Anda di halaman 1dari 61

Reduce my run-rate while improving my service levels

without risk to the business.

REPLATFORMING SAP
ONTO VBLOCKTM SYSTEMS
Michael La Fauci
Principal Product Manager | SAP
Specialized Business Systems Group

2012 VCE Company, LLC. All rights reserved.

TODAYS AGENDA.
ITS RARE I STAY ON THE SLIDES, BUT THERES ALWAYS A FIRST TIME

Introduction
The Why

The What

The components of the solution or Speeds & Feeds

The How

Most important part of the presentation because what you have


for SAP infrastructure works, more or less?

How we take the what to achieve the why

Overview of Vblock Specialized System for


SAP HANA Software

2012 VCE Company, LLC. All rights reserved.

THE WHY OF REPLATFORMING SAP ONTO


VBLOCKTM SYSTEMS
2012 VCE Company, LLC. All rights reserved.

TYPICAL LANDSCAPE REFRESH TRIGGERS

The business grows

This creates the need for more SAP instances, which creates need for more
network, servers and storage

New business, products, or services

Requires new SAP application modules which equals more infrastructure

Consolidation of business units, M&A

Involves re-architecting SAP applications and redesign of SAP infrastructure

SAP application upgrades

New functionality requires yet again more infrastructure or the impetus to redesign
the infrastructure

Adding new SAP application

If building new, might as well be all virtual

Hardware refresh cycle

Typically every 3-4 years

2012 VCE Company, LLC. All rights reserved.

STANDARDIZE FOR PROCESS WORKFLOW


AND DELIVERY AUTOMATION

Copyright 2011 VCE Company LLC, All rights reserved.

2012 VCE Company, LLC. All rights reserved.

COMMON SAP CUSTOMER PAIN POINTS


Pain Point

Impact

Peak operation times

Overspend/over-provision of HW

Continuous landscape changes

Increased maintenance

SAP sprawl (app growth)

Infrastructure sprawl

Company growth; M&A

Increased workload; changing priorities

Costly downtime

Missed deadlines; dissatisfied customers

IT costs

$$$

IT budget dilemma
73%
Maintain

IT sprawl

IT stress

27%
Invest

Source: Forrester Research


2012 VCE Company, LLC. All rights reserved.

STANDARDIZING SAP SERVICES DELIVERY


With Infrastructure Service Life Cycle Management
Define and create the infrastructure
service

Create

Configure Vblock platform components


and make available to be consumed
Decomission

Provision/Activate

Optimize Processes

Deactivate/Release

Copyright 2011 VCE Company LLC, All rights reserved.

Change

Add or remove infrastructure components


to dynamically respond to business needs
Deactivate a service or release all blade
resources from a service to reassign
elsewhere
De-provision Vblock platform components
and their dependencies, returning all
resources to available pools

2012 VCE Company, LLC. All rights reserved.

Yes, you can build this yourself if your management


thinks you should be your own SI for SAP?

THE WHAT OF REPLATFORMING ONTO


VBLOCKTM System
2012 VCE Company, LLC. All rights reserved.

VCE IS THE ONLY COMPANY TO PROVIDE

A fully integrated and


fully virtualized cloud
infrastructure system

2012 VCE Company, LLC. All rights reserved.

10

VCE PRODUCT STANDARDIZATION


System Mgmt

Converged
Infrastructure
and Cloud
Computing

Virtualization

Storage

Network

Virtualization, server, storage,


networking, and security
Pre-engineered, validated, and
physical and logical integration
Simplified management
Solutions validation

Roadmap planning, interoperability


testing, change management,
and upgrades
VCE Support

Compute

2012 VCE Company, LLC. All rights reserved.

11

VBLOCK SYSTEMS UNIQUELY


SOLVE KEY IT CHALLENGES
Business Challenges
Speed to deliver

SLAs and
high availability for
mission-critical apps

Operational Challenges
Management and
operational complexity

Vendor management

Financial Challenges
Environmental and
facilities costs

Running IT
Roadmap planning
New feature adoption
Upgrades
Interoperability
Patches
Change management
Performance envelopes
Compliance
Security
etc.

Investment Lifecycle
Protection (TCO)

2012 VCE Company, LLC. All rights reserved.

23%
Overworked
IT staff

Strategic

77%
Maintain

Source: IDC Converged


Infrastructure Survey, Dec. 2011

12

45 DAYS TO DELIVERY
Traditional Datacenter Experience
90-120 Days From Order to Production

VCE Datacenter Experience


~45 Days From Order to Production

Program & Provision


Receive Components

Staging

Rack & Cable

2012 VCE Company, LLC. All rights reserved.

13

VCETM SUPPORT
Single contract for support and warranty
Seamless support experience
Three tiers of support
24 x 7 follow-the-sun access
VCE Core Support
Integrated VCE support

VCE Premier Support


VCE Plus Support
Expanded support
providing proactive care
and software management

Comprehensive support with


complete platform and software
lifecycle management

VCE Integrated Systems (B2B & CRM), Web Portal, and Phone Support
VCE Technical Support (TSRs and vPSEs), Escalation Support
VCE Release Management (Code Currency), Tech Alerts, and Matrices
Consolidated Support Contracts (Parts, Logistics, and Field Service)

2012 VCE Company, LLC. All rights reserved.

14

THE INDUSTRYS BROADEST PORTFOLIO


DRIVING SIMPLICITY & IT RESULTS

SYSTEM
100

SYSTEM
200

SYSTEM
300

SYSTEM
700

SPECIALIZED
SYSTEMS

VCE VISION INTELLIGENT OPERATIONS


VCE CONFIDENTIAL. FOR INTERNAL USE ONLY.

2013
2012 VCE Company, LLC. All rights reserved.

15

VBLOCK SYSTEM 720

Fastest path to mission-critical cloud


Engineered to support mixed workloads and SLAs
Five 9s availability built-in
Integrated, best-of-breed products
Greater configuration choices supporting growth

2012 VCE Company, LLC. All rights reserved.

VBLOCK 720 ARCHITECTURE


Multi-controller, scale-out architecture,
designed for cloud infrastructures

Mission-critical workloads that require large-scale


consolidation and remote replication
2X performance and scale
Up to 2TB of Global Cache

Up to 384 compute half-width blades


or 194 full-width blades

48 chassis maximum
Maximum 5 domains (16 chassis per domain)

Flexible EMC Symmetrix VMAX Storage Configuration

VMAX 40K up to 3200 drives


VMAX 20K up to 2400 drives
VMAX 10K up to 1560 drives

2012 VCE Company, LLC. All rights reserved.

17

VBLOCK SYSTEM 720 COMPONENTS

COMPUTE

NETWORK

STORAGE

VIRTUALIZATION

Cisco UCS
6246/6296UP
Fabric Interconnects

MANAGEMENT
SOFTWARE

Cisco UCS
B-Series Blades

Cisco UCS
5108 Blade
Server Chassis

Cisco UCS
2204XP/2208XP
Fabric Extenders

2012 VCE Company, LLC. All rights reserved.

18

NOW SUPPORTS M3 BLADES

NEW
COMPUTE

Vblock System 700 already supports M2 Blades, and now


B200 M3 well suited for

Cisco UCS B200 M3

Intel

Xeon

Two processors from


E5-2600 product family
2, 4, or 8 cores
Up to 768 GB of RAM with 24 DIMM
VIC1240 mLOM (Dual 2x10GB adapter)

Cisco UCS B22 M3

Up to two processors from Intel Xeon


E5-2400 product family
Up to 192 GB of RAM with 12 DIMM slots
VIC 1240 mLOM

Virtualized workloads
IT and web infrastructure
Virtual desktops
Databases
Enterprise Resource Planning (ERP)
and Customer Relationship
Management (CRM) applications

B22 M3 well suited for

Web infrastructure
IT infrastructure
Distributed applications
Workloads that require balanced
price-to-performance metrics

2012 VCE Company, LLC. All rights reserved.

NEW

19

BARE-METAL SUPPORT 50% MAXIMUM

COMPUTE

Vblock System 720 blades can be deployed with


non-virtualized operating system and application
configurations
Bare-metal workloads require separate physical
spindles, disk groups, and pools
Bare-metal deployment must comply with the
following requirements
Adheres to VCE published, tested, and validated
hardware and software components
Application and operating system must be included
in the published support matrices for tested Vblock
System software
For both compute and storage components

2012 VCE Company, LLC. All rights reserved.

20

Cisco UCS Blade Options

VCE offers a range of Cisco UCS B-Series blade servers within each Vblock
The table below shows a list of the most commonly used blades for SAP solutions
SAPS shown are for both bare metal blade and showing reduction due to virtualisation overhead
vCPU are mapped to threads, so effective SAPS/thread also show
Blade options with large memory configuration generally chosen as SAP is increasingly memory intensive

Blade
Model

Processors

Total
Cores

Total
SAPS
bare
metal

Total
SAPS
with
VMware

B200 M2

2 x 3.46GHz/6c

12

25800

23220

968

192

B200 M3

2 x 3.30GHZ/4c

21400

19260

1204

384

B200 M3

2 x 2.70GHz/8c

16

40180

36162

1130

384

B230 M2

2 x 2.40GHz/10c

20

36720

33048

826

512

B440 M2

4 x 2.40GHz/10c

40

72250

65025

813

512

2012 VCE Company, LLC. All rights reserved.

SAPS /
Thread
with
VMware

Max Mem
(GB)

21

SERVICE PROFILE BENEFITS FOR SAP


Stateless Compute Resources
The SAP license is still valid after a Server
started on a different Blade. -> Same OS Image,
same MAC, ...

Automation
Based on server profile templates a new server
is deployed within minutes and ready to run SAP

Reduced complexity and increased Automation


equal less human errors

2012 VCE Company, LLC. All rights reserved.

VBLOCK SYSTEM 720 COMPONENTS

COMPUTE

NETWORK

STORAGE

VIRTUALIZATION

MANAGEMENT
SOFTWARE

VMAX

EMC VMAX
Storage
(10K, 20K, 40K)

(Optional)
EMC RecoverPoint

2012 VCE Company, LLC. All rights reserved.

23

VMAX 10K SUPPORT


Base configuration is 1 engine/maximum is 4 engines

NEW
STORAGE

VMAX 10K

Engines can be added one at a time

96 and 128GB Cache


16 8GB Multimode FC ports per engine
Minimum of 24 drives/maximum of 1560 Drives
Supports 2 drives, 3 drives and mixed drives
Minimum of 1 rack and a maximum of 6 racks
Engine Dispersion (only between engines 2 and 3)
D@RE is optional (must be configured at time of installation)
Integrated EMC RecoverPoint Splitter is optional

2012 VCE Company, LLC. All rights reserved.

NEW
24

VMAX 20K SUPPORT


Base configuration is 2 engine/maximum is 8 engines

STORAGE

VMAX 20K

Engines can be added one at a time

128 GB Cache
16 8GB Multimode FC ports per engine
Minimum of 88 drives/maximum of 2400 drives (3 only)
Minimum of 2 racks and a maximum of 11 racks
Storage Bay Dispersion
D@RE is optional (must be configured at time of installation)
Integrated EMC RecoverPoint Splitter is optional

2012 VCE Company, LLC. All rights reserved.

25

VMAX 40K SUPPORT


Base configuration is 2 engine/maximum is 8 engine
Engines can be added one at a time

NEW
STORAGE

VMAX 40K

96, 192 and 256GB Cache


16 8GB Multimode FC ports per engine
Minimum of 88 drives/maximum of 2400 3 drives, 3200 2
drives or 3040 mixed
Choice between 2 , 3 or both drive support Storage Bays,
mixing is allowed (but not in the same Storage Bay)
Minimum of 2 racks and a maximum of
12 racks with 3 drives
10 racks with 2 drives or mixed

System Bay Dispersion up to 25 Meters (between engines 3, 5 or 7)


D@RE is optional (must be configured at time of installation)
Integrated EMC RecoverPoint Splitter is optional
2012 VCE Company, LLC. All rights reserved.

NEW
26

VMAX 40K SUPPORT


Base configuration is 2 engine/maximum is 8 engine
Engines can be added one at a time

NEW
STORAGE

VMAX 40K

96, 192 and 256GB Cache


16 8GB Multimode FC ports per engine
Minimum of 88 drives/maximum of 2400 3 drives, 3200 2
drives or 3040 mixed
Choice between 2 , 3 or both drive support Storage Bays,
mixing is allowed (but not in the same Storage Bay)
Minimum of 2 racks and a maximum of
12 racks with 3 drives
10 racks with 2 drives or mixed

System Bay Dispersion up to 25 Meters (between engines 3, 5 or 7)


D@RE is optional (must be configured at time of installation)
Integrated EMC RecoverPoint Splitter is optional
2012 VCE Company, LLC. All rights reserved.

NEW
27

ELEMENT MANAGERS INCLUDED


Cisco UCS Manager
Cisco Data Center Network Manager

EMC Unisphere Manager


VMware vSphere Server Enterprise Plus
EMC PowerPath/VE

Cisco Secure Access Control Server (ACS)


EMC Secure Remote Support (ESRS) on Windows

2012 VCE Company, LLC. All rights reserved.

28

ADVANCED MANAGEMENT POD (AMP)


All Vblock System 700 models
require an AMP
Manages the Vblock System

HA-AMP

Mini-AMP
3 RU in size
One C200 Server
Two Catalyst 3560s
ESXi 5.0

Mini AMP default


HA AMP optional

AMP can be configured with Internal


or SAN storage

MiniAMP

By the customer
Remotely by VCE management

Two configurations

MANAGEMENT
SOFTWARE

Cisco UCS C220 servers


Cisco Catalyst 3560x Ethernet switch
EMC VNXe 3150
2012 VCE Company, LLC. All rights reserved.

HA-AMP
8 RU in size
Two C200 Servers
Two Catalyst 3560s
VNXe 3100 Series Storage
ESXi 5.0

29

VCE MANAGEMENT OVERVIEW


Abstract element managers into mediation layer and treat Vblock System as a single object
Management Framework Choice

Vblock System Visibility

Partner Portfolio

VCE Vision Intelligent


Operations Software
(API)

Integration

2012 VCE Company, LLC. All rights reserved.

30

THE TRANSFORMATIONAL SECRET SAUCE

2012 VCE Company, LLC. All rights reserved.

31

CREATE APP STORE FOR SAP

VAF
BO Data Services 3.10 SP1
CRM 7.0 SR1 ABAP
CRM 7.0 SR1 JAVA
IDES ECC 6.04 EHP4 Parent ID: XXX
NW Enterprise Portal 7.00+EHP01+BW
Live Cache 7.00
MDM 7.11
NW Business Warehouse 7.00 SP17 ABAP
NW Developer Studio 7.11
SCM 7.00 SR1 ABAP
SRM 7.00 JAVA
TREX 7.11

2012 VCE Company, LLC. All rights reserved.

32

INCREASE FLEXIBILITY
POLICY-DRIVEN SAP IT INFRASTRUCTURE WITH TEMPLATES
IT Requirements
# vCPU
Memory size

Define

Disk capacity (MB)


Operating system

Map

Storage Template
Compute Template
Fabric Template

Deploy

SAP Template

Backup policy
Security Policy
HA

Unified Infrastructure Manager

Templates ensure repeatable, compliant IT processes


IT defines storage, server, fabric and application and OS configuration
policies to meet the business SLAs
Resources rapidly assigned according to IT policies and SLA
reducing time to application availability
Reduces configuration error and non-compliance
2012 VCE Company, LLC. All rights reserved.

33

SINGLE-CLICK SIMPLE TO PROVISION


Vblock 4

Provision infrastructure
services (compute, network,
storage) in minutes not weeks
82% More Efficient
or months
Provisioning!

Vblock 3

CLARiiON CX4-480

Vblock 2
CLARiiON CX4-480

Vblock 1

CLARiiON CX4-480
CLARiiON CX4-480

UIM
Management
LAN

10/ 100/ 1000 Ether

Cisco MDS9606 SAN B

Cisco MDS9606 SAN A

Cisco MDS9606 SAN B

Cisco MDS9606 SAN A

Cisco MDS9606 SAN B

Cisco MDS
SAN A

Cisco MDS
SAN B

Nexus 6100 SeriesFabric


Interconnect
Nexus 6100 SeriesFabric
Interconnect
Nexus 6100 SeriesFabric
Interconnect
UCS Fabric
Interconnect

Inherently Efficient

Fibre
UCS Fabric

Cisco MDS9606 SAN A

UIM Server

DATA
LAN

5X Faster
Provisioning!

UCS Cluster Links


UCS Cluster Links

Fabric Links(10GE)

UCS Cluster Links

Fabric Links(10GE)

UCS Cluster Links

Fabric Links(10GE)
Fabric Links
(10GE)

Avoid slow, error-prone hand-offs

Nexus 6100 SeriesFabric


Interconnect
Nexus 6100 SeriesFabric
Interconnect
Nexus 6100 SeriesFabric
Interconnect
UCS Fabric
Interconnect

Always
Compliant!

UCS Blade Chassiswith Fabric Extender

UCS Blade Chassiswith Fabric Extender

Quick & Compliant Change

UCS Blade Chassiswith Fabric Extender


UCS Blade Chassis
with Fabric Extender

GEN-001313

Improved responsiveness to
the business, freed-up IT
resources, and meeting SLAs

ROI, assuming four provisioning events/quarter


Traditional

UIM

$ Savings

Yearly man
hours

2,877

530.1

82%

Yearly cost

$179,813

$33,131

$146,681

Traditional

UIM

Speed Increase

254

51

5x faster

Elapsed time
days
Copyright 2011 VCE Company LLC, All rights reserved.

2012 VCE Company, LLC. All rights reserved.

HOW BENEFITS ARE ACHIEVED?

2012 VCE Company, LLC. All rights reserved.

A GREAT PROOF-POINT STORY


Size
Migrate
Validate
Performance Test
Application Recovery

USE CASE
Migrate SAP from HP Itanium to Vblock 700 MX to

Improve performance of batch and dialog transactions


Improve operational agility

SAP ERP
APP
OS

RESULTS
50% greater performance (dialog response time)
using 50% less hardware on Vblock Systems
Demonstrated operational efficiency in provisioning,
recovery of failed server blades with UIM
Demonstrated elastic scaling of application
by dynamically adding resources
Demonstrate HA and live migration

59% BETTER
dialog response time

SAP ERP

SAP SCM

11 Physical
96 Cores
230GB RAM

2012 VCE Company, LLC. All rights reserved.

APP
OS

SAP SCM
APP
OS

APP
OS

VMWare ESX
and ESXi

6 Blades
28 Cores
196GB RAM
36

VBLOCK 720 CACHE DESIGN

1TB Maximum Useable Global Memory


Up to 75% of useable cache available for writes
VMAX cache is already mirrored
2012 VCE Company, LLC. All rights reserved.

37

VSTORAGE ARRAY API INTEGRATION (VAAI)


OFFLOAD SCSI TASKS FROM VMS TO STORAGE ARRAY

2012 VCE Company, LLC. All rights reserved.

38

VBLOCK 720 DYNAMIC CACHE PARTIONING

2012 VCE Company, LLC. All rights reserved.

39

VBLOCK 720 PRIORITY CONTROLS

2012 VCE Company, LLC. All rights reserved.

40

VIRTUAL PROVISIONING FOR SAP


SAP GROWTH WITHOUT DOWNTIME

2012 VCE Company, LLC. All rights reserved.

41

FAST VP FOR SAP ON VBLOCK

2012 VCE Company, LLC. All rights reserved.

42

FAST VP OVERVIEW:
PROMOTE
WHATS
HOT,
DEMOTE WHATS NOT
CLARiiON
CX4
Innovation
Block efficiency at the storage pool level

FAST
SubLUN
Tiering
automatically
moves active
data to Flash and
inactive data to
low-cost SATA

Copyright 2010 EMC Corporation. All rights reserved.

5% Active

Flash

95% Inactive

HDD

Storage pool

2012 VCE Company, LLC. All rights reserved.

14

43

EMC PowerPath Virtual Edition


Continuous operations

APP
OS

Path failover keeps your business in business


Continuous access to information
Online management and configuration

APP
OS
APP
OS

APP
OS

APP
OS

APP
OS
APP
OS

APP
OS

APP
OS

APP
OS

APP
OS
APP
OS

APP
OS
APP
OS

PowerPath

APP
OS

APP
OS

APP
OS
APP
OS

APP
OS

APP
OS

APP
OS

PowerPath

APP
OS
APP
OS

APP
OS
APP
OS

APP
OS

APP
OS

APP
OS
APP
OS

APP
OS
APP
OS

APP
OS

APP
OS

PowerPath

I/O path optimization

Advanced features
Prioritizes bandwidth utilization
Prioritizes devices & isolates application resources

2012 VCE Company, LLC. All rights reserved.

SAN

ESX Kernel
Integration
STORAGE

Optimizes server, storage, and data path utilization


Automated, dynamic, intelligent load management
Routing algorithm based on size of I/O, recent I/O, type of I/O,
and queuing delay on each path

VCE SAP SOLUTIONS

2012 VCE Company, LLC. All rights reserved.

POWERPATH/VE ON VBLOCK FOR SAP

2012 VCE Company, LLC. All rights reserved.

46

SYMANTEC APPLICATION HA FOR SAP


VMware HA protects
against most failure
scenarios
Symantec
ApplicationHA
extends that if
required
vCenter Plugin

2012 VCE Company, LLC. All rights reserved.

47

SYMANTEC APPLICATION HA FOR SAP

2012 VCE Company, LLC. All rights reserved.

VMWARE HA AND FAULT TOLERANCE FOR SAP

Protection with VMware HA and the ASCS virtual machine by


VMware FT, if possible
2012 VCE Company, LLC. All rights reserved.

SAP LANDSCAPE VIRTUALIZATION MANAGER


(LVM) OVERVIEW

2012 VCE Company, LLC. All rights reserved.

50

SAP NETWEAVER LANDSCAPE VIRTUALIZATION


MANAGEMENT (LVM)
Key features
SAP LVM is a Management Tool by SAP to centrally manage SAP landscape and basis technical tasks

1
1

2
3

2012 VCE Company LLC, All rights reserved.

2012 VCE Company, LLC. All rights reserved.

51

SAP LVM (LVM 1.0)


AVAILABLE TODAY ON VBLOCK
vSphere Integration
SAP NetWeaver Landscape Virtualization Management

Open API

vSphere SDK; compatible


with vSphere 4 & 5
Start/Stop of VMs
VM/OS Provisioning
VM based Cloning

Virtualization
Connect

vSphere API

OS
Connect

Storage
Connect

Custom
Exit

Storage Assisted (VAAI)

IT-Infrastructure

vCenter

ESXi

ESXi

Private
Cloud

ESXi

Hybrid

ESXi

Public
Cloud

2012 VCE Company, LLC. All rights reserved.

52

SAP LVM 1.0. (A WORK IN PROGRESS)


Computing Resources

Storage Integration

ERP CI

ERP CI

EMC SMI-S/SE
Bare Metal Servers
VM with RDM LUNS, VMDKs
not supported yet

ERP CI

ERP DB

SAN File System


Unprepare, Stop (Unmount)
Prepare, Start (Mount)

SAP SID

SAP LVM

SMI-S and Solutions Enabler


SAP LVM Library
Network

Physical
Resources

Storage Resources
VMAX
VNX

2012 VCE Company, LLC. All rights reserved.

Virtualization

SAP LVM 1.0


FEATURES TO ENHANCE LVM ON VBLOCK
End to End Visibility of Infrastructure
Layers via Vision Intelligent
Operations
LVM Monitoring Views

Discovery
Identification
Health Monitoring
Capacity
Performance

VCE Developed Plugins


and Adapters

Identification

Integratio
n
API

Validation
Health

RESTful Web Services API

Other Integration Points

Discovery

Poll & Alarm

Validation
Logging

2012 VCE Company, LLC. All rights reserved.

Logging

SAP LVM 1.0


FEATURES TO ENHANCE LVM ON VBLOCK
Landscape Operations

Automatic Capacity Management (ACM)


3rd party extensibility to elastically (manual/auto) provision
Vblock resources on demand
Vblock specific resource calculation mapped to SAPS

Relocation of SAP Systems


Support Relocation using vMotion triggered from LVM

2012 VCE Company, LLC. All rights reserved.

55

SAP SYBASE ASE


Sybase ASE is the next generation mission critical
database for high transaction applications
It has/will be highly optimized for SAP workloads
Improved overall SAP performance
Lower overall TCO over competitive databases for
SAP workloads

The objective of this project is to validate the


following areas on Vblock system:
Virtualized Sybase ASE for high performance
Take/plan to advantage of new features, capabilities,
and services as they relate to SAP workloads
Validate a new generation of database with lower
TCO on Vblock

2012 VCE Company, LLC. All rights reserved.

SAP LIFECYCLE MANAGEMENT


APPLICATION MOBILITY AND DISASTER RECOVERY
SOLUTION
SAP Application Mobility
and Disaster Avoidance

SAP VMs
ERP DB

ERP ENQ1

ERP DI1

ERP DI2

BENEFITS
Stretched clusters with zero RTO

Automated recovery with


near-zero RPO

AccessAnywhere

Hot/warm disaster recovery


and disaster avoidance across
long distances
Balance application workloads
between DC

2012 VCE Company, LLC. All rights reserved.

57

SAP ERP ON SYBASE ASE


REFERENCE ARCHITECTURE
SAP Environment in VMware CLUSTER with VMware HA On
SAP ECC DB
(Sybase ASE)

SAP ECC App


Server 1

SAP ECC App


Server 2

SAP ECC CI

SAP ECC App


Server 3

Performance Testing Platform


Load Runner
Client 1

SAP ECC App


Server 4

SUSE Linux 11 SP 2

SUSE Linux 11 SP 2

vSphere 5

vSphere 5

Load Runner
Client 2

Windows 2008 R2

vSphere 5

VBLOCK 700 LX

2012 VCE Company, LLC. All rights reserved.

vSphere 5

SAP ECC App


Server 4

SAP HANA SCALE-OUT OPTIONS


New

SAP HANA IS CERTIFIED ON VBLOCK SYSTEMS

New

New

Vblock Specialized System SAP


HANA

Vblock Specialized System SAP


HANA

3-Node Base (+1 Standby)

7-Node Base (+1 Standby)

FULLY FACTORY LOADED, TESTED, AND CONFIGURED


2012 VCE Company, LLC. All rights reserved.

VBLOCK SPECIALIZED SYSTEM SAP HANA


LOGICAL ELEVATIONS 4 NODE

42 RU CABINET

42 RU CABINET

DAE
HA-AMP

Compute
2 x 42RU Cabinets
2 x UCS-5108 Chassis
4 x B440-M2, 512GB
2 x UCS 6248UP
2 x Nexus 5548UP
HA-AMP
2 x C220-M3
1 x VNXe3150
2 x Cisco Catalyst 3560

Licenses
2 x UCS 5108 Chassis

Storage & SAN


2 x MDS 9148
1 x VNX 5300 DPE, DM, XS
2 x 2U 2.5 inch DAE

40x 600GB 2.5 10K SAS


Vault pack 300GB 2.5 10K SAS (8)
Boot drives 300GB 2.5 10KSAS (5)
Hot-spares: 2 x 600GB 2.5 10K

Software
SUSE Linux 11 SP2 (64-bit)
HANA v 1.0 SP5
HANA Studio
VMware ESX 5.1 on AMP
ESRS
EMC Unisphere

DAE
DM
XS
XS
VNX 5300
MDS 9148
MDS 9148
Nexus 5548UP
Nexus 5548UP
UCS 6248UP
UCS 6248UP
UCS 5108
2 blades

UCS 5108
2 blades

3 + 1 node
2012 VCE Company, LLC. All rights reserved.

60

VBLOCK SPECIALIZED SYSTEM SAP HANA


LOGICAL ELEVATIONS 8 NODES

42 RU CABINET

42 RU CABINET

DAE
HA-AMP
DAE

4 Nodes Hardware

+
Incremental Hardware
4 x B440-M2, 512GB
1 x VNX 5300 DPE, 2 x+ DAEs
Same Software as 4-Node

DM

DAE

XS
XS

DAE

VNX 5300

VNX 5300

MDS 9148
MDS 9148
Nexus 5548UP
Nexus 5548UP
UCS 6248UP
UCS 6248UP
UCS 5108
2 blades
2 blades
UCS 5108
2 blades
2 blades

7 + 1 node
2012 VCE Company, LLC. All rights reserved.

61

2012 VCE Company, LLC. All rights reserved.

Anda mungkin juga menyukai