Anda di halaman 1dari 90

DISEO DE ACERO EN VIGA TRAMO A-B, C-D

peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

1559

DETERMINACION DE CARGA VIVA

CV = s/c x at

868

Wu = 1.4 x CM + 1.7 x

3658.2

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

4.11

Tn/m

M A-B (+) =

Wu Ln2
16

2.57

Tn/m

M A-B (-) =

Wu Ln2
16

2.57

Tn/m

DETERMINACION DE SECCION

50

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =
As =

1.23
0.97
2.49
1.95
2.52

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
0.77
a =
0.60
As =
1.55
a =
1.22
As =
1.56

2.52
2 1/2

As =
2 1/2

1.56

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2884.5

DETERMINACION DE CARGA VIVA

CV = s/c x at

1711.5

Wu = 1.4 x CM + 1.7 x

6947.85

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

7.80

Tn/m

M A-B (+) =

Wu Ln2
14

5.57

Tn/m

M A-B (-) =

Wu Ln2
11

7.09

Tn/m

DETERMINACION DE SECCION

50

30

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =

2.34
1.83
4.78
3.75
4.89

As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
1.67
a =
1.31
As =
3.39
a =
2.66
As =
3.45

4.89
3 1/2 +15/8

As =

3.45
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2928.5

DETERMINACION DE CARGA VIVA

CV = s/c x at

1739.5

Wu = 1.4 x CM + 1.7 x

7057.05

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

7.92

Tn/m

M A-B (+) =

Wu Ln2
16

4.95

Tn/m

M A-B (-) =

Wu Ln2
16

4.95

Tn/m

DETERMINACION DE SECCION

50

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

30
PERALTE EFECTIVO
d= H- (rec+E+as/2)

CUANTIA BALANCEADA
44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =
As =

2.38
1.86
4.85
3.81
4.97

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
1.48
a =
1.16
As =
3.01
a =
2.36
As =
3.05

4.97
4 1/2

As =

3.05
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

3176

DETERMINACION DE CARGA VIVA

CV = s/c x at

1897

Wu = 1.4 x CM + 1.7 x

7671.3

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

8.61

Tn/m

M A-B (+) =

Wu Ln2
16

5.38

Tn/m

M A-B (-) =

Wu Ln2
16

5.38

Tn/m

DETERMINACION DE SECCION

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

50

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =
As =

2.58
2.03
5.29
4.15
5.42

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
1.61
a =
1.27
As =
3.28
a =
2.57
As =
3.32

5.42
3 1/2 1 5/8

As =

3.32
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2796.5

DETERMINACION DE CARGA VIVA

CV = s/c x at
Wu = 1.4 x CM + 1.7 x

1655.5
6729.45

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

7.55

Tn/m

M A-B (+) =

Wu Ln2
16

4.72

Tn/m

M A-B (-) =

Wu Ln2
16

4.72

Tn/m

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

DETERMINACION DE SECCION

50

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =

2.27
1.78
4.62
3.63
4.73

As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
1.42
a =
1.11
As =
2.87
a =
2.25
As =
2.91

4.73
2 1/2 +2 5/8

As =

2.91
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2956

DETERMINACION DE CARGA VIVA

CV = s/c x at
Wu = 1.4 x CM + 1.7 x

1757
7125.3

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

8.00

Tn/m

M A-B (+) =

Wu Ln2
16

5.00

Tn/m

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

M A-B (-) =

Wu Ln2
16

5.00

Tn/m

DETERMINACION DE SECCION

50

30
PERALTE EFECTIVO
d= H- (rec+E+as/2)

CUANTIA BALANCEADA
44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

ACERO A-B (-)


As =
a =
As =
a =
As =
As =
2 1/2+ 2 5/8

28.58435 Tn/m

2.40
1.88
4.90
3.84
5.02

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
1.50
a =
1.18
As =
3.04
a =
2.38
As =
3.08

5.02

As =
3 1/2

3.08

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

3264

DETERMINACION DE CARGA VIVA

CV = s/c x at
Wu = 1.4 x CM + 1.7 x

1953
7889.7

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

8.85

Tn/m

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

M A-B (+) =

Wu Ln2
16

5.53

Tn/m

M A-B (-) =

Wu Ln2
16

5.53

Tn/m

DETERMINACION DE SECCION

50

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =

2.66
2.08
5.44
4.27
5.58

As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
1.66
a =
1.30
As =
3.37
a =
2.64
As =
3.42

5.58
2 1/2 +2 5/8

As =

3.42
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35

ACERO A-B (-)


As =
0.77
a =
0.60
As =
1.55
a =
1.22
As =
1.56
As =
2 1/2

1.56

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35

ACERO A-B (-)


As =
2.13
a =
1.67
As =
4.33
a =
3.40
As =
4.42
As =
4.42
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35

ACERO A-B (-)


As =
1.48
a =
1.16
As =
3.01
a =
2.36
As =
3.05
As =
3.05
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35

ACERO A-B (-)


As =
1.61
a =
1.27
As =
3.28
a =
2.57
As =
3.32
As =
3.32
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35

ACERO A-B (-)


As =
1.42
a =
1.11
As =
2.87
a =
2.25
As =
2.91
As =
2.91
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35

ACERO A-B (-)


As =
1.50
a =
1.18
As =
3.04
a =
2.38
As =
3.08
As =
3 1/2

3.08

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35

ACERO A-B (-)


As =
1.66
a =
1.30
As =
3.37
a =
2.64
As =
3.42
As =
3.42
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

1559

DETERMINACION DE CARGA VIVA

CV = s/c x at

868

Wu = 1.4 x CM + 1.7 x

3658.2

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
16

7.69

Tn/m

M A-B (+) =

Wu Ln2
16

7.69

Tn/m

M A-B (-) =

Wu Ln2
16

7.69

Tn/m

DETERMINACION DE SECCION

50

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =
As =

2.31
1.81
4.71
3.69
4.82

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
2.31
a =
1.81
As =
4.71
a =
3.69
As =
4.82

4.82
2 1/2

As =
2 1/2

4.82

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2884.5

DETERMINACION DE CARGA VIVA

CV = s/c x at

1711.5

Wu = 1.4 x CM + 1.7 x

6947.85

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

23.37 Tn/m

M A-B (+) =

Wu Ln2
16

14.61 Tn/m

M A-B (-) =

Wu Ln2
10

23.37 Tn/m

DETERMINACION DE SECCION

50

30

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

CUANTIA MAXIMA
PMAX

CUANTIA MINIMA

0.016

MOMENTO ULTIMO RESISTENTE


Mu =

0.0213

PMIN

0.0027

W =

0.320

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
7.01
As =
4.38
5.50
a =
3.44
14.95
As =
9.12
11.73
a =
7.15
16.17
As =
9.54

As =

13.62

As =

6.00

4 5/8 +23/4
CUANTIA

0.010296

CUANTIA

0.00453561

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2928.5

DETERMINACION DE CARGA VIVA

CV = s/c x at

1739.5

Wu = 1.4 x CM + 1.7 x

7057.05

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

23.74 Tn/m

M A-B (+) =

Wu Ln2
16

14.84 Tn/m

M A-B (-) =

Wu Ln2
16

14.84 Tn/m

DETERMINACION DE SECCION

50

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

30
PERALTE EFECTIVO
d= H- (rec+E+as/2)

CUANTIA BALANCEADA
44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =
As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
7.12
As =
4.45
5.59
a =
3.49
15.21
As =
9.27
11.93
a =
7.27
16.47
As =
9.70
16.47

4 1/2

As =

9.70
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

3176

DETERMINACION DE CARGA VIVA

CV = s/c x at

1897

Wu = 1.4 x CM + 1.7 x

7671.3

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

25.81 Tn/m

M A-B (+) =

Wu Ln2
16

16.13 Tn/m

M A-B (-) =

Wu Ln2
16

16.13 Tn/m

DETERMINACION DE SECCION

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

50

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =
As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
7.74
As =
4.84
6.07
a =
3.79
16.63
As =
10.11
13.04
a =
7.93
18.17
As =
10.63
18.17

3 1/2 1 5/8

As =

10.63
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2796.5

DETERMINACION DE CARGA VIVA

CV = s/c x at
Wu = 1.4 x CM + 1.7 x

1655.5
6729.45

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

22.64 Tn/m

M A-B (+) =

Wu Ln2
16

14.15 Tn/m

M A-B (-) =

Wu Ln2
16

14.15 Tn/m

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

DETERMINACION DE SECCION

50

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
6.79
As =
4.24
5.33
a =
3.33
14.45
As =
8.82
11.34
a =
6.92
15.58
As =
9.21

As =

15.58
2 1/2 +2 5/8

As =

9.21
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2956

DETERMINACION DE CARGA VIVA

CV = s/c x at
Wu = 1.4 x CM + 1.7 x

1757
7125.3

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

23.97 Tn/m

M A-B (+) =

Wu Ln2
16

14.98 Tn/m

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

M A-B (-) =

Wu Ln2
16

14.98 Tn/m

DETERMINACION DE SECCION

50

30
PERALTE EFECTIVO
d= H- (rec+E+as/2)

CUANTIA BALANCEADA
44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

ACERO A-B (-)


As =
a =
As =
a =
As =
As =
2 1/2+ 2 5/8

28.58435 Tn/m
DETERMINACION DEL AREA DE ACERO
ACERO A-B (+)
7.19
As =
4.49
5.64
a =
3.52
15.36
As =
9.36
12.05
a =
7.34
16.66
As =
9.80
16.66

As =
3 1/2

9.80

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

3264

DETERMINACION DE CARGA VIVA

CV = s/c x at
Wu = 1.4 x CM + 1.7 x

1953
7889.7

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

26.54 Tn/m

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

M A-B (+) =

Wu Ln2
16

16.59 Tn/m

M A-B (-) =

Wu Ln2
16

16.59 Tn/m

DETERMINACION DE SECCION

50

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
7.96
As =
4.98
6.24
a =
3.90
17.14
As =
10.41
13.44
a =
8.17
18.79
As =
10.97

As =

18.79
2 1/2 +2 5/8

As =

10.97
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.8

ACERO A-B (-)


As =
2.31
a =
1.81
As =
4.71
a =
3.69
As =
4.82
As =
2 1/2

4.82

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.8

ACERO A-B (-)


As =
7.01
a =
5.50
As =
14.95
a =
11.73
As =
16.17
As =
16.17
3 1/2
CUANT 0.01222602

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
5.8
3.35
3.35
3.35
3.35
3.35

ACERO A-B (-)


As =
4.45
a =
3.49
As =
9.27
a =
7.27
As =
9.70
As =
9.70
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
5.8
3.35
3.35
3.35
3.35

ACERO A-B (-)


As =
4.84
a =
3.79
As =
10.11
a =
7.93
As =
10.63
As =
10.63
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
5.8
3.35
3.35
3.35

ACERO A-B (-)


As =
4.24
a =
3.33
As =
8.82
a =
6.92
As =
9.21
As =
9.21
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
3.35
5.8
3.35
3.35

ACERO A-B (-)


As =
4.49
a =
3.52
As =
9.36
a =
7.34
As =
9.80
As =
3 1/2

9.80

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
3.35
3.35
5.8
3.35

ACERO A-B (-)


As =
4.98
a =
3.90
As =
10.41
a =
8.17
As =
10.97
As =
10.97
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

1988

DETERMINACION DE CARGA VIVA

CV = s/c x at

1141

Wu = 1.4 x CM + 1.7 x

4722.9

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

4.93

Tn/m

M A-B (+) =

Wu Ln2
11

4.48

Tn/m

M A-B (-) =

Wu Ln2
10

4.93

Tn/m

DETERMINACION DE SECCION

40

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

d= H- (rec+E+as/2)

34.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

17.08968 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =

1.91
1.50
3.91
3.07
4.00

As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
1.74
a =
1.36
As =
3.55
a =
2.78
As =
3.62

6.50
2 1/2 +2 5/8

As =
6.50
2 1/2+2 5/8

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2884.5

DETERMINACION DE CARGA VIVA

CV = s/c x at

1711.5

Wu = 1.4 x CM + 1.7 x

6947.85

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

23.37 Tn/m

M A-B (+) =

Wu Ln2
16

14.61 Tn/m

M A-B (-) =

Wu Ln2
16

4.53

Tn/m

DETERMINACION DE SECCION

50

30

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
9.07
As =
5.67
7.11
a =
4.44
20.25
As =
12.12
15.88
a =
9.51
23.64
As =
13.17

As =

23.64
3 1/2 +15/8

As =

13.17
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2928.5

DETERMINACION DE CARGA VIVA

CV = s/c x at

1739.5

Wu = 1.4 x CM + 1.7 x

7057.05

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

7.36

Tn/m

M A-B (+) =

Wu Ln2
16

4.60

Tn/m

M A-B (-) =

Wu Ln2
16

4.60

Tn/m

DETERMINACION DE SECCION

50

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

30
PERALTE EFECTIVO
d= H- (rec+E+as/2)

CUANTIA BALANCEADA
44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =
As =

2.86
2.24
5.91
4.63
6.13

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
1.79
a =
1.40
As =
3.65
a =
2.86
As =
3.73

6.13
4 1/2

As =

3.73
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

3176

DETERMINACION DE CARGA VIVA

CV = s/c x at

1897

Wu = 1.4 x CM + 1.7 x

7671.3

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

8.00

Tn/m

M A-B (+) =

Wu Ln2
16

5.00

Tn/m

M A-B (-) =

Wu Ln2
16

5.00

Tn/m

DETERMINACION DE SECCION

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

50

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =
As =

3.10
2.44
6.44
5.05
6.71

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
1.94
a =
1.52
As =
3.97
a =
3.11
As =
4.07

6.71
3 1/2 1 5/8

As =

4.07
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2796.5

DETERMINACION DE CARGA VIVA

CV = s/c x at
Wu = 1.4 x CM + 1.7 x

1655.5
6729.45

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

7.02

Tn/m

M A-B (+) =

Wu Ln2
16

4.39

Tn/m

M A-B (-) =

Wu Ln2
16

4.39

Tn/m

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

DETERMINACION DE SECCION

50

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =

2.72
2.14
5.62
4.41
5.82

As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
1.70
a =
1.34
As =
3.47
a =
2.72
As =
3.55

5.82
2 1/2 +2 5/8

As =

3.55
3 1/2

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

2956

DETERMINACION DE CARGA VIVA

CV = s/c x at
Wu = 1.4 x CM + 1.7 x

1757
7125.3

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

7.43

Tn/m

M A-B (+) =

Wu Ln2
16

4.65

Tn/m

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

M A-B (-) =

Wu Ln2
16

4.65

Tn/m

DETERMINACION DE SECCION

50

30
PERALTE EFECTIVO
d= H- (rec+E+as/2)

CUANTIA BALANCEADA
44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

ACERO A-B (-)


As =
a =
As =
a =
As =
As =
2 1/2+ 2 5/8

28.58435 Tn/m

2.88
2.26
5.97
4.68
6.19

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
1.80
a =
1.41
As =
3.68
a =
2.89
As =
3.76

6.19

As =
3 1/2

3.76

DISEO DE ACERO EN VIGA TRAMO A-B, C-D


peso de tabiqueria
peso de acabado
s/c hotel
columna
fc
fy
viga
losa 20cm
peso de concreto

=
=
=
=
=
=
=
=
=

100
kg/m2
150
kg/m2
350
kg/m2
100 x
40 cm
210
kg/cm2
4200
kg/cm2
0.5 x
0.3 cm
300
kg/m2
2400
kg/m3

DETERMINACION DE CARGA ULTIMA (Wu)


DETERMINACION DE CARGA MUERTA

CM = PM x AT

3264

DETERMINACION DE CARGA VIVA

CV = s/c x at
Wu = 1.4 x CM + 1.7 x

1953
7889.7

DETERMINACION DE MOMENTOS FLECTORES

EJE 1-1 TRAMO A-B


M A-B (-) =

Wu Ln2
10

8.23

Tn/m

EJE
1.-1
2.-2
3.-3
4.-4
5.-5
6.-6
7.-7
8.-8

M A-B (+) =

Wu Ln2
16

5.14

Tn/m

M A-B (-) =

Wu Ln2
16

5.14

Tn/m

DETERMINACION DE SECCION

50

30
PERALTE EFECTIVO

CUANTIA BALANCEADA

d= H- (rec+E+as/2)

44.10

PB =

0.016

W =

0.0213

CUANTIA MAXIMA
PMAX

0.320

MOMENTO ULTIMO RESISTENTE


Mu =

28.58435 Tn/m

ACERO A-B (-)


As =
a =
As =
a =
As =

3.19
2.50
6.63
5.20
6.91

As =

DETERMINACION DEL AREA DE ACERO


ACERO A-B (+)
As =
2.00
a =
1.57
As =
4.09
a =
3.20
As =
4.19

6.91
2 1/2 +2 5/8

As =

4.19
3 1/2

B
3.26
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.23
5.8
5.8
5.8
5.8
5.8
5.8
5.8

ACERO A-B (-)


As =
1.91
a =
1.50
As =
3.91
a =
3.07
As =
4.00
CUANTIA DE ACERO
As =
4.00 PMAX
0.01600
2 1/2 +2 5/8P
0.00635
PMIN
0.00270

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.8

ACERO A-B (-)


As =
1.76
a =
1.38
As =
3.59
a =
2.81
As =
3.67
As =
3.67
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
5.8
3.35
3.35
3.35
3.35
3.35

ACERO A-B (-)


As =
1.79
a =
1.40
As =
3.65
a =
2.86
As =
3.73
As =
3.73
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
5.8
3.35
3.35
3.35
3.35

ACERO A-B (-)


As =
1.94
a =
1.52
As =
3.97
a =
3.11
As =
4.07
As =
4.07
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
5.8
3.35
3.35
3.35

ACERO A-B (-)


As =
1.70
a =
1.34
As =
3.47
a =
2.72
As =
3.55
As =
3.55
3 1/2

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
3.35
5.8
3.35
3.35

ACERO A-B (-)


As =
1.80
a =
1.41
As =
3.68
a =
2.89
As =
3.76
As =
3 1/2

3.76

B
2.48
4.89
4.97
5.42
4.73
5.02
5.58
2.43

Ln
3.35
3.35
3.35
3.35
3.35
3.35
5.8
3.35

ACERO A-B (-)


As =
2.00
a =
1.57
As =
4.09
a =
3.20
As =
4.19
As =
4.19
3 1/2