M4-8a
W20-1

R1-1

INSTALL 12" SW & "STOP"


PAVEMENT MARKING

100

ft

REMOVE (E) STRIPING

R11-2

W20-5

INSTALL 4" BW
100 ft

W20-1
100 ft

200 ft

14 ft
11 ft

100 ft

100 ft

13 ft

12 ft

12 ft

12 ft

12 ft

INSTALL 4" BW

REMOVE TRAFFIC SIGNAL


AND INSTALL "STOP"
PAVEMENT MARKING
& RIGHT TURN ARROW

R1-1

REMOVE CONCRETE ISLAND


AND EXISTING STRIPING

M4-10

100' NTS

W1-3R

R3-1L

R11-2

100' NTS

W20-1

125 ft

REMOVE (E) STRIPING


CMS #1: TELEGRAPH
CLOSED
AHEAD

M4-10

TA/NS

TA/NS

100 ft

CMS #2: TELEGRAPH


CLOSED
AHEAD

Date: 05/18/2015 Author: DD/PM Client: MCGUIRE & HESTER


Owner: CITY OF OAKLAND Location: OAKLAND TCP: 001
CMC Job #: 685 REV: 2

W20-5

Comments:
1) NO CONSTRUCTION TO BE PERFORMED ON HOLIDAYS UNLESS AUTHORIZED BY THE CITY.
2) TRAFFIC SIGNAL IN THE BROADWAY MEDIAN THAT CONTROL WB 15TH TRAFFIC TO BE REMOVED
AND REPLACED WITH "STOP" SIGN & "STOP" PAVEMENT MARKING.

W20-3

3) TRAFFIC SIGNAL FOR NB BROADWAY AT 15TH TO BE BAGGED AND MONITORED FOR TRAFFIC FLOW
4) TRAFFIC SIGNAL FOR SB BROADWAY AT 15TH TO BE BAGGED AND MONITORED FOR TRAFFIC FLOW
5) WORK HOURS WITHIN THE DESIGNATED WORK ZONE: 7 AM - 5 PM
WORK HOURS THAT INTERFERE WITH TRAFFIC OUTSIDE OF DESIGNATED WORK ZONE: 9 AM - 4 PM
TEMPORARY TRAFFIC CONTROL SHALL BE LEFT IN PLACE 24/7 DURING PHASE 1, 2 AND 3.
6) NO CONSTRUCTION TO BE PERFORMED ON HOLIDAYS UNLESS AUTHORIZED BY THE CITY.
Plan Scale
1 in = 50ft

www.invarion.com

M4-10
M4-10
CMS #4: TELEGRAPH
CLOSED
AHEAD

CMS #3: TELEGRAPH


CLOSED
AHEAD

W20-3
W20-2

R11-2

M4-10
100

ft

M4-8a

ft

CMS #2: TELEGRAPH


CLOSED
AHEAD

ft

100 ft

A/NS
75' T

W20-1

100

100

W20-1

R11-2
CMS #1: TELEGRAPH
CLOSED
AHEAD

M4-8a

S
TA/N

W1-3R

R9-11a(R)

TA/NS

R9-9

R9-11(L)

W20-5a

W1-3
125 ft

100' NTS

W20-1

100' NTS

125 ft

100 ft

11 ft

12 ft

12 ft

12 ft

12 ft

125 ft

W20-5

R11-2

R1-1

M4-10

100' NTS

REMOVE TRAFFIC SIGNAL


AND INSTALL "STOP"
PAVEMENT MARKING
& RIGHT TURN ARROW

W20-1

100' NTS

W20-1

R3-1L

M4-10

TA/NS

100' TA/NS

130 ft

100 ft

100 ft

11 ft

Date: 05/18/2015 Author: DD/PM Client: MCGUIRE & HESTER


Owner: CITY OF OAKLAND Location: OAKLAND TCP: 002
CMC Job #: 685 REV: 2

W20-5

Comments:
1) NO CONSTRUCTION TO BE PERFORMED ON HOLIDAYS UNLESS AUTHORIZED BY THE CITY.

CMS #2: TELEGRAPH


CLOSED
AHEAD

2) TRAFFIC SIGNAL IN THE BROADWAY MEDIAN THAT CONTROL WB 15TH TRAFFIC TO BE REMOVED
AND REPLACED WITH "STOP" SIGN & "STOP" PAVEMENT MARKING.

W20-3

3) TRAFFIC SIGNAL FOR NB BROADWAY AT 15TH TO BE BAGGED AND MONITORED FOR TRAFFIC FLOW
4) TRAFFIC SIGNAL FOR SB BROADWAY AT 15TH TO BE BAGGED AND MONITORED FOR TRAFFIC FLOW
5) SB BROADWAY TRAFFIC BETWEEN 15TH AND 17TH TO BE REDUCED TO ONE LANE DURING WATERLINE CONSTRUCTION.
6) WORK HOURS WITHIN THE DESIGNATED WORK ZONE: 7 AM - 5 PM
WORK HOURS THAT INTERFERE WITH TRAFFIC OUTSIDE OF DESIGNATED WORK ZONE: 9 AM - 4 PM
TEMPORARY TRAFFIC CONTROL SHALL BE LEFT IN PLACE 24/7 DURING PHASE 1, 2 AND 3.
Plan Scale
1 in = 50ft

7) NO CONSTRUCTION TO BE PERFORMED ON HOLIDAYS UNLESS AUTHORIZED BY THE CITY.

www.invarion.com

W20-1
ft
100

W20-1

W1-3

W1-3
100

A/NS
75' T

100

5 ft

12 ft

A/NS
75' T

A/NS
75' T

R1-1

INSTALL 12" SW & "STOP"


PAVEMENT MARKING

5 ft

14 ft
12 ft

5 ft

100 ft

W20-1

CONSTRUCT TEMPORARY
ADA PEDESTRIAN RAMPS
AND MAINTAIN 5' WALK-WAY

W1-3R
12 ft

CMS #1: TELEGRAPH


CLOSED
AHEAD

W20-5
75 ft

11 ft

11 ft

13 ft

13 ft

13 ft

13 ft

5 ft

100 ft

100 ft

TA/NS
50' TA/NS

100 ft

CONSTRUCT TEMPORARY
ADA PEDESTRIAN RAMPS
AND MAINTAIN 5' WALK-WAY

CONSTRUCT TEMPORARY
ADA PEDESTRIAN RAMPS
AND MAINTAIN 5' WALK-WAY

W20-5

REMOVE TRAFFIC SIGNAL


AND INSTALL "STOP"
PAVEMENT MARKING
& RIGHT TURN ARROW

100' NTS

W20-1

150 ft

R1-1

100' NTS

W20-1

125 ft

W20-1

5 ft

5 ft

100 ft

100 ft

ft

20 ft

CONSTRUCT TEMPORARY
ADA PEDESTRIAN RAMPS
AND MAINTAIN 5' WALK-WAY

ft

Date: 05/18/2015 Author: DD/PM Client: MCGUIRE & HESTER


Owner: CITY OF OAKLAND Location: OAKLAND TCP: 003
CMC Job #: 685 REV: 2

W20-5

Comments:
1) NO CROSSWALK SHALL BE ALLOWED TO BE CLOSED DURING CURB RAMP WORK EXCEPT DURING
DEMOLITION OF CURB RAMPS IN WHICH CONTRACTOR MAY CLOSE ONLY ONE CROSSWALK AT A
TIME AND PROVIDE TWO FLAGGERS TO GUIDE PEDESTRIANS TO THE OPEN CROSSWALK.

CMS #2: TELEGRAPH


CLOSED
AHEAD

2) TRAFFIC SIGNAL IN THE BROADWAY MEDIAN THAT CONTROL WB 15TH TRAFFIC TO BE REMOVED
AND REPLACED WITH "STOP" SIGN & "STOP" PAVEMENT MARKING.

W20-3

3) TRAFFIC SIGNAL FOR NB BROADWAY AT 15TH TO BE BAGGED AND MONITORED FOR TRAFFIC FLOW
4) TRAFFIC SIGNAL FOR SB BROADWAY AT 15TH TO BE BAGGED AND MONITORED FOR TRAFFIC FLOW
5) WORK HOURS WITHIN THE DESIGNATED WORK ZONE: 7 AM - 5 PM
WORK HOURS THAT INTERFERE WITH TRAFFIC OUTSIDE OF DESIGNATED WORK ZONE: 9 AM - 4 PM
TEMPORARY TRAFFIC CONTROL SHALL BE LEFT IN PLACE 24/7 DURING PHASE 1, 2 AND 3.
Plan Scale
1 in = 50ft

6) NO CONSTRUCTION TO BE PERFORMED ON HOLIDAYS UNLESS AUTHORIZED BY THE CITY.