Project Name: North Yaran Oil Field Development Cluster

Subject: PIPE

Page 1 of 4

Vendor's Name: HUNAN SHINESTAR STEEL GROUP


Proposal Reference No.: HNSSD-HT7-24-20
NO.

JSC COMMENTS

Reference: NY-JS-000-PI-MRQ-001

Date: 08/Sep/2015

Proposal Date: 24/Jul/2015

Clarification : 00

VENDORS REPLY

JSC REPLY

Whether a compliance or a deviation,


Vendor shall reply to the purchasers
requirements with item by item, specially
,Engineering specification and Specific job
requirement s attached in requisition
1.

through the deviation list. if there are any


deviations, exceptions and /or alternatives,
Vendor shall specify them with the detailed
technical reason in the deviation list form
attached on the requisition .Vendor shall
reply to general comments, even if they are
duplicate
The Supplier shall have, at its usual
practice, a Quality Assurance Program
proving with the support of documentary
evidence that the materials, design,
manufacture, examinations and testing of

2.

steel pipes are conform to


specifications and requirements of
corresponding requisition and purchase
order. When required by purchase order,
Supplier shall submit, for approval, its
Quality Assurance Program.
PAGE 1 OF 4

VENDORS SECOND REPLY

conclusion

Project Name: North Yaran Oil Field Development Cluster


Subject: PIPE

Page 2 of 4

Vendor's Name: HUNAN SHINESTAR STEEL GROUP


Proposal Reference No.: HNSSD-HT7-24-20
NO.

JSC COMMENTS

Reference: NY-JS-000-PI-MRQ-001

Date: 08/Sep/2015

Proposal Date: 24/Jul/2015

Clarification : 00

VENDORS REPLY

JSC REPLY

All material shall be furnished in


3.

accordance with the codes, standards and


specifications attached/specified in the MR.
Number of items shall be consider acc. to

4.

requirements of NACE MR 175/ ISO


15156, region 2, SSC & HIC requirements.

5.

Warranty & guarantee shall be considered


by vendor.

6.

Packing, Shipping & Marking shall

be

consider acc. to project specification.


7.

Number of items shall be revised acc. to


final MTO.

8.
9.

Length of pipes shall be in accordance with


IPS-M-PI-190 (2).
Please confirm that all requested mentioned
points in this document will be carried out
by vendor.

10.

All the pipes shall be submitted to


PAGE 2 OF 4

VENDORS SECOND REPLY

conclusion

Project Name: North Yaran Oil Field Development Cluster


Subject: PIPE

Page 3 of 4

Vendor's Name: HUNAN SHINESTAR STEEL GROUP


Proposal Reference No.: HNSSD-HT7-24-20
NO.

JSC COMMENTS

Reference: NY-JS-000-PI-MRQ-001

Date: 08/Sep/2015

Proposal Date: 24/Jul/2015

Clarification : 00

VENDORS REPLY

JSC REPLY

hydrostatic testing with a minimum test


pressure equal to 1.5 time of maximum
design

pressure,

or

maximum

value

indicated in API 5L. The most restrictive


value shall be selected. (acc. to NY-JS-000PI-ESS-004 & NY-JS-000-PI-ESS-001 )
11.

All pipes shall be protected from external


Corrosion for a period of 2 years as a min
so vendor shall confirm mill varnish will
protect pipes against corrosion for 2 years
as a min.

12.

The pipes shall be new and their internal


and external walls shall be clean, without
foreign matters. The traces of oxidation
shall be accepted, if they do not exceed a
certain surface area.

13.

Chemical Composition shall be completely


in accordance with related ASTM/ API..

14.

For all ASTM pipe material NDT testing


(RT or UT) shall be applied in accordance
with ASTM E 213.

15.

For all pipes, the certification documents


shall be provided according to E10204-3.2.
PAGE 3 OF 4

VENDORS SECOND REPLY

conclusion

Project Name: North Yaran Oil Field Development Cluster


Subject: PIPE

Page 4 of 4

Vendor's Name: HUNAN SHINESTAR STEEL GROUP


Proposal Reference No.: HNSSD-HT7-24-20
NO.
16.

JSC COMMENTS

Reference: NY-JS-000-PI-MRQ-001

Date: 08/Sep/2015

Proposal Date: 24/Jul/2015

Clarification : 00

VENDORS REPLY

JSC REPLY

Impact test shall be carried out with


considering acc. To NY-000-PI-ESS-011.

17.

Schedule of pipe shall be revised acc. to


wall thickness & final PMS.

18.

Check attached comments.

PAGE 4 OF 4

VENDORS SECOND REPLY

conclusion