Integrated Earned Value Method and Time Cost Trade Off Method for Optimum Project, Case study ( Tribune Works Stadion Kabupaten Bogor ) Post graduate Thesis of Civil Engineering 2014 Keywords : Earned Value, Time Cost Trade Off, Project Delays, Project Crashing Project management in every construction works have unique different characteristic. Any project constructions need analysis for project conditions and solutions for it. Earned value method give project conditions analysis and time cost trade off method give solution from project conditions. Tribune work Stadion Kabupaten Bogor have loss and delays from schedule, its identified by CPI and SPI average value below 1. Week 31 have worst performance by Schedule Variance value Rp. 85.703.421 and week 40 have biggest loss by Cost Variance value Rp. 165.938.499. Time cost trade off methods that use is addition work hours, extend work station and addition tools. There are 11 combinations from three options crash programs opportunities. Calculations crash programs results is 64.83 day or 23% faster than normal time and Rp. 3.345.315.750,00 or 18% less than normal costs.
iii
ABSTRAK
Muhammad Ganesha Adi Putra, 93213024
Integrasi Metode Earned Value dan Metode Time Cost Trade Off Untuk Optimasi Proyek, Studi Kasus ( Pekerjaan Tribun Proyek Stadion Kabupaten Bogor) Penulisan Tesis Magister Teknik Sipil 2014 Kata Kunci: Earned Value, Time Cost Trade Off, keterlambatan proyek, percepatan proyek Manajemen proyek pada setiap pekerjaan konstruksi memiliki karakteristik unik yang saling berbeda-beda. Pada setiap proyek diperlukan analisis yang dapat mengetahui keadaan proyek dan solusi terhadap keadaan proyek tersebut. Metode earned value menghasilkan analisis keadaan proyek dan metode time cost trade off menghasilkan solusi dari keadaan proyek tersebut. Pada pekerjaan tribun stadion Kabupaten Bogor mengalami kerugian dan keterlambatan dari perencanaan dengan identifikasi nilai CPI dan SPI rata-rata dibawah 1. Pada Minggu ke-31 mengalami kinerja terburuk dengan identifikasi nilai Schedule Variance sebesar Rp 85.703.421 dan minggu ke-40 mengalami kerugian terbesar dengan identifikasi nilai Cost Variance sebesar Rp 165.938.499. Metode time cost trade off yang dilakukan adalah penambahan jam kerja, penambahan luas tempat kerja dan penambahan alat bantu. Terdapat 11 opsi percepatan dari kombinasi tiga peluang. Dari hasil perhitungan diperoleh hasil percepatan selama 64.83 atau 23% lebih cepat dibandingkan dengan waktu normal dan biaya Rp 3.345.315.750,00 atau 18% lebih murah dibandingkan dengan biaya normal.