
525.00
275.00
5,925.00

41,325.00

41,300.00

5,062.50
10,687.50
1,181.25
385.00
17,316.25

227,786.25

227,700.00

111

4,050.00
8,550.00
945.00
275.00
13,820.00

157,860.00

157,800.00

4,050.00
8,550.00
945.00
275.00
13,820.00

76,870.00

76,800.00

4,050.00
8,550.00
945.00
275.00
13,820.00

57,500.00

57,500.00

1,991,225.00

1,991,200.00

112

1,343,315.67

1,343,300.00

189,858.00

189,800.00

113

Pekerjaan Lantai
NO.
1
1

JENIS PEKERJAAN

BAHAN

LANTAI GRANIT
Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 Lantai Granit Uk. 60 x 60 cm
Bahan
2.778 Bh Granit uk. 60 x 60 cm
10.000 Kg PC
0.045 m3 Pasir pasang (Pasir Kali)
1.500 Kg Semen warna
Upah
0.900 Oh Pekerja
0.450 Oh Tukang
0.045 Oh Kepala Tukang
0.045 Oh Mandor

Rp
Rp
Rp
Rp

93,333.33
1,500.00
85,000.00
4,000.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

259,280.00
15,000.00
3,825.00
6,000.00

284,105.00
2

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 Lantai Granit Uk. 40 x 40 cm
Bahan
6.630 Bh Granit uk. 40 x 40 cm
9.800 Kg PC
0.045 m3 Pasir pasang (Pasir Kali)
1.300 Kg Semen warna
Upah
0.260 Oh Pekerja
0.130 Oh Tukang
0.013 Oh Kepala Tukang
0.013 Oh Mandor

Rp
Rp
Rp
Rp

33,333.33
1,500.00
85,000.00
4,000.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

221,000.00
14,700.00
3,825.00
5,200.00

244,725.00
3

LANTAI KERAMIK Setara ROMAN


Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 lantai keramik uk 60 x 60 cm
Bahan
2.778 Bh Keramik uk 60 x 60 cm
10.000 Kg PC
0.045 m3 Pasir pasang (Pasir Kali)
1.500 Kg Semen warna
Upah
0.900 Oh Pekerja
0.450 Oh Tukang
0.045 Oh Kepala Tukang
0.045 Oh Mandor

Rp
Rp
Rp
Rp

43,333.33
1,500.00
85,000.00
4,000.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

120,380.00
15,000.00
3,825.00
6,000.00

145,205.00
4

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 lantai keramik uk 40 x 40 cm
Bahan
6.630 Bh Keramik uk 40 x 40 cm

Rp

20,000.00

132,600.00

114

2
9.800 Kg
0.045 m3
1.300 Kg
Upah
0.260 Oh
0.130 Oh
0.013 Oh
0.013 Oh

PC
Pasir pasang (Pasir Kali)
Semen warna

Rp
Rp
Rp

1,500.00
85,000.00
4,000.00

Pekerja
Tukang
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

14,700.00
3,825.00
5,200.00

156,325.00
5

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 lantai keramik 30 x 30 cm
Bahan
11.870 Bh Ubin keramik
10.000 Kg PC
0.045 m3 Pasir pasang (Pasir Kali)
1.500 Kg Semen warna
Upah
0.700 Oh Pekerja
0.350 Oh Tukang
0.035 Oh Kepala Tukang
0.035 Oh Mandor

Rp
Rp
Rp
Rp

8,272.73
1,500.00
85,000.00
4,000.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

98,197.27
15,000.00
3,825.00
6,000.00

123,022.27

115

1
6

DINDING KERAMIK Setara ROMAN


Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 Dinding Keramik uk 25 x 40 cm
Bahan
10.000 Bh Keramik
Rp
9.300 Kg PC
Rp
3
0.018 m Pasir pasang (Pasir Kali)
Rp
1.940 Kg Semen warna
Rp
Upah
0.900 Oh Pekerja
Rp
0.450 Oh Tukang
Rp
0.045 Oh Kepala Tukang
Rp
0.045 Oh Mandor
Rp

9,000.00
1,500.00
85,000.00
4,000.00

90,000.00
13,950.00
1,530.00
7,760.00

37,500.00
47,500.00
52,500.00
55,000.00
113,240.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 lantai parquet kayu
Bahan
1.050 m2 Parquet
0.600 Kg Lem
Upah
0.700 Oh Pekerja
0.350 Oh Tukang
0.035 Oh Kepala Tukang
0.035 Oh Mandor

Rp
Rp

140,000.00
15,000.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

147,000.00
9,000.00

156,000.00
8

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 conblock paving abu-abu tebal 6cm
Bahan
1.000 m2 Paving stone abu-abu
Rp
3
0.050 m Galian tanah
Rp
3
0.050 m Pasir urug
Rp
Upah
0.360 Oh Pekerja
Rp
0.120 Oh Tukang
Rp
0.012 Oh Kepala Tukang
Rp
0.018 Oh Mandor
Rp

56,500.00
29,500.00
58,500.00

56,500.00
1,475.00
2,925.00

37,500.00
47,500.00
52,500.00
55,000.00
60,900.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 conblock paving abu-abu tebal 6cm
Bahan
1.000 m2 Paving stone abu-abu
Rp
3
0.050 m Galian tanah
Rp
3
0.050 m Pasir urug
Rp
Upah
0.360 Oh Pekerja
Rp
0.120 Oh Tukang
Rp
0.012 Oh Kepala Tukang
Rp

67,000.00
29,500.00
58,500.00

67,000.00
1,475.00
2,925.00

37,500.00
47,500.00
52,500.00

116

2
0.018 Oh Mandor

3
Rp

55,000.00
71,400.00

10 Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 Lantai batu alam Uk. 40 x 60 cm
Bahan
1.079 m2 Lantai batu alam
10.000 Kg PC
0.045 m3 Pasir pasang (Pasir Kali)
1.500 Kg Semen warna
Upah
0.620 Oh Pekerja
0.350 Oh Tukang
0.035 Oh Kepala Tukang
0.030 Oh Mandor

Rp
Rp
Rp
Rp

115,000.00
1,500.00
85,000.00
4,000.00

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00

124,085.00
15,000.00
3,825.00
6,000.00

148,910.00

117

UPAH

JUMLAH

BULAT

33,750.00
21,375.00
2,362.50
2,475.00
59,962.50

344,067.50

344,000.00

9,750.00
6,175.00
682.50
715.00
17,322.50

262,047.50

262,000.00

33,750.00
21,375.00
2,362.50
2,475.00
59,962.50

205,167.50

205,100.00

118

9,750.00
6,175.00
682.50
715.00
17,322.50

173,647.50

173,600.00

26,250.00
16,625.00
1,837.50
1,925.00
46,637.50

169,659.77

169,600.00

119

33,750.00
21,375.00
2,362.50
2,475.00
59,962.50

173,202.50

173,200.00

26,250.00
16,625.00
1,837.50
1,925.00
46,637.50

202,637.50

202,600.00

13,500.00
5,700.00
630.00
990.00
20,820.00

81,720.00

81,700.00

13,500.00
5,700.00
630.00

120

990.00
20,820.00

92,220.00

92,200.00

23,250.00
16,625.00
1,837.50
1,650.00
43,362.50

192,272.50

192,200.00

121

Pekerjaan Kunci dan Kaca


NO.

JENIS PEKERJAAN

BAHAN

UPAH

1 Analisa SNI DPU Cipta Karya dan Tata Ruang


1 buah Pasang kunci pintu 2x putar
Bahan
1.000 Bh Kunci pintu 2x putar
Rp

196,900.00

196,900.00

Upah
0.060
0.600
0.060
0.003

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00
196,900.00

2 Analisa SNI DPU Cipta Karya dan Tata Ruang


1 buah Pasang kunci pintu 1x putar
Bahan
1.000 Bh Kunci pintu 1x putar
Rp
Upah
0.010
0.500
0.010
0.005

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

80,400.00

80,400.00

37,500.00
50,000.00
52,500.00
55,000.00
80,400.00

3 Analisa SNI DPU Cipta Karya dan Tata Ruang


1 set Pasang engsel pintu
Bahan
1.000 set Engsel nylon pintu
Rp
Upah
0.015
Pekerja
Rp
0.150
Tukang Kayu
Rp
0.015
Kepala Tukang
Rp
0.00075
Mandor
Rp

40,000.00
37,500.00
50,000.00
52,500.00
55,000.00

35,000.00

375.00
25,000.00
525.00
275.00
26,175.00

40,000.00

40,000.00
4 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 set Pasang engsel jendela
Bahan
1.000 set Engsel nylon jendela
Rp
Upah
0.010
Pekerja
Rp
0.100
Tukang Kayu
Rp
0.010
Kepala Tukang
Rp
0.00050
Mandor
Rp

2250
30000
3150
165
35,565.00

562.50
7,500.00
787.50
41.25
8,891.25

35,000.00

37,500.00
50,000.00
52,500.00
55,000.00
35,000.00

375.00
5,000.00
525.00
27.50
5,927.50

5 Analisa SNI DPU Cipta Karya dan Tata Ruang


1 set Pasang Hak angin maju mundur

122

2
Bahan
1.000
Upah
0.015
0.150
0.015
0.00750

set Hak Angin lurus biasa


(setel maju mundur)
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

3
Rp

19,500.00

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00

19,500.00

19,500.00
6 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m2 Pasang kaca tebal 3mm bening
Bahan
1.100
m2 Kaca 3 mm bening poloRp
Upah
0.015
Pekerja
Rp
0.150
Tukang Kayu
Rp
0.015
Kepala Tukang
Rp
0.00075
Mandor
Rp

71,500.00
37,500.00
50,000.00
52,500.00
55,000.00

89,400.00
37,500.00
50,000.00
52,500.00
55,000.00

108,000.00
37,500.00
50,000.00
52,500.00
55,000.00

98,600.00

562.50
7,500.00
787.50
41.25
8,891.25

118,800.00

118,800.00
9 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m2 Pasang kaca eS tebal 5 mm
Bahan
m2 Kaca ES 5 mm
1.100
Rp
Upah

562.50
7,500.00
787.50
41.25
8,891.25

98,340.00

98,340.00
8 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m2 Pasang kaca Rayban tebal 5 mm
Bahan
m2 Kaca Rayban 5 mm
1.100
Rp
Upah
0.015
Pekerja
Rp
0.150
Tukang Kayu
Rp
0.015
Kepala Tukang
Rp
0.00075
Mandor
Rp

562.50
7,500.00
787.50
412.50
9,262.50

78,650.00

78,650.00

7 Analisa SNI DPU Cipta Karya dan Tata Ruang


1 m2 Pasang kaca tebal 5mm bening
Bahan
m2 Kaca 5 mm bening poloRp
1.100
Upah
0.015
Pekerja
Rp
0.150
Tukang Kayu
Rp
0.015
Kepala Tukang
Rp
0.00075
Mandor
Rp

562.50
7,500.00
787.50
41.25
8,891.25

108,460.00

123

2
0.015
0.150
0.015
0.00075

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

3
Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00
108,460.00

10 Analisa SNI DPU Cipta Karya dan Tata Ruang


1 buah Pasang grendel tanam jendela
Bahan
Bh Grendel pernekel biasa Rp
1.000
Upah
0.010
Pekerja
Rp
0.100
Tukang Kayu
Rp
0.010
Kepala Tukang
Rp
0.00050
Mandor
Rp

9,700.00
37,500.00
50,000.00
52,500.00
55,000.00

9,700.00
37,500.00
50,000.00
52,500.00
55,000.00

44,500.00
37,500.00
50,000.00
52,500.00
55,000.00

45,600.00
18,000.00

375.00
5,000.00
525.00
27.50
5,927.50

44,500.00

44,500.00
13 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 m2 Pasang Kawat Harmonika
Bahan
m2 Pas. Kawat Harmonika Rp
1.000
0.030
Kg Paku
Rp
Upah
0.487
Pekerja
Rp
0.075
Tukang Kayu
Rp
0.008
Kepala Tukang
Rp
0.02400
Mandor
Rp

375.00
5,000.00
525.00
27.50
5,927.50

9,700.00

9,700.00
12 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 buah Pasang grendel tanam pintu
Bahan
Bh Grendel tanam coklat Rp
1.000
Upah
0.010
Pekerja
Rp
0.100
Tukang Kayu
Rp
0.010
Kepala Tukang
Rp
0.00050
Mandor
Rp

562.50
7,500.00
787.50
41.25
8,891.25

9,700.00

9,700.00
11 Analisa SNI DPU Cipta Karya dan Tata Ruang
1 buah Pasang grendel tanam pintu
Bahan
Bh Grendel pernekel
1.000
Rp
Upah
0.010
Pekerja
Rp
0.100
Tukang Kayu
Rp
0.010
Kepala Tukang
Rp
0.00050
Mandor
Rp

375.00
5,000.00
525.00
27.50
5,927.50

45,600.00
540.00

37,500.00
50,000.00
52,500.00
55,000.00
46,140.00

18,262.50
3,750.00
420.00
1,320.00
23,752.50

124

JUMLAH

BULAT

232,465.00

232,400.00

106,575.00

106,500.00

48,891.25

48,800.00

40,927.50

40,900.00

125

28,762.50

28,700.00

87,541.25

87,500.00

107,231.25

107,200.00

127,691.25

127,600.00

126

117,351.25

117,300.00

15,627.50

15,600.00

15,627.50

15,600.00

50,427.50

50,400.00

69,892.50

69,800.00

127

Pekerjaan Listrik
NO.

JENIS PEKERJAAN

BAHAN

UPAH

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 bh Titik Lampu
Bahan
15.000 m' Kabel NYA 1x2,5 mm
Rp
1.000 ljr
Pipa paralon 5/8"
Rp
1.000 Bh Sakkelar
Rp
1.000 Bh Isolator
Rp
1.000 Bh Las Dop
Rp
1.000 Bh Fiting Plafond
Rp
1.000 Bh T.Dos PVC
Rp
Upah
1.000 Oh Pekerja
Rp
1.000 Oh Tukang listrik
Rp
0.050 Oh Kepala Tukang
Rp

2,500.00
6,500.00
19,000.00
4,000.00
240.00
21,700.00
1,200.00

37,500.00
6,500.00
19,000.00
4,000.00
240.00
21,700.00
1,200.00

37,500.00
47,500.00
52,500.00
90,140.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 Titik Stop Kontak
Bahan
10.000 m' Kabel NYA 1x2,5 mm
Rp
0.200 ljr
Pipa paralon 5/8"
Rp
1.000 Bh Stop kontak
Rp
1.000 Bh T.Dos PVC
Rp
Upah
0.05 Oh Pekerja
Rp
0.5 Oh Tukang listrik
Rp
0.005 Oh Kepala Tukang
Rp

2,500.00
6,500.00
20,000.00
1,200.00

25,000.00
1,300.00
20,000.00
1,200.00

37,500.00
47,500.00
52,500.00
47,500.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 Set Panel Box
Bahan
1 Set set Panel Box
Rp
150,000.00
1 Bh bh MCB 10 Amp
Rp
53,500.00
1 set Set Miniswitch 32 Amp Rp
250,600.00
1 Ls Ls. Alat bantu/cleaner
Rp
66,300.00
Upah
1.000 Oh Pekerja
Rp
37,500.00
1.000 Oh Tukang listrik
Rp
47,500.00
0.050 Oh Kepala Tukang
Rp
52,500.00
Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 Set lampu TL 1 x 20 Watt
Bahan + upah
1 Bh Lampu TL 20 Watt
Rp

89,400.00

1,875.00
23,750.00
262.50
25,887.50

150,000.00
53,500.00
250,600.00
66,300.00

520,400.00
4

37,500.00
47,500.00
2,625.00
87,625.00

37,500.00
47,500.00
2,625.00
87,625.00

89,400.00

128

2
1 Ls

Upah kerja

3
Rp

8,940.00
89,400.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 Set lampu TL 1 x 40 Watt
Bahan + upah
1 Bh Lampu TL 40 Watt
Rp
1 Ls Upah kerja
Rp

95,400.00
9,540.00

8,940.00
8,940.00

95,400.00
95,400.00

9,540.00
9,540.00

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 Set armatur lampu pijar 25 Watt

Bahan + upah
1 Bh Armatur lampu pijar 25 W Rp
Rp
1 Ls Upah kerja

13,200.00
1,320.00

13,200.00
13,200.00

1,320.00
1,320.00

Analisa sendiri
Memasang AC. Window 2 PK Ex Jepang

Bahan
1 Unit AC. Window 2 PK
1 Unit Assesories

Upah
1.000 Ls

Upah pasang

Rp
Rp

### 13,435,500.00
671,775.00
671,775.00

Rp 1,343,550.00
14,107,275.00

1,343,550.00
1,343,550.00

Analisa sendiri
Memasang AC. Window 1,5 PK Ex Jepang

Bahan
1 Unit AC. Window 1,5 PK
1 Unit Assesories

Upah
1.000 Ls

Upah pasang

Rp 7,166,100.00
Rp
358,305.00
Rp

7,166,100.00
358,305.00

716,610.00
7,524,405.00

716,610.00
716,610.00

Analisa sendiri
Memasang AC. Window 1 PK Ex Jepang

Bahan
1 Unit AC. Window 1 PK
1 Unit Assesories

Upah
1.000 Ls

Upah pasang

Rp 6,269,000.00
Rp
313,450.00
Rp

6,269,000.00
313,450.00

626,900.00
6,582,450.00

626,900.00
626,900.00

10 Analisa sendiri
Memasang Exhaust Fan Ex Jepang

Bahan
1 Unit Exhaust fan
1 Unit Assesories

Rp
Rp

984,100.00
49,205.00

984,100.00
49,205.00

Upah

129

2
1.000 Ls

Upah pasang

3
Rp

98,410.00
1,033,305.00

4
98,410.00
98,410.00

11 Analisa sendiri
Memasang kipas angin gantung Ex Jepang

Bahan
1 Unit Kipas angin gantung
1 Unit Assesories

Upah
1.000 Ls

Upah pasang

Rp
Rp

805,700.00
40,285.00

Rp

80,570.00

805,700.00
40,285.00

845,985.00

80,570.00
80,570.00

130

JUMLAH

BULAT

177,765.00

177,700.00

73,387.50

73,300.00

608,025.00

608,000.00

131

98,340.00

98,300.00

104,940.00

104,900.00

14,520.00

14,500.00

15,450,825.00

###

8,241,015.00

###

7,209,350.00

###

132

5
1,131,715.00

6
###

926,555.00 926,500.00

133

No.
1
2
3
4
5
6
7
8
9
No.

Jenis Besi
Besi dia. 6 mm
Besi dia. 8 mm
Besi dia. 10 mm
Besi dia. 12 mm
Besi dia. 13 mm
Besi dia. 16 mm
Besi dia. 19 mm
Besi dia. 22 mm
Besi dia. 25 mm
Jenis Pekerjaan

Berat/meter
0.2220
0.3950
0.6170
0.8880
1.0420
1.5780
2.2260
2.9840
3.8530
Jrk begel

1.5
0.518
2.018
2.536
Uk. Kolom

1 Pasang foot plate K. 250

Pjg/m3

Tul. Utama

1.54

Besi D16
32.25

Brt Besi
1.578
Brt Besi
0.617

2 Pasang sloof 15/20 K. 175

0.2

0.15

0.2

33.33

Besi 10
4

3 Pasang sloof 20/30 K. 250

0.15

0.3

0.2

16.67

Besi D16
6

Brt Besi
1.578

44.44

Besi 10
4

Brt Besi
0.617
Brt Besi
2.226

3 Pasang kolom praktis 15/15 K. 175

0.2

0.15

0.15

4 Pasang kolom 35/35 K. 250

0.15

0.35

0.35

8.16

Besi 19
12

5 Pasang kolom 25/25 K. 250

0.15

0.25

0.25

16.00

Besi D16
8

Brt Besi
1.578

22.22

Besi 12
6

Brt Besi
0.888
Brt Besi
0.888

4 Pasang kolom 15/30 K. 175

0.15

0.15

0.3

5 Pasang kolom 12/25 K. 175

0.15

0.12

0.25

33.33

Besi 12
6

6 Pasang kolom 12/45 K. 175

0.15

0.12

0.45

18.52

Besi 12
6

Brt Besi
0.888

55.56

Besi 12
4

Brt Besi
0.888
Brt Besi
0.888
Brt Besi
1.042

7 Pasang balok latai 12/15 K. 175

0.15

0.12

0.15

8 Pasang balok luifel 12/20 K. 175

0.15

0.12

0.2

41.67

Besi 12
4

7 Pasang balok 12/25 K.225

0.15

0.12

0.25

33.33

Besi 13
5

4 Pasang balok 20/40 K. 250

4 Pasang balok 20/50 K. 250

0.1

0.1

0.2

0.2

0.4

0.5

12.50

Besi D16
9

Brt Besi
1.578

10.00

Besi D16
9

Brt Besi
3.853
Brt Besi
2.226

5 Pasang balok 30/80 K. 250

0.1

0.3

0.8

4.17

Besi D19
13

6 Pasang balok 35/60 K. 250

0.1

0.35

0.6

4.76

Besi D19
8

Brt Besi
2.226

7.14

Besi D16
7

Brt Besi
1.578
Brt Besi
2.226

5 Pasang balok 35/40 K. 250

0.1

0.35

0.4

5 Pasang balok 30/60 lantai 2 K. 250

0.15

0.3

0.6

5.56

Besi D19
10

8 Pasang balok 40/100 lantai 2 K. 250

0.1

0.4

2.50

Besi D25
15

Brt Besi
3.853

22.22

Besi D12
6

Brt Besi
0.888

9 Pasang balok 15/30 K. 250

10 Pasang plat lisplang tebal 10 cm

11 Pasang plat lantai tebal 12 cm

12 Pasang beton tangga tebal 15 cm

0.175

0.15

0.3

Besi 8
Brt Besi
10.00 6.6666666667 0.3950

0.1

Besi 10
10

Brt Besi
0.617

0.15

8.33

0.15

Besi 10
Brt Besi
6.67 13.333333333
0.617
Besi 22

Brt Besi

60

Besi 19
12

Brt Besi
2.226

Besi 16
8

Brt Besi
1.578

22

Besi 16
6

Brt Besi
1.578

Besi 12

Brt Besi

SETEKAN BESI
Pasang stekan besi kolom K1
1
Pasang stekan besi kolom K2
1
Pasang stekan besi kolom K3
1
Pasang stekan besi kolom K4

29

0.888

20

Besi 12
6

Brt Besi
0.888

10

Besi 12
6

Brt Besi
0.888

Pasang stekan besi kolom K5

Pasang stekan besi kolom K6

Pembesian plat lantai tebal 12 cm


Tumpuan
10 - 15 atas a
10 - 15 bawah a
10 - 15 atas b
10 - 15 bawah b
10 - 15 atas c
10 - 15 bawah c
10 - 15 atas d
10 - 15 bawah d
Lapangan
10 - 15
10 - 15
Bagi
8 - 20 atas a
8 - 20 bawah a
8 - 20 atas b
8 - 20 bawah b
8 - 20 atas c
8 - 20 bawah c
8 - 20 atas d
8 - 20 bawah d

12.27
6.13
11.33
5.67
12.27
6.13
11.33
5.67

x
x
x
x
x
x
x
x

1.07
1.07
0.97
0.97
0.68
0.68
0.83
0.83

x
x
x
x
x
x
x
x

0.617
0.617
0.617
0.617
0.617
0.617
0.617
0.617

=
=
=
=
=
=
=
=

0.617
0.617

=
=

0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395

=
=
=
=
=
=
=
=

0.100

Jumlah
12.27
11.33

x
x

1.7
1.84

x
x

4.60
0.00
4.00
0.00
2.65
0.00
3.25
0.00

x
x
x
x
x
x
x
x

3.3
3.3
3.15
3.15
3.3
3.3
3.15
3.15

x
x
x
x
x
x
x
x

Jumlah

Jumlah
Volume beton lantai
Jadi berat besi perM3

3.30

3.15

Jml tot
x

ul. Utama

Tul. Begel
Jumlah
78.535

Besi D12
24.6

Jumlah Total

DIBULATKAN Bekisting

Brt Besi Kliling Jumlah


0.8880
33.711

Brt Besi/m3
112.25

Brt Besi/m3
112.00

2.7778

Jumlah
Besi 6
Brt Besi Kliling Jumlah
82.267 166.66666667
0.222 0.63
23.310

Brt Besi/m3
105.58

Brt Besi/m3
105.00

13.3333

Jumlah
Besi 10
Brt Besi Kliling Jumlah
157.800 111.1111111111
0.617 0.93
63.757

Brt Besi/m3
221.56

Brt Besi/m3
221.00

6.6667

Jumlah
Besi 6
Brt Besi Kliling Jumlah
109.689 222.22222222
0.222 0.53
26.147

Brt Besi/m3
135.84

Brt Besi/m3
135.00

13.3333

Jumlah
Besi 10
Brt Besi Kliling Jumlah
218.057 54.421768707
0.617 1.33
44.659

Brt Besi/m3
262.72

Brt Besi/m3
262.00

11.4286

Jumlah
Besi 10
Brt Besi Kliling Jumlah
201.984 106.66666667
0.617 0.93
61.206

Brt Besi/m3
263.19

Brt Besi/m3
263.00

16.0000

Jumlah
Besi 6
Brt Besi Kliling Jumlah
118.400 148.14814815
0.395 0.83
48.570

Brt Besi/m3
166.97

Brt Besi/m3
166.00

13.3333

Jumlah
Besi 6
Brt Besi Kliling Jumlah
177.600 222.22222222
0.222 0.67
33.053

Brt Besi/m3
210.65

Brt Besi/m3
210.00

16.6667

Jumlah
Besi 6
Brt Besi Kliling Jumlah
98.667 123.45679012
0.222 1.07
29.326

Brt Besi/m3
127.99

Brt Besi/m3
127.00

16.6667

Jumlah
Besi 6
Brt Besi Kliling Jumlah
197.333 370.37037037
0.222 0.47
38.644

Brt Besi/m3
235.98

Brt Besi/m3
235.00

16.6667

Jumlah
Besi 6
Brt Besi Kliling Jumlah
148.000 277.77777778
0.222 0.57
35.150

Brt Besi/m3
183.15

Brt Besi/m3
183.00

16.6667

Jumlah
Besi 8
Brt Besi Kliling Jumlah
173.667 222.22222222
0.200 0.67
29.778

Brt Besi/m3
203.44

Brt Besi/m3
203.00

16.6667

Jumlah
177.525

Besi 10
125

Brt Besi Kliling Jumlah


0.6170 1.13
87.151

Brt Besi/m3
264.68

Brt Besi/m3
264.00

10.0000

Jumlah
346.770

Besi 10
100

Brt Besi Kliling Jumlah


0.6170 1.33
82.061

Brt Besi/m3
428.83

Brt Besi/m3
428.00

10.0000

Jumlah
Besi 10
Brt Besi Kliling Jumlah
120.575 41.666666667 0.6170 2.13
54.759

Brt Besi/m3
175.33

Brt Besi/m3
175.00

6.6667

Jumlah
Besi 10
Brt Besi Kliling Jumlah
84.800 47.619047619 0.6170 1.83
53.767

Brt Besi/m3
138.57

Brt Besi/m3
138.00

5.7143

Jumlah
Besi 10
Brt Besi Kliling Jumlah
78.900 71.428571429 0.6170 1.43
63.022

Brt Besi/m3
141.92

Brt Besi/m3
141.00

5.7143

Jumlah
Besi 10
Brt Besi Kliling Jumlah
123.667 37.037037037 0.6170 1.73
39.534

Brt Besi/m3
163.20

Brt Besi/m3
163.00

6.6667

Jumlah
144.488

Brt Besi Kliling Jumlah


0.6170 2.73
42.110

Brt Besi/m3
186.60

Brt Besi/m3
186.00

5.0000

Jumlah
Besi 6
Brt Besi Kliling Jumlah
118.400 126.98412698 0.2220 0.83
23.398

Brt Besi/m3
141.80

Brt Besi/m3
141.00

13.3333

Jumlah
Besi 8
Brt Besi Kliling Jumlah
26.333 6.6666666667 0.3950
26.333

Brt Besi/m3
52.67

Brt Besi/m3
52.00

10.0000

Jumlah
Besi 8
Brt Besi Kliling Jumlah
51.417 6.6666666667 0.3950
21.944

Brt Besi/m3
73.36

Brt Besi/m3
73.00

8.3333

Jumlah
Besi 8
Brt Besi Kliling Jumlah
54.844 13.333333333 0.3950
35.111

Brt Besi/m3
89.96

Brt Besi/m3
89.00

6.6667

Jumlah

Brt Besi/m3

Brt Besi/m3

Jumlah
1,602.72
Jumlah
75.74
Jumlah
208.30
Jumlah

Besi 10
25

Besi 10

Brt Besi Kliling Jumlah

103.01
Jumlah
106.56
Jumlah
53.28

8.098
4.049
6.783
3.391
5.147
2.573
5.804
2.902
38.748
12.867
12.867
25.733
5.996
4.977
3.454
4.044
18.471
82.952
1.040
79.800

Kg
M3
Kg

dibulatkan

2.50

13.00

6.50

13.00

11.00

16.00

13.00

16.50

16.50

16.50

16.50

16.50

10.00

10.00

6.50

5.50

5.50

6.50

5.00

13.00

10.00

8.00

6.50

DAFTAR ANALISA SNI DPU CIPTA KARYA DAN TA


KABUPATEN JEMBER TAHUN ANGGARAN 2
Analisa SNI DPU Cipta Karya dan Tata Ruang Wilayah Jember
NO.

JENIS PEKERJAAN

BAHAN

K. PEKERJAAN BESI DAN ALUMINIUM


1 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 Kg besi profil
Bahan
1.150 Kg Besi profil
Rp
Upah
0.060 Oh Pekerja
Rp
0.060 Oh Tukang las konstruksi
Rp
0.006 Oh Kepala Tukang
Rp
0.003 Oh Mandor
Rp

Err:509

Err:509

37,500.00
47,500.00
52,500.00
55,000.00
Err:509

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 Kg rangka kuda-kuda baja IWF
Bahan
1.150 Kg Besi baja IWF
Rp
Upah
0.060 Oh Pekerja
Rp
0.060 Oh Tukang las konstruksi
Rp
0.006 Oh Kepala Tukang
Rp
0.003 Oh Mandor
Rp

Err:509

Err:509

37,500.00
47,500.00
52,500.00
55,000.00
Err:509

Analisa SNI DPU Cipta Karya dan Tata Ruang


Mengerjakan 100 Kg pekerjaan perakitan
Bahan
1.000 Ltr Solar
Rp
0.100 Ltr Minyak pelumas
Rp
Upah
0.100 Oh Pekerja
Rp
0.100 Oh Tukang besi konstruksi
Rp
0.001 Oh Kepala Tukang
Rp
0.005 Oh Mandor
Rp
Alat
0.800 Jam Sewa alat
Rp

Err:509
Err:509

Err:509

37,500.00
47,500.00
52,500.00
55,000.00
Err:509

Analisa SNI DPU Cipta Karya dan Tata Ruang


Membuat 1 m2 pintu besi plat baja tebal 2mm rangkap, rangka baja siku
Bahan
### Kg Besi siku L 30.30.3
Rp
Err:509
Err:509
### Kg Besi plat baja
Rp
1,750.00
57,400.00
0.050 Kg Kawat las
Rp
Err:509
Upah

143

1.050 Oh
1.050 Oh
0.105 Oh
0.052 Oh

Pekerja
Tukang las biasa
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
47,500.00
52,500.00
55,000.00
Err:509

Analisa SNI DPU Cipta Karya dan Tata Ruang


Mengerjakan 10 cm pengelasan dengan las listrik
Bahan
0.400 Kg Kawat las listrik
Rp
0.300 ltr
Solar
Rp
0.040 ltr
Minyak pelumas
Rp
Upah
0.040 Oh Pekerja
Rp
0.020 Oh Tukang besi konstruksi
Rp
0.002 Oh Kepala Tukang
Rp
0.002 Oh Mandor
Rp
Alat
0.170 Jam Sewa alat
Rp

Err:509
Err:509

Err:509

37,500.00
47,500.00
52,500.00
55,000.00
Err:509

144

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 pintu rolling door besi
Bahan
1.000 m2 Pintu gulung besi
Rp
Upah
1.200 Oh Pekerja
Rp
1.200 Oh Tukang las biasa
Rp
0.120 Oh Kepala Tukang
Rp
0.006 Oh Mandor
Rp

Err:509

Err:509

37,500.00
47,500.00
52,500.00
55,000.00
Err:509

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 pintu lipat (Folding door) bahan plastik / PVC
Bahan
1.000 m2 Pintu lipat
Rp 879,400.00
Upah
0.440 Oh Pekerja
Rp
37,500.00
0.440 Oh Tukang
Rp
47,500.00
0.044 Oh Kepala Tukang
Rp
52,500.00
0.022 Oh Mandor
Rp
55,000.00

879,400.00

879,400.00
8

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 rolling door aluminium
Bahan
1.000 m2 Rolling door aluminium
Rp
Upah
1.000 Oh Pekerja
Rp
1.000 Oh Tukang khusus aluminium
Rp
0.100 Oh Kepala Tukang
Rp
0.050 Oh Mandor
Rp

Err:509

Err:509

37,500.00
47,500.00
52,500.00
55,000.00
Err:509

Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m kusen pintu aluminium
Bahan
1.100 m
Profil aluminium
Rp
2.000 Bh Skrup fixer
Rp
0.060 Tube Sealant
Rp
Upah
0.043 Oh Pekerja
Rp
0.043 Oh Tukang khusus aluminium
Rp
### Oh Kepala Tukang
Rp
### Oh Mandor
Rp

55,000.00
900.00
33,000.00

60,500.00
1,800.00
1,980.00

37,500.00
47,500.00
52,500.00
55,000.00
64,280.00

10 Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 pintu kaca rangka aluminium
Bahan
4.400 m' Pintu alluminium
Rp
4.500 m' Kaca Rayben 5mm lb. 1cm
Rp

Err:509
Err:509

Err:509

145

0.270 Tube
Upah
0.085 Oh
0.085 Oh
0.009 Oh
0.005 Oh

Sealant

Rp

33,000.00

Pekerja
Rp
Tukang khusus aluminium/kaca Rp
Kepala Tukang
Rp
Mandor
Rp

37,500.00
47,500.00
52,500.00
55,000.00

8,910.00

Err:509
11 Analisa Sendiri
Memasang 1 unit Kusen Pintu kaca Aluminium 3" Type P.2
Bahan
#REF! m' Kusen aluminium 3"
Rp
55,000.00
m2 Kaca polos tebal 8 mm
Rp 170,000.00
m1 Karet sponing
Rp
2,500.00
#REF! Tube Sealant
Rp
33,000.00
#REF! bh Engsel Pintu
Rp
40,000.00
bh Handle Pintu
Rp
60,000.00
bh Kunci pintu
Rp 150,000.00
0.100 Upah 10 % dari harga bahan
Rp
#REF!

#REF!
#VALUE!
#VALUE!
#REF!
#REF!
#VALUE!
#VALUE!
#REF!

12 Analisa Sendiri
Memasang 1 unit Kusen Pintu Aluminium 3" Type P.3
Bahan
#REF! m' Kusen aluminium 3"
Rp
55,000.00
m2 Daun pintu panil
Rp 473,500.00
#REF! Tube Sealant
Rp
33,000.00
#REF! bh Engsel Pintu
Rp
40,000.00
bh Kunci pintu
Rp 150,000.00
0.100 Upah 10 % dari harga bahan
Rp
#REF!

#REF!

#REF!

146

13 Analisa Sendiri
Memasang 1 unit Kusen Pintu kaca Aluminium 3" Type P.4
Bahan
#REF! m' Kusen aluminium 3"
Rp
55,000.00
m2 Daun pintu panil
Rp 473,500.00
m2 Kaca polos tebal 5 mm
Rp
89,400.00
#REF! Tube Sealant
Rp
33,000.00
#REF! bh Engsel Pintu
Rp
40,000.00
bh Kunci pintu
Rp 150,000.00
0.100 Upah 10 % dari harga bahan
Rp
#REF!

#REF!
#VALUE!
#VALUE!
#REF!
#REF!
#VALUE!
#REF!

14 Analisa Sendiri
Memasang 1 unit Kusen Jendela kaca Aluminium 3" Type J.1
Bahan
#REF! m' Kusen aluminium 3"
Rp
55,000.00
m2 Kaca polos tebal 5 mm
Rp
89,400.00
m1 Karet sponing
Rp
2,500.00
#REF! Tube Sealant
Rp
33,000.00
#REF! bh Engsel jendela
Rp
35,000.00
bh Grendel jendela
Rp
Err:509
bh Hak angin maju mundur
Rp
Err:509
bh Handle jendela
Rp
7,500.00
0.100 Upah 10 % dari harga bahan
Rp
#REF!

#REF!
#VALUE!
#VALUE!
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#REF!

15 Analisa Sendiri
Memasang 1 unit Kusen Jendela kaca Aluminium 3" Type J.2
Bahan
#REF! m' Kusen aluminium 3"
Rp
55,000.00
m2 Kaca polos tebal 5 mm
Rp
89,400.00
m1 Karet sponing
Rp
2,500.00
#REF! Tube Sealant
Rp
33,000.00
#REF! bh Engsel jendela
Rp
35,000.00
bh Grendel jendela
Rp
bh Hak angin maju mundur
Rp
bh Handle jendela
Rp
7,500.00
0.100 Upah 10 % dari harga bahan
Rp
#REF!

#REF!
#VALUE!
#VALUE!
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#REF!

16 Analisa Sendiri
Memasang 1 unit Kusen Jendela kaca Aluminium 3" Type BV
Bahan
#REF! m' Kusen aluminium 3"
Rp
55,000.00
m2 Kaca polos tebal 5 mm
Rp
89,400.00
m1 Karet sponing
Rp
2,500.00
#REF! Tube Sealant
Rp
33,000.00
0.100 Upah 10 % dari harga bahan
Rp
#REF!

#REF!

#REF!
17 Analisa Sendiri

147

Memasang 1 unit Pintu type P.1


Bahan
#REF! m' Bingkai pintu aluminium 3"
m2 Kaca polos tebal 8 mm
#REF! Tube Sealant
#REF! set #REF!
1.000 set Kunci
1.000 set Pasang handle
#REF! set Aksesories dan alat bantu
0.100 Upah 10 % dari harga bahan

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

55,000.00
#REF!
170,000.00
#VALUE!
33,000.00
#REF!
425,000.00
#REF!
150,000.00 150,000.00
60,000.00
60,000.00
55,000.00
#REF!
#REF!
#REF!

18 Analisa Sendiri
Memasang 1 m2 Rangka Plapon metal furing uk.20.40.1.4 mm
Bahan
3.400 m' metal furring
Rp
94,800.00
3.000 m' Kawat ramset
Rp
3,000.00
0.100 Upah dan alat bantu 10 % dari hargaRp 331,320.00

322,320.00
9,000.00
331,320.00

19 Analisa Sendiri
Memasang 1 unit Partisi type Pr.1
Bahan
#REF! m1 Runner U 3"
m1 Metal stud 3"
m2 kalsiboard tebal 6 mm
m1 kayu list uk.2 x 10 cm
m2 Cat Kalsiboard
m2 cat kayu list
#REF! Bh Skrup fixer
1.000 Ls
Aksesories dan alat bantu
0.100 Upah 10 % dari harga bahan

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

11,000.00
11,500.00
65,000.00
35,420.00
13,500.00
45,900.00
900.00
85,000.00
#REF!

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
85,000.00
#REF!

148

20 Analisa Sendiri
Memasang 1 unit Partisi type Pr.2
Bahan
#REF! m1 Runner U 3"
m1 Metal stud 3"
m2 kalsiboard tebal 6 mm
m1 kayu list uk.2 x 10 cm
m2 Cat Kalsiboard
m2 cat kayu list
#REF! Bh Skrup fixer
1.000 Ls
Aksesories dan alat bantu
0.100 Upah 10 % dari harga bahan

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

11,000.00
11,500.00
65,000.00
35,420.00
13,500.00
45,900.00
900.00
75,000.00
#REF!

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
75,000.00
#REF!

21 Analisa Sendiri
Memasang 1 unit Partisi type Pr.3
Bahan
#REF! m1 Runner U 3"
m1 Metal stud 3"
m2 kalsiboard tebal 6 mm
m1 kayu list uk.2 x 10 cm
m2 Cat Kalsiboard
m2 cat kayu list
#REF! Bh Skrup fixer
1.000 Ls
Aksesories dan alat bantu
0.100 Upah 10 % dari harga bahan

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

11,000.00
11,500.00
65,000.00
35,420.00
13,500.00
45,900.00
900.00
60,000.00
#REF!

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
60,000.00
#REF!

22 Analisa Sendiri
Memasang 1 unit Kusen type A 1
Bahan
#REF! m1 Kusen Aluminium 3"
m2 Kaca polos tebal 5 mm
m1 Karet sponeng
#REF! Tube Sealan
1.000 ls
Aksessoris dan alat bantu
0.100 Upah 10 % dari harga bahan

Rp
Rp
Rp
Rp
Rp
Rp

23 Analisa Sendiri
Memasang 1 unit Kusen type A 2
Bahan
#REF! m1 Kusen Aluminium 3"
m2 Kaca polos tebal 5 mm
m1 Karet sponeng
#REF! Tube Sealan
1.000 ls
Aksessoris dan alat bantu
0.100 Upah 10 % dari harga bahan

Rp
Rp
Rp
Rp
Rp
Rp

55,000.00
#REF!
89,400.00
2,500.00
33,000.00
175,000.00 175,000.00
#REF!
#REF!

55,000.00
89,400.00
2,500.00
33,000.00
75,000.00
#REF!

#REF!

75,000.00
#REF!

24 Analisa Sendiri

149

Memasang 1 unit Kusen type A 3


Bahan
#REF! m1 Kusen Aluminium 3"
m2 Kaca polos tebal 5 mm
m1 Karet sponeng
#REF! Tube Sealan
1.000 ls
Aksessoris dan alat bantu
0.100 Upah 10 % dari harga bahan

Rp
Rp
Rp
Rp
Rp
Rp

55,000.00
89,400.00
2,500.00
33,000.00
90,000.00
#REF!

#REF!

90,000.00
#REF!

25 Analisa Sendiri
Memasang 1 unit Kusen type A 4
Bahan
#REF! m1 Kusen Aluminium 3"
m2 Kaca polos tebal 5 mm
m1 Karet sponeng
#REF! Tube Sealan
1.000 ls
Aksessoris dan alat bantu
0.100 Upah 10 % dari harga bahan

Rp
Rp
Rp
Rp
Rp
Rp

55,000.00
#REF!
89,400.00
2,500.00
33,000.00
130,000.00 130,000.00
#REF!
#REF!

26 Analisa Sendiri
Memasang 1 unit Kusen type A 5
Bahan
#REF! m1 Kusen Aluminium 3"
m2 Kaca polos tebal 5 mm
m1 Karet sponeng
#REF! Tube Sealan
1.000 ls
Aksessoris dan alat bantu
0.100 Upah 10 % dari harga bahan

Rp
Rp
Rp
Rp
Rp
Rp

55,000.00
#REF!
89,400.00
2,500.00
33,000.00
130,000.00 130,000.00
#REF!
#REF!

150

27 Analisa Sendiri
Memasang 1 unit Kusen type A 6
Bahan
#REF! m1 Kusen Aluminium 3"
m2 Kaca polos tebal 5 mm
m1 Karet sponeng
#REF! Tube Sealan
1.000 ls
Aksessoris dan alat bantu
0.100 Upah 10 % dari harga bahan

Rp
Rp
Rp
Rp
Rp
Rp

55,000.00
#REF!
89,400.00
2,500.00
33,000.00
175,000.00 175,000.00
#REF!
#REF!

28 Analisa Sendiri
Memasang 1 unit Kusen type A 7
Bahan
#REF! m1 Kusen Aluminium 3"
m2 Kaca polos tebal 5 mm
m1 Karet sponeng
#REF! Tube Sealan
1.000 ls
Aksessoris dan alat bantu
0.100 Upah 10 % dari harga bahan

Rp
Rp
Rp
Rp
Rp
Rp

55,000.00
#REF!
89,400.00
2,500.00
33,000.00
130,000.00 130,000.00
#REF!
#REF!

29 Analisa Sendiri
Memasang 1 m2 Profil Pipa Hollow 20 x 40 x 1.4 mm
Bahan
1.100 m1 Pipa Hollow 20 x 40 x 1.4 mm Rp
23,125.00
2.400 cm Pengelasan Besi Hollow
Rp
Err:509
0.132 m2 Pengecatan Besi Hollow
Rp
Err:509
0.100 Upah Pasang 10 % dari harga bahan Rp
25,437.50

25,437.50

25,437.50
30 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m2 kawat nyamuk
Bahan
1.100 m2 Kawat nyamuk
Rp
### cm Pengelasan
Rp
1.716 Kg Baja strip (0.2 x 2) cm
Rp
Upah
0.100 Oh Pekerja
Rp
0.100 Oh Tukang
Rp
0.010 Oh Kepala Tukang
Rp
0.005 Oh Mandor
Rp

Err:509
3,000.00
12,400.00

Err:509
33,330.00
21,278.40

37,500.00
47,500.00
52,500.00
55,000.00
Err:509

31 Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m2 jendela nako dan tralis
Bahan
1.100 m2 Jendela nako (rangka+kaca 5m Rp
### Bh Paku skrup 1 - 2.5cm
Rp
7.000 m' Besi strip
Rp
Upah

102,240.00
1,520.00
12,400.00

112,464.00
15,200.00
86,800.00

151

0.200 Oh
0.200 Oh
0.020 Oh
0.001 Oh

Pekerja
Tukang
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

37,500.00
50,000.00
52,500.00
55,000.00
214,464.00

32 Analisa SNI DPU Cipta Karya dan Tata Ruang


Memasang 1 m' talang datar/jurai seng BJLS 28 lebar 90cm
Bahan
1.050 m' Seng plat
Rp
Err:509
Err:509
0.015 Kg Paku 1 - 2.5cm
Rp
18,000.00
270.00
0.019 m3 Papan kayu kelas II
Rp
### 123,500.00
Upah
0.200 Oh Pekerja
Rp
37,500.00
0.400 Oh Tukang
Rp
50,000.00
0.025 Oh Kepala Tukang
Rp
52,500.00
0.010 Oh Mandor
Rp
55,000.00
Err:509
33 Analisa SNI DPU Cipta Karya dan Tata Ruang
Memasang 1 m' talang lingkaran D-15cm, seng plat BJLS 30 lebar 45cm
Bahan
1.050 m' Seng plat
Rp
Err:509
Err:509
0.010 Kg Paku 1 - 2.5cm
Rp
18,000.00
180.00
0.500 Kg Besi strip
Rp
12,400.00
6,200.00
Upah
0.150 Oh Pekerja
Rp
37,500.00
0.300 Oh Tukang
Rp
50,000.00
0.030 Oh Kepala Tukang
Rp
52,500.00
0.008 Oh Mandor
Rp
55,000.00
Err:509

152

NI DPU CIPTA KARYA DAN TATA RUANG


EMBER TAHUN ANGGARAN 2012

UPAH

JUMLAH

BULAT

2,250.00
2,850.00
315.00
165.00
5,580.00

Err:509

Err:509

2,250.00
2,850.00
315.00
165.00
5,580.00

Err:509

Err:509

Err:509

Err:509

3,750.00
4,750.00
52.50
275.00
8,827.50

153

39,375.00
49,875.00
5,512.50
2,860.00
97,622.50

Err:509

Err:509

Err:509

Err:509

1,500.00
950.00
105.00
110.00
2,665.00

154

45,000.00
57,000.00
6,300.00
330.00
108,630.00

16,500.00
20,900.00
2,310.00
1,210.00
40,920.00

37,500.00
47,500.00
5,250.00
2,750.00
93,000.00

1,612.50
2,042.50
225.75
115.50
3,996.25

Err:509

Err:509

920,320.00

Err:509

68,276.25

920,300.00

Err:509

68,200.00

155

Err:509

Err:509

#REF!
#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

3,187.50
4,037.50
472.50
275.00
7,972.50

156

#REF!
#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

157

#REF!
#REF!

33,132.00
33,132.00

#REF!
#REF!

#REF!

364,452.00

#REF!

#REF!

364,400.00

#REF!

158

#REF!
#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

159

#REF!
#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

160

#REF!
#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

2,543.75
2,543.75

3,750.00
4,750.00
525.00
275.00
9,300.00

27,981.25

Err:509

27,900.00

Err:509

161

7,500.00
10,000.00
1,050.00
55.00
18,605.00

233,069.00

233,000.00

7,500.00
20,000.00
1,312.50
550.00
29,362.50

Err:509

Err:509

5,625.00
15,000.00
1,575.00
440.00
22,640.00

Err:509

Err:509

162

DAFTAR HARGA SATUAN SEWA ALAT


KABUPATEN JEMBER TAHUN 2012
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

JENIS ALAT

ASPHALT MIXING PLANT


ASPHALT FINISHER
ASPHALT SPRAYER
BATCHING PLANT
BULLDOZER D-65
COMPRESSOR 4000-6500 L\M
CONCRETE MIXER 0.3-0.6 m3
CRANE 10-15 TON
DUMP TRUCK 3 - 4 M3
DUMP TRUCK 8 - 10 M3
EXCAVATOR PC 125
FLAT BED TRUCK 3-4 M3
MOTOR GRADER GD-500R
TRACK LOADER 75-100 HP
WHEEL LOADER W-70
THREE WHEEL ROLLER 6-8 T
TANDEM ROLLER 6-8 T.
PNEUMATIC TIRE ROLLER 8-10 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
WATER PUMP 70-100 mm
WATER TANKER 3000-4500 L.
STAMPER
JACK HAMMER
GENSET ( Penerangan )
PICK UP TRUCK, 1 Ton.
PILE DRIVER
CRANE ON TRACK
MESIN LAS

KODE

E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E24
E25
E26
E27
E28
E29
E31

Jember,
2012
KEPALA DPU. CIPTA KARYA DAN TATA
KABUPATEN JEMBER

Ir.MERWIN LUSIANI,MM
Pembina Tk. I
NIP. 19650415 199003 2 008

AFTAR HARGA SATUAN SEWA ALAT


KABUPATEN JEMBER TAHUN 2012
BIAYA
ALAT / JAM (Rp.)
-

Jember,
2012
KEPALA DPU. CIPTA KARYA DAN TATA RUANG
KABUPATEN JEMBER

Ir.MERWIN LUSIANI,MM
Pembina Tk. I
NIP. 19650415 199003 2 008

Anda mungkin juga menyukai