Kerjasama2010
Kerjasama2010
Tahun
2008
Lokasi
PT TRISULA CBM
ENERGY
PT TRISULA CBM
ENERGY
Alamat/telepon
6
Kontrak *)
No./Tanggal
27 March 2008
$120,000.00
19-Mar-08
C 106-L-017-SSA-VI-08
$50,000.00
9-Jun-08
Yogyakarta dan Jakarta Pilona Petro Tanjung Lontar Britis Virgin Island at Portcullis
Ltd
TrustNet Cambers, PO BOX 3444,
Road Town, Tortola, British Virgin
Island
Sumatera Selatan
Kalimantan Tengah
003/KPC-P-PKS/VII/2008
8
1
001/MNI-FTUGM/PK/IX/08
4-Sep-08
10-Oct-08
200,000,000.00
17/BPS/VIII/08
Mulai
10
1-Feb-08
07/TRI/DIR/II/08
Februari 2008
Nilai (US$)
$75,000.00
Waktu Pelaksanaa
Nilai (Rp)
15-Jul-08
$45,650.00
160,000,000.00
2-Sep-08
JPY 9,985,230
(baru menerima
JPY 4,685,230)
763,650,000.00
29-Aug-08
4-Sep-08
10-Oct-08
No.
Tahun
Lokasi
Alamat/telepon
Kontrak *)
Waktu Pelaksanaa
No./Tanggal
Nilai (Rp)
Nilai (US$)
Mulai
$145,250.00
15-Dec-08
10
Premier Oil
10
$108,600.00
7-Nov-08
11
Pertamina - Petrocihina
East Java
$65,800.00
7-Nov-08
12
2009
01/05/II/LKFT-UGM/S/09
240,155,000.0
5-Feb-09
13
$70,500.00
Feb-09
14
$70,500.00
Feb-09
15
$20,000.00
3-Apr-09
16
17
18
19
2010
Oct-09
$89,347.50
28-Sep-09
$119,652.50
Dec-09
$87,033
10-May-10
No.
Tahun
20
Lokasi
3
Joint Study di Obi Area
4
Obi Area
Alamat/telepon
Kontrak *)
Waktu Pelaksanaa
No./Tanggal
Nilai (Rp)
Nilai (US$)
2010-07-06-01
$120,000
Mulai
10
Jul-10
aktu Pelaksanaan
Peneliti
Akhir
11
30-Apr-08
3 bulan
3 bulan
1,5 bulan
3 bulan
2 bulan
Valid pada 2
tahun pertama
Ket.
12
Hendra Amijaya
Agus Hendratno
Hendra Amijaya
Arifudin
Selesai. Dibayarkan
cash, tgl. 25-5-09,
Rp. 3.456.000
Hendra Amijaya
Lucas Donny S.
Belum selesai,
masih kurang
pelunasan.
Lucas Donny S.
Selesai. Via transfer
(Tidak melalui LKFT, Bank Mandiri, tgl.3langsung Fakultas) 3-09, Rp.
17.176.053
5 bulan
aktu Pelaksanaan
Peneliti
Akhir
11
Ket.
12
Belum selesai
Suryono
6 bulan
Budianta toha
Selesai.
6 bulan
Budianta toha
Selesai.
2 bulan
Lucas Donny S.
Selesai. Dibayarkan
cash, tgl. 25-5-09,
Rp. 7.702.426,00
4-10, Rp.
21.928.320,00
3 bulan
Sugeng Sapto
Suryono
Hendra Amijaya
Lucas Donny S.
Belum selesai
Sugeng Sapto
Belum selesai
Suryono, Donatus
Hendra Amijaya, Agus
Hendratno, Sugeng
Wiyono
Hendra Amijaya
6 minggu
Belum selesai
aktu Pelaksanaan
Peneliti
Akhir
11
12
Dr. Sugeng Sapto
Surjono
Ket.
DAFTAR KERJASAMA LEMBAGA KERJASAMA FAKULTAS TEKNIK (LKFT)- JURUSAN TEKNIK GEOLOGI UGM
SEBELUM TAHUN 2008
No.
Tahun
Sebelum
2008
Lokasi
Kontrak *)
Waktu Pelaksana
Nama
Alamat/telepon
No./Tanggal
Nilai (Rp)
Nilai
Mulai
10
aktu Pelaksanaan
Peneliti
Akhir
11
Ket.
12
Ir. Budianto Toha
Selesai. Rp.
35.400,00
Selesai. Rp.
10.000.000,00
Tahun
2008
Lokasi
Kontrak *)
Waktu Pelaksanaa
Nama
Alamat/telepon
No./Tanggal
Nilai (Rp)
Nilai
9
JPY 9,975,000
Mulai
10
4-Sep-08
aktu Pelaksanaan
Peneliti
Akhir
11
Ket.
12
Dr. Lucas Donny S.
Selesai. Rp.
17.161.000,00
DAFTAR KERJASAMA LEMBAGA KERJASAMA FAKULTAS TEKNIK (LKFT)- JURUSAN TEKNIK GEOLOGI UGM
TAHUN 2008
No.
Tahun
2008
Lokasi
Waktu Pelaksanaan
No./Tanggal
Nilai (Rp)
Nilai (US$)
Kontrak *)
Alamat/telepon
Mulai
10
Premier Oil
27 March 2008
$120,000.00
19-Mar-08
C 106-L-017-SSA-VI-08
$50,000.00
9-Jun-08
17/BPS/VIII/08
$45,650.00
29-Aug-08
001/MNI-FTUGM/PK/IX/08
160,000,000.00
2-Sep-08
10-Oct-08
763,650,000.00
10-Oct-08
$145,250.00
15-Dec-08
$108,600.00
7-Nov-08
Pertamina - Petrocihina
East Java
$65,800.00
7-Nov-08
aktu Pelaksanaan
Peneliti
Akhir
11
Arifudin
3 bulan
3 bulan
3 bulan
2 bulan
5 bulan
Ket.
12
Agus Hendratno
Hendra Amijaya
Hendra Amijaya
Lucas Donny S.
Selesai.
Rp.3.456.000,00
Selesai. Rp.
30.100.000,00
Selesai.
Rp.18.708.194,-
Selesai.
Rp.16.314.420,-
Operasional Selesai
Suryono
6 bulan
Budianta toha
Selesai. Rp.
34.693.399,00
6 bulan
Budianta toha
Selesai. Rp.
21.020.168,00
DAFTAR KERJASAMA LEMBAGA KERJASAMA FAKULTAS TEKNIK (LKFT)- JURUSAN TEKNIK GEOLOGI UGM
TAHUN 2009
No.
Tahun
12
2009
Lokasi
4
PT Kapuas Prima Coal
Alamat/telepon
Kontrak *)
No./Tanggal
01/05/II/LKFT-UGM/S/09
Waktu Pelaksanaa
Nilai (Rp)
Nilai (US$)
240,155,000.0
Mulai
10
5-Feb-09
$141,000.00
Feb-09
$20,000.00
3-Apr-09
$89,347.50
28-Sep-09
$119,652.50
Dec-09
aktu Pelaksanaan
Peneliti
Akhir
11
2 bulan
Ket.
12
Lucas Donny S.
Selesai. Rp.
7.702.426,00
43.856.640,00
3 bulan
Hendra Amijaya
Operasional Selesai
Sugeng Sapto
Operasional Selesai
Suryono, Donatus
Hendra Amijaya, Agus
Hendratno, Sugeng
Wiyono
Hendra Amijaya
Operasional Selesai
No.
NAMA INSTANSI
JANIS KEGIATAN
4-Sep-08
4-Sep-10
PT Pertamina PERSERO
1-Feb-09
31-Jan-11
2-Oct-09
2-Oct-14
2-Oct-09
2-Oct-14
Pusat Aplikasi Teknologi Isotop dan Radiasi Badan Penelitian Eksplorasi dan Eksploitasi Panasbumi
Tenaga Nuklir Nasional
22-Mar-10
22-Feb-15
26-Apr-06
26-Apr-11
22-Sep-10
22-Sep-11
7-Apr-10
9-Apr-10
31-Aug-10
1-May-10
10-May-10
28-Jun-10
Jasa Pemetaan Geologi Permukaan Blok West BelidaJambi dan Sumatera Selatan
25-Oct-10
24-Dec-10
1-Nov-10
5-Mar-11
18-Jun-10
31-Oct-20
1-Nov-10
30-Dec-10
ALAMAT
6
Century Toyota Bldg., 4-9-8, Meiki,
Nakamura-ku, Nagoya 450-8575 Japan
Direktorat Umum dan SDM, Jln. Medan
Merdeka Timur 1A, Jakarta 10110
Jl. Diponegoro No. 57, Bandung
Tahun
Lokasi
2008
PT TRISULA CBM
ENERGY
No./Tanggal
7
07/TRI/DIR/II/08
Februari 2008
27 March 2008
Kontrak *)
C 106-L-017-SSA-VI-08
17/BPS/VIII/08
001/MNI-FTUGM/PK/IX/08
10-Oct-08
Premier Oil
Pertamina - Petrocihina
East Java
Kontrak *)
Nilai (Rp)
8
Nilai (US$)
Waktu Pelaksanaan
Mulai
Akhir
$75,000.00
10
1-Feb-08
$120,000.00
19-Mar-08
3 bulan
$50,000.00
9-Jun-08
3 bulan
$45,650.00
Peneliti
11
30-Apr-08
29-Aug-08 3 bulan
160,000,000.00
2-Sep-08
763,650,000.00
10-Oct-08 5 bulan
2 bulan
Ket.
12
Hendra Amijaya
Agus Hendratno
Hendra Amijaya
Hendra Amijaya
Lucas Donny S.
Belum selesai,
masih kurang
pelunasan.
$145,250.00
15-Dec-08
Operasional Selesai
Suryono
$108,600.00
7-Nov-08
6 bulan
Budianta toha
Selesai. Rp.
34.693.399,00
$65,800.00
7-Nov-08
6 bulan
Budianta toha
Selesai. Rp.
21.020.168,00