RESERVOIRS AND PLANNING FOR DAM RESERVOIRS

(xi) Outflow ordinates are plotted so as to obtain the outflow hydrograph. The point
at which it crosses the inflow hydrograph gives the peak outflow rate. From this time,
the rate of outflow begins to fall due to decrease in the inflow rate.
(xii) The time lag between the two peaks is evaluated as to give the time lag.

An example has been solved to make the procedure very clear.


Example 18.13. The inflow flood discharges for a possible worst flood are tabulated in Table 18.22 at suitable intervals starting from 0.00 hours on august 20, 1975.
Table 18.22
T ~ m efrom
stari in hr

12

Dischargein
cumecs

50

280

102

114

610 1290 1900 2130 1900 1600 1440 1060 780 500 370 220

130

18

24

30

36

42

48

51

60

66

78

90

Thisflood approaches a reservoir with an uncontrolled spillway, the crest of which


is kept at RL 140.0 m. Determine the maximum reservoir level and the hydrograph of
the routed flood. Values of reservoir capacity'(above spillway crest) and outflow discharge at various elevations are tabulated in Tables 18.23 and 18.24 respectively.
Table 18.23

Elev~~tion
in metres

140.0

141.0

142.0

143.0

Reservoir storage with


spillway crest as datum inmillion crtblc metres (m.c.rn.)

0.0

15.0

35.0

-60.0-

145.0

146.0

95.0----140.0-

240.0

144.0

Table 18.24
Elevation

Outfow discharge in cumecs

140.0

Solution. The elevation storage curve and the elevation outflow curve are plotted
with the help of Tables 18.23 and 18.24, as shown in Fig. 18.20 and 18.21 respectively.
The hydrograph of the given flood is plotted in Fig. 18.22. Flood routing is carried out
by hit and trial method as shown in Table 18.25 and as explained earlier. This table is
otherwise self-explanatory.

Anda mungkin juga menyukai