INSTANSI
PEKERJAAN
LOKASI
TAHUN ANGGARAN
URAIAN KEGIATAN/PENUGASAN
HARGA SATUAN
(Rp.)
VOLUME
1.00 Orang
B. Tenaga Pendukung
1. Surveyor/ Juru Gambar
1.00 Orang
0.50 Bulan
JUMLAH HARGA
(Rp.)
7,000,000.00
3,500,000.00
0.50 Bulan
3,500,000.00
JUMLAH BIAYA LANGSUNG PERSONIL
1,750,000.00
5,250,000.00
URAIAN KEGIATAN/PENUGASAN
A. Biaya Transportasi
1. Ahli Teknik Bangunan Gedung
2. Surveyor/ Juru Gambar
VOLUME
1.00 Orang
1.00 Orang
x
x
HARGA SATUAN
(Rp.)
JUMLAH HARGA
(Rp.)
3.00 Hari
150,000.00
3.00 Hari
100,000.00
SUB TOTAL BIAYA PERJALANAN DINAS
450,000.00
300,000.00
750,000.00
HARGA SATUAN
(Rp.)
13.00
LS
100,000.00
SUB TOTAL BIAYA SURVEY LAPANGAN
JUMLAH HARGA
(Rp.)
1,300,000.00
1,300,000.00
HARGA SATUAN
(Rp.)
0.50 Bulan
300,000.00
0.50 Bulan
500,000.00
0.50 Bulan
200,000.00
SUB TOTAL BIAYA EKSPLOITASI DAN PERALATAN KANTOR
JUMLAH HARGA
(Rp.)
150,000.00
250,000.00
100,000.00
500,000.00
HARGA SATUAN
(Rp.)
3.00 Buku
200,000.00
3.00 Buku
200,000.00
3.00 Buah
50,000.00
SUB TOTAL BIAYA PEMBUATAN LAPORAN
JUMLAH BIAYA LANGSUNG NON PERSONIL
JUMLAH HARGA
(Rp.)
600,000.00
600,000.00
150,000.00
1,350,000.00
3,900,000.00
URAIAN KEGIATAN/PENUGASAN
VOLUME
URAIAN KEGIATAN/PENUGASAN
VOLUME
URAIAN KEGIATAN/PENUGASAN
1 Pembuatan Laporan
- Gambar Rencana Teknis (A3)
- CD Lengkap Pelaporan
VOLUME
REKAPITULASI
INSTANSI
PEKERJAAN
0.00
LOKASI
TAHUN ANGGARAN
No.
URAIAN KEGIATAN/PENUGASAN
(Rp.)
5,250,000.00
II.
3,900,000.00
9,150,000.00
PPN 10 %
915,000.00
TOTAL
10,065,000.00
DIBULATKAN
10,000,000.00
*** TERBILANG : LIMA PULUH JUTA RUPIAH ***
Medan,
April 2016
KUASA PENGGUNA ANGGARAN
BIDANG .........................
......................................
.................
Nip. ...........................................