Anda di halaman 1dari 115

DAFTAR HARGA SATUAN BAHAN DAN

A. Harga Satuan Bahan


NO

NAMA BARANG

1
2
5
7
12
20
23
35
36
37
38
39
40
41
42
43

FINISHING
Amplas
Kawat has
Cat Meni Besi/dasar (Polibest) Kaleng 0,8 kg
Cat Kayu
Cat menie kayu (polibest) 0,8 kg
Cat tembok Kaleng 5 kg
Dempul kayu (polibest) 0,8 Kg
Plamir tembok 5 kg
Politur (Boyo) kaleng 5 liter
Politur (Joly) kaleng 1 liter
Politur (vernis) kaleng 1 liter
Thiner A Avian kaleng 1 liter
Thiner B Avian kaleng 1 liter
Thiner Super 5 kg
Thiner A Spesial 5 kg
Impra

PENUTUP ATAP
43 Seng BJLS 0,30 gelombang
44 Seng Plat BJLS 30 lebar 28 cm
PENGGANTUNG
4 Engsel kupu-kupu pintu biasa 4cmx3cmx3mm merk jezz
6 Engsel jendela biasa Merk King
48 Kunci tanam 2 slag Biasa

12
13
14
15
16
17
18
19
20
24
25
26
27
28

KAYU DAN PLAFOND


Kayu Besi
10 x 10, panjang 4 m'
Kayu Besi
5 x 10, panjang 4 m'
Kayu Besi
5 x 5, panjang 4 m'
Papan Kayu besi 2,5 x 25, panjang 4 m'
Kayu Matoa 10 x10, panjang 4 m'
Kayu Matoa 5 x 10, panjang 4 m'
Kayu Matoa 5 x 5, panjang 4 m'
Papan Kayu Matoa 2,5 x 25, panjang 4 m'
Kayu dolken (pekerjaan sementara)
Lem Kayu (fox)
Lem Kayu (fox) besar
List Gypsum standar
Minyak bekisting
Tripleks 3 mm

Harga Barang dan Upah

Hal. 1

NO

NAMA BARANG

29 Plywood 3 mm
30 Trileks 4 mm
31 Plywood 4 mm
KERAMIK
1
2
9
10
11
12
13
14

Keramik 20 x 20
Keramik 30 x 30
Keramik 40 x 40 kelas I warna muda
Keramik 10 x 20 kelas II
Keramik 20 x 20 kelas II
Keramik 20 x 30 kelas II
Keramik 30 x 30 kelas II
Keramik 40 x 40 kelas II

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

SANITAIR
Bak mandi fibre glass 70x70x66 cm biasa
Bak mandi fibre glass 70x70x66 cm sudut
Bak mandi keramik 50x50
Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange "
Floor drain plastik
Floor drain stainless
Kloset duduk DATA komplit
Kloset duduk INA Komplit
Kloset duduk INA standard
Kloset duduk Amerika Standar
Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT
Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT
Kloset duduk " TOTO Type AVANTE CW 823 J
Kloset duduk " TOTO Type CW 660J
Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT
Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA
Kloset duduk LOLO warna COMPLIT
Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT
Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT
Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT
Kloset jongkok " TOTO Type CE 6 COMPLIT
Kloset jongkok " TOTO
Kloset porselin jongkok Avena (standar)
Kloset porselin jongkok Kia (standar)
Kloset porselin jongkok VITO (standar)
Kloset porselin jongkok Ina (standar)
Kloset porselin jongkok America (standar)
Kloset porselin jongkok DUTY
Kloset porselin jongkok DATA
Kloset porselin jongkok ROSI
Kloset porselin jongkok CHELSEA
Kran air 3/4 biasa dari besi ONDA
Kran air 3/4 biasa dari plastik
Kran air 1/2 biasa dari besi ONDA
Kran SunEi

Harga Barang dan Upah

Hal. 2

NO

NAMA BARANG

36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63

Kran TOTO T 205 LCSC


Kran TOTO T 205 MC
Kran TOTO T 23 B13
Kran TOTO T 23 B13V7N
Kran TOTO T 26 - 13
Kran TOTO TX 109 LH
Kran washtafel
Kran cuci piring
Penyekat Urinoir " TOTO " Type A 100 "
Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory )
Shower Spray biasa
Soap holder " TOTO " Type S 6 N "
Seal tape Besar
Seal tape kecil
Urinoir " TOTO U 57 M
Urinoir " TOTO U 57 M BODI
Wastagel KIA Standard
Wastagel INA
Wastafel Komplit " TOTO Tx " Type L 521V1A "
Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 "
Washtafel LOLO
Washtafel cuci tangan kecil (Standard)
Washtafel cuci tangan besar (Standard)
Washtafel cuci piring 2 lubang
Washtafel cuci piring 1 lubang
Bak cuci piring single besar
Bak cuci piring double besar
Bak cuci piring single kecil

Harga Barang dan Upah

Hal. 3

NO

NAMA BARANG

PAKU
1 Paku 5 biasa
2 Paku 5 putih
3 Paku 7 biasa
4 Paku 7 putih
5 Paku 10 biasa
6 Paku 10 putih
7 Paku 12 biasa
8 Paku 12 putih
9 Paku 14 biasa
10 Paku 15 biasa
11 Paku 15 putih
23 Paku tripleks

1
2
3
4
5
6
8
9
10
15
17
18
19
20
21

PASIR, BATU, KERIKIL, BATA DAN PARAS


Bata gosok ex Tobacco
Bata Merah 5 x 11 x 22 cm
Bataco
Batu tela
Batu gunung/ belah
Batu karang
Batu Pecah 2-3
Batu Pecah 5-7/5-10
Batu Pecah 10-19
Koral Beton
Pasir halus
Pasir kasar
Pasir sedot
Sirtu
Tanah urug

13
14
15
16
17
18
19

PIPA
Pipa Maspion AW 10
Pipa Maspion AW 1-1/2
Pipa Maspion D 1-1/2
Pipa Maspion AW 1-1/4
Pipa Maspion AW 12
Pipa Maspion AW 14
Pipa Maspion AW 16

1
6

SEMEN
Semen Gresik 40 kg
Semen putih

1
6
7

BESI BETON DAN PAGAR


Besi beton
Kawat beton RRT
Kawat ram

3
4

BAHAN LISTRIK
Saklar (Oni) double
Saklar (Oni) engkle

Harga Barang dan Upah

Hal. 4

NO

NAMA BARANG

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
22
32
33
34
35
36
37

Saklar tunggal philip


Saklar ganda philip
Stop kontak philip
Stop Kontak (Oni) 1 lubang
Stop Kontak (Oni) 2 lubang
Stop Kontak (Oni) 3 lubang
Stop Kontak (Oni) 4 lubang
Fitting Biasa
Fitting keramik
Steker biasa
Steker Broco
Coaxial cable 5C - 75 ohm commscof
Kabel NYM 3 x 2.5 mm ex. Eterna
Kabel NYM 4 mm, 2x4
Kabel telephone
Lampu XL 18 Watt
Pipa clipsal 20 mm
Pipa flexible clipsal 20 mm
Sock clipsal 20 mm
Tee dos clipsal 20 mm
Klem clipsal 0,5 "
Inbow dos plastik clipsal E 157 P

Harga Barang dan Upah

Hal. 5

TAR HARGA SATUAN BAHAN DAN UPAH


A. Harga Satuan Bahan
SATUAN

HARGA

lbr
m'
kg
kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
ltr

lbr
m'

ps
ps
bh

m3
m3
m3
m3
m3
m3
m3
m3
btg
ltr
klg
m'
ltr
Lbr
Harga Barang dan Upah

8,778.00
37,620.00
78,244.38
45,196.25
57,213.75
22,258.50
60,218.13
36,784.00
75,240.00
75,240.00
75,240.00
45,196.25
84,854.00
42,688.25
34,276.00
75,240.00
115,733.75
20,795.50
37,620.00
31,611.25
115,733.75
3,850,825.00
3,971,000.00
3,971,000.00
4,932,400.00
2,528,900.00
2,528,900.00
2,528,900.00
2,528,900.00
37,620.00
55,646.25
181,830.00
21,997.25
19,593.75
87,257.50
Hal. 6

SATUAN

HARGA

Lbr
Lbr
lbr

m2
m2
m2
m2
m2
m2
m2
m2

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Harga Barang dan Upah

117,301.25
87,257.50
93,266.25
71,634.75
75,240.00
84,854.00
56,540.77
59,106.51
63,222.50
46,998.88
67,218.32
488,015.00
548,102.50
205,603.75
269,437.58
25,602.50
47,234.00
908,627.50
2,230,552.50
722,356.25
1,076,872.50
1,809,940.00
6,749,132.50
6,737,115.00
731,729.90
1,647,703.75
1,799,124.25
1,809,940.00
3,367,648.35
2,639,147.50
2,091,990.73
421,918.75
307,752.50
169,551.25
217,621.25
187,577.50
187,577.50
283,717.50
199,595.00
145,516.25
139,507.50
187,577.50
49,637.50
25,602.50
44,830.50
120,540.75
Hal. 7

SATUAN

HARGA

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Harga Barang dan Upah

266,553.38
190,122.08
163,202.88
170,413.38
222,569.33
491,761.33
1,007,171.00
302,005.00
271,961.25
56,727.83
7,576.25
5,172.75
1,271,556.00
1,027,600.75
722,356.25
602,181.25
1,365,292.50
882,189.00
788,452.50
451,962.50
512,050.00
764,417.50
644,242.50
277,708.75
554,111.25
199,595.00
-

Hal. 8

SATUAN

HARGA

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

bj
bj
bj
bj
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m1
m1
m1
m1
m1
m1
m1

kg
kg

kg
kg
m'

bh
bh
Harga Barang dan Upah

25,602.50
25,602.50
25,602.50
25,602.50
25,602.50
25,602.50
25,602.50
25,602.50
25,602.50
25,602.50
25,602.50
29,207.75
31,718.27
7,683.27
7,683.27
7,683.27
353,732.50
279,910.20
1,110,835.00
1,086,800.00
1,086,800.00
1,176,931.25
594,082.50
594,082.50
485,925.00
425,837.50
245,575.00
34,636.53
24,662.00
24,361.56
17,751.94
48,396.56
58,911.88
73,933.75
2,586.38
11,181.50
13,786.99
30,409.50
40,023.50
25,602.50
13,585.00
Hal. 9

SATUAN

HARGA

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
m1
bh
bt
m1
bj
bh
bj
bj

Harga Barang dan Upah

25,602.50
31,611.25
31,611.25
15,988.50
15,988.50
20,795.50
26,804.25
13,585.00
19,593.75
15,988.50
25,602.50
8,417.48
15,988.50
29,207.75
7,576.25
57,213.75
13,585.00
12,383.25
3,370.13
12,383.25
5,172.75
5,172.75
-

Hal. 10

DAFTAR HARGA SATUAN UPAH

NO

NAMA BARANG

SPESIFIKASI

SATUAN

HARGA
(Rp.)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Mandor
Kepala Tukang
Tukang Politur
Tukang Batu
Tukang kayu
Tukang Besi
Tukang cat
Tukang gali/buruh/ pekerja
Tukang Listrik
Tukang Pipa/ Tukang Ledeng
Tukang Aspal
Tukang masak Aspal/pekerja
Pekerja
Tukang Ukir
Operator
Pembantu Operator
Mekanik
Pembantu Mekanik
Pasang Atap Alang-Alang
Pasang Bata Gosok Dua Muka
Pasang Bata Gosok Satu Muka
Pasang Batu Paras Diukir
Pasang Patu Paras Siap Diukir
Tukang Bongkar Begesting

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
M2
M2
M2
M2
Hari

120,000.00
110,000.00
100,000.00
90,000.00
100,000.00
100,000.00
100,000.00
75,000.00
100,000.00
100,000.00
100,000.00
75,000.00
75,000.00
100,000.00
100,000.00
75,000.00
100,000.00
75,000.00
100,000.00
297,000.00
159,500.00
317,350.00
275,000.00
90,000.00

DAFTAR ANALISA PEKERJAAN


0
NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

PEKERJAAN PERSIAPAN
1

(SNI 03-2835-2002)

1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu putih 5/7
0.0200 kg Paku Biasa 2" - 5"
0.0070 m3 Kayu Papan putih 3/20
0.1000 oh Tukang Kayu
0.1000 oh Pekerja
0.0100 oh Kepala Tukang
0.0050 oh Mandor
1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI
PLESTERAN
1.2500 btg Dolken Kayu 8 - 10/4m
0.1800 m3 Kayu Matoa
0.8500 kg Paku Biasa 2" - 5"
1.1000 kg Besi Strip
35.0000 kg Semen Portland
0.1500 m3 Pasir Pasang
0.1000 m3 Pasir Beton
0.1500 m3 Koral Beton
30.0000 bh Batu tela
0.2500 lbr Seng Plat
2.0000 bh Jendela Nako
0.0800 m2 Kaca Polos
0.1500 bh Kunci Tanam
0.0600 lbr Tripleks 4 mm
2.0000 oh Tukang Kayu
1.0000 oh Tukang Batu
2.0000 oh Pekerja
0.3000 oh Kepala Tukang
0.0500 oh Mandor
1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT
1.7000 btg Bambu Sedang
0.2100 m3 Kayu Matoa
0.3000 kg Paku Biasa 2" - 5"
10.5000 kg Semen Portland
0.0300 m3 Pasir Beton
0.0500 m3 Koral Beton
1.5000 lbr Seng gelombang BJLS 20
2.0000 oh Tukang Kayu
1.0000 oh Pekerja
0.2000 oh Kepala Tukang
0.0500 oh Mandor
1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU
3.0000 btg Bambu Sedang
0.2760 m3 Kayu Matoa
0.7000 kg Paku biasa 2" - 5"
1.5000 lbr Seng gelombang BJLS 20
1.5000 oh Tukang Kayu
1.0000 oh Pekerja
0.1500 oh Kepala Tukang
0.0500 oh Mandor

2,528,900.00
25,602.50
2,528,900.00
100,000.00
75,000.00
110,000.00
120,000.00
Total :

10,000.00
7,500.00
1,100.00
600.00
19,200.00

37,620.00
2,528,900.00
25,602.50
10,292.21
2,586.38
594,082.50
594,082.50
1,176,931.25
7,683.27
15,988.50
30,409.50
224,495.29
115,733.75
87,257.50
100,000.00
90,000.00
75,000.00
110,000.00
120,000.00
Total :

200,000.00
90,000.00
150,000.00
33,000.00
6,000.00
479,000.00

11,782.38
2,528,900.00
25,602.50
2,586.38
594,082.50
1,176,931.25
79,681.25
100,000.00
75,000.00
110,000.00
120,000.00
Total :

200,000.00
75,000.00
22,000.00
6,000.00
303,000.00

11,782.38
2,528,900.00
25,602.50
79,681.25
100,000.00
75,000.00
110,000.00
120,000.00
Total :

150,000.00
75,000.00
16,500.00
6,000.00
247,500.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja
0.0500 oh Mandor

1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang
0.1860 m3 Kayu Matoa
0.3000 kg Paku Biasa 2" - 5"
18.0000 kg Semen Portland
0.0300 m3 Pasir Beton
0.0500 m3 Koral Beton
1.5000 lbr Seng gelombang BJLS 20
1.3500 lbr Triplex 4 mm
2.0000 oh Tukang Kayu
1.0000 oh Pekerja
0.2000 oh Kepala Tukang
0.0500 oh Mandor

1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Matoa
0.0800 kg Paku Biasa 2" - 5"
1.0000 btg Matoa 5/5
0.3000 oh Tukang kayu
0.0015 oh Mandor

1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu
0.2500 kg Tali Ijuk
0.0170 oh Tukang Kayu
0.0020 oh Pekerja
0.2500 oh Kepala Tukang
0.0130 oh Mandor

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu belah
0.0900 m3 Batu Pecah 5 - 7
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
0.0500 oh Mandor

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja
0.3330 oh Mandor

12 1 M3 BONGKARAN DINDING TEMBOK BATU TELA


6.6670 oh Pekerja
0.0330 oh Mandor

II

PEKERJAAN TANAH
1

HARGA
UPAH
(Rp)
4

75,000.00
120,000.00
Total :

7,500.00
6,000.00
13,500.00

11,782.38
2,528,900.00
25,602.50
2,586.38
594,082.50
1,176,931.25
79,681.25
87,257.50
100,000.00
75,000.00
110,000.00
120,000.00
Total :

200,000.00
75,000.00
22,000.00
6,000.00
303,000.00

2,528,900.00
25,602.50
25,289.00
100,000.00
120,000.00
Total :

30,000.00
180.00
30,180.00

9,979.75
58,049.75
100,000.00
75,000.00
110,000.00
120,000.00

1,700.00
150.00
27,500.00
1,560.00
30,910.00

353,732.50
1,086,800.00
594,082.50
75,000.00
120,000.00
Total :

75,000.00
6,000.00
81,000.00

75,000.00
120,000.00
Total :

500,025.00
39,960.00
539,985.00

75,000.00
120,000.00
Total :

500,025.00
3,960.00
503,985.00

75,000.00
120,000.00
Total :

56,250.00
3,000.00
59,250.00

(SNI 2835 : 2008)

1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja
0.0250 oh Mandor
1 M3 GALIAN TANAH BIASA DALAM 2 METER

NO

URAIAN

0.9000
0.0450

oh Pekerja
oh Mandor

1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja
0.0670 oh Mandor

1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja
0.0320 oh Mandor

1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja
0.0600 oh Mandor

1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja
0.0450 oh Mandor

1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja
0.0050 oh Mandor

1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja
0.0100 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

75,000.00
120,000.00
Total :

67,500.00
5,400.00
72,900.00

75,000.00
120,000.00
Total :

78,750.00
8,040.00
86,790.00

75,000.00
120,000.00
Total :

75,000.00
3,840.00
78,840.00

75,000.00
120,000.00
Total :

112,500.00
7,200.00
119,700.00

75,000.00
120,000.00
Total :

90,000.00
5,400.00
95,400.00

75,000.00
120,000.00
Total :

3,750.00
600.00
4,350.00

75,000.00
120,000.00
Total :

24,750.00
1,200.00
25,950.00

1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja
0.0500 oh Mandor

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug
0.3000 oh Pekerja
0.0100 oh Mandor

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk
0.1500 oh Pekerja
0.0150 oh Mandor

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu
0.2500 oh Pekerja
0.0250 oh Mandor

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN


1.2000 m3 Tanah Urug
0.5000 oh Pekerja

75,000.00
120,000.00
Total :

37,500.00
6,000.00
43,500.00

485,925.00
75,000.00
120,000.00
Total :

22,500.00
1,200.00
23,700.00

4,451.70
75,000.00
120,000.00
Total :

11,250.00
1,800.00
13,050.00

425,837.50
75,000.00
120,000.00
Total :

18,750.00
3,000.00
21,750.00

245,575.00
75,000.00

37,500.00

NO

URAIAN

0.0500

oh Mandor

15 1 M3 URUGAN LIMESTONE PADAT


1.2000 m3 Limestone
0.2500 oh Pekerja
0.0250 oh Mandor

III
1

PEKERJAAN PONDASI

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

120,000.00
Total :

6,000.00
43,500.00

102,253.25
75,000.00
120,000.00
Total :

18,750.00
3,000.00
21,750.00

353,732.50
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

112,500.00
67,500.00
8,250.00
9,000.00
197,250.00

353,732.50
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

112,500.00
67,500.00
8,250.00
9,000.00
197,250.00

353,732.50
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

112,500.00
67,500.00
8,250.00
9,000.00
197,250.00

353,732.50
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

112,500.00
67,500.00
8,250.00
9,000.00
197,250.00

353,732.50
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

112,500.00
67,500.00
8,250.00
9,000.00
197,250.00

(SNI 2836 : 2008)

1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
202.0000 kg Semen Portland
0.4850 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
163.0000 kg Semen Portland
0.5200 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
136.0000 kg Semen Portland
0.5440 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
117.0000 kg Semen Portland
0.5610 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
91.0000 kg Semen Portland
0.5840 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20

353,732.50

NO

URAIAN

194.0000
0.3120
0.4680
126.0000
1.8000
3.4000
0.8500
0.0850
0.1700

IV

kg
m3
m3
kg
kg
oh
oh
oh
oh

Semen Portland
Pasir Beton
Koral Beton
Besi Beton
Kawat Beton
Pekerja
Tukang Batu
Kepala Tukang
Mandor

HARGA
UPAH
(Rp)

2,586.38
594,082.50
1,176,931.25
13,786.99
30,409.50
75,000.00
90,000.00
110,000.00
120,000.00

1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20
194.0000 kg Semen Portland
0.3120 m3 Pasir Beton
0.4680 m3 Koral Beton
2.4000 oh Pekerja
0.8000 oh Tukang Batu
0.0800 oh Kepala Tukang
0.1190 oh Mandor

1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20
0.4320 m3 Pasir Urug
0.7800 oh Pekerja
0.3900 oh Tukang Batu
0.0390 oh Kepala Tukang
0.0390 oh Mandor

PEKERJAAN DINDING

HARGA
SATUAN
(Rp)

255,000.00
76,500.00
9,350.00
20,400.00
361,250.00

353,732.50
2,586.38
594,082.50
1,176,931.25
75,000.00
90,000.00
110,000.00
120,000.00
Total :

180,000.00
72,000.00
8,800.00
14,280.00
275,080.00

353,732.50
485,925.00
75,000.00
90,000.00
110,000.00
120,000.00
Total :

58,500.00
35,100.00
4,290.00
4,680.00
102,570.00

(SNI 6897 : 2008)

1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 2 PS


27.0000 bh Batu Tela
18.8496 kg Semen Portland
0.0776 m3 Pasir Pasang
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

7,683.27
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00

1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 3 PS


27.0000 bh Batu Tela
14.3700 kg Semen Portland
0.0400 m3 Pasir Pasang
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

7,683.27
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00

1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 4 PS


27.0000 bh Batu Tela
11.4950 kg Semen Portland
0.0473 m3 Pasir Pasang
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

7,683.27
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00

24,000.00
9,000.00
1,100.00
1,800.00
35,900.00

24,000.00
9,000.00
1,100.00
1,800.00
35,900.00

24,000.00
9,000.00
1,100.00
1,800.00

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

35,900.00
4

1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 5 PS


27.0000 bh Batu Tela
9.6800 kg Semen Portland
0.0450 m3 Pasir Pasang
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

7,683.27
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00

1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 6 PS


54.0000 bh Batu Tela 5 x 11 x 22 cm
18.5000 kg Semen Portland
0.1220 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

7,683.27
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00

1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 2 PS


27.0000 bh Batu Tela 10 x 15 x 25 cm
18.9500 kg Semen Portland
0.0380 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

7,683.27
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00

1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 3 PS


40.0000 bh Batu Tela 10 x 15 x 25 cm
14.3700 kg Semen Portland
0.0400 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 4 PS


40.0000 bh Batu Tela 10 x 15 x 25 cm
11.5000 kg Semen Portland
0.0430 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 5 PS


40.0000 bh Batu Tela 10 x 15 x 25 cm
9.6800 kg Semen Portland
0.0450 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

10 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 6 PS


40.0000 bh Batu Tela 10 x 15 x 25 cm
8.3200 kg Semen Portland

24,000.00
9,000.00
1,100.00
1,800.00
35,900.00

45,000.00
18,000.00
2,200.00
3,600.00
68,800.00

22,500.00
9,000.00
1,100.00
1,800.00
34,400.00

7,683.27
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
9,000.00
1,100.00
1,800.00
34,400.00

7,683.27
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
9,000.00
1,100.00
1,800.00
34,400.00

7,683.27
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
9,000.00
1,100.00
1,800.00
34,400.00

7,683.27
2,586.38

NO

URAIAN

0.0490
0.3000
0.1000
0.0100
0.0150

m3
oh
oh
oh
oh

Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

11 1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 8 PS


40.0000 bh Batu Tela 10 x 15 x 25 cm
6.5000 kg Semen Portland
0.0500 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)


12.5000 bh Batako
7.5000 kg Semen Portland
0.0270 m3 Pasir Pasang
1.9500 kg Besi Beton 8 mm
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako
7.5000 kg Semen Portland
0.0270 m3 Pasir Pasang
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik
11.0000 kg Semen Portland
0.0350 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I
0.0140 m3 Kayu Matoa usuk/reng
0.0120 kg Paku Biasa
0.0030 m3 List Kayu 2/4
0.1000 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0020 oh Mandor

PEKERJAAN PLESTERAN
1

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
9,000.00
1,100.00
1,800.00
34,400.00

7,683.27
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
9,000.00
1,100.00
1,800.00
34,400.00

7,683.27
2,586.38
594,082.50
13,786.99
75,000.00
90,000.00
110,000.00
120,000.00
Total :

24,000.00
9,000.00
1,100.00
1,800.00
35,900.00

7,683.27
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

24,000.00
9,000.00
1,100.00
1,800.00
35,900.00

81,248.75
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
9,000.00
1,100.00
1,800.00
34,400.00

28,371.75
2,528,900.00
15,988.50
2,528,900.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

7,500.00
5,000.00
550.00
240.00
13,290.00

(SNI 2837 : 2008)

1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM


15.5040 kg Semen Portland
0.0160 m3 Pasir Pasang

2,586.38
594,082.50

NO

URAIAN

0.3000
0.1500
0.0150
0.0150
2

oh
oh
oh
oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 PLESTERAN
10.2240 kg
0.0200 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

CAMP. 1 PC : 2 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 PLESTERAN
7.7760 kg
0.0230 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

CAMP. 1 PC : 3 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 PLESTERAN
6.2400 kg
0.0240 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

CAMP. 1 PC : 4 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
13,500.00
1,650.00
1,800.00
39,450.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
13,500.00
1,650.00
1,800.00
39,450.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
13,500.00
1,650.00
1,800.00
39,450.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
13,500.00
1,650.00
1,800.00
39,450.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 PLESTERAN
5.1840 kg
0.0260 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

CAMP. 1 PC : 5 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 PLESTERAN
4.4160 kg
0.0270 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

CAMP. 1 PC : 6 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 PLESTERAN
3.4560 kg
0.0290 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

CAMP. 1 PC : 8 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 PLESTERAN
13.6320 kg
0.0270 m3
0.4000 oh
0.2000 oh
0.0200 oh
0.0220 oh

CAMP. 1 PC : 2 PS TEBAL 20 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 PLESTERAN
10.3680 kg
0.0310 m3
0.4000 oh
0.2000 oh
0.0200 oh
0.0220 oh

CAMP. 1 PC : 3 PS TEBAL 20 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

10 1 M2 PLESTERAN
8.3200 kg
0.0320 m3
0.4000 oh
0.2000 oh
0.0200 oh
0.0220 oh

CAMP. 1 PC : 4 PS TEBAL 20 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

11 1 M2 PLESTERAN
6.9120 kg
0.0350 m3
0.4000 oh
0.2000 oh
0.0200 oh
0.0220 oh

CAMP. 1 PC : 5 PS TEBAL 20 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM

HARGA
UPAH
(Rp)
4

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
13,500.00
1,650.00
1,800.00
39,450.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
13,500.00
1,650.00
1,800.00
39,450.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
13,500.00
1,650.00
1,800.00
39,450.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

30,000.00
18,000.00
2,200.00
2,640.00
52,840.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

30,000.00
18,000.00
2,200.00
2,640.00
52,840.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

30,000.00
18,000.00
2,200.00
2,640.00
52,840.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

30,000.00
18,000.00
2,200.00
2,640.00
52,840.00

NO

URAIAN

5.8880
0.0360
0.4000
0.2000
0.0200
0.0220

kg
m3
oh
oh
oh
oh

Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland
0.0130 m3 Pasir Pasang
0.0800 oh Pekerja
0.4000 oh Tukang Batu
0.0400 oh Kepala Tukang
0.0040 oh Mandor

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland
0.0060 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

30,000.00
18,000.00
2,200.00
2,640.00
52,840.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

6,000.00
36,000.00
4,400.00
480.00
46,880.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
9,000.00
1,100.00
1,800.00
34,400.00

2,586.38
75,000.00
90,000.00
110,000.00
120,000.00
Total :

11,250.00
6,750.00
880.00
960.00
19,840.00

2,586.38
75,000.00
90,000.00
110,000.00
120,000.00
Total :

5,250.00
3,150.00
440.00
480.00
9,320.00

2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

22,500.00
13,500.00
1,650.00
1,800.00
39,450.00

2,586.38
75,000.00
100,000.00
110,000.00
120,000.00
Total :

15,000.00
10,000.00
1,100.00
1,200.00
27,300.00

15
1 M2 FINISHING SIAR PASANGAN DINDING BATU TELA (=20 M')
3.1080 kg Semen Portland
0.1500 oh Pekerja
0.0750 oh Tukang Batu
0.0080 oh Kepala Tukang
0.0080 oh Mandor

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK


EKSPOSE (= 8 M')
1.6000 kg Semen Portland
0.0700 oh Pekerja
0.0350 oh Tukang Batu
0.0040 oh Kepala Tukang
0.0040 oh Mandor

17 1 M2 FINISHING SIAR PASANGAN BATUKALI/BELAH ADUKAN 1PC


: 2 PS
6.3400 kg Semen Portland
0.0120 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg
0.2000 oh Pekerja
0.1000 oh Tukang Labur/Cat
0.0100 oh Kepala Tukang
0.0100 oh Mandor

VI

PEKERJAAN KAYU

(SNI 3434 : 2008)

NO

URAIAN

HARGA
SATUAN
(Rp)

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS I (KAYU BESI)
1.1000 m3 Balok Kayu Besi
1.2500 Kg Paku 10 Cm
1.0000 Kg Lem Kayu
7.0000 oh Pekerja
21.0000 oh Tukang Kayu
2.1000 oh Kepala Tukang
0.3500 oh Mandor

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS II/III (KAYU MATOA)
1.2000 m3 Balok Kayu Matoa
1.2500 Kg Paku 10 Cm
1.0000 Kg Lem Kayu
6.0000 oh Pekerja
18.0000 oh Tukang Kayu
1.8000 oh Kepala Tukang
0.3000 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU


KELAS II (KAYU MATOA)
0.0400 m3 Papan Kayu Matoa
0.0500 Kg Paku 5-7 Cm
0.3500 oh Pekerja
1.0500 oh Tukang Kayu
0.1050 oh Kepala Tukang
0.0180 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA


KAYU KELAS III (KAYU PUTIH)
0.0400 m3 Papan Kayu Putih
0.0500 Kg Paku 5-7 Cm
0.3500 oh Pekerja
1.0500 oh Tukang Kayu
0.1050 oh Kepala Tukang
0.0180 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II (KAYU BESI)
0.0473 m3 Papan Kayu Besi
0.5000 Kg Lem Kayu
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA,


KAYU KELAS I/II (KAYU BESI)
0.0240 m3 Papan Kayu Besi
1.0000 m2 Kaca rayben 5 mm
0.3000 Kg Lem Kayu
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

HARGA
UPAH
(Rp)
4

3,971,000.00
25,602.50
55,646.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

525,000.00
2,100,000.00
231,000.00
42,000.00
2,898,000.00

2,528,900.00
25,602.50
55,646.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

450,000.00
1,800,000.00
198,000.00
36,000.00
2,484,000.00

2,528,900.00
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

26,250.00
105,000.00
11,550.00
2,160.00
144,960.00

2,528,900.00
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

26,250.00
105,000.00
11,550.00
2,160.00
144,960.00

4,932,400.00
55,646.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

75,000.00
300,000.00
33,000.00
6,000.00
414,000.00

4,932,400.00
331,787.50
55,646.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

60,000.00
240,000.00
26,400.00
4,800.00
331,200.00

NO

URAIAN

HARGA
SATUAN
(Rp)

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI,


KAYU KELAS I/II (KAYU BESI)
0.0640 m3 Papan Kayu Besi
0.5000 Kg Lem Kayu
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor

MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA


TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Matoa
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Taekwood 4 mm
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor

MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA


EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Besi
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Teakwood 4 mm
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

HARGA
UPAH
(Rp)
4

4,932,400.00
55,646.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

75,000.00
300,000.00
33,000.00
6,000.00
414,000.00

2,528,900.00
25,602.50
55,646.25
147,345.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

75,000.00
300,000.00
33,000.00
6,000.00
414,000.00

4,932,400.00
25,602.50
55,646.25
147,345.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

60,000.00
240,000.00
26,400.00
4,800.00
331,200.00

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600
0.1500
0.6700
2.0000
0.2000
0.3350

m3
Kg
oh
oh
oh
oh

Papan Kayu Besi


Paku 1-2,5 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU


KELAS I
0.0256 m3 Papan Kayu Besi
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Teakwood 4 mm uk 90x220 cm
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA


EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Matoa
0.0300 Kg Paku 1-2,5 Cm
0.8000 Kg Lem Kayu
1.0000 Lbr Teakwood 4 mm uk 90x220 cm
0.5000 Lbr Formika
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

4,932,400.00
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

50,250.00
200,000.00
22,000.00
40,200.00
312,450.00

4,932,400.00
25,602.50
55,646.25
147,345.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

60,000.00
240,000.00
26,400.00
4,800.00
331,200.00

2,528,900.00
25,602.50
55,646.25
147,345.00
117,301.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

60,000.00
240,000.00
26,400.00
4,800.00
331,200.00

3,971,000.00
10,292.21
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

300,000.00
1,200,000.00
132,000.00
24,000.00
1,656,000.00

3,971,000.00
10,292.21
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

502,500.00
2,010,000.00
221,100.00
40,200.00
2,773,800.00

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL,


KAYU KELAS I,II,III Bentang 6 M'
1.1000
15.0000
5.6000
4.0000
12.0000
1.2000
0.2000

m3
Kg
Kg
oh
oh
oh
oh

Balok Kayu Besi


Besi Strip Tebal 5 cm
Paku 12 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU


KELAS I
1.2000
15.0000
5.6000
6.7000
20.1000
2.0100
0.3350

m3
Kg
Kg
oh
oh
oh
oh

Balok Kayu Besi


Besi Strip Tebal 5 cm
Paku 12 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II


1.1000
15.0000
3.0000

m3 Balok Kayu Matoa


Kg Besi Strip Tebal 5 cm
Kg Paku 12 Cm

2,528,900.00
10,292.21
25,602.50

NO

URAIAN

2.4000
7.2000
0.7200
0.1200

oh
oh
oh
oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

75,000.00
100,000.00
110,000.00
120,000.00
Total :

180,000.00
720,000.00
79,200.00
14,400.00
993,600.00

2,528,900.00
2,528,900.00
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

7,500.00
10,000.00
1,100.00
600.00
19,200.00

2,528,900.00
2,528,900.00
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

7,500.00
10,000.00
1,100.00
600.00
19,200.00

2,528,900.00
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

9,000.00
12,000.00
1,320.00
720.00
23,040.00

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU


KELAS II
0.0140
0.0036
0.2500
0.1000
0.1000
0.0100
0.0050

m3
m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Reng ( 2 x 3 ) Cm
Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS


II
0.0140
0.0072
0.2500
0.1000
0.1000
0.0100
0.0050

m3
m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Reng ( 2 x 3 ) Cm
Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II


0.1650
0.2000
0.1200
0.1200
0.0120
0.0060

m3
Kg
oh
oh
oh
oh

Balok Kayu Matoa


Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M3 PEKERJAAN TIANG & MIRPLAT KAYU BESI 10/10


1.1000 M Kayu Besi
8.0000 OH Tukang Kayu
0.8000 OH Kepala Tukang Kayu
4.0000 OH Pekerja
0.0200 OH Mandor

3,850,825.00
100,000.00

800,000.00

110,000.00

88,000.00

75,000.00

300,000.00

120,000.00

2,400.00
1,190,400.00

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU


KELAS II/III
0.0154
0.3750
0.2000
0.1500
0.3000
0.0300
0.0750

m3
lbr
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 5 ) Cm
tripleks 4 mm
Paku 7 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU


KELAS II/III

2,528,900.00
87,257.50
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

11,250.00
30,000.00
3,300.00
9,000.00
53,550.00

NO

URAIAN

0.0163
0.2500
0.2000
0.3000
0.0300
0.0100

m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Paku 7 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

2,528,900.00
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

15,000.00
30,000.00
3,300.00
1,200.00
49,500.00

4,932,400.00
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

7,500.00
20,000.00
2,200.00
600.00
30,300.00

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II


0.0108
0.1000
0.1000
0.2000
0.0200
0.0050

m3
Kg
oh
oh
oh
oh

Papan Kayu Besi


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II


0.0110
0.0500
0.1000
0.2000
0.0200
0.0050

m3
Kg
oh
oh
oh
oh

Papan Kayu Besi


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

4,932,400.00
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

7,500.00
20,000.00
2,200.00
600.00
30,300.00

2,528,900.00
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

11,250.00
45,000.00
4,950.00
960.00
62,160.00

2,528,900.00
25,602.50
147,345.00
55,646.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

11,250.00
45,000.00
4,950.00
960.00
62,160.00

2,528,900.00
25,602.50
93,266.25
55,646.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

15,000.00
60,000.00
6,600.00
1,200.00
82,800.00

4,932,400.00
25,602.50
21,396.38
75,000.00
100,000.00
110,000.00
120,000.00
Total :

45,000.00
180,000.00
19,800.00
3,600.00
248,400.00

93,266.25
25,602.50
75,000.00

1,875.00

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM,


KAYU KELAS II/III
0.0280
0.1500
0.1500
0.4500
0.0450
0.0080

m3
Kg
oh
oh
oh
oh

Balok Kayu Matoa


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280
0.1500
0.8600
0.5600
0.1500
0.4500
0.0450
0.0080

m3
Kg
Lbr
Kg
oh
oh
oh
oh

Balok Kayu Matoa


Paku 5 Cm dan 7 Cm
Teakwood 4 mm uk 90x220 cm
Lem Kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280
0.1500
0.8600
0.5600
0.2000
0.6000
0.0600
0.0100

m3
Kg
Lbr
Kg
oh
oh
oh
oh

Balok Kayu Matoa


Paku 5 Cm dan 7 Cm
Plywood tebal 4 mm uk 120 x 240 cm
Lem Kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I


0.0070
0.1000
0.1500
0.6000
1.8000
0.1800
0.0300

m3
Kg
Kg
oh
oh
oh
oh

Papan Kayu Besi


Paku 5 Cm dan 10 Cm
Paku Skrup 10 cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120


X 240) CM
0.4000
0.0500
0.0250

Lbr Plywood tebal 4 mm uk 120 x 240 cm


Kg Paku 1 Cm dan 2.5 Cm
oh Pekerja

NO

URAIAN

0.0750
0.0080
0.0010

VII
1

oh Tukang Kayu
oh Kepala Tukang
oh Mandor

HARGA
SATUAN
(Rp)
3

100,000.00
110,000.00
120,000.00
Total :

HARGA
UPAH
(Rp)
4

7,500.00
880.00
120.00
10,375.00

PEKERJAAN BETON ( SNI 7394:2008)


1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR
218.0000 kg Semen Portland
0.5200 m3 Pasir Beton
0.8700 m3 Koral Beton
1.6500 oh Pekerja
0.2500 oh Tukang Batu
0.0250 oh Kepala Tukang
0.0800 oh Mandor

1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR
232.0000 kg Semen Portland
0.5200 m3 Pasir Beton
0.7800 m3 Koral Beton
1.6500 oh Pekerja
0.2500 oh Tukang Batu
0.0250 oh Kepala Tukang
0.0800 oh Mandor

1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
280.0000 kg Semen Portland
0.4500 m3 Pasir Beton
0.9000 m3 Koral Beton
1.6500 oh Pekerja
0.2500 oh Tukang Batu
0.0250 oh Kepala Tukang
0.0800 oh Mandor

PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


10.5000 kg Besi Beton (Polos/ Ulir)
0.1500 kg Kawat Beton
0.0700 oh Pekerja
0.0700 oh Tukang Besi
0.0070 oh Kepala Tukang
0.0040 oh Mandor

1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Bekisting
0.3000 kg Paku Biasa 5' - 10'
0.1000 ltr Minyak Bekisting
0.5200 oh Pekerja
0.2600 oh Tukang Kayu
0.0260 oh Kepala Tukang
0.0260 oh Mandor

1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Bekisting
0.3000 kg Paku Biasa 5' - 10'
0.1000 ltr Minyak Bekisting
0.5200 oh Pekerja
0.2600 oh Tukang Kayu
0.0260 oh Kepala Tukang
0.0260 oh Mandor

2,586.38
594,082.50
1,176,931.25
75,000.00
90,000.00
110,000.00
120,000.00

123,750.00
22,500.00
2,750.00
9,600.00
158,600.00

2,586.38
594,082.50
1,176,931.25
75,000.00
90,000.00
110,000.00
120,000.00
Total :

123,750.00
22,500.00
2,750.00
9,600.00
158,600.00

2,586.38
594,082.50
1,176,931.25
75,000.00
90,000.00
110,000.00
120,000.00
Total :

123,750.00
22,500.00
2,750.00
9,600.00
158,600.00

13,786.99
30,409.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

5,250.00
7,000.00
770.00
480.00
13,500.00

2,528,900.00
25,602.50
19,593.75
75,000.00
100,000.00
110,000.00
120,000.00
Total :

39,000.00
26,000.00
2,860.00
3,120.00
70,980.00

2,528,900.00
25,602.50
19,593.75
75,000.00
100,000.00
110,000.00
120,000.00

39,000.00
26,000.00
2,860.00
3,120.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Bekisting
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4 m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Bekisting
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0180 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

HARGA
UPAH
(Rp)
4

Total :

70,980.00

2,528,900.00
25,602.50
19,593.75
2,528,900.00
180,212.86
37,620.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

49,500.00
33,000.00
3,630.00
3,960.00
90,090.00

2,528,900.00
25,602.50
19,593.75
2,528,900.00
180,212.86
37,620.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

49,500.00
33,000.00
3,630.00
3,960.00
90,090.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Bekisting
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
6.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

10 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Bekisting
0.4000 Kg Paku Biasa 5' - 12'
0.2000 Ltr Minyak Bekisting
0.0200 M3 Kayu Usuk 4/6
0.3500 Lbr Plywood 9 mm
3.0000 Btng Dolken Kayu 8" - 10"/4m
4.0000 Bh Formite/penjaga jarak bekisting/spacer
0.6600 Oh Pekerja
0.3300 Oh Tukang Kayu
0.0330 Oh Kepala Tukang
0.0330 Oh Mandor

11 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Bekisting
0.4000 kg Paku Biasa 5' - 12'
0.1500 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

2,528,900.00
25,602.50
19,593.75
2,528,900.00
180,212.86
37,620.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

2,528,900.00
25,602.50
19,593.75
2,528,900.00
180,212.86
37,620.00
2,000.00
75,000.00
100,000.00
110,000.00
120,000.00

HARGA
UPAH
(Rp)
4

49,500.00
33,000.00
3,630.00
3,960.00
90,090.00

49,500.00
33,000.00
3,630.00
3,960.00
90,090.00

2,528,900.00
25,602.50
19,593.75
2,528,900.00
180,212.86
37,620.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

49,500.00
33,000.00
3,630.00
3,960.00
90,090.00

2,528,900.00
25,602.50
37,620.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

11,250.00
5,000.00
550.00
960.00
17,760.00

13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Bekisting
2,528,900.00
1.5000 kg Paku Biasa 5' - 12'
25,602.50
0.4000 ltr Minyak Bekisting
19,593.75
157.0000 kg Besi Beton
13,786.99
2.2500 kg Kawat Beton
30,409.50
336.0000 kg Semen Portland
2,586.38
0.5400 m3 Pasir Beton
594,082.50
0.8100 m3 Koral Beton
1,176,931.25
5.3000 oh Pekerja
75,000.00
0.2750 oh Tukang Batu
90,000.00
1.3000 oh Tukang Kayu
100,000.00
1.0500 oh Tukang Besi
100,000.00

397,500.00
24,750.00
130,000.00
105,000.00

12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


0.0264 m3 Kayu Kelas III (Papan Kayu putih)
0.6000 kg Paku Biasa 5' - 12'
0.5000 btg Dolken Kayu 8" - 10"/4m
0.1500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0080 oh Mandor

NO

URAIAN

0.2620
0.2650

oh Kepala Tukang
oh Mandor

14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Bekisting
2.0000 kg Paku Biasa 5' - 12'
0.6000 ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
5.6500 oh Pekerja
0.2750 oh Tukang Batu
1.5600 oh Tukang Kayu
1.4000 oh Tukang Besi
0.3230 oh Kepala Tukang
0.2830 oh Mandor

15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +


BEKISTING)
0.4000 m3 Kayu Bekisting
4.0000 kg Paku Biasa 5' - 12'
2.0000 ltr Minyak Bekisting
315.0000 kg Besi Beton
4.5000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1500 m3 Kayu Kelas II balok
3.5000 lbr Plywood 9 mm
20.0000 btg Dolken Kayu 8" /4 m
7.0500 oh Pekerja
0.2750 oh Tukang Batu
1.6500 oh Tukang Kayu
2.1000 oh Tukang Besi
0.4030 oh Kepala Tukang
0.3530 oh Mandor

16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)
0.3200 m3 Kayu Bekisting
3.2000 kg Paku Biasa 5' - 12'
1.6000 ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1400 m3 Kayu Kelas II balok
2.8000 lbr Plywood 9 mm
16.0000 btg Dolken Kayu 8" /4 m
6.3500 oh Pekerja
0.2750 oh Tukang Batu
1.6500 oh Tukang Kayu
1.4000 oh Tukang Besi
0.3330 oh Kepala Tukang
0.3180 oh Mandor
17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +
BEKISTING

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

110,000.00
120,000.00
Total :

28,820.00
31,800.00
717,870.00

2,528,900.00
25,602.50
19,593.75
13,786.99
30,409.50
2,586.38
594,082.50
1,176,931.25
75,000.00
90,000.00
100,000.00
100,000.00
110,000.00
120,000.00
Total :

423,750.00
24,750.00
156,000.00
140,000.00
35,530.00
33,960.00
813,990.00

2,528,900.00
25,602.50
19,593.75
13,786.99
30,409.50
2,586.38
594,082.50
1,176,931.25
2,528,900.00
180,212.86
37,620.00
75,000.00
90,000.00
100,000.00
100,000.00
110,000.00
120,000.00
Total :

528,750.00
24,750.00
165,000.00
210,000.00
44,330.00
42,360.00
1,015,190.00

2,528,900.00
25,602.50
19,593.75
13,786.99
30,409.50
2,586.38
594,082.50
1,176,931.25
2,528,900.00
180,212.86
37,620.00
75,000.00
90,000.00
100,000.00
100,000.00
110,000.00
120,000.00
Total :

476,250.00
24,750.00
165,000.00
140,000.00
36,630.00
38,160.00
880,790.00

NO

URAIAN

0.3200
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1200
2.8000
32.0000
5.3000
0.2750
1.3000
1.0500
0.2650
0.2650

m3
kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
oh
oh
oh
oh
oh
oh

Kayu Bekisting
Paku Biasa 5' - 12'
Minyak Bekisting
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Kelas II balok
Plywood 9 mm
Dolken Kayu 8" /4 m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

2,528,900.00
25,602.50
19,593.75
13,786.99
30,409.50
2,586.38
594,082.50
1,176,931.25
2,528,900.00
180,212.86
37,620.00
75,000.00
90,000.00
100,000.00
100,000.00
110,000.00
120,000.00

397,500.00
24,750.00
130,000.00
105,000.00
29,150.00
31,800.00
718,200.00

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +


BEKISTING)
0.2400
3.2000
1.6000
157.0000
2.2500
336.0000
0.5400
0.8100
0.1600
2.8000
24.0000
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

m3
kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
oh
oh
oh
oh
oh
oh

Kayu Bekisting
Paku Biasa 5' - 12'
Minyak Bekisting
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Kelas II balok
Plywood 9 mm
Dolken Kayu 8" /4 m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

2,528,900.00
25,602.50
19,593.75
13,786.99
30,409.50
2,586.38
594,082.50
1,176,931.25
2,528,900.00
180,212.86
37,620.00
75,000.00
90,000.00
100,000.00
100,000.00
110,000.00
120,000.00

19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +


BEKISTING)
0.2500 m3 Kayu Bekisting
3.0000 kg Paku Biasa 5' - 12'
1.2000 ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1050 m3 Kayu Kelas II balok
2.5000 lbr Plywood 9 mm
14.0000 btg Dolken Kayu 8" /4 m
5.6500 oh Pekerja
0.2750 oh Tukang Batu
1.5600 oh Tukang Kayu
1.4000 oh Tukang Besi
0.3230 oh Kepala Tukang
0.2830 oh Mandor

2,528,900.00
25,602.50
19,593.75
13,786.99
30,409.50
2,586.38
594,082.50
1,176,931.25
2,528,900.00
180,212.86
37,620.00
75,000.00
90,000.00
100,000.00
100,000.00
110,000.00
120,000.00

397,500.00
24,750.00
130,000.00
105,000.00
28,820.00
31,800.00
717,870.00

423,750.00
24,750.00
156,000.00
140,000.00
35,530.00
33,960.00
813,990.00

20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11


CM)
0.0020
0.0100
3.0000
0.0450
4.0000
0.0060
0.0090
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

m3
kg
kg
kg
kg
m3
m3
oh
oh
oh
oh
oh
oh

Kayu Bekisting
Paku Biasa 5' - 12'
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

2,528,900.00
25,602.50
13,786.99
30,409.50
2,586.38
594,082.50
1,176,931.25
75,000.00
90,000.00
100,000.00
100,000.00
110,000.00
120,000.00
Total :

21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15


CM)
0.0030
0.0200
3.6000
0.0500

m3
kg
kg
kg

Kayu Bekisting
Paku Biasa 5' - 12'
Besi Beton
Kawat Beton

2,528,900.00
25,602.50
13,786.99
30,409.50

13,500.00
1,800.00
2,000.00
2,000.00
660.00
1,080.00
21,040.00

NO

URAIAN

5.5000
0.0090
0.0150
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150

kg
m3
m3
oh
oh
oh
oh
oh
oh

Semen Portland
Pasir Beton
Koral Beton
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

2,586.38
594,082.50
1,176,931.25
75,000.00
90,000.00
100,000.00
100,000.00
110,000.00
120,000.00
Total :

22,275.00
2,970.00
3,300.00
3,300.00
1,100.00
1,800.00
34,745.00

3,442.23
75,000.00
100,000.00
110,000.00
120,000.00
Total :

11,250.00
6,000.00
660.00
960.00
18,870.00

3,225.92
75,000.00
100,000.00
110,000.00
120,000.00
Total :

11,250.00
6,000.00
660.00
960.00
18,870.00

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1

1 M2 PEKERJAAN ATAP GENTENG PLENTONG


25.0000 bh Genteng Plentong
0.1500 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0080 oh Mandor

1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


25.0000 bh Genteng Plentong Dicat
0.1500 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0080 oh Mandor

1 M1 PASANG BUBUNGAN GENTENG PLENTONG


5.0000 bh Bubungan Plentong
8.0000 kg Semen Portland
0.0320 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Kayu
0.0200 oh Kepala Tukang
0.0020 oh Mandor

10,220.10
2,586.38
594,082.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :
1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm
41,946.30
0.1200 kg Paku Pancing 60 x 230
24,100.31
0.1400 oh Pekerja
75,000.00
0.0700 oh Tukang Kayu
100,000.00
0.0070 oh Kepala Tukang Kayu
110,000.00
0.0070 oh Mandor
120,000.00
Total :
1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M
2.4000 lbr Bubungan Stel Gelombang
6.0000 kg Paku Skrup 3,5"
0.0840 oh Pekerja
0.1250 oh Tukang Kayu
0.0130 oh Kepala Tukang
0.0040 oh Mandor
1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap
0.2000 kg Paku Biasa 1/2" - 1"
0.1660 oh Pekerja
0.2500 oh Tukang Kayu
0.0250 oh Kepala Tukang
0.0080 oh Mandor

30,000.00
20,000.00
2,200.00
240.00
52,440.00

10,500.00
7,000.00
770.00
840.00
19,110.00

30,409.50
30,610.19
75,000.00
100,000.00
110,000.00
120,000.00
Total :

6,300.00
12,500.00
1,430.00
480.00
20,710.00

13,825.35
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

12,450.00
25,000.00
2,750.00
960.00
41,160.00

NO
1

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28
0.0600 kg Paku biasa 1/2" - 1"
0.0500 kg Paku biasa 2" - 5"
0.0040 m3 Kayu papan 3 cm
0.1250 oh Pekerja
0.2500 oh Tukang kayu
0.0250 oh Kepala Tukang
0.0080 oh Mandor

1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang
0.5000 glg Tali pengikat
0.2000 oh Pekerja
0.0100 oh Mandor

1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 32
0.0200 kg Paku Biasa 1/2" - 1"
0.1200 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0060 oh Mandor

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL


1.0500 m2 Aluminium Foil
0.1500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0080 oh Mandor

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28
0.0400 kg Paku biasa 1/2" - 1"
0.1500 oh Pekerja
0.0700 oh Tukang Kayu
0.0080 oh Kepala Tukang
0.0060 oh Mandor

20,795.50
25,602.50
25,602.50
4,932,400.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

9,375.00
25,000.00
2,750.00
960.00
38,085.00

14,786.75
55,646.25
75,000.00
120,000.00
Total :

15,000.00
1,200.00
16,200.00

115,733.75
31,611.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

9,000.00
6,000.00
660.00
720.00
16,380.00

36,418.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

11,250.00
5,000.00
550.00
960.00
17,760.00

20,795.50
31,611.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

11,250.00
7,000.00
880.00
720.00
19,850.00

12 1 M2 MEMASANG ATAP MULTIROOF


1.0200 lbr Multiroof
0.2000 kg Paku
0.2000 oh Pekerja
0.1000 oh Tukang Kayu
0.0100 oh Kepala Tukang
0.0100 oh Mandor

63,758.06
15,300.00
75,000.00
100,000.00
110,000.00
120,000.00

13 1 M1 MEMASANG BUBUNGAN MULTIROOF


5.0000 bh Bubungan Multiroof
0.8000 kg Semen Portland
0.0320 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Kayu
0.0200 oh Kepala Tukang
0.0020 oh Mandor

43,628.75
2,586.38
594,082.50
75,000.00
100,000.00
110,000.00
120,000.00

15,000.00
10,000.00
1,100.00
1,200.00
27,300.00

30,000.00
20,000.00
2,200.00
240.00
52,440.00

NO

URAIAN

HARGA
SATUAN
(Rp)

IX
1

HARGA
UPAH
(Rp)
4

PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


MEMASANG 1 M2
DAN 6 MM
1.1000 lbr
0.0100 kg
0.0300 oh
0.0700 oh
0.0070 oh
0.0040 oh

LANGIT-LANGIT ETERNIT, TEBAL 4 MM, 5 MM


Eternit
Paku Biasa 1/2" - 1"
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/4MM


0.3750 lbr Tripleks 4 mm
0.0300 kg Paku Biasa 1/2" - 1"
0.1000 oh Pekerja
0.1000 oh Tukang Kayu
0.0100 oh Kepala Tukang
0.0050 oh Mandor

1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan
0.0100 kg Paku Biasa 1/2" - 1"
0.8000 oh Pekerja
0.8000 oh Tukang Kayu
0.0800 oh Kepala Tukang
0.0400 oh Mandor

59,617.25
31,611.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

2,250.00
7,000.00
770.00
480.00
10,500.00

87,257.50
31,611.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

7,500.00
10,000.00
1,100.00
600.00
19,200.00

4,932,400.00
31,611.25
75,000.00
100,000.00
110,000.00
120,000.00

60,000.00
80,000.00
8,800.00
4,800.00

Total : 153,600.00
4

1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil
0.1000 kg Paku list SQ
0.0500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0030 oh Mandor

121,742.50
25,602.50
75,000.00
100,000.00
110,000.00
120,000.00

3,750.00
5,000.00
550.00
360.00

Total :

9,660.00

2,528,900.00
25,602.50
59,617.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

13,500.00
32,000.00
3,520.00
1,080.00
50,100.00

1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup
21,396.38
0.3640 lbr Gypsum Board (120x240x9)
78,244.38
0.1000 oh Pekerja
75,000.00
0.0500 oh Tukang Kayu
100,000.00
0.0050 oh Kepala Tukang
110,000.00
0.0050 oh Mandor
120,000.00
Total :

7,500.00
5,000.00
550.00
600.00
13,650.00

1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Matoa Usuk 4/6 cm
0.0600 kg Paku Biasa 2" - 5"
1.1000 lbr Asbes
0.1800 oh Pekerja
0.3200 oh Tukang Kayu
0.0320 oh Kepala Tukang
0.0090 oh Mandor

1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


0.1100 kg Paku Sekrup
0.3640 lbr Kalsiboard 4.5 mm
0.1000 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang

21,396.38
87,257.50
75,000.00
100,000.00
110,000.00

7,500.00
5,000.00
550.00

NO

URAIAN

0.0050

oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

120,000.00
Total :

600.00
13,650.00

PEKERJAAN SANITASI ( SNI 2002 )

X
1

MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK


1.0000 bh Kloset duduk/ monoblok
Perlengkapan
6% x harga kloset
3.3000 oh Pekerja
1.1000 oh Tukang batu
0.0010 oh Kepala Tukang
0.1600 oh Mandor

MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 bh Kloset jongkok porselen
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
1.5000 oh Tukang batu
1.5000 oh Kepala Tukang
0.1600 oh Mandor

MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir
Perlengkapan
6% x harga Urin
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
1.0000 oh Tukang batu
0.1000 oh Kepala Tukang
0.1000 oh Mandor

MEMASANG 1 BUAH WASHTAFEL KIA


1.0000 bh Washtafel
Perlengkapan
12% x harga wast
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.2000 oh Pekerja
1.4500 oh Tukang batu
0.1500 oh Kepala Tukang
0.1000 oh Mandor

MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass
Perlengkapan
18% x harga wast
1.8000 oh Pekerja
2.7000 oh Tukang batu
0.5400 oh Kepala Tukang
0.1100 oh Mandor

MEMASANG 1 M1 PIPA GALVANIS 0,5" - 1 "


1.2000 m1 Pipa galvanis
Perlengkapan
35% x harga pipa
0.0540 oh Pekerja
0.0900 oh Tukang Pipa
0.0090 oh Kepala Tukang
0.0270 oh Mandor

MEMASANG 1 M1 PIPA GALVANIS 1,5" - 3"

1,647,703.75
75,000.00
90,000.00
110,000.00
120,000.00
Total :

247,500.00
99,000.00
110.00
19,200.00
365,810.00

187,577.50
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

75,000.00
135,000.00
165,000.00
19,200.00
394,200.00

1,271,556.00
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

75,000.00
90,000.00
11,000.00
12,000.00
188,000.00

722,356.25
2,586.38
594,082.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

90,000.00
130,500.00
16,500.00
12,000.00
249,000.00

488,015.00
75,000.00
90,000.00
110,000.00
120,000.00
Total :

135,000.00
243,000.00
59,400.00
13,200.00
450,600.00

56,299.38
75,000.00
100,000.00
110,000.00
120,000.00
Total :

4,050.00
9,000.00
990.00
3,240.00
17,280.00

NO

URAIAN

1.2000

M' Pipa galvanis


Perlengkapan
35% x harga pipa
0.1080 Oh Pekerja
0.1800 Oh Tukang Pipa
0.0180 Oh Kepala Tukang
0.0054 Oh Mandor

MEMASANG 1 M1 PIPA PVC TYPE AW 0,5" - 1,5"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0360 oh Pekerja
0.0600 oh Tukang Pipa
0.0060 oh Kepala Tukang
0.0018 oh Mandor

MEMASANG 1 M1 PIPA PVC TYPE AW 2"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0540 oh Pekerja
0.0900 oh Tukang Pipa
0.0090 oh Kepala Tukang
0.0027 oh Mandor

10 MEMASANG 1 M1 PIPA PVC TYPE AW 3" - 4"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0810 oh Pekerja
0.1350 oh Tukang Pipa
0.0135 oh Kepala Tukang
0.0041 oh Mandor

11 MEMASANG 1 BUAH KRAN 0,75" ATAU 0,5"


1.0000 bh Kran air
0.0250 bh Seal tape
0.0100 oh Pekerja
0.1000 oh Tukang Pipa
0.0100 oh Kepala Tukang
0.0050 oh Mandor

XI
1

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

166,459.79
75,000.00
100,000.00
110,000.00
120,000.00
Total :

8,100.00
18,000.00
1,980.00
648.00
28,728.00

24,662.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

2,700.00
6,000.00
660.00
216.00
9,576.00

28,567.69
75,000.00
100,000.00
110,000.00
120,000.00
Total :

4,050.00
9,000.00
990.00
324.00
14,364.00

114,492.81
75,000.00
100,000.00
110,000.00
120,000.00
Total :

6,075.00
13,500.00
1,485.00
492.00
21,552.00

49,637.50
7,576.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

750.00
10,000.00
1,100.00
600.00
12,450.00

21,396.38
75,000.00
100,000.00
110,000.00
120,000.00
Total :

450.00
6,000.00
660.00
36.00
7,146.00

37,620.00
21,396.38
10,292.21
75,000.00
100,000.00
110,000.00
120,000.00
Total :

15,000.00
20,000.00
2,200.00
120.00
37,320.00

PEKERJAAN BESI DAN ALUMINIUM


(SNI 7393:2008)
1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF
0.0060 oh Pekerja
0.0600 oh Tukang besi
0.0060 oh Kepala Tukang
0.0003 oh Mandor

1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako
10.0000 bh Paku biasa 1 cm - 2,5 cm
7.0000 m' Besi strip
0.2000 oh Pekerja
0.2000 oh Tukang besi
0.0200 oh Kepala Tukang
0.0010 oh Mandor

NO
1

XII
1

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

1 M1 PASANG TALANG DATAR, SENG BJLS 28


1.0500 lbr Seng plat
0.0150 kg Paku biasa 0,5" - 1"
0.0190 m3 Kayu papan matoa
0.1500 oh Pekerja
0.4000 oh Tukang besi
0.0250 oh Kepala Tukang
0.0013 oh Mandor

20,795.50
21,396.38
2,528,900.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

11,250.00
40,000.00
2,750.00
156.00
54,156.00

115,733.75
75,000.00
100,000.00
110,000.00
120,000.00
Total :

750.00
50,000.00
1,100.00
600.00
52,450.00

37,620.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

1,125.00
15,000.00
1,650.00
96.00
17,871.00

31,611.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

750.00
10,000.00
1,100.00
60.00
11,910.00

PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 BH PASANG KUNCI TANAM BIASA
1.0000 bh Kunci tanam biasa
0.0100 oh Pekerja
0.5000 oh Tukang besi
0.0100 oh Kepala Tukang
0.0050 oh Mandor

1 PS PASANG ENGSEL PINTU


1.0000 ps Engsel pintu
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

1 PS PASANG ENGSEL JENDELA KUPU-KUPU


1.0000 ps Engsel jendela
0.0100 oh Pekerja
0.1000 oh Tukang besi
0.0100 oh Kepala Tukang
0.0005 oh Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

1 BH PASANG KAIT ANGIN


1.0000 ps Kait angin
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot
0.0200 oh Pekerja
0.2000 oh Tukang besi
0.0200 oh Kepala Tukang
0.0010 oh Mandor

1 M2 PASANG KACA, TEBAL 3 - 5 MM


1.1000 bh Kaca
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako
10.0000 bh Paku biasa 1 cm - 2,5 cm
7.0000 m' Besi strip
0.2000 oh Pekerja
0.2000 oh Tukang besi
0.0200 oh Kepala Tukang
0.0010 oh Mandor

XIII PEK. PENUTUP LANTAI DAN DINDING


7395:2008)
1

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


11.8700 bh Keramik 30 x 30 cm
10.0000 kg Semen Portland
0.0450 m3 Pasir Pasang
1.5000 kg Semen warna/semen grouting
0.7000 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala Tukang
0.0350 oh Mandor

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


26.5000 bh Keramik 20 x 20 cm
10.4000 kg Semen Portland
0.0450 m3 Pasir Pasang
1.6200 kg Semen warna/semen grouting
0.7000 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala Tukang

HARGA
UPAH
(Rp)
4

13,585.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

1,125.00
15,000.00
1,650.00
96.00
17,871.00

31,611.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

1,500.00
20,000.00
2,200.00
120.00
23,820.00

271,700.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

1,125.00
15,000.00
1,650.00
96.00
17,871.00

37,620.00
21,396.38
12,040.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

15,000.00
20,000.00
2,200.00
120.00
37,320.00

6,840.00
2,586.38
594,082.50
11,181.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

52,500.00
31,500.00
3,850.00
4,200.00
92,050.00

2,865.39
2,586.38
594,082.50
11,181.50
75,000.00
90,000.00
110,000.00

52,500.00
31,500.00
3,850.00

(SNI

NO

URAIAN

0.0350

oh Mandor

1 M1 PASANG PLIN KERAMIK 10 X 30 CM


3.3300 bh Keramik 30 x 30 cm
1.1400 kg Semen Portland
0.0030 m3 Pasir Pasang
0.1000 kg Semen warna/semen grouting
0.0900 oh Pekerja
0.0900 oh Tukang batu
0.0090 oh Kepala Tukang
0.0050 oh Mandor
1 M2 PASANG DINDING KERAMIK 20 X 20 CM
26.5000 bh Keramik 20 x 20 cm
9.3000 kg Semen Portland
0.0180 m3 Pasir Pasang
1.9400 kg Semen warna/semen grouting
0.9000 oh Pekerja
0.4500 oh Tukang batu
0.0450 oh Kepala Tukang
0.0450 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

120,000.00
Total :

4,200.00
92,050.00

6,840.00
2,586.38
594,082.50
11,181.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

6,750.00
8,100.00
990.00
600.00
16,440.00

2,865.39
2,586.38
594,082.50
11,181.50
75,000.00
90,000.00
110,000.00
120,000.00
Total :

67,500.00
40,500.00
4,950.00
5,400.00
118,350.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Matoa
0.0500 kg Paku sekrup 3,5'
0.1200 oh Pekerja
0.1200 oh Tukang kayu
0.0120 oh Kepala Tukang
0.0060 oh Mandor

HARGA
UPAH
(Rp)
4

2,528,900.00
24,167.00
75,000.00
100,000.00
110,000.00
120,000.00
Total :

9,000.00
12,000.00
1,320.00
720.00
23,040.00

57,213.75
60,218.13
78,244.38
45,196.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

5,250.00
900.00
660.00
300.00
7,110.00

75,240.00
60,218.13
8,778.00
21,997.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

12,000.00
16,000.00
1,760.00
300.00
30,060.00

36,784.00
78,244.38
22,258.50
75,000.00
100,000.00
110,000.00
120,000.00
Total :

1,500.00
6,300.00
693.00
300.00
8,793.00

1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar
78,244.38
0.1800 kg Cat Penutup 2x
22,258.50
0.0280 oh Pekerja
75,000.00
0.0420 oh Tukang cat
100,000.00
0.0042 oh Kepala Tukang
110,000.00
0.0025 oh Mandor
120,000.00
Total :

2,100.00
4,200.00
462.00
300.00
7,062.00

XIV PEKERJAAN PENGECATAN (SNI 2002)


1

1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,


1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni
0.1500 kg Dempul
0.1700 kg Cat dasar
0.2600 kg Cat Penutup 2x
0.0700 oh Pekerja
0.0090 oh Tukang cat
0.0060 oh Kepala Tukang
0.0025 oh Mandor

1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis
0.0500 kg Dempul
0.1000 lbr Amplas
0.0100 bh Kuas
0.1600 oh Pekerja
0.1600 oh Tukang cat
0.0160 oh Kepala Tukang
0.0025 oh Mandor
1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir
0.1000 kg Cat dasar
0.2600 kg Cat Penutup 2x
0.0200 oh Pekerja
0.0630 oh Tukang cat
0.0063 oh Kepala Tukang
0.0025 oh Mandor

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


0.1000 kg Meni besi
0.0100 lbr Kuas
0.0200 oh Pekerja
0.2000 oh Tukang cat
0.0200 oh Kepala Tukang
0.0100 oh Mandor

1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI

27,170.00
21,997.25
75,000.00
100,000.00
110,000.00
120,000.00
Total :

1,500.00
20,000.00
2,200.00
1,200.00
24,900.00

NO

URAIAN

0.3000
0.0060
0.0600
0.0120
0.0060

kg
oh
oh
oh
oh

Cat besi
Pekerja
Tukang cat
Kepala Tukang
Mandor

1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220 ltr Politur
2.0000 lbr Amplas
0.0600 oh Pekerja
0.0600 oh Tukang cat
0.0160 oh Kepala Tukang
0.0025 oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

81,248.75
75,000.00
100,000.00
110,000.00
120,000.00
Total :

450.00
6,000.00
1,320.00
720.00
8,490.00

75,240.00
8,778.00
75,000.00
100,000.00
110,000.00
120,000.00

4,500.00
6,000.00
1,760.00
300.00

Total :

12,560.00

31,718.27
2,586.38
297,000.00
Total :

297,000.00
297,000.00

3,135.00
2,586.38
159,500.00
Total :

159,500.00
159,500.00

31,718.27
2,586.38
159,500.00
Total :

159,500.00
159,500.00

3,135.00
2,586.38
159,500.00
Total :

159,500.00
159,500.00

31,718.27
3,135.00
2,586.38
159,500.00
Total :

159,500.00
159,500.00

31,718.27
2,586.38
317,350.00
Total :

317,350.00
317,350.00

3,135.00
2,586.38
317,350.00
Total :

317,350.00
317,350.00

XV PEKERJAAN TETEMPELAN STYLE BALI


1

1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok
8.4000 kg Semen Portland
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan
8.4000 kg Semen Portland
Upah Kerja ( Lumpsum)

1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Bata Gosok
4.2000 kg Semen Portland
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras
4.2000 kg Semen Portland
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok
4.4917 bh Batu paras
5.2500 kg Semen Portland
Upah Kerja ( Lumpsum)

1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok
4.2000 kg Semen Portland
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras
4.2000 kg Semen Portland
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR

NO

URAIAN

55.0000
4.4917
5.2500

bh Bata gosok
bh Batu paras
kg Semen 50 Kg
Upah Kerja ( Lumpsum)

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

31,718.27
3,135.00
2,586.38
317,350.00
Total :

317,350.00
317,350.00

90,000.00
110,000.00
75,000.00
120,000.00
Total :
-

22,500.00
2,750.00
37,500.00
3,000.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00

485,925.00
90,000.00
110,000.00
75,000.00
120,000.00
Total :

45,000.00
5,500.00
75,000.00
6,000.00
131,500.00

2,586.38
594,082.50
90,000.00
110,000.00
75,000.00
120,000.00
Total :

22,500.00
1,100.00
46,875.00
3,720.00
74,195.00

23 Kanstein Jumbo (P:50,L:15,T:30 cm K225)


24 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)

2,586.38
594,082.50
90,000.00
110,000.00
75,000.00
120,000.00
Total :
-

31,500.00
3,850.00
71,250.00
11,400.00
118,000.00
118,000.00
118,000.00

25 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat
0.0710 kg Thiner
0.0300 oh Tukang Cat
0.0030 oh Kep. Tukang

81,248.75
84,854.00
100,000.00
110,000.00

3,000.00
330.00

XVI PEKERJAAN LANDSCAPE


1

2
4
5
5
7
8
10
11
12
14
15
16
18

1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 6 cm K225
0.2500 oh Tukang Batu
0.0250 oh Kepala Tukang
0.5000 oh Pekerja
0.0250 oh Mandor
Paving 10 x 20 cm tebal 6 cm K350
Paving 10 x 20 cm tebal 8 cm K225
Paving 10 x 20 cm tebal 8 cm K350
Paving 10 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 6 cm K225
Paving 20 x 20 cm tebal 6 cm K350
Paving 20 x 20 cm tebal 8 cm K225
Paving 20 x 20 cm tebal 8 cm K350
Paving 20 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 10 cm K225
Paving 20 x 20 cm tebal 10 cm K350
Paving 20 x 20 cm tebal 10 cm K425
Paving Tiga Berlian tebal 6 cm K225

20 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block
0.0690 m3 Pasir Urug
0.5000 oh Tukang Batu
0.0500 oh Kepala Tukang
1.0000 oh Pekerja
0.0500 oh Mandor

21 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat
9.2800 zak Semen
0.2000 m3 Pasir pasang
0.2500 oh Tukang Batu
0.0100 oh Kepala Tukang
0.6250 oh Pekerja
0.0310 oh Mandor
22 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225
0.4500 zak Semen 50 Kg
0.0023 m3 Pasir Pasang
0.3500 oh Tukang Batu
0.0350 oh Kepala Tukang
0.9500 oh Pekerja
0.0950 oh Mandor

NO

URAIAN

0.1500
0.0150

oh Pekerja
oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

75,000.00
120,000.00
Total :

11,250.00
1,800.00
16,380.00

1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme
15,988.50
3.0000 bt Pipa Clipsal 20 mm hitam
13,585.00
2.0000 bh Tee dos clipsal 20 mm hitam
12,383.25
15.0000 bj Klem clipsal 20 mm hitam
5,172.75
3.0000 bj Sock clipsal 20 mm hitam
3,370.13
1.0000 bj Inbow dos plastik clipsal E 157 P
5,172.75
1.0000 ttk Biaya pasang
50,000.00
Total :

50,000.00
50,000.00

1 BUAH TITIK LAMPU XL 18 WATT


1 BUAH PASANGAN SAKLAR
1 BUAH PASANG STOP KONTAK
1 BUAH PASANG SEKRING KAS

57,213.75
25,602.50
15,988.50
15,988.50

XVII PEKERJAAN ELEKTRIKAL


1

1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme
3.0000 bt Pipa Clipsal 20 mm hitam
1.0000 bh Tee dos clipsal 20 mm hitam
15.0000 bj Klem clipsal 20 mm hitam
4.0000 bj Sock clipsal 20 mm hitam
1.0000 bj Inbow dos plastik clipsal E 157 P
1.0000 m1 Pipa flexible clipsal 20 mm hitam
1.0000 ttk Biaya pasang

1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone
8.0000 bt Pipa Clipsal 20 mm putih
1.0000 bh Tee dos clipsal 20 mm putih
25.0000 bj Klem clipsal 20 mm putih
5.0000 bj Sock clipsal 20 mm putih
1.0000 bj Inbow dos plastik clipsal E 157 P
1.0000 ttk Biaya pasang

15,988.50
13,585.00
12,383.25
5,172.75
3,370.13
5,172.75
12,383.25
50,000.00
Total :

50,000.00
50,000.00

7,576.25
13,585.00
12,383.25
5,172.75
3,370.13
5,172.75
50,000.00
Total :

50,000.00
50,000.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof
6.0000 bt Pipa Clipsal 20 mm putih
2.0000 bh Tee dos clipsal 20 mm putih
20.0000 bj Klem clipsal 20 mm putih
6.0000 bj Sock clipsal 20 mm putih
1.0000 bj Inbow dos plastik clipsal E 157 P
1.0000 ttk Biaya pasang

1 BH SEPTICTANK UK. 1,5 X 1,5 X 1,0 DAN PERESAPAN


9.0000 M3 Galian tanah
3.1500 M3 Urugan tanah kembali
0.1800 M3 Urugan pasir bawah lantai
4.0320 M3 Pas. Batu belah 1:3
0.1350 M3 Cor lantai 1:3:5
0.1630 M3 Plat penutup bt bertulang 1:2:3
1.0000

Pipa dan peresapan

8,417.48
13,585.00
12,383.25
5,172.75
3,370.13
5,172.75
50,000.00
Total :

59,250.00
20,737.50
606,810.00
1,432,306.76
2,055,282.84
2,209,360.25
73,933.75

HARGA
UPAH
(Rp)
4

50,000.00
50,000.00

ANALISA PEKERJAAN
0
HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

30,346.80
512.05
17,702.30

48,561.15

67,761.15

47,025.00
455,202.00
21,762.13
11,321.43
90,523.13
89,112.38
59,408.25
176,539.69
230,498.04
3,997.13
60,819.00
17,959.62
17,360.06
5,235.45

1,286,763.29

1,765,763.29

20,030.04
531,069.00
7,680.75
27,156.94
17,822.48
58,846.56
119,521.88

782,127.64

1,085,127.64

35,347.13
697,976.40
17,921.75
119,521.88

870,767.15

1,118,267.15

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

13,500.00

14,727.97
470,375.40
7,680.75
46,554.75
17,822.48
58,846.56
119,521.88
117,797.63

853,327.41

1,156,327.41

91,040.40
2,048.20
25,289.00

118,377.60

148,557.60

9,979.75
14,512.44

24,492.19

55,402.19

53,059.88
97,812.00
5,940.83

156,812.70

237,812.70

539,985.00

503,985.00

59,250.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

72,900.00

86,790.00

78,840.00

119,700.00

95,400.00

4,350.00

25,950.00

li dari indeks pekerjaan galian

43,500.00

583,110.00

583,110.00

606,810.00

26,710.20

26,710.20

39,760.20

511,005.00

511,005.00

294,690.00

532,755.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

294,690.00

338,190.00

122,703.90

122,703.90

144,453.90

424,479.00
522,447.75
288,130.01

1,235,056.76

1,432,306.76

424,479.00
421,579.13
308,922.90

1,154,981.03

1,352,231.03

424,479.00
351,747.00
323,180.88

1,099,406.88

1,296,656.88

424,479.00
302,605.88
333,280.28

1,060,365.16

1,257,615.16

424,479.00
235,360.13
346,944.18

1,006,783.31

169,791.60

1,204,033.31

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

501,756.75
185,353.74
550,803.83
1,737,160.25
54,737.10

3,199,603.27

3,560,853.27

159,179.63
501,756.75
185,353.74
550,803.83

1,397,093.94

1,672,173.94

424,479.00
209,919.60

634,398.60

736,968.60

207,448.24
48,752.22
46,072.75

302,273.21

338,173.21

207,448.24
37,166.21
23,763.30

268,377.75

207,448.24
29,730.40
28,096.39

304,277.75

HARGA
BAHAN
(Rp)
5

265,275.03

HARGA
JUMLAH
(Rp)
6

301,175.03

207,448.24
25,036.11
26,733.71

259,218.06

295,118.06

414,896.48
47,847.94
72,478.07

535,222.48

604,022.48

207,448.24
49,011.81
22,575.14

279,035.18

313,435.18

307,330.72
37,166.21
23,763.30

368,260.23

402,660.23

307,330.72
29,743.31
25,545.55

362,619.58

397,019.58

307,330.72
25,036.11
26,733.71

359,100.55
307,330.72
21,518.64

393,500.55

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

29,110.04

357,959.41

392,359.41

307,330.72
16,811.44
29,704.13

353,846.29

388,246.29

96,040.85
19,397.81
16,040.23
26,884.62

158,363.51

194,263.51

96,040.85
19,397.81
16,040.23

131,478.89

167,378.89

2,437,462.50
28,450.13
20,792.89

2,486,705.51

2,521,105.51

42,557.63
35,404.60
191.86
7,586.70

85,740.79

40,099.16
9,505.32

99,030.79

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

49,604.48

89,054.48

26,443.10
11,881.65

38,324.75

77,774.75

20,111.65
13,663.90

33,775.55

73,225.55

16,138.98
14,257.98

30,396.96

69,846.96

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

13,407.77
15,446.15

28,853.91

68,303.91

11,421.43
16,040.23

27,461.66

66,911.66

8,938.51
17,228.39

26,166.90

65,616.90

35,257.46
16,040.23

51,297.69

104,137.69

26,815.54
18,416.56

45,232.09

98,072.09

21,518.64
19,010.64

40,529.28

93,369.28

17,877.02
20,792.89

38,669.91

91,509.91

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

15,228.58
21,386.97

36,615.55

89,455.55

1,293.19
7,723.07

9,016.26

55,896.26

11,173.14
3,564.50

14,737.64

49,137.64

8,038.45

8,038.45

27,878.45

4,138.20

4,138.20

13,458.20

16,397.62
7,128.99

23,526.61

62,976.61

8,405.72

8,405.72

35,705.72

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

4,368,100.00
32,003.13
55,646.25

4,455,749.38

7,353,749.38

3,034,680.00
32,003.13
55,646.25

3,122,329.38

5,606,329.38

101,156.00
1,280.13

102,436.13

247,396.13

101,156.00
1,280.13

102,436.13

247,396.13

233,055.90
27,823.13

260,879.03

674,879.03

118,377.60
331,787.50
16,693.88

466,858.98

798,058.98

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

315,673.60
27,823.13

343,496.73

757,496.73

63,222.50
768.08
27,823.13
147,345.00

239,158.70

653,158.70

126,269.44
768.08
27,823.13
147,345.00

302,205.64

633,405.64

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

295,944.00
3,840.38

299,784.38

612,234.38

126,269.44
768.08
27,823.13
147,345.00

302,205.64

633,405.64

63,222.50
768.08
44,517.00
147,345.00
58,650.63

314,503.20

645,703.20

4,368,100.00
154,383.08
143,374.00

4,665,857.08

6,321,857.08

4,765,200.00
154,383.08
143,374.00

5,062,957.08

2,781,790.00
154,383.08
76,807.50

7,836,757.08

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

3,012,980.58

4,006,580.58

35,404.60
9,104.04
6,400.63

50,909.27

70,109.27

35,404.60
18,208.08
6,400.63

60,013.31

79,213.31

417,268.50
5,120.50

422,389.00

445,429.00

4,235,907.50

4,235,907.50

5,426,307.50

38,945.06
5,120.50

44,065.56

97,615.56

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

41,221.07
6,400.63

47,621.70

97,121.70

53,269.92
2,560.25

55,830.17

86,130.17

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

54,256.40
1,280.13

55,536.53

85,836.53

70,809.20
3,840.38

74,649.58

136,809.58

70,809.20
3,840.38
126,716.70
31,161.90

232,528.18

294,688.18

70,809.20
3,840.38
80,208.98
31,161.90

186,020.45

268,820.45

34,526.80
2,560.25
3,209.46

40,296.51

37,306.50
1,280.13

288,696.51

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

38,586.63

48,961.63

563,829.75
308,922.90
1,023,930.19

1,896,682.84

2,055,282.84

600,039.00
308,922.90
918,006.38

1,826,968.28

1,985,568.28

724,185.00
267,337.13
1,059,238.13

2,050,760.25

2,209,360.25

144,763.35
4,561.43

149,324.78

162,824.78

101,156.00
7,680.75
1,959.38

110,796.13

101,156.00
7,680.75
1,959.38

181,776.13

HARGA
BAHAN
(Rp)
5

110,796.13

HARGA
JUMLAH
(Rp)
6

181,776.13

101,156.00
10,241.00
3,918.75
37,933.50
63,074.50
75,240.00

291,563.75

381,653.75

101,156.00
10,241.00
3,918.75
45,520.20
63,074.50
75,240.00

299,150.45

389,240.45

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

101,156.00
10,241.00
3,918.75
37,933.50
63,074.50
225,720.00

442,043.75

532,133.75

75,867.00
10,241.00
3,918.75
50,578.00
63,074.50
112,860.00
8,000.00

324,539.25

414,629.25

75,867.00
10,241.00
2,939.06
37,933.50
63,074.50
75,240.00

265,295.06

355,385.06

66,762.96
15,361.50
18,810.00

100,934.46

505,780.00
38,403.75
7,837.50
2,164,556.82
68,421.38
869,022.00
320,804.55
953,314.31

118,694.46

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

4,928,140.31

5,646,010.31

682,803.00
51,205.00
11,756.25
2,895,267.09
91,228.50
869,022.00
320,804.55
953,314.31

5,875,400.70

6,689,390.70

1,011,560.00
102,410.00
39,187.50
4,342,900.63
136,842.75
869,022.00
320,804.55
953,314.31
379,335.00
630,745.02
752,400.00

9,538,521.76

10,553,711.76

809,248.00
81,928.00
31,350.00
2,895,267.09
91,228.50
869,022.00
320,804.55
953,314.31
354,046.00
504,596.02
601,920.00

7,512,724.47

8,393,514.47

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

809,248.00
81,928.00
31,350.00
2,171,450.32
68,421.38
869,022.00
320,804.55
953,314.31
303,468.00
504,596.02
1,203,840.00

7,317,442.57

8,035,642.57

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

606,936.00
81,928.00
31,350.00
2,164,556.82
68,421.38
869,022.00
320,804.55
953,314.31
404,624.00
504,596.02
902,880.00

6,908,433.08

7,626,303.08

632,225.00
76,807.50
23,512.50
2,895,267.09
91,228.50
869,022.00
320,804.55
953,314.31
265,534.50
450,532.16
526,680.00

7,104,928.11

7,918,918.11

5,057.80
256.03
41,360.96
1,368.43
10,345.50
3,564.50
10,592.38

72,545.59

7,586.70
512.05
49,633.15
1,520.48

93,585.59

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

14,225.06
5,346.74
17,653.97

96,478.15

131,223.15

86,055.75

86,055.75

104,925.75

80,647.88

80,647.88

99,517.88

51,100.50
20,691.00
19,010.64

90,802.14

143,242.14

31,459.73
2,892.04

34,351.76

53,461.76

72,982.80
183,661.15

256,643.95

277,353.95

829,521.00
5,120.50

834,641.50

875,801.50

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

8,318.20
1,536.15
1,280.13
19,729.60

30,864.08

68,949.08

96,113.88
27,823.13

123,937.00

140,137.00

81,013.63
632.23

81,645.85

98,025.85

38,239.16

38,239.16

55,999.16

6,238.65
1,264.45

7,503.10

27,353.10

65,033.22
3,060.00

68,093.22

95,393.22

218,143.75
2,069.10
19,010.64

239,223.49

291,663.49

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

65,578.98
316.11

65,895.09

76,395.09

32,721.56
948.34

33,669.90

52,869.90

73,986.00
316.11

74,302.11

227,902.11

127,829.63
2,560.25

130,389.88

140,049.88

30,346.80
1,536.15
65,578.98

97,461.93

147,561.93

2,353.60
28,480.95

30,834.55

2,353.60
31,761.73

44,484.55

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

34,115.33

47,765.33

1,647,703.75
98,862.23

1,746,565.98

2,112,375.98

187,577.50
15,518.25
5,940.83

209,036.58

603,236.58

1,271,556.00
76,293.36
15,518.25
5,940.83

1,369,308.44

1,557,308.44

722,356.25
86,682.75
15,518.25
5,940.83

830,498.08

1,079,498.08

488,015.00
87,842.70

575,857.70

1,026,457.70

67,559.25
19,704.78

87,264.03

104,544.03

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

199,751.75
58,260.93

258,012.68

286,740.68

29,594.40
8,631.70

38,226.10

47,802.10

34,281.23
9,998.69

44,279.92

58,643.92

137,391.38
40,072.48

177,463.86

199,015.86

49,637.50
189.41

49,826.91

62,276.91

24,605.83

24,605.83

31,751.83

41,382.00
213,963.75
72,045.44

327,391.19

364,711.19

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

21,835.28
320.95
48,049.10

70,205.32

124,361.32

115,733.75

115,733.75

168,183.75

37,620.00

37,620.00

55,491.00

31,611.25

31,611.25

43,521.25

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

13,585.00

13,585.00

31,456.00

31,611.25

31,611.25

55,431.25

298,870.00

298,870.00

316,741.00

41,382.00
213,963.75
84,283.50

339,629.25

376,949.25

81,190.80
25,863.75
26,733.71
16,772.25

150,560.51

75,932.84
26,898.30
26,733.71
18,114.03

242,610.51

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

147,678.88

239,728.88

22,777.20
2,948.47
1,782.25
1,118.15

28,626.07

45,066.07

75,932.84
24,053.29
10,693.49
21,692.11

132,371.72

250,721.72

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

7,586.70
1,208.35

8,795.05

31,835.05

11,442.75
9,032.72
13,301.54
11,751.03

45,528.04

52,638.04

11,286.00
3,010.91
877.80
219.97

15,394.68

45,454.68

3,678.40
7,824.44
5,787.21

17,290.05

26,083.05

9,389.33
4,006.53

13,395.86

20,457.86

2,717.00
219.97

2,936.97

27,836.97

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

24,374.63

24,374.63

32,864.63

39,275.28
17,556.00

56,831.28

69,391.28

3,489,009.49
21,725.55
3,510,735.04

3,807,735.04

43,106.25
21,725.55
64,831.80

224,331.80

1,744,504.74
10,862.78
1,755,367.52

1,914,867.52

57,475.00
10,862.78
68,337.78

227,837.78

1,744,504.74
14,081.38
13,578.47
1,772,164.59

1,931,664.59

1,744,504.74
10,862.78
1,755,367.52

2,072,717.52

57,475.00
10,862.78
68,337.78

385,687.78

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

1,744,504.74
14,081.38
13,578.47
1,772,164.59

2,089,514.59

65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00
65,750.00

33,528.83

33,528.83

165,028.83

24,001.56
118,816.50

142,818.06

217,013.06

1,163.87
1,366.39

2,530.26
142,818.06
142,818.06

23,074.65
6,024.63

120,530.26
260,818.06
260,818.06

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

29,099.28

45,479.28

127,908.00
40,755.00
24,766.50
77,591.25
10,110.38
5,172.75
286,303.88

336,303.88

336,303.88
336,303.88
336,303.88
336,303.88

393,517.63
361,906.38
352,292.38
352,292.38

159,885.00
40,755.00
12,383.25
77,591.25
13,480.50
5,172.75
12,383.25
50,000.00
371,651.00

421,651.00

189,406.25
108,680.00
12,383.25
129,318.75
16,850.63
5,172.75
461,811.63

511,811.63

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

168,349.50
81,510.00
24,766.50
103,455.00
20,220.75
5,172.75
403,474.50

453,474.50

533250
65323.125
109225.8
5775060.8664
277463.1830625
360125.72075
73933.75
7,194,382.45

7,194,382.45

REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN


0
NO

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN

Err:509

1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK

1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN

1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT

1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU

1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN

1 M2 PEMBUATAN BEDENG BURUH

1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM

1 M2 PEMBUATAN STEGGER DARI BAMBU

10

1 M2 PEMBUATAN JALAN SEMENTARA

11

1 M3 BONGKARAN BETON BERTULANG

12

1 M3 BONGKARAN DINDING TEMBOK BATU TELA

II

PEKERJAAN TANAH

1 M3 GALIAN TANAH BIASA DALAM 1 METER

1 M3 GALIAN TANAH BIASA DALAM 2 METER

1 M3 GALIAN TANAH BIASA DALAM 3 METER

1 M3 GALIAN TANAH KERAS DALAM 1METER

1 M3 GALIAN TANAH CADAS DALAM 1 METER

1 M3 GALIAN TANAH LUMPUR DALAM 1 METER

1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER

1 M3 PEMBUANGAN TANAH SEJAUH 15 METER

1 M3 URUGAN KEMBALI

10

1 M3 PEMADATAN TANAH ( Per 20 Cm )

11

1 M3 URUGAN PASIR

12

1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM

13

1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan

14

1 M3 URUGAN TANAH PILIHAN DIPADATKAN

15

1 M3 URUGAN LIMESTONE PADAT

III PEKERJAAN PONDASI

(SNI 03-2835-2002)

(SNI 2835 : 2008)

(SNI 2836 : 2008)

1 M3 BATU KALI CAMP. 1 PC : 3 PS

1 M3 BATU KALI CAMP. 1 PC : 4 PS

1 M3 BATU KALI CAMP. 1 PC : 5 PS

1 M3 BATU KALI CAMP. 1 PC : 6 PS

NO

URAIAN PEKERJAAN

1 M3 BATU KALI CAMP. 1 PC : 8 PS

1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI

1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M

1 M3 PASANGAN BATU KOSONG

NO

URAIAN PEKERJAAN

IV PEKERJAAN DINDING

(SNI 6897 : 2008)

1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 2 PS

1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 3 PS

1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 4 PS

1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 5 PS

1 M2 PASANGAN BATU TELA TEBAL 1 TELA CAMP. 1 PC : 6 PS

1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 2 PS

1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 3 PS

1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 4 PS

1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 5 PS

10

1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 6 PS

11

1 M2 PASANGAN BATU TELA TEBAL 1/2 TELA CAMP. 1 PC : 8 PS

12

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)

13

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI

14

1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM

15

1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU

PEKERJAAN PLESTERAN

1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM

1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM

10

1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM

11

1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM

12

1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM

13

1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM

14

1 M2 PLESTERAN CIPRAT 1 PC : 2 PS

15

1 M2 FINISHING SIAR PASANGAN DINDING BATU TELA (=20 M')

16

1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M')

17

1 M2 FINISHING SIAR PASANGAN BATUKALI/BELAH ADUKAN 1PC : 2 PS

18

1 M2 PEKERJAAN ACIAN

(SNI 2837 : 2008)

NO

URAIAN PEKERJAAN

VI PEKERJAAN KAYU

(SNI 3434 : 2008)

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I (KAY

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II (KAYU

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III (KAY

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II (KAYU BES

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II (KA

7
8

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II (
MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA TERTUTUP, KAYU
KELAS II (Lebar Sampai 90 Cm)
MEMBUAT 1 M2 DAUN PINTU TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU
KELAS I/II

9
10

MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II

11

MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I


MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE,
KAYU KELAS II

12
13

MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS


I,II,III Bentang 6 M'

14

MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I

15

MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

16

MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II

17

MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II

18

MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

19

MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III

20

MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III

21

MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II

22

MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II

23

MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III

24

MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA


KAYU KELAS II

25

MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA


KAYU KELAS II

26

MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

27

MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM

NO

URAIAN PEKERJAAN

VII PEKERJAAN BETON ( SNI 7394:2008)


1

1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR

1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR

1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR

PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR

1 M2 PASANG BEKISTING UNTUK PONDASI

1 M2 PASANG BEKISTING UNTUK SLOOF

1 M2 PASANG BEKISTING UNTUK KOLOM

1 M2 PASANG BEKISTING UNTUK BALOK

1 M2 PASANG BEKISTING UNTUK LANTAI

10

1 M2 PASANG BEKISTING UNTUK DINDING

11

1 M2 PASANG BEKISTING UNTUK TANGGA

12

1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON

13

1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)

14

1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)

15

1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)

16

1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)

17

1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING

18

1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)

19

1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)

20

1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)

21

1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1

1 M2 PEKERJAAN ATAP GENTENG PLENTONG

1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT

1 M1 PASANG BUBUNGAN GENTENG PLENTONG

1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM

1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M

1 M2 PEKERJAAN ATAP SIRAP

1 M2 PEKERJAAN ATAP NOK SIRAP

1 M2 PASANG ATAP ALANG-ALANG 3 M1

1 M2 PEKERJAAN ATAP SENG GELOMBANG

10

1 M2 PASANGAN LAPISANG ALUMINIUM FOIL

11

1 M1 PASANG NOK SENG GELOMBANG

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1

MEMASANG 1 M2 LANGIT-LANGIT ETERNIT, TEBAL 4 MM, 5 MM DAN 6 MM

1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/4MM

NO

URAIAN PEKERJAAN

1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING

1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL

1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA

1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM

1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM

NO

URAIAN PEKERJAAN

PEKERJAAN SANITASI ( SNI 2002 )

MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK

MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN

MEMASANG 1 BUAH URINOIR

MEMASANG 1 BUAH WASHTAFEL KIA

MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3

MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "

MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"

MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"

MEMASANG 1 M1 PIPA PVC TYPE AW f 2"

10

MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"

11

MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"

XI PEKERJAAN BESI DAN ALUMINIUM


1

1 KG PASANG RANGKA ATAP BAJA

1 M2 PASANG JENDELA NAKO

1 M1 PASANG TALANG DATAR, SENG BJLS 28

(SNI 7393:2008)

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1

1 BH PASANG KUNCI TANAM BIASA

1 PS PASANG ENGSEL PINTU

1 PS PASANG ENGSEL JENDELA KUPU-KUPU

1 BH PASANG KAIT ANGIN

1 BH PASANG KUNCI SLOT

1 M2 PASANG KACA, TEBAL 3 - 5 MM

XIII PEK. PENUTUP LANTAI DAN DINDING


1

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM

1 M1 PASANG PLIN KERAMIK 10 X 30 CM

1 M2 PASANG DINDING KERAMIK 20 X 20 CM

1 M1 PASANG PLIN KAYU 2 X 10 CM

XIV PEKERJAAN PENGECATAN (SNI 2002)


1

1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,


1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS

1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,


1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

(SNI 7395:2008)

NO

URAIAN PEKERJAAN

1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI

1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI

1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR

NO

URAIAN PEKERJAAN

XV PEKERJAAN TETEMPELAN STYLE BALI


1

1 M2 PASANGAN BATA GOSOK 2 MUKA

1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA

1 M2 PASANGAN BATA GOSOK 1 MUKA

1 M2 PASANGAN PARAS 1 MUKA

1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA

1 M2 PASANGAN BATA GOSOK DIUKIR

1 M2 PASANGAN PARAS DIUKIR

1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR

XVI PEKERJAAN LANDSCAPE


1

1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225

Paving 10 x 20 cm tebal 6 cm K350

Paving 10 x 20 cm tebal 8 cm K225

Paving 10 x 20 cm tebal 8 cm K350

Paving 20 x 20 cm tebal 6 cm K225

Paving 20 x 20 cm tebal 6 cm K350

Paving 20 x 20 cm tebal 8 cm K225

Paving 20 x 20 cm tebal 8 cm K350

Paving 20 x 20 cm tebal 8 cm K425

10

Paving 20 x 20 cm tebal 10 cm K225

11

Paving 20 x 20 cm tebal 10 cm K350

12

Paving 20 x 20 cm tebal 10 cm K425

13

Paving Tiga Berlian tebal 6 cm K225

14

1 M2 PASANGAN GRASS BLOCK

15

1 M2 PASANGAN KORAL SIKAT

16

1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225

17

Kanstein Jumbo (P:50,L:15,T:30 cm K225)

18

Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)

19

1 M2 PENGECATAN KANSTEIN

XVII PEKERJAAN ELEKTRIKAL


1

1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN

1 TITIK INSTALASI AC

1 TITIK INSTALASI TELEPHONE

1 TITIK INSTALASI MATV

Fakfak, 16 Agustus 2012

Panitia Penyusunan Standard Harga


Satuan Tahun 2013
,Ketua
Ir. ARIEF HARTADI, MT
NIP. 19640121 199403 1 004

NO

URAIAN PEKERJAAN

Fakfak, 16 Agustus 2012

Panitia Penyusunan Standard Harga


Satuan Tahun 2013
,Ketua

Sekretaris,

Ir. ARIEF HARTADI, MT


NIP. 19640121 199403 1 004

LIZA NEIRASARI, ST
NIP. 19751016 200111 2
001
Mengetahui,
Kepala Dinas Pekerjaan Umum
Kabupaten Fakfak ,

SAMAUN DAHLAN, S.Sos, MAP


NIP. 19681005 199108 1 002

KERJAAN

HARGA
3

Rp. Err:509
Rp.

67,761.15

Rp.

1,765,763.29

Rp.

1,085,127.64

Rp.

1,118,267.15

Rp.

13,500.00

Rp.

1,156,327.41

Rp.

148,557.60

Rp.

55,402.19

Rp.

237,812.70

Rp.

539,985.00

Rp.

503,985.00

Rp.

59,250.00

Rp.

72,900.00

Rp.

86,790.00

Rp.

78,840.00

Rp.

119,700.00

Rp.

95,400.00

Rp.

4,350.00

Rp.

25,950.00

Rp.

Rp.

43,500.00

Rp.

606,810.00

Rp.

39,760.20

Rp.

532,755.00

Rp.

338,190.00

Rp.

144,453.90

Rp.

1,432,306.76

Rp.

1,352,231.03

Rp.

1,296,656.88

Rp.

1,257,615.16

HARGA
3

Rp.

1,204,033.31

Rp.

3,560,853.27

Rp.

1,672,173.94

Rp.

736,968.60

HARGA
3

Rp.

338,173.21

Rp.

304,277.75

Rp.

301,175.03

Rp.

295,118.06

Rp.

604,022.48

Rp.

313,435.18

Rp.

402,660.23

Rp.

397,019.58

Rp.

393,500.55

Rp.

392,359.41

Rp.

388,246.29

Rp.

194,263.51

Rp.

167,378.89

Rp.

2,521,105.51

Rp.

99,030.79

Rp.

89,054.48

Rp.

77,774.75

Rp.

73,225.55

Rp.

69,846.96

Rp.

68,303.91

Rp.

66,911.66

Rp.

65,616.90

Rp.

104,137.69

Rp.

98,072.09

Rp.

93,369.28

Rp.

91,509.91

Rp.

89,455.55

Rp.

55,896.26

Rp.

49,137.64

Rp.

27,878.45

Rp.

13,458.20

Rp.

62,976.61

Rp.

35,705.72

HARGA
3

Rp.

7,353,749.38

Rp.

5,606,329.38

Rp.

247,396.13

Rp.

247,396.13

Rp.

674,879.03

Rp.

798,058.98

Rp.

757,496.73

Rp.

653,158.70

Rp.

633,405.64

Rp.

612,234.38

Rp.

633,405.64

Rp.

645,703.20

Rp.

6,321,857.08

Rp.

7,836,757.08

Rp.

4,006,580.58

Rp.

70,109.27

Rp.

79,213.31

Rp.

445,429.00

Rp.

97,615.56

Rp.

97,121.70

Rp.

86,130.17

Rp.

85,836.53

Rp.

136,809.58

Rp.

294,688.18

Rp.

268,820.45

Rp.

288,696.51

Rp.

48,961.63

HARGA
3

Rp.

2,055,282.84

Rp.

1,985,568.28

Rp.

2,209,360.25

Rp.

162,824.78

Rp.

181,776.13

Rp.

181,776.13

Rp.

381,653.75

Rp.

389,240.45

Rp.

532,133.75

Rp.

414,629.25

Rp.

355,385.06

Rp.

118,694.46

Rp.

5,646,010.31

Rp.

6,689,390.70

Rp.

10,553,711.76

Rp.

8,393,514.47

Rp.

8,035,642.57

Rp.

7,626,303.08

Rp.

7,918,918.11

Rp.

93,585.59

Rp.

131,223.15

Rp.

104,925.75

Rp.

99,517.88

Rp.

143,242.14

Rp.

53,461.76

Rp.

277,353.95

Rp.

875,801.50

Rp.

68,949.08

Rp.

140,137.00

Rp.

98,025.85

Rp.

55,999.16

Rp.

27,353.10

Rp.

76,395.09

Rp.

52,869.90

HARGA
3

Rp.

227,902.11

Rp.

140,049.88

Rp.

147,561.93

Rp.

44,484.55

Rp.

47,765.33

HARGA
3

Rp.

2,112,375.98

Rp.

603,236.58

Rp.

1,557,308.44

Rp.

1,079,498.08

Rp.

1,026,457.70

Rp.

104,544.03

Rp.

286,740.68

Rp.

47,802.10

Rp.

58,643.92

Rp.

199,015.86

Rp.

62,276.91

Rp.

31,751.83

Rp.

364,711.19

Rp.

124,361.32

Rp.

168,183.75

Rp.

55,491.00

Rp.

43,521.25

Rp.

31,456.00

Rp.

55,431.25

Rp.

316,741.00

Rp.

242,610.51

Rp.

239,728.88

Rp.

45,066.07

Rp.

250,721.72

Rp.

31,835.05

Rp.

52,638.04

Rp.

45,454.68

Rp.

26,083.05

HARGA
3

Rp.

20,457.86

Rp.

27,836.97

Rp.

32,864.63

Rp.

69,391.28

HARGA
3

Rp.

3,807,735.04

Rp.

224,331.80

Rp.

1,914,867.52

Rp.

227,837.78

Rp.

1,931,664.59

Rp.

2,072,717.52

Rp.

385,687.78

Rp.

2,089,514.59

Rp.

65,750.00

Rp.

65,750.00

Rp.

65,750.00

Rp.

65,750.00

Rp.

65,750.00

Rp.

65,750.00

Rp.

65,750.00

Rp.

65,750.00

Rp.

65,750.00

Rp.

65,750.00

Rp.

65,750.00

Rp.

65,750.00

Rp.

65,750.00

Rp.

165,028.83

Rp.

217,013.06

Rp.

120,530.26

Rp.

260,818.06

Rp.

260,818.06

Rp.

45,479.28

Rp.

336,303.88

Rp.

421,651.00

Rp.

511,811.63

Rp.

453,474.50

16 Agustus 2012

sunan Standard Harga


an Tahun 2013
,Ketua

F HARTADI, MT
121 199403 1 004

HARGA

16 Agustus 2012

sunan Standard Harga


an Tahun 2013
,Ketua

F HARTADI, MT
121 199403 1 004

CV PASPAN ABADI

REKAPITULASI
SKPD

: DINAS PERHUBUNGAN KOMUNIKASI DAN INFORMATIKA PROVINSI PAPUA BARAT

PAKET

: PEMBANGUNAN PAGAR PENGAMAN BANDARA DEO TAHAP I

LOKASI

: KOTA SORONG

TAHUN

: 2016

NO

JUMLAH HARGA

URAIAN

PEKERJAAN PENDAHULUAN

II

PEKERJAAN PONDASI

III

PEKERJAAN PAGAR

(RP)

109,211,875.00
1,039,503,946.65
214,500,000.00
REAL COST
PPN 10%

1,363,215,821.65
136,321,582.17

JUMLAH HARGA

1,499,537,403.82

DIBULATKAN

1,499,530,000.00

Terbilang : satu milyar empat ratus sembilan puluh sembilan juta lima ratus tiga puluh ribu rupiah

DIBUAT OLEH
PENYEDIA
CV PASPAN ABADI

EVIANA WAITA
Direktur

RENCANA ANGGARAN BIAYA (RAB)


SKPD

DINAS PERHUBUNGAN KOMUNIKASI DAN INFORMATIKA PROVINSI PAPUA BARAT

PAKET

PEMBANGUNAN PAGAR PENGAMAN BANDARA DEO TAHAP I

LOKASI

KOTA SORONG

TAHUN

2016

No

Uraian Pekerjaan

Sat

Volume

###

Harga Satuan

Jumlah Harga

(Rp)

(Rp)

PEKERJAAN PENDAHULUAN

Pembersihan Lokasi

M2

109,211,875.00

Pengukuran Awal dan Shop Drawing

LS

As Built Drawing

LS

Gudang Semen dan Peralatan

M2

II

PEKERJAAN PONDASI

Bowplank

M'

230.94

63,976.40

14,774,708.89

Galian Tanah

M3

324.65

94,160.00

30,569,044.00

Urugan Kembali

M3

150.34

19,750.00

2,969,215.00

Urugan Pasir di Bawah Pondasi

M3

23.19

554,332.00

12,854,959.08

Pondasi Tiang Beton K125

BH

631.00

1,550,453.28

978,336,019.68

III

PEKERJAAN PAGAR

Pek. Pagar Tipe Wiremesh Hot Dip Gavanized L250 SET

31.50

800,000.00

25,200,000.00

315.50

600,000.00

189,300,000.00

15,500.00

36,211,875.00

1.00

20,000,000.00

20,000,000.00

1.00

23,000,000.00

23,000,000.00

6.00

5,000,000.00

30,000,000.00
###

214,500,000.00

T215,h dia.6mm, v dia.4mm + Tiang Pagar Tipe Tekuk


di Atas Hot Dep Galvanized T244 Dia 2" + Aksesoris
2

Pek. Pagar Tipe Wiremesh Hot Dip Gavanized L250 SET


T215,h dia.6mm, v dia.4mm + Tiang Pagar Tipe Tekuk
di Atas + Skor Hot Dep Galvanized Dia.2" + Aksesoris

DAFTAR ANALISA PEKERJAAN


SKPD

: DINAS PERHUBUNGAN KOMUNIKASI DAN INFORMATIKA PROVINSI PAPUA BARAT

PAKET

: PEMBANGUNAN PAGAR PENGAMAN BANDARA DEO TAHAP I

LOKASI

: KOTA SORONG

TAHUN

: 2016

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 Pembersihan Lokasi
0.100 oh Pekerja
0.050 oh Mandor

1 M' Bowplank
0.012
0.020
0.007
0.100
0.100
0.010
0.005

m3
kg
m3
oh
oh
oh
oh

Kayu Putih 5/7


Paku Biasa 2" - 5"
Kayu Papan Putih 3/20
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
UPAH
(Rp)
4

Total :
90,000.00
130,000.00

15,500.00
9,000.00
6,500.00

Total :
2,191,800.00
24,109.80
2,191,800.00
110,000.00
90,000.00
120,000.00
130,000.00

21,850.00

11,000.00
9,000.00
1,200.00
650.00

1 M3 Galian Tanah
1.000 oh Pekerja
0.032 oh Mandor

Total :
90,000.00
130,000.00

94,160.00
90,000.00
4,160.00

1 M3 Urugan Kembali
0.192 oh Pekerja
0.019 oh Mandor

Total :
90,000.00
130,000.00

19,750.00
17,280.00
2,470.00

1 M3 Urugan Pasir di Bawah Pondasi


1.200 m3 Pasir Urug
0.300 oh Pekerja
0.010 oh Mandor

Total :
438,360.00
90,000.00
130,000.00

28,300.00

1 M3 Pasang Batu Kosong Pondasi


1.200 m3 Batu Belah
0.432 m3 Pasir Urug
0.780 oh Pekerja
0.390 oh Tukang Batu
0.039 oh Kepala Tukang
0.039 oh Mandor

Total :
547,950.00
438,360.00
90,000.00
110,000.00
120,000.00
130,000.00

122,850.00

1 M3 Pondasi Batu Gunung Camp. 1PC : 4PS


1.200 m3 Batu Belah
163.000 kg Semen Portland
0.520 m3 Pasir Pasang

Total :
547,950.00
2,630.16
438,360.00

236,250.00

27,000.00
1,300.00

70,200.00
42,900.00
4,680.00
5,070.00

NO

URAIAN

1.500
0.750
0.075
0.075

oh
oh
oh
oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M3 Urugan Peninggian Lantai Dipadatkan


1.200 m3 Tanah Urug
0.500 oh Pekerja
0.050 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

90,000.00
110,000.00
120,000.00
130,000.00

135,000.00
82,500.00
9,000.00
9,750.00

Total :
219,180.00
90,000.00
130,000.00

51,500.00
45,000.00
6,500.00

AN

PUA BARAT

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

15,500.00

42,126.40
26,301.60
482.20
15,342.60

63,976.40

94,160.00

19,750.00

526,032.00
526,032.00

554,332.00

846,911.52
657,540.00
189,371.52

969,761.52

1,314,203.28
657,540.00
428,716.08
227,947.20

1,550,453.28

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

263,016.00
263,016.00

314,516.00

DAFTAR HARGA BAHAN DAN UPAH


SKPD

: DINAS PERHUBUNGAN KOMUNIKASI DAN INFORMATIKA PROVINSI PAPUA BARAT

PAKET

: PEMBANGUNAN PAGAR PENGAMAN BANDARA DEO TAHAP I

LOKASI

: KOTA SORONG

TAHUN

: 2016

HARGA

NO

NAMA

SATUAN

BAHAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

Amplas
Bak Fibreglass
Bak Cuci Stainless Steel
Balok Kayu Besi
Balok Kayu Matoa
Keramik Tekstur
Batu Alam Brownies
Batu Belah
Batu Tela
Besi Beton
Besi Holow 4/4
Besi Holow 2/4
Besi Siku
Besi Strip Tebal 5 cm
Biaya Pasang
Cat Batu Alam
Cat dasar
Cat meni
Cat Penutup 2x
Cat Penutup 2 x Mowilex
Dempul
Dolken Kayu 8" - 10"/4m
Engsel jendela
Engsel pintu
Floor Drain
Grendel
Grendel Jendela
Handle
Inbow dos plastik clipsal E 157 P
Kabel NYM 3 x 2.5 mm
Kaca rayben 5 mm
Kait angin

Lbr
Bh
Bh
M3
M3
M2
M2
M3
Bh
Kg
M'
M'
M'
Kg
Ls
Kg
Kg
Kg
Kg
Kg
Kg
BH
Ps
Ps
Bh
Ps
Ps
Ps
Bh
M'
M2
Ps

10,959.00
657,540.00
1,095,900.00
3,287,700.00
2,301,390.00
120,549.00
410,962.50
547,950.00
3,835.65
17,534.40
36,164.70
27,397.50
50,411.40
17,534.40
60,000.00
65,000.00
25,205.70
65,754.00
25,205.70
104,110.50
40,548.30
23,013.90
32,877.00
43,836.00
27,397.50
27,397.50
16,438.50
219,180.00
32,877.00
27,397.50
220,166.35
54,795.00

Rp.

HARGA

NO

NAMA

SATUAN

Kg
BH
M3
M3
M3
M3
M'
Bh
Bh
Bh
Bh
Bh
M3
Bh
Bh

27,397.50
4,602.78
2,191,800.00
2,191,800.00
2,191,800.00
2,191,800.00
13,698.75
87,672.00
109,590.00
164,385.00
1,643.85
219,180.00
876,720.00
21,918.00
16,438.50

33
34
35
36
37
38
39
40
41
42
43
44
45
46
47

Kawat Beton
Kawat Las
Kayu Bekisting
Kayu Papan Putih 3/20
Kayu Putih 5/7
Kayu Usuk 4/6
Kawat Duri Anti Karat
Keramik 20 x 20 cm
Keramik 20 x 25 cm
Keramik 40 x 40 cm
Klem clipsal 20 mm hitam
Kloset Jongkok
Koral Beton
Kran air
Kuas

Rp.

HARGA

NO

NAMA

SATUAN

48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90

Kunci tanam biasa


Lampu XL 5 Watt
Lampu XL 18 Watt
Lampu TL 40 Watt
Lem Kayu
List Kaca
List Kayu Profil
Minyak Bekisting
Paku 10 Cm
Paku 12 Cm
Paku Biasa 1/2" - 1"
Paku Biasa 2" - 5"
Paku Biasa 5' - 10'
Paku Biasa 5' - 12'
Paku Kayu
Paku list SQ
Papan Kayu Besi
Papan Kayu Pintu Kelas 1
Pasir Beton
Pasir Pasang
Pasir Urug
Pipa Clipsal 20 mm hitam
Pipa dan peresapan
Pipa PVC 0.5" - 3/4 ''
Pipa PVC 3'' - 4''
Plamir
Plat Besi
Plywood 9 mm
Saklar Ganda
Saklar Tunggal
Seal tape
Sekring Kas
Semen Portland
Semen Warna
Semen warna/semen grouting
Semen warna/semen grouting
Seng Plat
Seng Gelombang 3" x 6" BJLS 32
Sock clipsal 20 mm hitam
Stop kontak
Tanah Urug
Tee dos clipsal 20 mm hitam
Tripleks 4 mm

Bh
Bh
Bh
BH
Kg
M'
M'
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M3
M3
M3
M3
M3
Bh
Ls
Bh
Bh
Kg
M2
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
M'
Bh
Bh
Bh
M3
Bh
Bh

49,315.50
43,836.00
65,754.00
109,590.00
21,918.00
26,301.60
9,589.13
38,356.50
24,109.80
24,109.80
24,109.80
24,109.80
24,109.80
24,109.80
24,109.80
24,109.80
3,287,700.00
4,383,600.00
438,360.00
438,360.00
438,360.00
21,918.00
1.00
32,877.00
164,385.00
10,959.00
346,304.40
191,782.50
21,918.00
16,438.50
16,438.50
32,877.00
2,630.16
16,438.50
16,438.50
16,438.50
60,274.50
82,192.50
1,534.26
21,918.00
219,180.00
4,383.60
88,767.90

Rp.

NO

NAMA

SATUAN

91

HARGA
Rp.
4

Water Drain + Asesories

Ls

1.00

UPAH
Pekerja
Tukang Kayu
Tukang Batu
Tukang Besi
Tukang Cat
Tukang Las
Tukang Pipa
Kepala Tukang
Mandor

OH
OH
OH
OH
OH
OH
OH
OH
OH

90,000.00
110,000.00
110,000.00
110,000.00
110,000.00
110,000.00
110,000.00
120,000.00
130,000.00

B
1
2
3
4
5
6
7
8
9

TAR HARGA BAHAN DAN UPAH

UNGAN KOMUNIKASI DAN INFORMATIKA PROVINSI PAPUA BARAT

KET
5

KET
5

KET
5

KET
5

Anda mungkin juga menyukai