Reservoir Pressure
Reservoir Temperature
Productivity Index
Use Vogel below buble point
Depth
Tubing
Ambient Temp , F
Well Head Pressure, psi
Water Cut
GLR
API
SG
Water SG
Kick Off Gas Lift Pressure, Psi
Operating GL
Gas Lift Temperature,F
Sink = 75 Psi
Length B1 = 5 KM
Size = 8 Inch
Well 1
1,750
200
1.00
Yes
Well 2
1,750
200
1.20
Yes
Well 3
1,500
200
1.30
Yes
7,500
3
80
125
7,500
3
80
125
7,500
3
80
125
30
150
45
0.64
1.05
40
150
45
0.64
1.05
50
200
45
0.64
1.05
1,200
1,000
70
1,200
1,000
70
1,200
1,000
70
1. (5 point) Tentukan Qmax masing-masing Well. "Copy to Clipboard" masing-masing nodal analysis
Well 1
Well 2
Well 3
Qmax (STB/day)
2. (15 point) Tentukan kebutuhan gas Lift masing-masing well untuk produksi optimum well tsb.
Copy Clipboard Gas Lift Response Curve masing-masing well.
Pakai sensitivy "step 0.25 untuk analisa Gas Lift Response"
Well 1
Well 2
Well 3
Total
3. (15 point) Design GLV untuk masing-masing well. Jawaban no 2 dipakai untuk melakukan design GLV
Well 1
Well 2
Well 3
Total
3. (15 point) Jika Gas Lift yang tersedia adalah 50% dari yang dibutuhkan (Jawaban soal no 2),
tentukan produksi optimum well tsb.
Well 1
Well 2
Well 3
Total
Gas Lift ( MMSCFD)
Q (STB/day)