Departamento de Ingeniera
07/30/2016
Hoja 1de 10
CLIENTE
: NEPTUNIA S.A.
UBICACIN :
CALLAO
OBRA
VIGENCIA
SET. 2002
MATERIAL
PRTICOS (10 unidades)
Columnas
PL-1/2"x250
PL-1/2"x250
PL-1/4"x275/875
PL-3/8"x 875/1475
PL-3/4"x300
PL-3/4"x250
PL-1/2"x250
PL-1/2"x120
PL-1/2"x120
PL-3/8"x250
Vigas
PL-1/2"x250
PL-3/8"x 1475/725
PL-3/8"x 1225/725
PL-1/4"x725
VS-319x150x9.5x6.4
PL-3/8"x120
PL-3/4"x250
PL-3/4"x250
L-4"x4"x1/4"
VIGAS MAESTRAS, POSTES Y DINTELES
Tubo-8"x6"x3.0
Tubo-6"x6"x3.0
PL-3/8"x250
PL-3/8"x250
PL-3/8"x350
PL-3/8"x450
VS-419x150x9.5x6.4
VS-419x150x9.5x6.4
VS-419x150x9.5x6.4
PL-3/8"x250
L-3"x3"x1/4"
Tubo-6"x4"x3.0
Tubo-6"x4"x3.0
U-6"x3"x3.0
CORREAS
De Techo
C-8"x3"x2.0
L-2"x2"x3/16"
De Paredes
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
L-2 1/2"x2 1/2"x3/16"
CANT
LONG
P.UNIT.
PESO
20
20
20
20
20
20
20
40
40
16
11,400
10,050
5,700
5,700
350
1,500
1,500
1,500
2,000
250
24.92
24.92
28.89
87.63
44.98
37.48
24.92
11.96
11.96
18.64
5,682
5,009
3,293
9,990
315
1,124
748
718
957
75
40
20
20
20
10
20
80
20
320
24,200
7,200
5,000
11,900
3,000
1,200
900
1,500
150
24.92
82.03
72.71
36.42
37.44
8.95
37.48
37.48
9.82
24,123
11,812
7,271
8,668
1,123
215
2,699
1,124
471
85,417
18
18
36
36
16
8
4
4
4
12
96
3
1
8
7,900
7,900
250
200
400
400
11,200
12,000
12,800
450
150
7,900
7,300
6,000
16.28
13.89
18.64
18.64
26.10
33.56
42.47
42.47
42.47
18.64
7.29
11.50
11.50
6.95
2,315
1,975
168
134
167
107
1,903
2,039
2,174
101
105
273
84
334
11,879
360
27
7,900
300
5.97
3.63
16,979
29
120
12
106
8
4
4
7,900
950
7,300
6,000
650
25,700
5.18
5.18
5.18
5.18
5.18
4.57
4,911
59
4,008
249
13
470
S I G R A L S. A.
Departamento de Ingeniera
07/30/2016
Hoja 2de 10
CLIENTE
: NEPTUNIA S.A.
UBICACIN :
CALLAO
OBRA
VIGENCIA
SET. 2002
MATERIAL
CANT
LONG
P.UNIT.
PESO
26,718
SISTEMA DE ARRIOSTRAMIENTO
De Paredes
WT-4x9
L-2"x2"x3/16"
L-2 1/2"x2 1/2"x3/16"
Barra 1/2"(Rosca+doble tuerca)
De Techo
L-2 1/2"x2 1/2"x3/16"
L-2 1/2"x2 1/2"x3/16"
L-2 1/2"x2 1/2"x3/16"
L-2"x2"x3/16"
Barra 1/2"
Barra 1/2"
32
36
36
660
6,600
1,350
2,150
1,750
13.39
3.63
4.57
1.00
2,828
176
354
1,155
86
36
72
72
756
54
10,700
2,150
1,750
1,250
1,950
1,650
4.57
4.57
4.57
3.63
1.00
1.00
4,205
354
576
327
1,474
89
11,538
135,552
=
=
=
=
=
135,552
4,202
139,754
3,694
37.83
TOTAL METRADO
PESO TOTAL
VARIACIN ESTIMADA (3%)
PESO PARA PRESUPUESTO
AREA TECHADA
DENSIDAD
kg
kg
kg
m2
kg/m2
NOTAS.1. Este metrado no incluye una provisin por desperdicios, los que debern ser considerados en el
precio unitario.
S I G R A L S. A.
Departamento de Ingeniera
07/30/2016
Hoja 3de 10
CLIENTE
: NEPTUNIA S.A.
UBICACIN :
CALLAO
OBRA
VIGENCIA
SET. 2002
MATERIAL
TIJERALES (10 unidades)
PL-1/2"x250
PL-1/4"x300/750
PL-3/8"x 750/1030
WTS-212.7x250x12.7x9.5
WTS-212.7x250x12.7x9.5
PL-1/2"x300
PL-3/8"x250
PL-3/8"x120
PL-1/2"x250
PL-3/8"x150
PL-1/4"x100
Tubo-75x75x3.0
Tubo-100x100x3.0
L-4"x4"x1/4"
VIGAS MAESTRAS, POSTES Y DINTELES
Tubo-8"x6"x3.0
Tubo-6"x6"x3.0
PL-3/8"x250
PL-3/8"x250
PL-3/8"x350
PL-3/8"x450
VS-419x150x9.5x6.4
PL-3/8"x250
L-3"x3"x1/4"
Tubo-6"x4"x3.0
Tubo-6"x4"x3.0
U-6"x3"x3.0
CORREAS
De Techo
C-8"x3"x2.0
L-2"x2"x3/16"
De Paredes
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
L-2 1/2"x2 1/2"x3/16"
SISTEMA DE ARRIOSTRAMIENTO
De Paredes
WT-4x9
Barra 1/2"(Rosca+doble tuerca)
De Tijerales
Tubo-6"x6"x3.0
L-2 1/2"x2 1/2"x3/16"
CANT
LONG
P.UNIT.
PESO
40
20
20
20
10
20
20
40
80
160
480
180
170
320
7,300
4,500
2,800
18,350
36,500
350
300
350
600
600
200
1,800
2,700
150
24.92
26.38
66.37
39.84
39.84
29.91
18.64
8.95
24.92
11.19
5.02
6.60
8.96
9.82
7,277
2,374
3,717
14,621
14,542
209
112
125
1,196
1,074
482
2,138
4,113
471
52,451
18
18
36
36
16
8
12
12
96
3
1
8
7,400
7,400
250
200
400
400
12,000
450
150
7,400
6,900
6,000
16.28
13.89
18.64
18.64
26.10
33.56
42.47
18.64
7.29
11.50
11.50
6.95
2,168
1,850
168
134
167
107
6,116
101
105
255
79
334
11,584
360
27
7,900
300
5.97
3.63
16,979
29
120
12
106
8
4
4
7,900
950
7,300
6,000
650
25,700
5.18
5.18
5.18
5.18
5.18
4.57
4,911
59
4,008
249
13
470
26,718
32
660
6,600
1,750
13.39
1.00
2,828
1,155
9
18
7,900
8,300
13.89
4.57
988
683
S I G R A L S. A.
Departamento de Ingeniera
07/30/2016
Hoja 4de 10
CLIENTE
: NEPTUNIA S.A.
UBICACIN :
CALLAO
OBRA
VIGENCIA
SET. 2002
MATERIAL
De Techo
L-2 1/2"x2 1/2"x3/16"
L-2 1/2"x2 1/2"x3/16"
L-2 1/2"x2 1/2"x3/16"
L-2"x2"x3/16"
Barra 1/2"
Barra 1/2"
CANT
LONG
86
36
72
72
756
54
10,700
2,150
1,750
1,250
1,950
1,650
=
=
=
=
=
103,432
3,206
106,638
3,694
28.87
P.UNIT.
PESO
4.57
4.57
4.57
3.63
1.00
1.00
TOTAL METRADO
PESO TOTAL
VARIACIN ESTIMADA (3%)
PESO PARA PRESUPUESTO
AREA TECHADA
DENSIDAD
kg
kg
kg
m2
kg/m2
NOTAS.1. Este metrado no incluye una provisin por desperdicios, los que debern ser considerados en el
precio unitario.
4,205
354
576
327
1,474
89
12,679
103,432
S I G R A L S. A.
Departamento de Ingeniera
07/30/2016
Hoja 5de 10
CLIENTE
: NEPTUNIA S.A.
UBICACIN :
CALLAO
OBRA
VIGENCIA
SET. 2002
MATERIAL
CANT
LONG
P.UNIT.
PESO
40
14,640
9.82
5,751
L-4"x4"x1/4"
40
10,980
14.58
6,404
L-4"x4"x1/4"
20
47,750
9.82
9,378
L-4"x4"x1/4"
40
1,830
9.82
719
160
4,900
4.56
3,575
L-2"x2"x3/16"
200
2,600
3.63
1,888
140
3,260
4.56
2,081
240
1,900
4.56
2,079
L-2"x2"x3/16"
160
1,500
3.63
871
L-2"x2"x3/16"
90
200
3.63
65
PL-1/2"x300
PL-3/8"x300
PL-1/4"x100
20
40
540
350
400
250
29.91
22.37
5.02
209
358
678
10
3,000
37.44
1,123
320
150
9.82
471
35,650
18
18
36
36
16
8
12
12
96
3
1
8
7,400
7,400
250
200
400
400
12,000
450
150
7,400
6,900
6,000
16.28
13.89
18.64
18.64
26.10
33.56
42.47
18.64
7.29
11.50
11.50
6.95
2,168
1,850
168
134
167
107
6,116
101
105
255
79
334
11,584
360
27
7,900
300
5.97
3.63
16,979
29
120
12
106
8
4
4
7,900
950
7,300
6,000
650
25,700
5.18
5.18
5.18
5.18
5.18
4.57
4,911
59
4,008
249
13
470
26,718
VS-319x150x9.5x6.4
L-4"x4"x1/4"
VIGAS MAESTRAS, POSTES Y DINTELES
Tubo-8"x6"x3.0
Tubo-6"x6"x3.0
PL-3/8"x250
PL-3/8"x250
PL-3/8"x350
PL-3/8"x450
VS-419x150x9.5x6.4
PL-3/8"x250
L-3"x3"x1/4"
Tubo-6"x4"x3.0
Tubo-6"x4"x3.0
U-6"x3"x3.0
CORREAS
De Techo
C-8"x3"x2.0
L-2"x2"x3/16"
De Paredes
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
L-2 1/2"x2 1/2"x3/16"
SISTEMA DE ARRIOSTRAMIENTO
S I G R A L S. A.
Departamento de Ingeniera
07/30/2016
Hoja 6de 10
CLIENTE
: NEPTUNIA S.A.
UBICACIN :
CALLAO
OBRA
VIGENCIA
SET. 2002
MATERIAL
De Paredes
WT-4x9
Barra 1/2"(Rosca+doble tuerca)
De Tijerales
Tubo-6"x6"x3.0
L-2 1/2"x2 1/2"x3/16"
De Techo
L-2 1/2"x2 1/2"x3/16"
L-2 1/2"x2 1/2"x3/16"
L-2 1/2"x2 1/2"x3/16"
L-2"x2"x3/16"
Barra 1/2"
Barra 1/2"
CANT
LONG
P.UNIT.
PESO
32
660
6,600
1,750
13.39
1.00
2,828
1,155
9
18
7,900
8,800
13.89
4.57
988
724
86
36
72
72
756
54
10,700
2,150
1,750
1,250
1,950
1,650
4.57
4.57
4.57
3.63
1.00
1.00
4,205
354
576
327
1,474
89
12,720
86,672
=
=
=
=
=
86,672
2,687
89,359
3,694
24.19
TOTAL METRADO
PESO TOTAL
VARIACIN ESTIMADA (3%)
PESO PARA PRESUPUESTO
AREA TECHADA
DENSIDAD
kg
kg
kg
m2
kg/m2
NOTAS.1. Este metrado no incluye una provisin por desperdicios, los que debern ser considerados en el
precio unitario.
S I G R A L S. A.
Departamento de Ingeniera
07/30/2016
Hoja 7de 10
CLIENTE
: NEPTUNIA S.A.
UBICACIN :
CALLAO
OBRA
VIGENCIA
SET. 2002
MATERIAL
CANT
LONG
P.UNIT.
PESO
40
25,880
7.29
7,547
L-3"x3"x1/4"
40
23,850
7.29
6,955
L-3"x3"x1/4"
40
1,840
7.29
537
L-3"x3"x1/4"
40
1,500
7.29
437
L-2"x2"x3/16"
520
2,400
3.63
4,530
L-2"x2"x3/16"
520
1,500
3.63
2,831
PL-1/2"x300
PL-3/8"x300
30
40
350
400
29.91
22.37
314
358
PL-1/4"x100
520
250
5.02
653
10
3,000
37.44
1,123
320
150
9.82
471
25,756
10
10
12,300
400
70.34
39.88
8,652
160
Tubo-8"x6"x3.0
Tubo-6"x6"x3.0
PL-3/8"x250
PL-3/8"x250
PL-3/8"x350
PL-3/8"x450
VS-419x150x9.5x6.4
PL-3/8"x250
L-3"x3"x1/4"
Tubo-6"x4"x3.0
Tubo-6"x4"x3.0
U-6"x3"x3.0
18
18
36
36
16
8
12
12
96
3
1
8
7,400
7,400
250
200
400
400
12,000
450
150
7,400
6,900
6,000
16.28
13.89
18.64
18.64
26.10
33.56
42.47
18.64
7.29
11.50
11.50
6.95
2,168
1,850
168
134
167
107
6,116
101
105
255
79
334
20,396
360
27
7,900
300
5.97
3.63
16,979
29
120
12
106
8
4
4
7,900
950
7,300
6,000
650
25,700
5.18
5.18
5.18
5.18
5.18
4.57
4,911
59
4,008
249
13
470
26,718
VS-319x150x9.5x6.4
L-4"x4"x1/4"
CORREAS
De Techo
C-8"x3"x2.0
L-2"x2"x3/16"
De Paredes
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
C-6"x3"x2.0
L-2 1/2"x2 1/2"x3/16"
SISTEMA DE ARRIOSTRAMIENTO
De Paredes
S I G R A L S. A.
Departamento de Ingeniera
07/30/2016
Hoja 8de 10
CLIENTE
: NEPTUNIA S.A.
UBICACIN :
CALLAO
OBRA
VIGENCIA
SET. 2002
LONG
MATERIAL
CANT
P.UNIT.
PESO
WT-4x9
Barra 1/2"(Rosca+doble tuerca)
De Techo
L-2 1/2"x2 1/2"x3/16"
L-2 1/2"x2 1/2"x3/16"
L-2 1/2"x2 1/2"x3/16"
L-2"x2"x3/16"
Barra 1/2"
Barra 1/2"
32
660
6,600
1,750
13.39
1.00
2,828
1,155
86
36
72
72
756
54
10,700
2,150
1,750
1,250
1,950
1,650
4.57
4.57
4.57
3.63
1.00
1.00
4,205
354
576
327
1,474
89
11,008
83,878
=
=
=
=
=
83,878
2,600
86,478
3,694
23.41
TOTAL METRADO
PESO TOTAL
VARIACIN ESTIMADA (3%)
PESO PARA PRESUPUESTO
AREA TECHADA
DENSIDAD
kg
kg
kg
m2
kg/m2
NOTAS.1. Este metrado no incluye una provisin por desperdicios, los que debern ser considerados en el
precio unitario.
S I G R A L S. A.
Departamento de Ingeniera
07/30/2016
Hoja 9de 10
CLIENTE
: NEPTUNIA S.A.
UBICACIN :
CALLAO
OBRA
VIGENCIA
SET. 2002
MATERIAL
CANT
LONG
P.UNIT.
PESO
20
11,300
74.80
16,905
PL-3/4"x300
20
600
44.75
537
PL-3/8"x250
20
800
18.64
298
PL-3/8"x250
20
300
18.64
112
L-3"x3"x1/4"
140
150
7.29
153
L-3"x3"x1/4"
28
280
7.29
57
L-4"x4"x1/4"
40
25,400
9.82
9,977
L-4"x4"x1/4"
20
50,600
9.82
9,938
L-4"x4"x1/4"
40
1,380
9.82
542
40
1,800
4.56
328
L-2"x2"x3/16"
200
2,600
3.63
1,888
L-2"x2"x3/16"
160
3,260
3.63
1,893
L-2"x2"x3/16"
160
2,300
3.63
1,336
240
1,900
4.56
2,079
140
3,300
4.56
2,107
L-2"x2"x3/16"
160
1,500
3.63
871
L-2"x2"x3/16"
550
200
3.63
399
VS-319x150x9.5x6.4
L-4"x4"x1/4"
10
320
3,000
150
37.44
9.82
1,123
471
51,014
18
18
36
36
16
8
12
12
96
3
1
8
7,400
7,400
250
200
400
400
12,000
450
150
7,400
6,900
6,000
16.28
13.89
18.64
18.64
26.10
33.56
42.47
18.64
7.29
11.50
11.50
6.95
2,168
1,850
168
134
167
107
6,116
101
105
255
79
334
11,584
360
27
7,900
300
5.97
3.63
16,979
29
120
12
106
7,900
950
7,300
5.18
5.18
5.18
4,911
59
4,008
Tijerales
S I G R A L S. A.
Departamento de Ingeniera
07/30/2016
Hoja 10de 10
CLIENTE
: NEPTUNIA S.A.
UBICACIN :
CALLAO
OBRA
VIGENCIA
SET. 2002
MATERIAL
C-6"x3"x2.0
C-6"x3"x2.0
L-2 1/2"x2 1/2"x3/16"
SISTEMA DE ARRIOSTRAMIENTO
De Paredes
WT-4x9
Barra 1/2"(Rosca+doble tuerca)
De Tijerales
Tubo-6"x6"x3.0
L-2 1/2"x2 1/2"x3/16"
De Techo
L-2 1/2"x2 1/2"x3/16"
L-2 1/2"x2 1/2"x3/16"
L-2 1/2"x2 1/2"x3/16"
L-2"x2"x3/16"
Barra 1/2"
Barra 1/2"
CANT
LONG
P.UNIT.
PESO
8
4
4
6,000
650
25,700
5.18
5.18
4.57
249
13
470
26,718
32
660
6,600
1,750
13.39
1.00
2,828
1,155
9
18
7,900
8,800
13.89
4.57
988
724
86
36
72
72
756
54
10,700
2,150
1,750
1,250
1,950
1,650
4.57
4.57
4.57
3.63
1.00
1.00
4,205
354
576
327
1,474
89
12,720
102,036
=
=
=
=
=
102,036
3,163
105,199
3,694
28.48
TOTAL METRADO
PESO TOTAL
VARIACIN ESTIMADA (3%)
PESO PARA PRESUPUESTO
AREA TECHADA
DENSIDAD
kg
kg
kg
m2
kg/m2
NOTAS.1. Este metrado no incluye una provisin por desperdicios, los que debern ser considerados en el
precio unitario.