MATERIAL
REQUEST CORE
BLOCK
NG
RETURN TO STORE
NCM
INSPECT
ADJUST PRESSURE
UNTIL IT MEET
REQUIREMENT
NG
analysis
GOOD
VISUAL
INSPECTION
CORE BLOCK
SAW
EQUEST CORE
BLOCK
NSPECT
START
AUTONOMOUS
MAINTAINENCE
block carry
with fork lift
INSPECTION
REFER TO PRWP
2400-21
NG
VENDOR
PRESSURE
IT MEET
REMENT
BLOCK VACUUMING
REFER TO PRWP C131
NG
GOOD
VERIFY
PRESSURE
SETTING
VENDOR
START EXECUTE
CUTTING PROGRAM
FAILUREPO
SSIBLY?
NOTIFY SU
ANALY
NG
END
CUTTING
PROGRAM
sheet being
pull out
endmachine
back to
origin
VISUAL
NSPECTION
BESAW
REFER
TO PRWP
C130
GOOD
OV
REFER TO PRWP C140
STORE
NG
STORE
PROGRAM
PPE
5S
NOTIFY SUPERIOR
ANALYSIS
NG
VENDOR
FM
FM
VENDOR
GOOD
PROGRAM SETTING
(INPUT DATA)
NOTIFY SUPERIOR
ANALYSIS
ANALYSIS
SCRAP
DESCRIPTION of TASK
Sun
Mon
Tue
Wed
Clean the dust on the floor at Block Saw machine area after
finished work shift.
range.
12 Make sure saw blade at the centre of the hanger and not
touch the bearing
Thu
Fri
Sat