DATE: 29.06.

2015
PROJECT: ANANTA APPARELS LTD.
SUBJECT: BILL OF QUANTITY OF FIRE PROTECTION SYSTEM
Supply, installation, testing and commissioning of fire protection system
Foreign (USD)

Sl
No.

Description

Qty

Unit

100

Meter

owner's supply

Job

At actual by owner

100

Rm

At actual by owner

Unit Rate

Amount

GENERAL
12.0 Electrical & Control System
12.1 Conduit Work (Pump Room)
Providing & Laying of following PVC pipe from reputed
manufacturers embedded in wall / column / ceiling / floor
etc. with all accessories, 18 SWG GP sheet pull box with
3 mm thick ebonite sheet cover (if required), circular
box, tee, bend, socket with fixing materials, etc. as
required including mending the damages good. The
work shall be carried out as per direction / approval /
acceptance of the Engineer in-charge.

i)

20 mm dia GI/MS Flexible pipe

12.2 Groove cutting complete with back finishing works


Groove Cutting Works in Brick Wall/ RCC Column/ Beam/
floor and ceiling etc including back finishing as per
direction of engineer in charge.

12.3 Cable Tray


Supply and Installation of 18 SWG GI Cable tray
complete of following sizes with hanging arrangement
38mm x 38mm x 5 mm MS Angle support and 10 mm MS
Rod, as per drawing & direction of engineer in charge.
( As per Site Measurement)

150 mm wide x 75 mm depth


12.4 NYY insulated cable

Page 1 of 8

DATE: 29.06.2015
PROJECT: ANANTA APPARELS LTD.
SUBJECT: BILL OF QUANTITY OF FIRE PROTECTION SYSTEM
Supply, installation, testing and commissioning of fire protection system
Sl
No.

Foreign (USD)
Description

Qty

Unit

Unit Rate

Amount

Supply, installation, testing & commissioning of the


following PVC insulated & NYY insulated & PVC
sheathed cable (2XY) with PVC insulated green/white
coloured ECC wire (BYA) connecting at both ends,
through cable tray/ PVC conduit of reputed manufacturer
complete with necessary accessories. All electrical
contacts shall be of brass/copper connected through
connector or soldering ( no twisting shall be allowed) and
cables shall be manufactured and tested according to
relevant IEC/BDS/ BS/ VDE standards. The work shall be
carried out as per direction/approval/acceptance of the
Engineer.

i)
ii)

1x1C-4 sq.mm.(BYA) cable with 4 sq.mm (BYA) ECC .


( As per Site Measurement)
1x1C-6 sq.mm.(BYA) cable with 10 sq.mm (BYA) ECC .
( As per Site Measurement)

iii)

1x1C-70 sq.mm.(NYY) cable with 25 sq.mm (BYA) ECC .


( As per Site Measurement)

iv)

1x1C-150 sq.mm.(NYY) cable with 70 sq.mm (NYY)


ECC . ( As per Site Measurement)
General Expenses
Mobilization
Temporary Power & Water Supply
Coordination w/Building Contractor
Patching / Sealing / Escutcheon Plate
Painting of Pipes
Cleaning of Site
Cutting & Mending works
Cutting floors, walls and also making holes in floors, walls
& mending the damages etc. all complete in all respects
as per technical specification and approved by the
Engineer in Charge.

13.0
13.1
13.2
13.3
13.4
13.5
13.6
13.7

14.0 Shop Drawing & Documentation

Rm

as per site measurement, at


actual, owner's supply

Rm

as per site measurement, at


actual, owner's supply

Rm

as per site measurement, at


actual, owner's supply

Rm

as per site measurement, at


actual, owner's supply

1
1
1
1
1
1
1

lot
lot
lot
lot
lot
lot
lot

lot

Page 2 of 8

owner's supply
At actual
At actual
At actual, by owner

DATE: 29.06.2015
PROJECT: ANANTA APPARELS LTD.
SUBJECT: BILL OF QUANTITY OF FIRE PROTECTION SYSTEM
Supply, installation, testing and commissioning of fire protection system
Sl
No.

Foreign (USD)
Description

Qty

Unit

Job

job

Job

lot

Preparation of detail Shop drawing including layout


drawing, section deatails, schematic drawi ng etc.get
approval of Shop drawing before any fabrication or
installation works. Shop drawing must be coordinated with
other services likely Electrical cabling, Light Fixtures,
False Ceiling and Interior design. The works also
includes:a) Show actual dimention of Equipment b)
Submit actual KW rating of all equipment c) Reconfirm
Electrical cable sizing d) Reconfirming Ampere ratings of
electrical components. e) Submit electrical connection
diagram of electric f) Submit general arrangement of
Electrical panels g) Submit plinith drawing for equipment
and Pipe supports. h) Submit advance copy of
installation, operation and maintenance manuals.

15.0 Nameplate / Tag / Identification


Proper Nameplate of the Equipments, Tagging and
Identification of all items as per recommendation of the
Consultant.
16.0 Testing, Installation, Commissioning & Balancing
The whole systems, including yard piping and fire
department connections shall be tested hydrostatically at
not less than 200 psi (13.8 bar) of pressure for 2 hours, or
at 50 psi (3.5 bar) in excess of the maximum working
pressure where the maximum pressure is in excess of
150 psi (10.3 bar). The inside standpipe system piping
shall show no leakage. Underground pipe shall be tested
in accordance with NFPA 24, Standard for the Installation
of Private Fire Service Mains and Their Appurtenances.

16.1 Installation, commissioning & test trial of Fire hydrant


system
16.2 Installation, commissioning & test trial of Sprinkler system
17.0 As Built Drawing Drawing & Operation Manual

Page 3 of 8

Unit Rate

Amount

DATE: 29.06.2015
PROJECT: ANANTA APPARELS LTD.
SUBJECT: BILL OF QUANTITY OF FIRE PROTECTION SYSTEM
Supply, installation, testing and commissioning of fire protection system
Foreign (USD)

Sl
No.

Description

Qty

Unit

lot

lot

Unit Rate

Amount

Preparation and submission of As-built drawing in


following forms: i) One set in tracing paper, size A1 ii)
Two sets printout in A1 paper iii) Soft copy in CD in
AutoCAD version 2007 or above iv) Soft copy in PDF
version.
18.0 Training Operation
The contractor shall arrange training to the selected staffs
by the client for a period of 1 day or as required so that
they can be acquainted with the system and can handle
the equipment well.

19.0 Maintenance & Services During Guarantee Period


Operation and maintenance of all installed items for one
year defect liability period after completion of tne Trail
run. During this period if any defect in supply / Intallation
is defcted, the Contractor will rectify that at his cost. The
Contractor shall also supply all cosumable materials,
tools, manpower for operation and maintenance.

0.00

1.0 Contractor is instructed to verify quantity of material before placement of order.


2.0 Quantity mentioned are estimated. Actual payment shall be made based on work measurement.

Page 4 of 8

Local (TK)
Rate

Amount

0.00

0.00

0.00

0.00

0.00

Page 5 of 8

Local (TK)
Rate

Amount

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

50,000.00
0.00
0.00
0.00
0.00
25,000.00
0.00

50,000.00
0.00
0.00
0.00
0.00
25,000.00
0.00

50,000.00

50,000.00

Page 6 of 8

Local (TK)
Rate

Amount

25,000.00

25,000.00

0.00

0.00

0.00

0.00

50,000.00

50,000.00

Page 7 of 8

Local (TK)
Rate

Amount

0.00

0.00

0.00

0.00

200,000.00

Page 8 of 8