Program Perhitungan Biaya


Metoda Langsung (Straigh Line Method)
Nama Alat
Harga Buku/Pembelian (P)
Nilai Sisa (S)
Depresiasi total
Umur Investasi
Umur Ekonomis

Tahun Investasi
0
1
2
3
4
5
6
7
8

Bulldozer Caterpillar
Rp1,750,000,000
10 %
Rp1,575,000,000
8 Tahun
10,000 Jam

Tabel Depersiasi Alat


Harga Buku
Depresiasi (Rp)
Tahun
Jam
Rp1,750,000,000
Rp1,553,125,000
Rp196,875,000
Rp157,50
Rp1,356,250,000
Rp196,875,000
Rp157,50
Rp1,159,375,000
Rp196,875,000
Rp157,50
Rp962,500,000
Rp196,875,000
Rp157,50
Rp765,625,000
Rp196,875,000
Rp157,50
Rp568,750,000
Rp196,875,000
Rp157,50
Rp371,875,000
Rp196,875,000
Rp157,50
Rp175,000,000
Rp196,875,000
Rp157,50

iaya
ne Method)
Rumus :
Depresiasi total
Depresiasi TH (n)
Depresiasi J

Rp175,000,000

1,250 Jam/tahun

Jam
Rp157,500
Rp157,500
Rp157,500
Rp157,500
Rp157,500
Rp157,500
Rp157,500
Rp157,500

P-S
Dtotal / n
DTH/J

Grafik Depresiasi Alat

2000000000

presiasi (Rp)

=
=
=

1800000000
1600000000
1400000000
1200000000
1000000000
800000000
600000000
400000000
200000000
0

Harga Baku

Depresiasi Tahun

Depresiasi Jam

am

P-S
Dtotal / n
DTH/J

Cahyo Widyanto
3112120003
3 sipil 1 sore

Program Perhitungan Biaya


Metoda Pengurangan Berganda (Double Incleaning Balan
Nama Alat
Harga Buku/Pembelian (P)
Nilai Sisa (S)
Depresiasi
Umur Investasi
Umur Ekonomis

Bulldozer Caterpillar
Rp
Rp1,750,000,000
10
Rp
100%
8
10,000

Tabel Depersiasi Alat


Tahun Investasi
0
1
2
3
4
5
6
7
8

Harga Buku
1,750,000,000
1,312,500,000
984,375,000
738,281,250
553,710,938
415,283,203
311,462,402
233,596,802
175,197,601

gram Perhitungan Biaya


ganda (Double Incleaning Balance Methode)

erpillar

Rumus :
%

Rp

Tahun
Jam

175,000,000

1,250 Jam/tahun

Grafik De

l Depersiasi Alat
Depresiasi (Rp)
Tahun
437,500,000
328,125,000
246,093,750
184,570,313
138,427,734
103,820,801
77,865,601
58,399,200

Jam
350,000
262,500
196,875
147,656
110,742
83,057
62,292
46,719

2000000000
1800000000
1600000000
1400000000
1200000000
1000000000
800000000
600000000
400000000
200000000
0

3
Haga Buku

0
0
0
0
0
0
0
0
0
0
0

Rumus :
Depresiasi total
Depresiasi TH (n)
Depresiasi J

=
dianggap 100%
= [ 2 x (100%/n) x P(n-1)]
=
DTH/J

Grafik Depresiasi Alat

3
Haga Buku

4
Tahun

5
Jam

Cahyo Widyanto
3112120003
3 sipil 1 sore

Program Perhitungan Biaya


Penjumlahan Angka Tahunan (Sum of The Years Metho
Nama Alat
Biaya Pemilikan (P)
Nilai Sisa (S)
Depresiasi total
Umur Investasi (n)
Umur Ekonomis

Bulldozer Caterpillar
Rp
Rp1,750,000,000
10 %
Rp
1,575,000,000
8 Tahun
10,000 Jam

Rp

Tabel Depersiasi Alat


Tahun Investasi
0
1
2
3
4
5
6
7
8

Harga Buku
1,750,000,000
1,400,000,000
1,093,750,000
831,250,000
612,500,000
437,500,000
306,250,000
218,750,000
175,000,000

Depresiasi (Rp)
Tahun
350,000,000
306,250,000
262,500,000
218,750,000
175,000,000
131,250,000
87,500,000
43,750,000

Jam

28
24
21
17
14
10
7
3

aya
he Years Methode)

175,000,000

Rumus :
Depresiasi total
Depresiasi TH (n)
Depresiasi J

=
=
=

P-S
Dtotal x An /
DTH/J

1,250 Jam/tahun

epresiasi (Rp)

2,000,000,000

Jam

1,800,000,000

280,000
245,000
210,000
175,000
140,000
105,000
70,000
35,000

1,600,000,000
1,400,000,000
1,200,000,000
1,000,000,000
800,000,000
600,000,000
400,000,000
200,000,000
-

2
Harga buku

4
Tahun

5
Jam

P-S
Dtotal x An / At
DTH/J

5
Jam

Cahyo Widyanto
3112120003
3 sipil 1 sore

Biaya Investasi Alat Berat


Nama Alat
Biaya Pemilikan (P)
Umur Investasi (n)
Umur Ekonomis
Pajak
Bunga Bank
Asuransi
Jumlah (I)

Bulldozer Caterpillar
Rp
Rp1,750,000,000
8 Tahun
10,000 Jam
15%
Rp
8%
3%
26%

Biaya Investasi Alat Berat (It)


Biaya Investasi Alat Berat per jam

=
=

255,937,500
204,750

at
Rumus :
lt = {(n+1)/2n x P } x i
=

1,250 Jam/tahun

Biaya Operasional Alat Berat


1. Biaya Bahan Bakar Minyak (BBM)
Nama Alat
Biaya Pemilikan (P)
Umur Investasi (n)
Umur Ekonomis
Mesin Diesel
Mesin Bensin
HP
Efesiensi
Berat Jenis Bahan Bakar
Solar (liter)

Bulldozer Caterpillar
Rp
Rp1,750,000,000
8 Tahun
10,000 Jam

Rp

0.15
0.22
110 HP
20%
0.85
6,400.00
Mesin Diesel

Biaya BBM (1 jam)


Biaya BBM (1 hari)
Biaya BBM (1 bulan)

3.88 Ltr/HP/Jam
27.18 Ltr/HP/Hari
815.29 Ltr/HP/Bulan

lat Berat

Rp
Rp
Rp

1,250 Jam/tahun

Biaya MD
24,847
173,929
5,217,882

Mesin Bensin
5.69 Ltr/HP/Jam
39.86 Ltr/HP/Hari
1,195.76 Ltr/HP/Bulan

Cahyo Widyanto
3112120003
3 sipil 1 sore

Rp
Rp
Rp

Biaya MB
36,442
255,096
7,652,894

2. Biaya Bahan Pelumas (Menurut Caterpillar)


Nama Alat
Biaya Pemilikan (P)
Umur Investasi (n)
Umur Ekonomis

Bulldozer Caterpillar
Rp
=
=

HP
Faktor Operasi
- Baik
- Sedang
- Buruk
Siklus pergantian oli (t)
Kapasitas crank case (c)

Kebutuhan Oli (FO baik)

Harga per galon


Harga oli per jam

=
=

=
=
=
=
=

q= (HP x f x 0,006 lb/HP/jam) : 7,4 lb per galon + (C

rut Caterpillar)
Bulldozer Caterpillar
1,750,000,000
8 Tahun
10,000 Jam
110 HP
0.85
0.65
0.55
100 Jam
4 Galon
0.1158108108 galon/jam
200,000
23,162

6 lb/HP/jam) : 7,4 lb per galon + (C/t)

1,250 Jam/tahun

3. Biaya Filter
Nama Alat
Biaya Pemilikan (P)
Umur Investasi (n)
Umur Ekonomis

Jumlah filter
Masa guna (jam)

Bulldozer Caterpillar
Rp
1,750,000,000
=
8 Tahun
=
10,000 Jam

Biaya Filter Engine


=
=

Harga Filter Engine


Biaya Filter Engine

2
2000
Rp300,000.00
Rp300

Biaya Filter Transmission


=
Jumlah filter
=
Masa guna (jam)
Harga Filter Transmission
Biaya Filter Transmission
Biaya Filter Hidrolik
=
Jumlah filter
=
Masa guna (jam)
Harga Filter Hidrolik
Biaya Filter Hidrolik
Biaya Filter Udara
Jumlah filter
=
Masa guna (jam)
=
Harga Filter Udara

2
1000

Rp300,000.00
Rp600

1
2000
Rp300,000.00
Rp150

1
500
Rp300,000.00

Biaya Filter Udara


TOTAL (jam)

Rp600
Rp1,650

1,250 Jam/tahun

4. Biaya BAN
Nama Alat
Harga Ban / set
Umur Ekonomis
Bekerja di kawasan batuan tajam
(Zona C)

Bulldozer Caterpillar
Rp
12,000,000
=
500 Jam

Biaya Ban per Jam

Rp

96,000

5. Biaya Perawatan dan Reparasi


80%-90% dari biaya depresiasi
Depresiasi
Presentase

= Rp
=

M&R

= Rp

an dan Reparasi
biaya depresiasi
1,575,000,000
80%
1,260,000,000

5. Operator
Gaji operator per hari
Gaji operator per jam

=
=

Rp
Rp

150,000
21,429

Cahyo Widyanto
3112120003
3 sipil 1 sore

Biaya Operasional Alat Berat


1. Biaya Bahan Bakar Minyak (BBM)
Nama Alat
Biaya Pemilikan (P)
Umur Investasi (n)
Umur Ekonomis
Mesin Diesel
Mesin Bensin
HP
Efesiensi
Berat Jenis Bahan Bakar
Solar (liter)

Bulldozer Caterpillar
Rp
Rp1,750,000,000
8
10,000
0.15
0.22
110
20%
0.85
6,400.00

Rp

Mesin Diesel
Biaya BBM (1 jam)
Biaya BBM (1 hari)
Biaya BBM (1 bulan)

3.88
27.18
815.29

asional Alat Berat

Tahun
Jam

1,250 Jam/tahun

HP

Diesel
Ltr/HP/Jam
Ltr/HP/Hari
Ltr/HP/Bulan

Rp
Rp
Rp

Biaya MD
24,847
173,929
5,217,882

Mesin Bensin
5.69 Ltr/HP/Jam
39.86 Ltr/HP/Hari
1,195.76 Ltr/HP/Bulan

Biaya MB
Rp
Rp
Rp

Biaya MB
36,442
255,096
7,652,894

Cahyo Widyanto
3112120003
3 sipil 1 sore

Biaya Operasional Alat Berat


2. Biaya Bahan Pelumas (Menurut Caterpillar)
Nama Alat
Biaya Pemilikan (P)
Umur Investasi (n)
Umur Ekonomis

Bulldozer Caterpillar
Rp Rp1,750,000,000
=
8 Tahun
=
10,000 Jam

HP
Faktor Operasi
- Baik
- Sedang
- Buruk
Siklus pergantian oli (t)
Kapasitas crank case (c)

Kebutuhan Oli (FO baik)

Harga per galon


Harga oli per jam

=
=

=
=
=
=
=

110 HP
0.85
0.65
0.55
100 Jam
4 Galon
0.1158108108 galon/jam
200,000
23,162

1,250 Jam/tahun

Cahyo Widyanto
3112120003
3 sipil 1 sore

Biaya Operasional Alat Berat


3. Biaya Filter
Nama Alat
Biaya Pemilikan (P)
Umur Investasi (n)
Umur Ekonomis

Jumlah filter
Masa guna (jam)

Bulldozer Caterpillar D6D


Rp
Rp1,750,000,000
=
8 Tahun
=
10,000 Jam

Biaya Filter Engine


=
=

Harga Filter Engine


Biaya Filter Engine

Rp300,000.00
Rp300

Biaya Filter Transmission


=
Jumlah filter
=
Masa guna (jam)
Harga Filter Transmission
Biaya Filter Transmission

Jumlah filter
Masa guna (jam)
Harga Filter Hidrolik

2
2000

Biaya Filter Hidrolik


=
=

2
1000
Rp300,000.00
Rp600

1
2000
Rp300,000.00

Biaya Filter Hidrolik

Jumlah filter
Masa guna (jam)
Harga Filter Udara
Biaya Filter Udara
TOTAL (jam)

Rp150
Biaya Filter Udara
=
=

1
500
Rp300,000.00
Rp600
Rp1,650

Berat

1,250 Jam/tahun

Cahyo Widyanto
3112120003
3 sipil 1 sore

Biaya Operasional Alat Berat


4. Biaya BAN
Nama Alat
Harga Ban / set
Umur Ekonomis
Bekerja di kawasan batuan tajam
(Zona C)

Loader
Rp
=

Biaya Ban per Jam

Rp

12,000,000
500 Jam

96,000

Berat

Cahyo Widyanto
3112120003
3 sipil 1 sore

Biaya Operasional Alat Berat


5. Biaya Perawatan dan Reparasi
80%-90% dari biaya depresiasi
Depresiasi Total
Presentase

=
=

Rp

1,575,000,000
80%

M&R

Rp

1,260,000,000

rat

Cahyo Widyanto
3112120003
3 sipil 1 sore

Biaya Operasional Alat Berat


5. Operator
Gaji operator per hari
Gaji operator per jam

=
=

Rp
Rp

150,000
21,429

Cahyo Widyanto
3112120003
3 sipil 1 sore

Rekapitulasi BP & O
A
1
2
3
4
5
B
6
7
8
C
9
10
11
12
13
14
15

Biaya Penyusutan
Harga pembelian
Harga ban
Harga beli tanpa ban
Harga sisa
Harga penyusutan total
Biaya Pemilikan
Penyusutan
Biaya investasi
Biaya pemilikan per jam
Biaya Operasional
Bahan bakar
bahan pelumas
Fillter
Reparasi
Ban
Gaji Operator
Biaya operasional per jam
BP & O per jam

Rp1,750,000,000
Rp12,000,000
Rp1,738,000,000
Rp175,000,000
Rp1,563,000,000
Rp1,250,400
Rp204,750
Rp1,455,150
Rp36,442
Rp23,162
Rp1,650
Rp1,260,000,000
Rp96,000
Rp21,429
Rp1,260,178,683
Rp1,261,633,833

panjang jalan
lebar tanah untuk badan jalan

6
6000
1.5
7
1

km
m
x
x
x

tanah biasa t
rata-rata dalam galian
buldozer

1.6
1.85
type strength

cara kerja slot dozing

v masuk
v mundur
10
30
60
0.6
1998
40
0.4
199.8
4
6.5
0.05

ton/m3
m
H
L
t
4
6.5
%
cm
%
x
m3
%
x
m3
km/jam
km/jam
menit

kelandaian
tebal lapisan
volume galian

volume timbunan

v maju
v mundur
waktu pindah gigi
faktor effisiensi
C1
C2
C3
C4
C5
C6
C7

waktu kerja
operator
cuaca
pekerasan tanah
metode kerja
blade
kelandaian

50
pandai
kemarau
lepas
slot & dozing
strenght
10

4
2
2

6
14
2
22

1.2
3
0.05
km/jam
km/jam

m
m
m

0.3
x
6000

6000
x

x
1.85

x
1998

volume galian
x

x
0.25

66.66666667
108.3333333

menit/jam

0.64
1
1
1.2
1
0.81
0.85
0.528768

1.85
x
swell

x
0.3

0.3

Produktifitas
kapasitas blade (B)
jarak effisiensi (J)
cycle time (CT)
produktifitas max ( Q')
produksi nyata (Q)

B=LxHxH
J = ((H x H)/t)
CT = (J/v maju) + (J/v mundur) x FT
Q' = (60 x B)/ CT
Q = Q' x E total

=
=
=
=
=

4.32
M3
28.8
=
0.776923 menit
333.6238 km/jam
176.4096 km3/jam

30

panjang
lapisan
kedalaman
lapisan
v urug/ lapisan
v urugan
swell
durasi (jam)
durasi (hari)

2400
0.3
1.85
6.166667 =
15840 m3
110880 m3
27720 m3
415.438 jam
29.67415
30 hari

7 lapis

biaya operasi
alat baru dibeli
masa invest
nilai sisa
harga nilai sisa
depresiasi total
masa guna
nilai inves
biaya inves
biaya pemilikan
Bp&o
biaya pekerjaan
profit
total biaya awal

450000 Rp/jam
Rp1,750,000,000
8
10 %
Rp175,000,000
Rp1,575,000,000
1,250
22%
IT

pertahun
216562500 Rp/thn
173,250 Rp/jam

330,750
780,750
349776000
10% biaya pekerjaan
384,753,600

34977600

ksp profit overhead


ksp

10%
192569.4 Rp/m3

pajak
biaya total aktual
pajak 15%
biaya penawaran

15%
384,753,600
52466400
437,220,000