PROJECT:
Name of Applicant
>
Last Name
First Name
Middle Name
ROSALYN B. SHIMOKAWA
Address:
Street NO.
Barangay
City / Municipality
Street NO.
Barangay
City / Municipality
>
Location:
>
> 137-2012002460
>
Sq.m
>
Date Issued:
Building
>
Place Issued:
Electrical
Mechanical
>
Plumbing
T.I.N.
Others (Specify)
>
TOTAL COST
Php
Php
Php
Total
Php
LOT OWNER
Name :
Last Name
>
Address:
First Name
Middle Name
ROSALYN B. SHIMOKAWA
Street NO.
Barangay
City / Municipality
> 0
Tax Declaration No.
> 0
>
>
137-2015003801,-2028,-2029
CDO
> 0
Date Issued:
> 12/30/1899
Place Issued:
> 0
T.I.N.
> 0
Architect
Electrical Engineer
Name:
Name:
Address:
Address:
PTR NO.
PTR NO.
> 4037160
> 4030066B
TIN:
TIN:
> 920-165-451
> 15013
> 2835
Date Issued:
Date Issued:
> 16-Jan-15
> jan/8/2015
Place Issued:
Place Issued:
> CDO
> CDO
Master Plumber
Mechanical Engineer
Name:
Name:
Address:
Address:
PTR NO.
PTR NO.
> 4039435
> 4019193B
TIN:
TIN:
> 114-752-873
> 144-327-259
> 939
> 3126
Date Issued:
Date Issued:
> 3-Jan-15
> 6-Jan-15
Place Issued:
Place Issued:
> CDO
> CDO
Civil Engineer
Place
Address:
>
Name:
PTR NO.
> 9504543B
TIN:
> 75326
Date Issued:
> 27-Jan-15
Place Issued:
> CDO
BUILDING PERMIT
BP NO.
Date
BOX 1 (To be accomplished by designing Architect/Civil Engineer, in print)
Last Name
First Name
M.I.
NAME OF APPLICANT:
ROSALYN B. SHIMOKAWA
For Construction owned
Form of Ownership
0
Main Economic Activity/Kind of Business
by an Enterprise
ADDRESS:
Street no.
LOCATION:
Street no.
Barangay
City/Municipality
Barangay
City/Municipality
0
KAUSWAGAN, CAGAYAN DE ORO CITY, NEAR QUADRO OCHO
SCOPE OF WORK:
[ ] Repair [ ] Renovation
RESIDENTIAL
[ ] Single
[ ] Duplex
[ ] Rowhouse / Accessories
[ ] Others ( specify 2-storey
)
COMMERCIAL
[ ] Bank
[ ] Stores
[ ] Market
[ ] Gasoline Station
[ ] Hotel/Motel/Restaurants, etc.
[ ] Office, Condominium/Business Office
[ ] Shop (Dress, Tailoring, Barber, and the like)
[ ] Dormitory or othe Lodging House
[ ] Others ( specify )
INDUSTRIAL
[ ] Factory
[ ] Repair Shop, Machine Shop
[ ] Refinery
[ ] Printing Press
[ ] Warehouse
[ ] Others ( specify )
AGRICULTURAL
[ ] Barns, Poultry Houses, etc.
[ ] Grain, Mill
[ ] Others ( specify )
INSTITUTIONAL
[ ] School
[ ] Church and Other Religious Structures
[ ] Hospital or Similar Structures
[ ] Welfare and Charitable Structures
[ ] Theater, Auditorium, Stadium, Court
[ ] Others ( specify )
] Perspective
] Architectural Plans
] Structural Plans
] Sanitary/Plumbing Plans
] Electrical Plans
[
[
[
[
[
] Mechanical Plans
Others (Specify)
] Specifications
] Bill of Materials and Cost Estimate
] Soil Analysis
] Structural Analysis
APPROVED:
Date
NOTE: This permit may be canceled or revoked pursuant to Section 305 & 306 of the National Building Code
APPLICATION NO.
PERMIT NUMBER
DATE ISSUED
PAID UNDER OR No.
AMOUNT
DATE
DATE FILED
BOX 1
NAME OF
LAST NAME
OWNER / APLLICANT:
ADDRESS:
NO.
FIRST NAME
MIDDLE NAME
TIN
ROSALYN B. SHIMOKAWA
STREET
BARANGAY
CITY/MUNICIPALITY
STREET
BARANGAY
CITY/MUNICIPALITY
0
LOCATION OF
NO.
INSTALLATION:
BOX 2
ASSESSED FEES
AMOUNT DUE
ASSESSED BY
O.R. NUMBER
DATE PAID
REVIEWED BY:
CHIEF,PROCESSING DIV/SEC.
BOX 3
PERMIT IS HEREBY GRANTED TO INSTALL THE ELECTRICAL WIRING DEVICES AND EQUIPMENT ENUMERATED IN THE APPLICATION
4. THAT A CERTIFICATE OF FINAL ELECTRICAL INSPECTION BE SECURED PRIOR TO THE ACTUAL OCCUPANCY OF THE BUILDING
5. THIS PERMIT SHALL BE POSTED AT THE DOOR ON SITE OF WORK.
APPROVED:
DATE
NOTED:
0
BUILDING OFFICIAL
DATE
This permit may be cancelled or revoked pursuant to Sections 305 & 306 of the National Building Code.
Alterations on this form are not allowed.
Permit Number
Date of Application
BOX 1 (To be accomplished by Sanitary Engineer/Master Plumber, in print)
NAME OF APPLICANT
Last Name
First Name
M.I.
ADDRESS
No.
Street
Barangay/City Municipality
Telephone Number
0
LOCATION OF INSTALLATION :
No.
Street
Barangay/City Municipality
Telephone Number
ROSALYN B. SHIMOKAWA
New Installation
Addition of
Removal of
Repair of
Others
Residential
Commercial
Industrial
Institutional
Agricultural
Parks/Plazas
Recreational
Others
FIXTURES TO BE INSTALLED:
QTY.
5
New
Fixtures
x
10
Floor Drain
Laundry Trays
Lavatories
Dental Cuspidor
Kitchen Sink
Gas Heater
Faucet
Electric Heater
Shower Head
Water Boiler
Water Meter
Drinking Fountain
Grease Trap
Bar Sink
Bath Tabs
Slop Sink
Laboratory Sink
Urinal
Sterilizer
Air Conditioning
Swimming Pool
Water Tank/Reservoir
Others (Specify)
10
5
Existing Kind of
Fixtures Fixtures
Water Closet
x
x
QTY.
5
New
Fixtures
x
TOTAL
x
Shallow Well
Others
Number of Storeys of Building
Proposed Date Start of Installation
Expected Date of Completion
Kind of
Fixtures
Bidette
TOTAL
Water Supply
Deep Well & Pump Set
Existing
Fixtures
Street Canal
Water Course
0
Total Area of Building/Subdivi
Total Cost of Installation
Prepared by MR. REYNALDO DIUPIN C. TY
sq.m.
Action Taken:
PERMIT is hereby GRANTED to install the Sanitary/Plumbing Fixtures enumerated herein subject to the ff. condition:
1.
That the proposed installation shall be in accordance with approved
plans filed with this Office and in accordance with the conformity with
the National Building Code;
2.
That a duly licensed Sanitary Engineer/Master Plumber be in-charge
of the installation/construction;
0
3.
That a Certificate of Completion duly signed by the Sanitary Engine
City Building Official
Master Plumber in-charge of the installation be submitted not later
than seven (7) days after the completion of the installation;
4.
That a Certificate of Final Inspection and Certificate of Occupancy
be secured prior to the actual occupancy of the building.
Date
NOTE:
This permit may be canceled or revoked pursuant to Section 306 of the National Building Code.
e System
he ff. condition:
APPLICATION NO.
PERMIT NO.
MECHANICAL PERMIT
DATE OF APPLICATION
DATE ISSUED
ROSALYN B. SHIMOKAWA
TELEPHONE NO.
0
LOCATION OF INSTALLATION: NO., STREET, BARANGAY, CITY/MUNICIPALITY
ADDITION OF
REMOVAL OF
CERTIFICATE OF OCCUPANCY N
OTHERS (SPECIFY)
AGRICULTURAL
COMMERCIAL
LANDSCAPING
INDUSTRIAL
OTHERS (SPECIFY)
INSTITUTIONAL
INSTALLATION AND OPERATION
BOILER
DUMBWAITER
PRESSURE VESSELS
MECHANICAL VENTILATION
PUMPS
ESCALATOR
MOVING SIDEWAK
INSTITUTIONAL AND/OR
FREIGHT ELEVATOR
INDUSTRIAL GAS
PASSENGER ELEVATOR
OTHERS (SPECIFY
PROPOSED DATE OF INSTALLATION
TOTAL INSTALLATION COST
AND/OR MONORAILS
EXPECTED DATE OF COMPLETIO
Feb-16
-
PREPARED BY:
Mar-17
ALFREDO T. BUTEN
NOTE: THIS PERMIT MAY BE CANCELLED OR REVOKED PURSUANT TO SECTIONS 305 & 306 OF THE "NATIONAL BUILDING CODE."
PERMIT NO.
FENCING PERMIT
Date of Application
Date Issued
M.I.
ROSALYN B. SHIMOKAWA
For construction
Form of Ownership
by an Enterprise
ADDRESS
No.
Street
Barangay
City/Municipality
LOCATION
No.
Street
0
Barangay
City/Municipality
Tel. No.
Additional
Renovation
Repair
Others (Specify)
MEASUREMENTS:
LENGTH, in meters
HEIGHT, in meters
Type of fencing:
Indigenous Materials
Others (Specify)
0
City Building Official
NOTE: This permit may be cancelled or revoked pursuant to Section 305 & 306 of the National Building Code.
PERMIT NO.
FENCING PERMIT
Date of Application
Date Issued
First Name
M.I.
ROSALYN B. SHIMOKAWA
For construction
by an Enterprise
ADDRESS
Form of Ownership
No.
Street
Barangay
City/Municipality
Tel. No.
0
LOCATION
No.
Street
Barangay
City/Municipality
New Fence
Additional
Renovation
Repair
Others (Specify)
LENGTH, in meter
HEIGHT, in mete
Type of fencing:
Indigenous Materials
Others (Specify)
SIGN PERMIT
APPLICATION NO.
SP NO.
Date
BOX 1 (To be accomplished by designing Architect/Civil Engineer, in print)
NAME OF APPLICANT
Last Name
First Name
M.I.
ROSALYN B. SHIMOKAWA
For Construction owned
Form of Ownership
by an Enterprise
ADDRESS:
No.
Street
Barangay
City/Municipality
No.
Street
Barangay
City/Municipality
0
LOCATION:
New Construction
Addition
Repair
[X]
TYPE OF SIGN
Renovation
Demolition
Others (Specify)
Wall
Projecting
[X]
Cloth/Canvas
G.I. Sheets
Others (Specify)
Others (Specify)
Neon
Panaflex
Streamer
Wooden
Posters
Steel
Others (Specify)
Others (Specify)
Lot Title
Mechanical Plan
Lease/Rental Contract
Architectural Plans
Specifications
Structural Plans
Others (Specify)
Electrical Plans
CLEARED AS TO TOURISM:
APPROVED:
That the signage shall be installed in conformity with Chapter 20 of P.D. 1096 and
Rule V of its implementing Rules and Regulations.
2.
3.
This permit must be kept in the premises of the establishment wherein the sign is
installed for inspection purposes.
Date
NOTE:
THIS SIGN PERMIT MAY BE CANCELLED OR REVOKED PURSUANT TO SECTION 305 & 306 OF THE NATIONAL BUILDING CODE
(P.D. 1096) AND WHEN PUBLIC INTERESTSO DEMANDS.
Building
Electrical
Mechanica
Plumbing
Php
TOTAL COST
Php
] Without Roofdeck
Total Area
sq.m.
###
Proposed Date of Constructi
Feb-16
Expected Date of Completio
Mar-17
Material of Construction
[ ] Steel [ ] Concrete
[ ] Wood[ X ] Mixed
Others (Specify)
] With
Php
Total
ASSESSMENT
CATEGORY
AMOUNT DUE
ASSESSED FEES
O.R. NUMBER
DATE PAID
TOTALS
PROGRESS
NOTED:
IN
TIME
DATE
FLOW
OUT
TIME
DATE
ACTION /
REMARKS
PROCESSED BY
P.R.C. No.
15013
4037160.00
Signature
Name :
ARCH. HEINRICH S. TY
Place Issued
16-Jan-15
CDO
T.I.N.
75326
Place Issued
9504543B
Signature
T.I.N.
CDO
27-Jan-15
920-165-451
ARCHITECT/CIVIL ENGINEER
(In-Charge of Construction)
P.R.C. No.
15013
137-2015003801,-2028,-2029
Name :
Name :
ARCH. HEINRICH S. TY
Place Issued
16-Jan-15
ROSALYN B. SHIMOKAWA
Address :
Residence Certificate No.
Date Issued
CDO
T.I.N.
Place Issued
12/30/1899
Signature
0.00
T.I.N.
920-165-451
BOX 9 (To be accomplished by the Applicant)
Signature
ROSALYN B. SHIMOKAWA
APPLICANT
0.00
Date Issued
Place Issue
hout Roofdeck
PERMIT NUMBER
Date of Completion
TIN
ROSALYN B. SHIMOKAWA
ADDRESS
NO.
STREET
BARANGAY
0
TEL/FAX NO.
CITY/MUNICIPALITY
0
LOCATION OF
NO.
STREET
BARANGAY
CITY/MUNICIPALITY
INSTALLATION
SCOPE OF WORK
x NEW INSTALLATION
ANNUAL INSPECTION
ADDITION OF
REPAIR OF
REMOVAL OF
OTHERS (SPECIFY)
RENOVATION
F. INDUSTRIAL
D. INSTITUTIONAL
NUMBER OF OUTLETS
### LIGHT
35 CONVENIENCE/RECEPTACLE
SPO,AIRCON
J. ACCESSORY
X K. OTHERS (SPECIFY)
COMMERCIAL
TOGGLE SWITCH
FA DETECTORS
SPO,WATER HEATER
BELL/BUZZER
SPO,WATER PUMP
PUSH BUTTON
BOX 2 (PROFESSIONAL ELECTRICAL ENGINEER WHO SIGNED AND SEALED PLANS AND SPECIFICATIONS)
NAME
ADDRESS
PTR NO.
SIGNATURE
DATE SIGNED
VALIDITY
TEL./FAX NO.
PLACE ISSUED
TIN
CDO
VALIDITY
ADDRESS
TEL./FAX NO.
NAME
ADDRESS
PTR NO.
SIGNATURE
VALIDITY
TEL./FAX NO.
PLACE ISSUED
TIN
CDO
NAME
SIGNATURE
TIN
CTC NO.
DATE ISSUED
ROSALYN B. SHIMOKAWA
PLACE ISSUED
137-2015003801,-2028,-2029
December 30, 1899
0
DATE RECEIVED:
Cost Estimates
Bill of Materials
Others (Specify)
Assessed by
O.R. Number
Date Paid
IN
TIME
FLOW
OUT
DATE
TIME
DATE
ACTION/
REMARKS
PROCESSED
BY
BOX 8
PRC Reg. No.
939
Signature
Address
KAUSWAGAN, CDO
PTR No.
Date Issued
4039435
01/03/15
Signature
Applicant
Place Issued
CDO
114-752-873
BOX 7
SANITARY ENGINEER/PLUMBER
939
KAUSWAGAN, CDO
PTR No.
4039435
Date Issued
Place Issued
30-Dec-99
TIN No.
Date Issued
Place Issued
01/03/15
CDO
Signature
TIN No.
114-752-873
BILL OF MATERIALS
COST ESTIMATES
OTHERS (SPECIFY)
AMOUNT DUE
FEE
ASSESSED BY
O.R. NUMBER
DATE PAID
REVIEWED BY:
CHIEF,PROCESSING DIV/SEC
BOX 5 (TO BE ACCOMPLISHED BY THE DIVISION/SECTION CONCERNED)
NOTED
IN
PROGRESS FLOW
OUT
TIME
Chief,Processing Div./Sec.
DATE
TIME
DATE
ACTION / REMARKS
PROCESSED BY
BOX 6
PROF. MECHANICAL ENGINEER
BOX 8
PRC REG. NO.
3126
Signature
ROSALYN B. SHIMOKAWA
ALFREDO T. BUTEN
Address
PTR No.
4019193B
Signature
APPLICANT
SCIONS KAUSWAGAN CDOC
Date Issued
Place Issued
1/6/2015
CDO
BOX 7
PROF. MECHANICAL ENGINEER
3126
ALFREDO T. BUTEN
Address
4019193B
Date Issued
Place Issued
30-Dec-99
TIN
144-327-259
PTR No.
CDO
Signature
TIN
144-327-259
IN
TIME
FLOW
ACTIONS/REMARKS
OUT
DATE
TIME
PROCESSED
BY
DATE
We hereby affix our hands signifying our conformity in the information herein written above set forth.
BOX 6 (To be accomplished by the Designer)
ARCHITECT/CIVIL ENGINEER
PRC No.
15013
Print Name
75326
Print Name
ARCH. HEINRICH S. TY
ROMMEL D. RAFISURA
ADDRESS
ADDRESS
KAUSWAGAN, CDO
PTR NO.
LAPASAN, CDOC
DATE ISSUED
PLACE ISSUED
16-Jan-15
CDO
4037160
SIGNATURE
TIN
PTR No.
DATE ISSUED
9504543B
SIGNATURE
PLACE ISSUED
1/27/2015
CDO
TIN
186 - 383 - 721
920-165-451
BOX 7 (To be accomplished by Constrution in-charge)
ARCHITECT/CIVIL ENGINEER
TCT/OCT NO.
137-2015003801,-2028,-2029
PRC No.
15013
Print Name
Print Name
ARCH. HEINRICH S. TY
ROSALYN B. SHIMOKAWA
ADDRESS
ADDRESS
KAUSWAGAN, CDO
PTR NO.
PRC No.
DATE ISSUED
PLACE ISSUED
16-Jan-15
CDO
4037160
SIGNATURE
TIN
RES.CERT.NO.
0
DATE ISSUED
P-ISSUED
12/30/1899
SIGNATURE
30-Dec-99
TIN
###
920-165-451
BOX 9 (TO BE ACCOMPLISHED THE APPLICANT)
SIGNATURE
ROSALYN B. SHIMOKAWA
APPLICANT
RES.CERT.NO.
0
DATE ISSUED
12/30/1899
PLACE ISSUED
0
AMOUNT DUE
FEES
ASSESSED BY
O.R. NUMBER
DATE PAID
TOTALS
Received By:
Chief, Processing Division/Section
IN
TIME
DATE
FLOW
ACTIONS/REMARKS
OUT
(OK/Lacking Reqmt.)
TIME
DATE
PROCESSED
BY
15013
Signature
ARCH. HEINRICH S. TY
ROSALYN B. SHIMOKAWA
Address
APPLICANT
KAUSWAGAN, CDO
PTR No.
Date Issued
Place Issued
4037160
16-Jan-15
CDO
Signature
Date Issued
Place Issued
12/30/1899
TIN
920-165-451
BOX 8 (To be accomplished by construction in-charge)
ARCHITECT/CEVIL ENGINEER
PRC No.
15013
137-2015003801,-2028,-2029
ARCH. HEINRICH S. TY
ROSALYN B. SHIMOKAWA
Address
Address
KAUSWAGAN, CDO
PTR No.
4037160
Signature
Print Name
Date Issued
Place Issued
16-Jan-15
CDO
TIN
Res. Certificate
Date Issued
12/30/1899
Signature
920-165-451
Place Issued
0
TIN
MP
IN
OUT
ACTION/
Chief,Processing Div/Sect.
TIME
DATE
TIME
DATE
PROCESSED BY:
REMARKS
We hereby affix our hands signifying our conformity to the information herein set forth.
PRC No.
15013
PRC No.
15013
Print name
Print Name
ARCH. HEINRICH S. TY
ARCH. HEINRICH S. TY
Address
Address
KAUSWAGAN, CDO
PTR No.
Date Issued
4037160
KAUSWAGAN, CDO
Place Issued
1/16/2015
Signature
PTR No.
CDO
Date Issued
4037160
TIN
Place Issued
1/16/2015
Signature
CDO
TIN
920-165-451
920-165-451
ARCHITECT/CIVIL ENGINEER
TCT/OCT No.
PRC No.
15013
In-Charge of Construction
137-2015003801,-2028,-2029
Print name
Print Name
ARCH. HEINRICH S. TY
ROSALYN B. SHIMOKAWA
Address
Address
KAUSWAGAN, CDO
PTR No.
4037160
Date Issued
Place Issued
1/16/2015
Signature
0
Res. Certificate No.
CDO
TIN
Date Issued
Place Issued
12/30/1899
Signature
0
TIN
920-165-451
0
BOX 8 (To be accomplished by the Applicant)
Signature
ROSALYN B. SHIMOKAWA
APPLICANT
Date Issued
Place Issued
ARCH. HEINRICH S. TY
T-SQUARE BUILDING, 2ND FLOOR, SAINT IGNATIUS ST., KAUSWAGAN, CDO
Project
Owner
Location
SPECIFICATIONS
1. GENERAL:
These specifications are intended to cover all labor and materials required for the construction
of this building as shown and describe in these specifications. This entire work is to be finished in
every part with a first class job to the owner of his Architect.
(a)The contractor shall check the dimensions on the plans. He will not be allowed any extra in case any
discrepancy should be discovered during the progress of the work. Should the contractor deviate from
the intent of the plans and specifications without the consent of the owner or his Architect. He shall be
subjected to liquidate damages.
(b)The owner shall have the right to alter, add or omit any part of the plan. The bill for all extras must be
submitted to the owner or his Architect in writing before the final acceptance of the building. A third
person maybe employed if the owner and the contractor may not agree to the extra price of the
alterations, additions or deductions due to omissions.
(c)All permits required by law will be paid by the owner. The deposit for electric meters if so required will be
paid by the owner. The contractor will pay for the deposit for the temporary installations of water meter
and light meter.
(d)The contractor shall be held responsible for any liabilities under the Workmens Compensation Act. He shall
be responsible for all the direct accidents on the job and for all injuries to person and damages of
materials when cause by him or his workmen.
(e)The contractor must employ and select the experienced foreman on the job, who can understand and
speak English or Visayan dialect and acceptable to the owner or his Architect.
(f)Before commencing the work, the contractor shall clear the site from obstructions, and provide the
necessary enclosures. After the construction is finished, the contractor shall have the building cleaned
and ready for occupancy. It is understood that all tiles, floor, walls, gutter, glasses, etc. must be properly
cleaned. The ground around the building shall be properly graded and all rubbish and superfluous
building materials must be removed from the lot.
A.Type of Building: This building shall be constructed in concrete and wooden framework as indicated in the
plans and walled with 6 thick cement hollow blocks.
2. CONCRETE AND MASONRY WORKS: All structural framework of the building except roof frame shall be
reinforced concrete as follows:
a. Foundations, footings
b. Columns, beams and slabs
c. Lintels
d. Parapets
e. Septic Vault
f. Ground floor slab
Class
Class
Class
Class
Class
Class
A mix
A mix
A mix
A mix
B mix
A mix
3. FORMS: Forms shall conform to the shape, lines and dimensions or the finished concrete as called for on the
plans. Lumber used in forms for exposed surfaces shall be dressed to a uniform thickness and shall be
free from loose knots or other defects. Joints in form shall be either horizontal or vertical. For unexposed
surfaces and rough work, undress lumber may be used.
Lumber forms once used shall be ridden of nails and their surfaces to be in contact with concrete shall be
thoroughly cleaned and wetted before being used again. Forms shall be substantially and sufficiently tight to prevent
leakage of mortar and shall be properly braced or tied together so as to maintain correct position and shape.
4. MASONRY FINISHES: All cement finishes unless indicated shall be plain cement plaster finish.
All interior shall be plastered with cement, toweled smooth.
5. FLOOR FINISHES: Floor finish shall be plain cement unless specified in the plans.
6. FLOORING AND WALLING: Use Plain cement except those specified in the plans.
7. CEILING: Ceiling boards of the interior shall be 3.5MM thick hardiflex boards or Gypsum boards except those
specified in the plans. Use 2"x1" metal furring fo ceiing framing (FOR CR'S ONLY)
8. FINISHING HARDWARES: All finishing hardwires such as hinges, door locks, etc.,
shall be approved by the owner.
9. PAINTING: All paints to be used shall be BOYSEN/ DAVIES / RAIN & SHINE brand.
Masonry and other concrete or hollow block walls shall be painted with two (2) coats latex-based paint.
All exterior walls and woodwork shall be painted with two coats of exterior gloss oil paint.
All exterior walls and partitions shall be semi-gloss interior enamel painted made in two (2) coats.
Areas of hollow block walls shall be washed with a solution of zinc sulfate and rinsed with clear water before a
stucco concrete primer and sealer is applied. After the sealer follows the finishing coat which is semi-gloss
interior enamel.
All interior ceilings shall be finished with flat wall enamel paint applied in two (2) COATS.
All built-in closets and cabinets shall be painted with sprayer. The surface shall be puttied and prepared with a
primer surface before any coat of paint is applied.
All doors and stone cut ceiling shall be finished with a dead flat or gloss lacquer paint. Doors shall be uniformly
stained with a wood stain before the finishing lacquer is applied.
All knots, etc. shall be patched puttied before sandpapering it. It shall be well sandpapered before painting it.
No painting or lacquering shall be allowed at rainy days especially in the exterior parts of the house.
(CR PAINTINGS ONLY)
10. ELECTRICAL: All electrical wiring connections and installations shall be done on rigid metal conduits unless
specified in the plans.
All switches and convenient wall outlets shall be quietmatic or National brand.
Provide a safety circuit breaker at the main entrance switch. (General Electric brand)
All electrical wirings and connections shall be in accordance and in conformity with the National Electrical Code
and of the Local Electrical Regulations.
All electrical wires must be Far East or Phelp Dodge brand.
NOTE:
PREPARED BY:
ARCH. HEINRICH S. TY
ARCHITECT
PRC:
15013
PTR NO:
4037160
DATE:
TIN:
16-Jan-15
920-165-451
ROSALYN B. SHIMOKAWA
OWNER
ARCH. HEINRICH S. TY
#8, T-SQUARE BUILDING, SAINT IGNATIUS ST., KAUSWAGAN, CDO
Project
Owner
: ROSALYN B. SHIMOKAWA
Location
SPECIFICATIONS
1. GENERAL:
These specifications are intended to cover all labor and materials required for the construction
of this building as shown and describe in these specifications. This entire work is to be finished in
every part with a first class job to the owner of his Architect.
(a)The contractor shall check the dimensions on the plans. He will not be allowed any extra in case any
discrepancy should be discovered during the progress of the work. Should the contractor deviate from
the intent of the plans and specifications without the consent of the owner or his Architect. He shall be
subjected to liquidate damages.
(b)The owner shall have the right to alter, add or omit any part of the plan. The bill for all extras must be
submitted to the owner or his Architect in writing before the final acceptance of the building. A third
person maybe employed if the owner and the contractor may not agree to the extra price of the
alterations, additions or deductions due to omissions.
(c)All permits required by law will be paid by the owner. The deposit for electric meters if so required will be
paid by the owner. The contractor will pay for the deposit for the temporary installations of water meter
and light meter.
(d)The contractor shall be held responsible for any liabilities under the Workmens Compensation Act. He shall
be responsible for all the direct accidents on the job and for all injuries to person and damages of
materials when cause by him or his workmen.
(e)The contractor must employ and select the experienced foreman on the job, who can understand and
speak English or Visayan dialect and acceptable to the owner or his Architect.
(f)Before commencing the work, the contractor shall clear the site from obstructions, and provide the
necessary enclosures. After the construction is finished, the contractor shall have the building cleaned
and ready for occupancy. It is understood that all tiles, floor, walls, gutter, glasses, etc. must be properly
cleaned. The ground around the building shall be properly graded and all rubbish and superfluous
building materials must be removed from the lot.
A.Type of Building: This building shall be constructed in concrete and wooden framework as indicated in the
plans and walled with 6 thick cement hollow blocks.
2. STORE FRONT: Shall be 12mm thick, TEMPERED,CLEAR, FRAMELESS GLASS with butt joints & Glazing shall
be from floor to ceiling. Store front openings shall be one eight tenth meters (1.80m)
Doors - shall swing in but must be DOUBLE ACTION for emergency purposes
3. MASONRY FINISHES: All cement finishes unless indicated shall be plain cement plaster finish.
All interior shall be plastered with cement, troweled smooth.
4. FLOOR FINISHES: Floor finish shall be plain cement unless specified in the plans.
5. WALLING: Use Hardiflex or gypsum board with metal furring or specified in the plans.
6. CEILING: Ceiling boards of the interior shall be hardiflex or gypsum board w/ metal furring
Ceiling framing shall be already ready for the prepared of PDAS and sprinkler installation and construction.
Service manhole shall be providedper serviceable area with min. dimension of 600 mm x 600mm.
Metal hangers & supports should have 2 coats of rust-protective paint
7. FINISHING HARDWARES: All finishing hardwares such as hinges, cabinets, pulls and catches, door locks, etc.,
shall be approved by the owner.
8. PAINTING: All paints to be used shall be davies brand or other brand.
All exterior walls and partitions shall be semi-gloss interior enamel painted made in two (2) coats.
All interior ceilings shall be finished with flat wall latex paint applied in two (2) COATS.
All built-in closets and cabinets shall be painted with sprayer. The surface shall be puttied and prepared with a
primer surfacer before any coat of paint is applied.
All doors and stone cut ceiling shall be finished with a dead flat or gloss lacquer paint. Doors shall be uniformly
stained with a wood stain before the finishing lacquer is applied.
All knots, etc. shall be patched puttied before sandpapering it. It shall be well sandpapered before painting it.
All wooden floors shall be machine sanded and finish with a Boysen sanding sealer, applied in two (2) coats
with a sprayer.
No painting or lacquering shall be allowed at rainy days especially in the exterior parts of the house.
The roof shall be painted with 2 coats of roofing paint. (Acrylic roof paint)
11. ELECTRICAL: All electrical wiring connections and installations shall be done on rigid metal conduits unless
specified in the plans.
All switches and convenient wall outlets shall be quietmatic or National brand.
Provide a safety circuit breaker at the main entrance switch. (General Electric brand)
All electrical wirings and connections shall be in accordance and in conformity with the National Electrical Code
and of the Local Electrical Regulations.
All electrical wires must be Far East or Phelp Dodge brand.
12. SIGNAGE: Customized letters fabricated from bras, stainles steel. G.I. Sheet are allowed. Dimensional letter
hard-lit or indirectly lit with light emitting diodes (LED')
Exit Signs The mechanct as required by code, shall install exit Signs within the merchant space
NOTE:
PREPARED BY:
COMFORME BY:
ARCH. HEINRICH S. TY
ROSALYN B. SHIMOKAWA
ARCHITECT
OWNER
PRC:
15013
PTR:
4037160
DATE:
TIN:
16-Jan-15
920-165-451