EURONAVY S.A.

A GUIDE FOR ES301


COATING SYSTEM
APPRAISAL

Collection of relevant
testing, certifications and
track record
information

October 2008

EURONAVY S.A.

A GUIDE FOR ES301 COATING SYSTEM APPRAISAL


October 2008

The Euronavy Case


x

ES301 Slide Presentation

The ES301 and the IMO PSPC


x

CONTENT

IMO PSPC Type Approvals

The US Navy Case


x

Announcing ES301 approval by MIL-PRF 23236C standard

MIL-PRF 23236C standard: Performance Specification Coating systems for ship


structures.

Qualified Product List for MIL-PRF 23236C.

Navseas PPI 63101-001 Ballast Tanks (systems approved for 20 years service
life).

USS Belleau Wood: 24-Month Evaluation of Euronavy Paint System Test


Application in Three Ballast Tanks.

USS Detroit: One Year Follow-up Report Bilge Coatings Test Application

The Petrobras Case


x

Petrobras experience with ES301: text received from Petrobras reporting


comprehensive data on ES301 system testing and use by Petrobras since the
90s.

Technical Specification N I-ET-3010.00-1300-140-PPC-002: Surface Tolerant


Solvent Free Epoxy Paint For Wet Surfaces. ES301 complies with this product
specification.

The Transocean Case


x

Letter of recommendation from Transocean (Discoverer 534 project)

The Aker Case


x

Photo Report and Pull-off Test Report on ES301 application over hydroblasting
(Aker Smart 1 Project).

The BP Case
x

Painting at Night in the Gulf of Mexico. Ken Judice Jr., Coatings&Linings


Feb2007. Article on the use of ES301 at Thunder Horse field.

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal
Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

EURONAVY S.A.

A GUIDE FOR ES301 COATING SYSTEM APPRAISAL


October 2008

The Euronavy Case


Euronavy developed a unique coating system. The ES301 solvent-free
epoxy series system joins low-VOC, surface and humidity tolerance, edgeretention and outstanding anticorrosive properties and adhesion to the
substrate in an unique way. Such features are helping Euronavy customers
to adopt hydroblasting as a safe and environmentally preferable surface
preparation method.

Attached
x

Euronavy References, Marine & Offshore: List of relevant projects and track
record information.

ES301 Coating System: Cost Savings, Durability, Environmental Compliance (slide


presentation)

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal
Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

EURONAVY S.A.

EURONAVY
REFERENCES
Marine & Offshore

List of relevant projects


and track record
information

June 2008

EURONAVY S.A.

EURONAVY REFERENCE LIST


Marine & Offshore
June 2008

SUMMARY
This document is attaching a list of main offshore and marine industries projects that adopted Euronavy
coating systems (Appendix 1). The listed projects account for more than six million square meters of
steel treated with over four million litres of ES301 solvent-free products since year 2000 only.
Accounting with older marine & offshore projects using ES301 since early 90s, with the dispersed sale of
these products for numerous OEMs and contractors and with the sales for on-shore industrial uses
(including oil & gas and energy industries, steel bridges and other steel structures), Euronavy estimates
that over eleven million square meters of steel have been protected with ES301 systems since this
type of products have been developed.
For each project, the table details the project type and data such as type and dimension (m2) of areas
coated, surface preparation method(s) and year and place of application. These projects include
maintenance & repair, conversion and new building jobs. All the projects used ES301 solvent-free surface
& humidity tolerant coatings as main anticorrosive system. Ultra High Pressure hydroblasting was widely
used as surface preparation method.
Apart from the attached reference list, a summary of the action that took place with Euronavy systems in
some major clients is given.
An ES301-based coating system as been Type Approved as IMO PSPC1 compliant. The IMO PSPC is the
new set of rules for the protective coatings selection and application for ballast tanks at new building
stage. Being one of the first coating systems being Type Approved under such stringent prequalification
rules enables Euronavy to positioning itself in the front row of the marine new building market for
protective coatings. The results of such positioning will surely be reflected in this reference list in a near
future.

IMO PSPC refers to the Resolution MSC.215(82) of IMOs Maritime Safety Committee adopted on 8 December 2006, designated

PERFORMANCE STANDARD FOR PROTECTIVE COATINGS FOR DEDICATED SEAWATER BALLAST TANKS IN ALL TYPES OF
SHIPSAND DOUBLE-SIDE SKIN SPACES OF BULK CARRIERS
Euronavy Tintas Martimas e Industriais S.A.
Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal * Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

EURONAVY S.A.

EURONAVY REFERENCE LIST


Marine & Offshore
June 2008

US NAVY (USA)
ES301 coating system was one of the few coating systems going through extensive evaluation since
1994, when DoD Department NAVSEA 05M launched a Program aimed to review all blasting and painting
procedures for US Navy and US Coast Guard, in order to improve the service life of traditional coating
protection being applied so far. As a result, NAVSEA has already published extensive new specifications
for coating onboard US Navy and US Cost
Guard ships and is now trying to disseminate
the new standards through the US Navy fleet.
ES301 was approved for the most demanding
areas and is listed in the Advanced Coatings
List by Navsea. ES301 is approved as a 20
years service life coating system for ballast
tanks, is the only system approved for ballast
tanks when hydroblasting is to be used as
surface preparation and is approved by the
most stringent standard for coating
qualification for ships: the MIL-PRF 23236C
standard.
The information regarding the several ships
using ES301 (for ballast tanks, bilges and
other areas where it is approved for use) is
not available. Nevertheless, abundant
technical information and some inspection
reports by independent sources can be
supplied in separate.

PEMEX (MEXICO)
Euronavy products are included in PEMEX Standards &
Specifications for Anticorrosive Protection. Oil rig PSS
Chemul (Mobile, AL, USA, 2005) is a recent example, ES301
system being used for a full refurbishment and life extension
project. Pemex is also using ES301 for general maintenance
onboard ships and offshore platforms in Gulf of Mexico.

PSS Chemul

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal * Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

EURONAVY S.A.

EURONAVY REFERENCE LIST


Marine & Offshore
June 2008

PETROBRAS AND TRANSPETRO (BRAZIL)


Petrobras tested and
thoroughly evaluated
EURONAVY products.
The result was the
recognition of the
superior performance
of the EURONAVY
products, and it
specification and use
in Petrobras Projects
in USA, Europe,
Singapore, Brazil, and
many other locations
in the world.
(Platforms, Ships,
Equipments, etc.).
More than 4 million
m2 were already
coated with ES301 at
Petrobras and
Transpetro projects.

Petrobras P52 FPU: the hull in the photo was built in Singapore (Keppel Fels) and totally
protected with Euronavy coating systems

Transpetro is the Petrobras-owned oil&gas products transportation company and manages a fleet of
product carriers. Transpetro is using ES301 coating system for a few years
now, mostly for ballast and cargo tanks repair. One good example is the
crude cargo tanks of MT Ataulfo Alves, fully refurbished in 2002 using
MT Cartola cargo tanks, after
hydroblasting and ES301 coating system. An inspection performed in 2008
treatment in 2002
by ABS, more than 5 years after coating application, found the surface in
pristine condition, proving the outstanding performance of Euronavy ES301
coating system for anticorrosive protection.

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal * Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

EURONAVY S.A.

EURONAVY REFERENCE LIST


Marine & Offshore
June 2008

AKER
Aker Floating Production ASA, a subsidiary
of Aker Group, launched recently his FPSO
conversion program. The first FPSO being
converted by Aker is the Aker Smart 1. This
project started in 2007 at Jurong Shipyard
in Singapore and Euronavy was chosen as
single coating supplier for the hull
Aker Smart 1, deck coating
conversion. Thanks to the ES301 coating
with ES301 after hydroblasting:
tolerance in action.
system, hydroblasting is being used as the
main surface preparation method for this
project. The scope of supply includes
Aker Smart 1
modules fabrication in Malaysia and
Indonesia, apart from the activities in Singapore. The Aker Smart 1
FPSO is due to sail from Singapore in July 2008.

BP
BPs Thunder Horse semisub, offshore in the Gulf of
Mexico, used ES301 system for deck refurbishment. It was
applied in 2006 using UHP hydroblasting as surface
preparation method. The advantage of the system was
well perceived in such a situation: the painting job was
performed during the night, with very high humidity levels.
This humidity tolerance feature, together with the ability
of reaching effective adhesion values over surfaces with
reduced profile of roughness, have been the main causes
for the adoption of ES301 technology.

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal * Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

Painting at night in the Gulf of


Mexico. Photo and title
extracted from Ken Judice Jrs
article in Coatings & Linings,
Feb07

EURONAVY S.A.

EURONAVY REFERENCE LIST


Marine & Offshore
June 2008

TRANSOCEAN (USA)
Transocean had chosen the ES301 system for the refurbishment of the
tanks of the Discoverer 534 drill ship in 2007 (Sembawang Shipyard,
Singapore), using
hydroblasting as
surface preparation
method. The quality
of the protection after
application (namely
the pull-off tests) and
the quality of
Nordic jack up
technical service from
Euronavy have been
praised by Transoceans project team. Thanks to the
good feedback obtained from the D534 project,
ES301&hydroblasting concept was again chosen for the
Discoverer 534 drill ship
refurbishment of the Seven Seas drill ship in 2008 (again
in Singapore) and for an extensive tank repair job at the
tanks of the Nordic jack up (Malaysia, 2008).

QUEIROZ GALVAO (BRAZIL)


Queiroz Galvao Oleo e Gas is engaged in offshore drilling and oil & gas exploration since the 80s and
started using ES301 system in the 90s, for the repair
of the Alaskan Star oil rig. Today (June 2008) the
Olinda Star (ex-Petrobras P13)
being refurbished in Maua
ES301 coating system, together with hydroblasting
Shipyard, Brazil, May 2008
surface preparation, is being used as main
anticorrosive system for the oil rig Olinda Star
refurbishment project (Maua shipyard, Niteroi, Brazil).
This project is due to completion before the end of
2008 and uses Euronavy systems for all areas of the
platform (tanks, legs, deck, new steel structures, etc).

Discoverer 534 drill ship

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal * Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

EURONAVY S.A.

EURONAVY REFERENCE LIST


Marine & Offshore
June 2008

HDW (GERMANY) AND PORTUGUESE NAVY


Euronavy coating systems had been
selected for the coating of most of the
areas of the new Type 209PN
submarines for the Portuguese Navy
being built in the HDW shipyard in Kiel,
Germany. Two submarines are now
being built, with a third one as option.
ES301 solvent free coating system is
being use for critical areas and was
submitted to extensive testing in
Germany.

SHIPYARDS
Euronavy coatings had been extensively applied by numerous shipyards world wide. Some examples are
presented below, listed by geographical location. This list is an excellent indication of the dissemination of
Euronavy concept.

North America

South America

Asia

Bender Shipyard (Mobile, USA)

Maua Shipyard (Niteroi, Brazil)

Jurong Shipyard (Singapore)

Atlantic Marine (Mobile, USA)

Brasfels (Angra dos Reis, Brazil)

Keppel Fels (Singapore)

Dynamics (New Iberia, USA)

Sermetal (Rio de Janeiro, Brazil)

Keppel Shipyard (Singapore)

Halifax Shipyard (Canada)

EISA (Rio de Janeiro, Brazil)

Sembawang (Singapore)

Norfolk Navy Shipyard (USA)

Mac Laren (Niteroi, Brazil)

MSE (Malaysia)

San Diego Shipyard (USA)

Bason Shipyard (Vietnam)


Hyundai Vinashin(Vietnam)

Europe

Middle East

Lisnave (Setubal, Portugal)

Dubai Dry Docks (UAE)

HDW (Kiel, Germany)

Asry Shipyard (Bahrein)

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal * Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

Cam Rahn Shipyard (Vietnam)


Sasebo (Japan)

EURONAVY S.A.

EURONAVY REFERENCE LIST


Marine & Offshore
June 2008

MORE EXAMPLES
Apart from the examples mentioned above, Euronavy is supplying a growing number of marine and
offshore clients. The biggest ever seagoing ballast tank repair, for example, with over 500,000 m2 of steel
being treated since 2003, is being done using ES301 coating system, applied by a Norwegian contractor
and Mobil saw ES301 coating system being applied for the refurbishment of ballast tanks and cargo
tanks of their Zaphiro Producer FPSO, offshore West Africa. Many companies engaged in the supply chain
of marine and offshore projects (OEMs, steel
structures construction yards, etc) are also
joining the list of Euronavy clients at an
increasing pace. Euronavy coating materials
are being shipped to virtually every corner of
the earth, to be used by steel construction
yards in Brazil, Malaysia or Indonesia, valve
manufacturers in Europe or Navy suppliers in
USA or Japan. New clients are being
conquered, like SBM (using ES301 system for
the full refurbishment of two single buoys at
Brasfels shipyard in Brazil). The likes of Rolls
Royce, GE Oil&Gas (Nuovopignone), or
Halliburton are also part of Euronavy list of
clients. Its the Euronavy vision being
increasingly adopted by the marine & offshore
industries.

APPENDIX
The table of Appendix 1 presents detailed data about projects using Euronavy systems. The information
is not exhaustive and includes projects since the year 2000 only.

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal * Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

APPENDIX1

REFERENCELISTJUNE2008
MainMarine&OffshoreProjectssinceyear2000

CLIENT

COUNTRY

PROJECT

TYPE

SITE&LOCATION

YEAR

USNAVY&USCOAST
GUARD

USA

Allapplications

Severaltypes

MostlyUSA,Japan,
MidleEast

19942008

USNAVY

USA

USSBelleawWood

AircraftCarrier(repair)

Sasebo,Japan

2000

Ballasttanks

USNAVY

USA

USSDetroit

SupportShip(repair)

NWS,USA

2000

Bilges

TRANSPETRO

BRAZIL

O/OMAFRA

Tanker(repair)

DubaiDryDocks,UAE

2000

BallastTanks.

TRANSPETRO

BRAZIL

N/TNORMA

Tanker

Renavy(Brazil)

2001

TRANSPETRO

BRAZIL

O/OMARAC

Tanker

AsryShipyard(Bahrain)

FPSO

JurongShipyard
(Singapore)

PETROBRAS

BRAZIL

P43

SCOPE
Mostlytanksandbilges

SURFACEPREPARATION
Hydroblasting,abrasive,
powertooling

ESTIMATEDAREAS
(m2)

CONSUMPTION
ES301(Lt.)

300,000

180,000

Hydroblasting

undisclosed

undisclosed

Hydroblasting

undisclosed

undisclosed

Gritblasting

12,500

7,300

CargoTanks.

HydroBlasting

3,600

2,200

2001

BallastTanks.

Gritblasting

8,000

5,300

2002

CargoOilTanks,DieselOilTanksand
DoubleBottoms.

Gritblasting

120,000

70,000

40,000

28,000

13,000

7,000

Hydroblasting
Gritblasting
Hydroblasting
Gritblasting

PETROBRAS

BRAZIL

P17

FSU

Brasfels(Brazil)

2002

Generalmaintenanceandconversion.

TRANSOCEAN

USA

HARVEYWARD

OILRIG

SembawangShipyard
(Singapore)

2002

Drillwatertanks.

TRANSPETRO

BRAZIL

ATAULFOALVES

Tanker

SembawangShipyard
(Singapore)

2002

CargoOilTankBottoms.

Hydroblasting

11,000

5,350

TRANSPETRO

BRAZIL

CARTOLA

Tanker

SembawangShipyard
(Singapore)

2002

CargoOilTankBottoms.

Hydroblasting

11,000

5,200

PETROBRAS

BRAZIL

P43

FPSO

MauaJurong(Brazil)

2003

Modules.

Gritblasting

20,000

14,000

PETROBRAS

BRAZIL

P48

FPSO

Brasfels(Brazil)

2003

Modules.FullAreas.

Gritblasting

550,000

335,000

PETROBRAS

BRAZIL

P40

FPSO

OffshoreBrazil

2003

Maindeck.Onlyprimer.

HydroBlasting

11,000

2,500

PETROBRAS

BRAZIL

P50

FPSO

DinamicShipyard(USA)

2003

Gritblasting

70,000

55,000

PETROBRAS

BRAZIL

P50

FPSO

JurongShipyard
(Singapore)

20032004

650,000

450,000

PETROBRAS

BRAZIL

P47

FPSO

Ultratec(Brazil)

2003

46,000

25,000

PETROBRAS

BRAZIL

P50

FPSO

MauaJurong(Brazil)

20032005

Hydroblasting

180,000

134,000

PEMEX

MXICO

CHEMUL

FPU

BenderShipyard

2004

Gritblasting

80,000

85,000

ModulesPO2A&BandPO3A&B,
equipmentandpiping.
Vessel.
FullArea.
Generalmaintenanceinsidecargo
tanks.
Vessel.Assemblyandrepairs.
FullArea.
Externalhull.FullArea.

Hydroblasting
Gritblasting
Hydroblasting
MechanicalTreat

Appendix 1
Page 1/3

APPENDIX1

REFERENCELISTJUNE2008
MainMarine&OffshoreProjectssinceyear2000

PROJECT

TYPE

SITE&LOCATION

YEAR

TRANSPETRO

BRAZIL

N/TPIRAJUI

Tanker

SELMETALSHIPYARD

2004

BallastTanks.

Hydroblasting

5,000

2,200

PETROBRAS

BRAZIL

PIII

FSO

MauaJurong(Brazil)

2004

Externalhull.FullArea.

Hydroblasting

5,000

3,200

PETROBRAS

BRAZIL

P52

FPU

KeppelFels(Singapore)

20042006

220,000

BRAZIL

P51

FPU

KeppelFels(Singapore)

2005

Hydroblasting
Gritblasting
Hydroblasting
Gritblasting

350,000

PETROBRAS

60,000

48,000

PETROBRAS

BRAZIL

P34

FPSO

GDK(Brazil)

2005

Pontoonandcolumnsbelowmain
deck.FullArea.
Nodesfrompontoon.
FullArea.
Generalmaintenance,skidsfrom
chemicalmodulesandpiping.

Hydroblasting

50,000

30,000

2005

BallastTanks.

Hydroblasting

45,000

31,000

2005

BallastTanks.

Hydroblasting

45,000

29,000

2005

BallastTanks,CargoTanksandHull.

Gritblasting

42,000

30,000

Hull,legs,underdeck.

Hydroblasting

4,500

2,500

Gritblasting

5,000

3,000

410,000

280,000

10,000

6,500

650,000

480,000

900,000

750,000

Gritblasting

200,000

140,000

Gritblasting

100,000

60,000

TRANSPETRO

BRAZIL

M/VBicas

Tanker

TRANSPETRO

BRAZIL

M/VBrotas

Tanker

AULAC

VIETNAM

AulacAngel

Tanker

QUEIROZGALVO

BRAZIL

ALASKASTAR

FPU

OffshoreBrazil

2005

PETROBRAS

BRAZIL

PRA1

FSO

MacLarenShipyard
(Brazil)]

2005

PETROBRAS

BRAZIL

P51

FPU

Brasfels(Brazil)

20052007

PETROBRAS

BRAZIL

P52

FPU

Brasfels(Brazil)

20052006

PETROBRAS

BRAZIL

P54

FPSO

PETROBRAS

BRAZIL

P53

FPU

PETROBRAS

BRAZIL

P53

FPU

PETROBRAS

BRAZIL

P54

FPSO

TRANSOCEAN

USA

DISCOVER534

DRILLSHIP

JurongShipyard
(Singapore)
KeppelShipyardTuas
(Singapore)
EstaleiroRioGrande
(Brazil)

20052006

MauaJurong(Brazil)

20052006

SembawangShipyard
(Singapore)
SembawangShipyard
(Singapore)

20052006

20052008

Ibeamsandpanelsfrommodule.
Moduleassembly.
Pontoon,columns,maindeck,
modulesandequipment.Assembly.
Pontoonandcolumnsbelowmain
deck.Assembly.FullArea.
Vessel.
FullArea.
Vessel.
FullArea.
Modules01,02,03,05,06,07,08,09,
11,12andassembly.
Modules01,02,03,05,06,07,08,09,
11,12andassembly.

SURFACEPREPARATION

CONSUMPTION
ES301(Lt.)

COUNTRY

SembawangShipyard
(Singapore)
SembawangShipyard
(Singapore)
HyundaiVinashin
(Vietname)

SCOPE

ESTIMATEDAREAS
(m2)

CLIENT

Hydroblasting
Gritblasting
Hydroblasting
Gritblasting
Hydroblasting
Gritblasting
Hydroblasting
Gritblasting

2006

Maintenanceoftheentireship.

Hydroblasting

25,000

17,000

2006

BallastTanks,PumpRoomandFore
PeakTank.

Hydroblasting

14,000

7,500

TESMA

INDONESIA

BROTOJOYO

FPSO

TRANSPETRO

BRAZIL

N/TCARIOCA

Tanker

(Argentina)

2006

CargoTanks.

Hydroblasting

4,300

2,600

TRANSPETRO

BRAZIL

N/TPOTI

Tanker

ASRY(Bahrain)

2006

BallastTanks.

Gritblasting

8,000

4,300

Appendix 1
Page 2/3

APPENDIX1

REFERENCELISTJUNE2008
MainMarine&OffshoreProjectssinceyear2000

CLIENT

COUNTRY

PROJECT

TYPE

SITE&LOCATION

YEAR

BP

UK/USA

THUNDERHORSE

OffshoreGulfofMexico

2006

TECO

NORWAY

IranNoah,IranNabi,IranNoor,
IranNessa,IranNajm

FiveVLCCTankers

Seagoing

Since2003

TRANSPETRO

BRAZIL

N/TPIRAJU

Tanker

ASRY(Bahrain)

2007

JurongShipyard
(Singapore)

AKERFLOATING
PRODUCTIONS

NORWAY

AKERSMART1

FPSO

PETROBRAS

BRAZIL

MEXILHAO

GasRig

JURONGSHIPYARD

SINGAPORE

SKIDTRUSS

SupportStructure

TRANSOCEAN

USA

DISCOVERERSEVENSEAS

DRILLSHIP

TRANSOCEAN

USA

NORDIC

JACKUPRIG

PETROBRAS

BRAZIL

GAROUPA

FLOTEL

QUEIROZGALVO

BRAZIL

OLINDASTAR

20072008

BTEngineering(Singapore) 20072008
JurongShipyard
(Singapore)
SembawangShipyard
(Singapore)

SCOPE
Helydeckandstructures.
BallastTanks.
BallastTanks.
VesselFullAreasincludingmodules
andstructures
ModuleandEquipment

SURFACEPREPARATION

ESTIMATEDAREAS
(m2)

CONSUMPTION
ES301(Lt.)

Hydroblasting

16,000

11,000

WetGritBlasting
Hydroblasting

500,000

350,000

Gritblasting

11,500

5,880

Hydroblasting
Gritblasting

400,000

250,000

Gritblasting

20,000

15,000

20072008

Maintenanceofsteelstructure

Hydroblasting

10,000

6,500

20072008

Ballasttanks

Hydroblasting

20,000

10,000

JohorPort(Malaysia)

20072008

Ballasttanks

Hydroblasting

30,000

19,000

OffshoreBrazil

20072008

Fullrefurbishment.

Hydroblasting

44,000
85,000

56,000

FPU

MauaShipyard(Brazil)

20072008

FullAreas.

Hydroblasting
Gritblasting

CamRanhShipyard
(Vietname)

20072008

FullAreas

Gritblasting

110,000

70,000

Brasfels(Brazil)

20072008

Fullrefurbishment.

Hydroblasting
Gritblasting

21,000

16,000

FullAreas(quantitiesuptoJune2008
only)

Gritblasting

16,400

11,800

SHINPETROL

VIETNAM

VSP01

SBM

MONACO

SBMIMODICOSO17480
1e2

Tanker22,500DWT(new
building)
Singlebuoysx2
(refurbishment)

PORTUGUESENAVY

PORTUGAL

SUBMARINES209PN

Submarines(newbuilding)

HDW(Germany)

20062008

TRANSPETRO

BRAZIL

N/TPEDREIRAS

Tanker

ASRY(Bahrain)

2008

BallastTanks.

Gritblasting

8,500

4,340

TRANSPETRO

BRAZIL

N/TBICAS

Tanker

ASRY(Bahrain)

2008

BallastTanks.

Gritblasting

7,000

3,520

Appendix 1
Page 3/3

COST SAVINGS, DURABILITY, ENVIRONMENTAL COMPLIANCE


January 2008

ES301 COATING SYSTEM

COATING SYSTEM

CHOOSE DIFFERENT, CHOOSE BETTER

ES301

WHY?

ES301 COATING SYSTEM


CHOOSE DIFFERENT, CHOOSE BETTER

2
January 2008

WHAT?
ES301

CONVENTIONAL
COATING

No Need For
Dehumidification

Need Dehumidifier
% Humidity < 85%
Needing 2 or 3-coat 400 450 microns, for extended
service life.
Solvent Based

2 coat system 300


microns, for 20 years
service life in BWT
Solvent-free

Easy application: 3 hours Easy application if solvent


potlife@25C. 56:1 air-less -based, troublesome if
solvent-free
Profile Is Not Critical
Profile is critical, need
> 50 microns
January 2008

ES301 COATING SYSTEM

Grit blasting to Sa 2.5


CHOOSE DIFFERENT, CHOOSE BETTER

Hydroblasting WJ2M

WHAT?
Surface tolerant
Flash rust tolerant
Navy Environmental
Health Center approved.

Limited surface tolerance for


long service life.

Universal system for


corrosion protection:
BWT, COT, hull, deck...

Need different anticorrosive


systems for each area.
Critical areas may need
solvent-free solutions or
expensive ceramic coatings
Low edge retention (<30%)

High Edge retention


Good fire resistance:
reduced flame spread
Expecting > 12 MPa
January 2008

Additional health & safety


risks. No NEHC approval.

Repairs produce higher


dammages over adjacent areas

Satisfied with > 5 MPa

ES301 COATING SYSTEM

CONVENTIONAL COATING

CHOOSE DIFFERENT, CHOOSE BETTER

ES301

WHAT?
ES301 PERFORMANCE: approvals
US Navy approved: 20 years service life system for
ballast tanks.
Approved by MIL PRF 23236C standard as Type VII:

ACQPA, French Association for Corrosion Protection


(Government official approval): approved for High Corrosivity
steel protection over abrasive blasting Sa 2.5 and hydroblasting
WJ2.
January 2008

ES301 COATING SYSTEM

SNCF, French Railway: approved for steel bridges using


hydroblasting.

CHOOSE DIFFERENT, CHOOSE BETTER

formulation with no solvent added, absence of pigments that are


hazardous or create hazardous waste.
- Class 7 (seawater ballast tanks) B1 hard coating equivalent.
- Class 15b (applicable over wet surfaces) Only ES301 is approved
-Class 17 (bilges).

ES301 COATING SYSTEM


CHOOSE DIFFERENT, CHOOSE BETTER

H
IT
W ING
TY T
LI E T
BI J
TI ER
PA T
M WA
CO P
UH

6
January 2008

ES301 COATING SYSTEM

WHAT?

WHAT?

ES301 COATING SYSTEM

January 2008

Y
T
I
ID
M
HU T
O S
T
U
E
R
C
N SH
A
R FLA
E
L &

CHOOSE DIFFERENT, CHOOSE BETTER

TO

ES301 COATING SYSTEM

ES301 COATING SYSTEM

AD

HE

O
SI

CHOOSE DIFFERENT, CHOOSE BETTER

H
G
HI

8
January 2008

ES301 COATING SYSTEM

WHAT?

ES301 COATING SYSTEM


CHOOSE DIFFERENT, CHOOSE BETTER

N
IO
NT
TE
RE 101%
GE 4
ED 7

9
January 2008

ES301 COATING SYSTEM

WHAT?

BENEFITS

COST

PERFORMANCE

ES301 COATING SYSTEM

H&S AND ENVIRONMENT

CHOOSE DIFFERENT, CHOOSE BETTER

TIME

PETROBRAS FPSO P50, JURONG


January 2008

ES301 red (1st coat) being applied after HP water cleaning.

10

BENEFITS: PRIMARY SURFACE PREP


CONVENTIONAL SOLUTION
Grit to Sa 2.5, dehumidification.
Need profile > 50 microns.

EURONAVY CONCEPT

COST

Savings on the DH (if not using shop


primer). Possible use of recyclable
shot blast in one passage (enough for
35microns)

TIME

Higher autoblast output (quicker )

H&S & ENVIRONMENT

---

PERFORMANCE

---

January 2008

ES301 COATING SYSTEM

BENEFITS

CHOOSE DIFFERENT, CHOOSE BETTER

Grit to remove mill scale. No


mandatory profile. Nevertheless
the expected result is Sa 2.5
and min. 35 microns profile

11

BENEFITS: SHOP PRIMING


CONVENTIONAL SOLUTION

Inorganic low zinc shop primer

EURONAVY CONCEPT
No shop primer
OR
PE31 zinc free organic shop primer

Material savings (if not using shop


primer)

TIME

---

H&S & ENVIRONMENT

Avoid zinc; No zinc fumes on welding

PERFORMANCE

No risk for coating delamination over


white zinc oxide residues on shop pr.

January 2008

ES301 COATING SYSTEM

COST

CHOOSE DIFFERENT, CHOOSE BETTER

BENEFITS

12

BENEFITS: SECONDARY SURF PREP


CONVENTIONAL SOLUTION
Grit to Sa 2.5 & sweep; humidity
control required

EURONAVY CONCEPT
Hydroblast to WJ2 & HP wash; no
humidity restrictions

Lower surface prep costs; lower block


transportation costs; no cost for DH; no
grit disposal costs

TIME

Quicker block completion


2000 m2 block, 1st coat included:
Water & ES301 = 1 2 days shorter schedule
compared with grit.

Concurrent hot works possible (no grit)


H&S & ENVIRONMENT

No grit, cleaner yard.

PERFORMANCE

No risk of ricochet damage; easier to


reach lower chloride levels

January 2008

ES301 COATING SYSTEM

COST

CHOOSE DIFFERENT, CHOOSE BETTER

BENEFITS

13

BENEFITS: PAINT APPLICATION


CONVENTIONAL SOLUTION
Solvent based;
Humidity control need;
Paint 1,2 1,4 L/m2
Need for thinning

EURONAVY CONCEPT
Solvent-free (ES301)
No dew point restrictions
Paint 0,8 1,0 L/m2
No thinning (ES301)

Painting outdoors: avoiding DH and


chamber costs; Lower logistic costs;
lower thinner consumption.

TIME

Quicker paint application


Concurrent hot works possible (no solvent)
No delays due to weather constraints
Can paint at night

H&S & ENVIRONMENT

Much less solvent release; less use of


thinners; less drum disposal

PERFORMANCE

Superior adhesion and protection

January 2008

ES301 COATING SYSTEM

COST

CHOOSE DIFFERENT, CHOOSE BETTER

BENEFITS

14

BENEFITS: REPAIRS
CONVENTIONAL SOLUTION
St3 or grit
High flame spread after hot works
on top or behind applied
coating

EURONAVY CONCEPT
St3 or hydroblasting
Lower flame spread on coating
film, lower fumes release.

Area to be repaired after hot works or


cuttings is lower

TIME

Areas damaged after completion are


less than with conventional, thus repair
time is reduced.

H&S & ENVIRONMENT

Quantity and toxicity of fumes when


burning ES301 are lower.

PERFORMANCE

Higher adhesion over low profile


surfaces

January 2008

ES301 COATING SYSTEM

COST

CHOOSE DIFFERENT, CHOOSE BETTER

BENEFITS

15

BENEFITS: HULL (conversion & repair)


CONVENTIONAL SOLUTION

Sa 2.5 blasting, HP wash of overall


area. Blasting possible in onego. Washing and painting in
one go. No humidity constraints

COST

Cost savings associated with reduced


docking time. Lower risk of having to
re-blast.

TIME

Quicker hull blasting & coating (1-go)


No delays due to weather constraints,
can paint during the night (ES301)

H&S & ENVIRONMENT

No solvent release (ES301); ES301 dry


film is NOT an hazardous residue.

PERFORMANCE

Superior adhesion and protection,


higher impact resistance.

January 2008

ES301 COATING SYSTEM

BENEFITS

CHOOSE DIFFERENT, CHOOSE BETTER

Sa 2.5 at the moment of paint


application. Low flash rust
tolerance. Need for multiple
blasting/painting cycles.
Humidity constraints.

EURONAVY CONCEPT

16

BENEFITS: TANKS (conversion & repair)


CONVENTIONAL SOLUTION

EURONAVY CONCEPT

Grit Sa 2.5 required for guarantee,


need humidity control, low flash
rust tolerance.

Hydroblasting WJ2 adequate for


guarantee; no humidity nor dew
point restrictions; flash rust
tolerance

Lower cost of UHP inside tanks; no cost


for DH; no cost for grit disposal.

TIME

Concurrent hot works possible

H&S & ENVIRONMENT

No solvent release

PERFORMANCE

The best performance in ballast and


crude cargo tanks and voids.

January 2008

ES301 COATING SYSTEM

COST

CHOOSE DIFFERENT, CHOOSE BETTER

BENEFITS

17

WHOM?

Adoption by referential Customers

US NAVY SPECIFIES ES301 AS A 20-YEARS SERVICE


LIFE
January
2008 SYSTEM FOR BALLAST TANKS

ES301 COATING SYSTEM

vessel areas, namely the most critical (ballast tanks


and bilges).

CHOOSE DIFFERENT, CHOOSE BETTER

US NAVY approved ES301 system for numerous

18

WHOM?

Adoption by referential Customers


Petrobras FPSO P53
conversion @ Keppel
Shipyard, 2007
Fully coated with ES301
system

ES301 COATING SYSTEM

building and conversion projects for off-shore platforms and


FPSOs. The system comply with the demands of this customer
for a solvent-free and humidity tolerant epoxy system with pulloff adhesion
> 12 Mpa.
January
2008

CHOOSE DIFFERENT, CHOOSE BETTER

PETROBRAS is using ES301 system on several new

19

WHOM?

Adoption by referential Customers


Discoverer 534 drill ship
Sembawang Shipyard, 2007

ES301 COATING SYSTEM

total refurbishment of drill ship D534, using UHP


hydroblasting .
January 2008

CHOOSE DIFFERENT, CHOOSE BETTER

TRANSOCEAN choose ES301 system for the

20

WHOM?

Adoption by referential Customers


Aker Smart 1 FPSO started
conversion March 2007 at
Jurong Shipyard, Singapore

January 2008

ES301 COATING SYSTEM

AKER select ES301 system for FPSO conversion.

CHOOSE DIFFERENT, CHOOSE BETTER

The conversion is using


Euronavy products
exclusively.

21

WHOM?

Adoption by referential Customers


FPU P52 hull leaving Keppel
Fells, fully coated with ES301

ES301 COATING SYSTEM

the best out of ES301 coating system since 2002. Near


to 3 million m2 were blasted and coated up to now with
ES301, an important slice of it using UHP
hydroblasting
as surface preparation method.
January
2008

CHOOSE DIFFERENT, CHOOSE BETTER

SINGAPORE yards have been using and taking

22

CONCLUSION
YOU NEED:
- controlled costs

- lower environmental impact


- safer applications.

Hydroblasting + ES301 approach


will help you to have it.
January 2008

ES301 COATING SYSTEM

- better performance

CHOOSE DIFFERENT, CHOOSE BETTER

- to save time

24

EURONAVY S.A.

A GUIDE FOR ES301 COATING SYSTEM APPRAISAL


October 2008

ES301 and the IMO PSPC


Euronavy is proud to announce that an ES301-based coating system have
been Type Approved as IMO PSCP compliant by ABS and Germanischer
Lloyds. It is one of the very few systems being Type Approved at this early
stage.
The IMO Resolution MSC.215(82) dictated a new mandatory Performance
Standard For Protective Coatings For Ballast Tanks (PSPC) at new building
stage. This standard entered in to force in December 2006 for tankers and
bulkers under the Class Common Structural Rules (CSR) and will be
mandatory to all ships with more than 500 dwt for contracts signed after
1st July 2008. The IMO PSPC introduces stringent guidelines concerning
coating pre-qualification and application for a service life target of 15 years
in ballast tanks.

Attached
x

ABS Type Approval Certificate N. 08-HS314072/1-PDA

Germanischer Lloyds Type Approval Certificate GL-KORR 1159 HH

Lloyds Register Type Approval Certificate MNDE/2008/2847

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal
Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

Certificate Number: 08-HS314072/2-PDA

Confirmation of Type Approval


This is to certify that, pursuant to the Rules of American Bureau of Shipping (ABS), on 28/APR/2008 the
manufacturer of the below listed product held a valid Manufacturing Assessment (MA) and a valid Product Design
Assessment (PDA) for the below listed product, entitling the product to type approval. The validity of the
Manufacturing Assessment is dependent on satisfactory audits as required by the Rules. The Product Design
Assessment is valid only for products intended for use on ABS classed vessels, MODUs or facilities which are in
existence or under contract for construction on the date of the ABS Rules used to evaluate the Product.
For Date of ABS Rules used for evaluation; Please refer to the ABS Rules below.
This Confirmation of Product Type Approval is valid as of the date shown above for the below listed product.
ABS makes no representations regarding type approval of the Product for use on vessels, MODUs or facilities built
after the date of the ABS Rules used for evaluation.
Due to wide variety of specifications used in the products ABS has evaluated for Type Approval, it is part of our
contract that the Client has full responsibility for continued compliance with the evaluation standard, whether the
standard is an ABS Rule or a non-ABS Rule. As specified in the ABS Rules, Unit Certification may be required in
addition to Product Type Approval. Please refer to the "Service Restrictions" shown below to determine if Unit
Certification is required for this product.

EURONAVY TINTAS MARITIMAS E INDUSTRIAIS S.A.


Model Name(s): Euro-basic ES301K (primer) / ES301S (topcoat)
Presented to:
EURONAVY TINTAS MARITIMAS E INDUSTRIAIS S.A.
ESTRADA VALVE DE MULATAS
QUINTA DE S. FRANCISCO
2914-516 SETUBAL
Portugal
Intended Service:

Immersed and emersed service in marine and offshore industries, namely for crude
and ballast tanks, voids, slop tanks, external hull, and decks.

Description:

Solvent-free epoxy tank coating system and multipurpose heavy-duty protection.


Moisture and surface tolerant.

Ratings:

MIL-PRF-23236 C Type VII coating, Classes 7, 15b and 17. This testing is
considered equivalent to the test procedure indicated in IMO PSPC MSC.215(82),
as permitted in IMO PSPC MSC.215(82) Table 1 Section 1.3.

Service Restrictions:

Unit Certification is not required for this product. If the manufacturer or purchaser
requests an ABS Certificate for compliance with a specification or standard, the
specification or standard, including inspection standards and tolerances, must be
clearly defined. For applications requiring coating system approval in accordance
with IMO PSPC MSC.215(82), use only on suitably prepared bare steel. To be
stored according to coating producer's data sheet. Euro-basic ES301K (primer) to
be applied and cured at temperatures of 15C (59F) and above. ES301S (topcoat)
to be applied and cured at temperatures above +11C (52F).

Comments:

Coating application is to comply with Chapters 8 and 11, and Appendix A [IMO
PSPC MSC.215(82)], of 2007 ABS Guidance Notes on the Inspection,
Maintenance, and application of Marine Coating Systems, for the following
applications: Protective coatings for dedicated seawater ballast tanks in all types of
ships, and double-side skin spaces of bulk carriers, built to Common Structural
Rules and contracted after December 2006; and for all vessels over 500GT
contracted after July 2008.

04/28/2008 6:00:47 AM

Copyright 2001 American Bureau of Shipping. All rights reserved.

Page 1 of 2

Certificate Number: 08-HS314072/2-PDA

Notes / Documentation:

This Product Design Assessment (PDA) is valid only for products intended for use
on ABS classed vessels, MODUs or facilities which are in existence or under
contract for construction on the date of the ABS Rules used to evaluate the
Product.

Term of Validity:

This Design Assessment Certificate number 08-HS314072/2-PDA, dated


22/Apr/2008 will expire on 21/Apr/2013 or at an earlier date should there be
alterations to the product's design or changes to the referenced ABS Rules and
other specifications, which affect the product. Product use on or after 1 January
2009, will be subject to compliance with the ABS Rules or specifications in effect
when the vessel, MODU or facility is contracted. The product's acceptability on
board ABS-classed vessels or facilities is defined in the service restrictions of this
certificate.

ABS Rules:

2008 Steel Vessels Rules 1-1-4/7.7 & 1-1/A3; 2007 ABS Guidance Notes on the
Inspection, maintenance, and Application of Marine Coating Systems, Chapter 8
Section 10

National Standards:
International Standards:

IMO PSPC

Government Authority:

MIL-PRF-23236 C Type VII coating, Classes 7, 15b and 17

EUMED:
Others:

Manager, ABS Programs


ABS has used due diligence in the preparation of this certificate and it represents the information on the product in the ABS Records as of the
date and time the certificate was printed. Type Approval requires Drawing Assessment, Prototype Testing and assessment of the
manufacturer's quality assurance and quality control arrangements. Limited circumstances may allow only Prototype Testing to satisfy Type
Approval. The approvals of Drawings and Products remain valid as long as the ABS Rule, to which they were assessed, remains valid. ABS
cautions manufacturers to review and maintain compliance with all other specifications to which the product may have been assessed. Further,
unless it is specifically indicated in the description of the product; Type Approval does not necessarily waive witnessed inspection or survey
procedures (where otherwise required) for products to be used in a vessel, MODU or facility intended to be ABS classed or that is presently in
class with ABS. Questions regarding the validity of ABS Rules or the need for supplemental testing or inspection of such products should, in all
cases, be addressed to ABS.

04/28/2008 6:00:47 AM

Copyright 2001 American Bureau of Shipping. All rights reserved.

Page 2 of 2

EURONAVY S.A.

A GUIDE FOR ES301 COATING SYSTEM APPRAISAL


October 2008

The US Navy Case


ES301 coating system was one of the few coating systems going through
extensive evaluation since 1994, when DoD Department NAVSEA 05M
launched a Program aimed to review all blasting and painting procedures
for US Navy and US Coast Guard, in order to improve the service life and
environmental compliance of traditional coating protection being applied so
far. ES301 is approved for the most demanding areas and is listed in the
Advanced Coatings List by Navsea. ES301 is presented as a 20 years
service life coating system for ballast tanks, is the only system approved
for ballast tanks when hydroblasting is to be used as surface preparation
and is approved by the most stringent standard for coating qualification for
ships: the MIL-PRF 23236C standard. In the path for approval, ES301
behaviour was inspected onboard USS Belleau Wood and USS Detroit and
extensive testing was done as per MIR-PRF 23236C requisites.
Attached
x

USS Belleau Wood: 24-Month Evaluation of Euronavy Paint System Test


Application in Three Ballast Tanks.

USS Detroit: One Year Follow-up Report Bilge Coatings Test Application

Announcing ES301 approval by MIL-PRF 23236C standard

MIL-PRF 23236C standard: Performance Specification Coating systems for ship


structures.

Qualified Product List for MIL-PRF 23236C.

Navseas PPI 63101-001 Ballast Tanks (systems approved for 20 years service
life).

ES301 Testing Regarding Fire: flame spread and smoke development values
obtained by ASTM E84 standard & classification under US national fire protection
association (NFPA)

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal
Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

USS BELLEAU WOOD (LHA-3)


SECNAV/NAVSEA Engineering for
Reduced Maintenance (ERM)
24-Month Evaluation of Euronavy Paint System
Test Application in Three Ballast Tanks

February 2002

Corrosion Engineering Services, Inc.


3635 Ruffin Road, Suite 100
San Diego, CA 92123

Table of Contents

Executive Summary
Appendix One:
Photographs of Original Application
Photographs of 6-Month Evaluation
Photographs of 24-Month Evaluation

Executive Summary
Corrosion Engineering Services (CES), Inc., was tasked by the Commander,
Naval Sea Systems Command (NAVSEASYSCOM) to document the 24-month
in-service assessment of the test application of the EURONAVY ES-301K / ES301S, 100% solids coating system. Seawater ballast tanks 4-113-2-W, 6-113-0W, and 6-117-0-W on the USS Belleau Wood (LHA-3) were selected for the
application. This test was to evaluate surface preparation utilizing UHP water
blasting followed by application of ballast tank coatings. The original application
was accomplished from April 19th through June 19th, 2000 while the ship was
waterborne, pierside in Sasebo, Japan. CES photographed and documented the
ballast tank conditions as of February 2002. Due to a high level of water in tank
4-113-2-W, only tanks 6-113-0-W and 6-117-0-W were inspected.
The purpose of this test was to evaluate surface preparation by utilizing UHP
water blasting. Use of EURONAVY 301 paint system was chosen because of its
tolerance to high humidity and moisture. The ballast tanks selected for this
procedure were heavily corroded and contaminated with the existing coating
system applied approximately 9 to 10 years ago.
When inspected the ship was docked at Naval Station San Diego, California. A
NACE-certified inspector conducted a visual inspection of the Euronavy paint
system. The inspection revealed the paint system to be in excellent condition.
Coatings breakdown was estimated at of 1% in the tanks inspected. Some
edges showed corrosion due to mechanical/impact damage. Areas inspected
show adequate coverage and adherence in areas where heavy pitting was
visible. Overall these tanks were in excellent condition and showed no signs of
premature coating failure. The ability to perform ballast tank preservation while
pierside (vice in drydock; a less costly alternative to drydocking), the use of UHP
waterjetting for surface preparation, and the surface and moisture-tolerant
coating system are providing excellent service life benefits to the ballast tanks
assessed and to the Navy.

USS BELLEAU WOOD (LHA 3)


As Found Conditions

April 2000

USS BELLEAU WOOD (LHA 3)


As Found Conditions

April 2000

USS BELLEAU WOOD (LHA 3)


As Found Conditions

April 2000

USS BELLEAU WOOD (LHA 3)


Final Coat

June 2000

USS BELLEAU WOOD (LHA 3)


Final Coat

June 2000

USS BELLEAU WOOD (LHA 3)


Final Coat

June 2000

USS BELLEAU WOOD (LHA 3)


6-Month Follow-up

December 2000

USS BELLEAU WOOD (LHA 3)


6-Month Follow-up

December 2000

USS BELLEAU WOOD (LHA 3)


6-Month Follow-up

December 2000

USS BELLEAU WOOD (LHA 3)


24-Month Follow-up

February 2002

USS BELLEAU WOOD (LHA 3)


24-Month Follow-up

February 2002

USS BELLEAU WOOD (LHA 3)


24-Month Follow-up

February 2002

USS BELLEAU WOOD (LHA 3)


24-Month Follow-up

February 2002

USS BELLEAU WOOD (LHA 3)


24-Month Follow-up

February 2002

USS BELLEAU WOOD (LHA 3)


24-Month Follow-up

February 2002

USS BELLEAU WOOD (LHA 3)


24-Month Follow-up

February 2002

USS BELLEAU WOOD (LHA 3)


24-Month Follow-up

February 2002

USS DETROIT (AOE-4)


SECNAV/NAVSEA

Capital Investment Labor Initiative (CILI)


One Year Follow-up Report
Bilge Coatings Test Application

1 Year Follow-up Survey May 2001


A test application in the MMR-1 and MMR-2 Bilges
Utilizing

ULTRAHIGH PRESSURE WATERBLASTING (UHP)


SURFACE PREPARATION WITH EURONAVY S
FORMULA STRIPE AND TOPCOAT IN A BILGE
APPLICATION
N

a California Corporation

3635 Ruffin Road, Suite 100


San Diego, CA 92123

Table of Contents
Executive Summary
Pictorial Report

USS Detroit in Drydock at Metro Machine Corporation of Pennsylvania February 2000

EXECUTIVE SUMMARY
Corrosion Engineering Services, Inc. (CES) was tasked by the
Commander, Naval Sea Systems Command (NAVSEASYSCOM) to
document the one-year follow-up inspection of the bilges in MMR-1,
6-198-0-E, and MMR 2, 6-220-0-E, on USS Detroit (AOE 4). The
EURONAVY S 100% Solids Epoxy system was the coating applied
to the bilges in April 2000. CES photographed and documented the
bilge conditions as of May 2001 while the ship was inport Naval
Weapons Station, Earl, New Jersey. Application was accomplished
in MMR-1 (6-198-0-E): Center, Port Wing and Starboard Wing MMR2 (6-220-0-E): Center, Port Wing and Starboard Wings. The USS
Detroit was in availability at Metro Machine Corporation of
Pennsylvania at Philadelphia Naval Shipyard.
The scope of work delineated by the SUPSHIP Specification: Bilges
are defined as that area of a compartment from the inner bottom
plating to the top of the existing bilge red/white line located above the
lower level deck plates. Included is shell plating and attached
structural members, bulkheads, tank top plating and manhole covers,
bilge wells and sumps, foundations, floor plates/gratings and support
structure, piping and associated support structure, valves, and
normally painted equipment therein.
Metro Machine Corporation of Pennsylvania served as the prime
contractor and also accomplished the in process control and
documentation. United Coatings Corporation (UCC) of Portsmouth,
Virginia performed the work for Metro Machine Corporation.
SUPSHIP Portsmouth, Colts Neck Detachment, administered the
contract and served as the NAVSEA/TYCOM authorized
representative with technical authority, as required by the Task Group
Instruction. Corrosion Engineering Services (CES) only observed the
checkpoints.
NAVSEA Task Group Instruction 631-63111-002 Rev -, Bilge
Preservation - Euronavy ES 301 (all K formula) was specified by
SUPSHIP Specifications 631-31-001: Machinery Room Number 2
Bilges; inspect, repair, and preserve; and 631-31-002: Machinery
Room Number One Bilge; inspect, repair, and preserve. The
specification was modified to use the Euronavy S formula for stripe

coat and topcoat in accordance with NAVSEA TGI 631-63111-004:


BILGE AND FOUNDATION PRESERVATION EURONAVY ES 301
AND ES 301S (By: Ultrahigh-Pressure Water Jetting)
The work specification requirements included Surface preparation for
surfaces accessible with water blast wand. Ultra High Pressure
(UHP) water blasting WJ-2: SSPC-SP-12. For surfaces inaccessible
to UHP wand: SSPC-SP-11 by needle gun. For surfaces
inaccessible to needle gun: SSPC-SP-3. For surfaces inaccessible to
power tools: SSPC-SP-2
Coating Application:
Prime coat
ES301K Green
Stripe coat
ES301S Lt Gray
Finish coat
ES301S Red Oxide

4-6 mils DFT


6-8 mils DFT.
6-8mils DFT.

Notes:
1) Total film thickness requirement is 10-14 mils DFT.
2) Stripe coat must cover and hide the prime coat.

The prime contractor, Metro Machine Corp, provided quality


assurance. Oversight was provided by SUPSHIP Portsmouth: Colts
Neck, N.J detachment. CES acted as observer only.
Due to a large amount of steel, piping and system repairs required
throughout these bilges, the surface preparation was accomplished,
repairs made, and then the surfaces were re-prepared and coated.
The project was completed in April 2000 and the spaces were turned
over to Ships Force.
The Euronavy coating system is in excellent condition
throughout MMR-1 and MMR-2 with less than of 1 %
corrosion, primarily mechanical damage. The USS Detroit utilizes
1200 Lb. steam plants and these bilges have routine contact daily
with steam, salt water, and oil. The crew has had to perform zero
maintenance on the bilge coating system. The only complaint the
crew has concerning the Euronavy coating system is the difficulty
encountered in removing the coating from nuts, bolt heads and
fasteners requiring disassembly. This is an indication of the excellent
adhesion of the coating system.

Pictorial Report
MMR-1

Note edges are in good condition

Pipe bracket shows some deterioration but over all coating in excellent condition

Pictorial Report
MMR-1

Coating is soiled only, no corrosion. Rivets are in excellent condition.

Coating is soiled only, no corrosion. Edges are in good shape.

Pictorial Report
MMR-1

Coating is soiled only, no corrosion

Coating is soiled only, no corrosion. Note pitting in tank-top plating in lower


center of photo

Pictorial Report
MMR-1

Coating is soiled only, no corrosion. Note excellent condition of fasteners, pipe


brackets and edges

Euronavy coating system applied over UHP surface preparation gives good
service

Pictorial Report
MMR-1

Euronavy coating system is intact

Note pipes, brackets and edges are in good shape

Pictorial Report
MMR-2

Overall condition of Euronavy coating system in MMR -2 is excellent

Coating is soiled only, no corrosion

Pictorial Report
MMR-2

Coating is soiled only, no corrosion. Note good condition of edges.

Coating is soiled only, no corrosion. Note excellent condition of pipes and


brackets

Pictorial Report
MMR-2

Coating is soiled only, no corrosion other than scattered mechanical damage

Coating is soiled only, no corrosion

Pictorial Report
MMR-2

Coating is soiled only, no corrosion

Coating is soiled only, no corrosion. Note good condition of edges and pipe
brackets .

Pictorial Report
MMR-2

Coating is soiled only, no corrosion

Coating is soiled only, no corrosion. This Euronavy bilge coating system should
give many years of service.

EURO-basic ES301
coating system approved by
US Navy /NAVSEA
in accordance to

MIL-PRF-23236C
standard

Announcement, Description and Related Documentation

EURONAVY S.A.

US NAVY approved ES301 in


accordance with
MIL-PRF-23236C standard
Washington D.C., USA, 2005-12-30

The double coat ES301+ES301S systems was approved in accordance with the highly
demanding MIL-PRF-23236C standard (Performance Specification - Coating Systems For Ship
Structures), issued by the North American Department of Defence (DoD-NAVSEA), this being
the main reference in the US Navy for the selection of modern protective coating systems for its
fleets. The ES301 systems were approved as Type VII for a number of different classes and
grades and were included on the last issue of the Qualified Products List published by NAVSEA
(QPL-23236-75, 30-12-2005, attached).
The approval includes the authorization for production at EURONAVY Plant in Setbal,
Portugal. This site is the only approved manufacturing plant outside the United States of
America.
Its classification as Type VII recognizes the system as having no solvent added in its
composition and in line with the more demanding environmental rules for this type of products.
The classes for which EURONAVY requested and received certification are Class 7 (ballast
tanks), Class 15b (system may be applied on humid surfaces) and Class 17 (bilges). At present
date (30-12-2005), the EURONAVY system is the sole system approved for Classes 15b and 17
as per QPL-23236-75.
Two types of ES301 systems were approved:
Grade B (T = 0 10C)
1st coat ES301L, 6-8 mils (150-200 microns) DFT
2nd coat ES301S, 6-8 mils (150-200 microns) DFT
Total thickness 12-18 mils (300-400 microns)
Grade C (T > 11C)
1st coat ES301K, 6-8 mils (150-200 microns) DFT
2nd coat ES301S, 6-8 mils (150-200 microns) DFT
Total thickness 12-18 mils (300-400 microns)
Please refer to next pages for details regarding the Type, Classes and Grades for which
EURONAVYs ES301 system granted the MIL-PRF-23236C approval. Some extracts of the
standard are also presented, describing the most relevant tests performed for approval purposes:
cyclic immersion tests and edge retention. Many other tests were performed and passed by
ES301-systems to grant the present approval: for full details report to the attached
documentation.

US NAVY approved ES301 in accordance with MIL-PRF 23236C standard

EURONAVY S.A.

Glossary of Definitions & Tests as per MIL-PRF 23236C Standard, 12/08/2003


TYPE:
Type VII: A coating system having a maximum VOC content of 150 g/L (1.25 lb/gal) of coating,
except for classes requiring use of an inorganic binder shop primer (see 3.2.2.2 and 6.6.5).
Hazardous air pollutants (HAPs) in the solvent will not exceed VOC levels (see 3.2.2.3). Use of
pigments that are hazardous to workers or create hazardous waste is restricted to trace levels
(see 3.2.3.2). May be used in any air quality management district regulating VOC. Dry coating
is not a hazardous waste under USEPA regulations. Coatings proposed for qualification testing
to this Type have no solvent added to either the base resin component or the hardener
component.
CLASS:
Class 7 - A coating system without a shop primer (see 6.6.5) for use in dedicated seawater
ballast tanks. Class 7 coatings are not for use in tanks that may be used for freshwater, potable
water, fuels, or other hydrocarbons.
Class 15b - A coating system intended as a repair or touch-up coating, without a shop primer,
for use over wet surfaces that are prepared to bare metal surfaces where the paint has been
removed to the bare metal substrate.
Class 17 - A coating system without a shop primer intended for use on properly cleaned and
prepared bilge surfaces.

GRADE:
Grade B - A coating system which is to be applied, and cured at temperatures above 32 F (0
C) up to 49 F (10 C).
Grade C - A coating system which is to be applied and cured at a temperature above 50 F (11
C).
IMMERSION RESISTANCE TESTS REQUIRED FOR APPROVAL AS CLASS 7
BALLAST TANKS
The following page presents an excerpt of the MIL-PRF236C standard (please find the complete
text in the attached document) describing the immersion cyclic tests used for approval as Class
7 coating system. Paragraph 3.9.3 lists the conditions that should be observed after the cyclic
immersion tests (pinholes, rusting, blistering, etc). Paragraph 4.5.2.2. describes the two
alternative immersion tests that can be used for the approval. ES301 coating system was tested
accordingly to the Cycle A described at paragraph 4.5.2.2.1, which is considered equivalent to
the DNV/Marintek wave test described at 4.5.2.2.2. for approval purposes (achieving B1 hard
coating rate). The immersion cycles were performed during 4250 h (total 25 cycles).

US NAVY approved ES301 in accordance with MIL-PRF 23236C standard

EURONAVY S.A.

EXCERPT OF MIL-PRF-23236C: Immersion testing for Class 7 approval


(quote)
3. REQUIREMENTS
3.9. Immersion resistance
3.9.3 Classes 7 and 8 (seawater only).
When tested as specified in 4.5.2.2, the total coating system shall show no pinhole rusting, loss of adhesion either
between coats or to the substrate. There shall be no blistering rated in excess of ASTM D714, blister size number 4,
Few. There shall be no surface imperfections (includes peeling) larger than 1.5 mm (116-inch) and any blistering
shall be unbroken. Type VII coating system shall have no edge rusting. Blisters and surface imperfections smaller
than 1.5 mm (116-inch), which do not increase in size after the tenth cycle and are not greater than 3 percent of
the test panel surface area, shall not be considered failure. At completion of the test, adhesion of the recoat to the
original coating shall be at least 50 percent of that of the original coating area of the test panel to itself. Type VII
edge rusting shall not exceed 0.1 percent of total edge length. Physical damage caused by handling may be ignored
in condition evaluation. For coating systems evaluated in Cycle B of paragraph 4.5.2.2.2, a "B1" rating must be
achieved to meet this requirement.
4. VERIFICATION
4.5. Test Procedures
4.5.2. Immersion Resistance
4.5.2.2 Dedicated salt water ballast (all types, classes 7 and 8, all grades). Two test panels, prepared as specified
in 4.5.2 (a) and (b) above shall be tested in accordance with either of the following cycles (cycle A or cycle B):
4.5.2.2.1 Cycle A.
a. Salt water Immersion for 5 days: Immerse panels with panels prepared as specified in 4.5.2(a) and (b) totally for
1 week in either natural seawater or ASTM D1141 Substitute Ocean Water solution at a temperature of 27 6 C
(80 10 F).
b. Remove panels from test and allow to dry for 2 days.
c. Hot water immersion for 2 hours: This operation is intended to simulate conditions encountered in the use of
tank cleaning equipment. Following the drying period, immerse the panels totally in hot, synthetic seawater for 2
hours at 80 C (175 F) (nominal).
Operations (a) to (c) constitute one complete test cycle. This cycle is repeated and coating deterioration recorded
after each complete cycle. If coating is still satisfactory after 25 cycles, wipe lightly with a soft cloth and
freshwater, allow 48 hours to thoroughly dry, and recoat the upper one third of one side of each panel, masking the
portion from the edge to 13 mm (1/2 inch) inward, with one coat of the finish coat of the coating system (or primer
coat and finish coat if appropriate). Allow 1-week dry time and complete immersion test with 25 additional test
cycles. Coating system shall be evaluated for pinhole rusting, ASTM D4541, Type II tester, adhesion of both
original and recoated surfaces, blistering larger than 1.5 mm (116 inch) in diameter, and surface imperfections
larger than 1.5 mm (116 inch). Type VII coating systems shall be evaluated for edge rusting. Test results shall be
as specified in 3.9.3.
4.5.2.2.2 Test cycle B.
This test cycle shall be performed by Det Norske Veritas, N-1322, H vik, Norway, phone 47 67 57 00, FAX 47 67
57 99 11 and shall be as specified in the test program described in Paper no. 505 of the NACE Corrosion 96
Conference report. Surface preparation and paint application shall be as specified in 4.4 and 4.5 and shall be
performed by Marine Materials AS, unless special application equipment is required that is not available to
Marine Materials. With prior approval of NAVSEA, Marine Materials AS may arrange for application by others
with supervision by Marine Materials AS. If coating system is still satisfactory after 20 cycles in the wave test
chamber portion of the testing, surface prepare the tested coating as specified in 4.4. Recoat the central upper third
of one side of each panel as specified in 4.4 and conduct an additional 5 cycles of the wave chamber test. After the
additional testing in the wave chamber, the adhesion of the recoat and original coats shall be as specified in the
requirements of 3.9.3. After completion, all testing panels shall be rated by the criterion of Paper No, 505 and
assigned a rating. This rating shall be as specified in the requirements of 3.9.3. Test results shall also be as
specified in 3.9.3
(unquote)
US NAVY approved ES301 in accordance with MIL-PRF 23236C standard

EURONAVY S.A.

EDGE RETENTION TESTS REQUIRED FOR APPROVAL AS TYPE VII COATING


An important requirement for the approval as Type VII coating system is the inclusion of a
topcoat with high edge coverage retention (in EURONAVY case, the ES301S is the edgeretentive top coat). Below please find the excerpts of the MIL-PRF-23236C describing the
criteria for approval as edge-retentive coating and respective test procedures.
Quote
3.8.1 Edge coverage retention (Applicable to type VII, all classes and all grades). When tested as specified in 4.5.9,
the retained percent dry film thickness (DFT) of coating on any single 90-degree outside edge test specimen shall
be not less than 50 percent of the paint DFT on flat areas. The average coating (percent) retained on a 90-degree
outside edge of no less than three specimens shall be an average minimum of 70 percent of the measured dry film
thickness on the flat areas of the test specimen. There shall be no pin holes, cracks or other defects along the edge
that extends more than 10 percent into the thickness of the coating on the edge, nor shall any defect extend
completely to the metal of the test specimen. The edge coverage retention applies to the topcoat only and not to the
primer.
()
4.5.9 Edge coverage retention (Applicable to topcoat only of Type VII all classes and grades). Panel preparation,
paint application and percent of dry film thickness retained on an edge shall be as described in Appendix A of this
specification. Scaled photomicrographs of each edge shall be taken. This test procedure will be conducted at
government expense at the Naval Research Laboratory, Key West, Florida. Coating shall meet 3.8.1.
()
Appendix A
EDGE RETENTION TEST
A.1 Scope. This appendix is intended to provide the test method procedure referenced in paragraph 4.5.9 of this
specification for compliance with paragraph 3.8.1 of this specification. This Appendix is a mandatory part of the
specification. The information contained herein is intended for compliance.
A.2 Specimen preparation. The edge retention specimen should
use an Aluminum Alloy 6061 structural angle (90-degree)
section approximately 6 inches long. Preparation of the
specimen for test will require three basic steps: sample
machining to meet initial dimension requirements, grit blasting
to provide acceptable anchor tooth and surface cleaning prior to
coatings application. Procedures for preparation are as follows:
A.2.1 Sample machining. Both exterior surfaces should be milled
so that faces are square (90-degree 0.1-degree) and have a
surface finish of 63 micro-inch. The exterior edge should be left
as a "sharp" edge with no radius tolerance or chamfer.
A.2.2 Grit blasting. Specimen should be grit blasted using Al2O3
media to achieve an anchor tooth profile of 1-3 mil. Care should
be taken to minimize rounding of the edge with excess blasting.
Final edge radius should not exceed 0.04 inch (10 percent).
A.2.3 Cleaning. Specimen should be cleaned thoroughly with
acetone or appropriate solvent to remove all traces of grease
prior to abrasive blasting and coating application.
A.3 Paint application. Topcoat is then spray applied to unprimed
metal, maintaining correct pump pressure and distance from
substrate (approx. 18 inches) according to manufacturers
recommendations. Paint is applied to both sides (first) and the
edge (last) within one minute. Measure the wet film thickness on
the flat sides to ensure compliance with minimum recommended
film thickness. After paint application, cure the specimens at
ambient laboratory conditions for a minimum of 72 hours before
sectioning. (see figure A-1)
Unquote
US NAVY approved ES301 in accordance with MIL-PRF 23236C standard

EURONAVY S.A.

ATTACHEMENTS

Attached please find the following relevant documents:


x

QPL-23236-75, 30-12-2005

MIL-PRF 23236C, full text of the standard, last version.

PPI 63101-001H Ballast tanks, 20 years service life (mentioning ES301). Note that, for the
same life expectancy (20 years), the Euronavy Coating System is the one approved with
lower DFT (10-14 MILS / 250-350 Pm), allowing lower consumptions when compared with
the other approved Coating Systems (14-20 MILS / 350-500 Pm).

US NAVY approved ES301 in accordance with MIL-PRF 23236C standard

QUALIFICATIONS CERTIFIED
DECEMBER 2005

QPL-23236-75
30 December 2005
SUPERSEDING
QPL-23236-74
22 November 2004
QUALIFIED PRODUCTS LIST
OF

PRODUCTS QUALIFIED UNDER PERFORMANCE SPECIFICATION


MIL-PRF-23236
COATING SYSTEMS FOR SHIP STRUCTURES

This list has been prepared for use by or for the Government in the acquisition of products covered by the
subject specification and such listing of a product is not intended to and does not connote endorsement of the product by
the Department of Defense. All products listed herein have been qualified under the requirements for the product as
specified in the latest effective issue of the applicable specification. This list is subject to change without notice;
revision or amendment of this list will be issued as necessary. The listing of a product does not release the contractor
from compliance with the specification requirements.
THE ACTIVITY RESPONSIBLE FOR THIS QUALIFIED PRODUCTS LIST IS THE NAVAL SEA
SYSTEMS COMMAND, SEA 05Q, 1333 ISAAC HULL AVENUE SE STOP 5160, WASHINGTON NAVY YARD
DC 20376-5160.

MIL-PRF-23236C
TOTAL DRY
FILM
THICKNESS
(mils)
2 coats @ 3 5 mils per
coat

TEST OR
QUALIFICATION
REFERENCE
NAVSEC
23236-226

GOVERNMENT
DESIGNATION
Type V
Class 7
Grade C

MANUFACTURER'S
DESIGNATION
Amercoat 385
Amercoat 385

Type V
Class 5 (for topside
and underwater hull)
Class 7
Grades B & C
Type VII
Classes 5, 7 & 9
Grade C

Amercoat 235
Amercoat 235

2 coats @ 4 6 mils per


coat

NAVSEA
23236-211

Amercoat 133
Amercoat 333

4 8 mils
10 - 12 mils

Ameron Test Rpt.


BGN-R2700108 &
R2700106

Type VI, Classes 5


& 7 , Grade C

Amercoat 236
Amercoat 236

2 coats @ 4
6 mils per
coat

Devoe Reports
236K1642 and
236K2904

Type VII
Classes 7, 15b

EuroNavy ES 301L
Primer

6-8 mils DFT

Sherwin-Williams
Rpts. 7/6/2005,

AMSC N/A

MANUFACTURER'S
NAME
(Addresses:
Last Page)
Ameron International
Performance
Coatings & Finishes
Group
Ameron International
Performance
Coatings & Finishes
Group
Ameron International
Performance
Coatings & Finishes
Group
Ameron International
Performance
Coatings & Finishes
Group
EuroNavy International

FSC 8010

DISTRIBUTION STATEMENT A Approved for public release; distribution unlimited


1 of 10

QPL-23236-75

GOVERNMENT
DESIGNATION
and 17
Grade B

Type VI
Classes 5 & 7
Grade C

MANUFACTURER'S
DESIGNATION
(Red, haze gray,
green)
EuroNavy ES 301S
Topcoat
(White, red, gray,
black, haze gray)
EuroNavy ES 301K
Primer (Red, haze
gray, green)
EuroNavy ES 301S
Topcoat
(White, red, gray,
black, haze gray)
Interline 604
(THA 660 Series/
THA 665)

Type VI
Classes 5 & 7
Grade B

Intergard 264
(FP Series/
FCA 321)

Type VI
Classes 5 & 7
Grade C

Intergard 264
(FP Series/ FPA 327)

Type VI
Class 7
Grade C

Intergard 403
(KB 400 Series/ KB
403)

Type V
Classes 6 & 8
Grade C

Intergard 292
(NHA 200
Series/NHA 210)

Type VI
Classes 6 & 8
Grade C

Primer/Topcoat
System
Interplate 997
NQA990/NQA997
1 Coat

Type VII
Classes 7, 15b
and 17
Grade C

TOTAL DRY
FILM
THICKNESS
(mils)

6-8 mils DFT


System 12-16
mils MDFT

6-8 mils DFT


6-8 mils DFT

TEST OR
QUALIFICATION
REFERENCE
1/7/2005; NEHC
Rpts. IH17/000874000877 4/29/2005

MANUFACTURER'S
NAME
(Addresses:
Last Page)

Sherwin-Williams
Rpts. 7/6/2005,
1/7/2005; NEHC
Rpts. IH17/000874000877 4/29/2005

EuroNavy International

International Test
Report 950082;
NEHC Rpts
IH17/000305-308
3-14-05
NAVSEA
23236-223;
NEHC Rpt.
IH17/000281-287
3-10-05
NAVSEA
23236-223
NEHC Rpts.
IH17/000281-287
3-10-05
Courtlands Rpt.
MB1004& NSTM
S9086 BD-ST-M000/ Chapter 631,
Change 8, Table 63193; NEHC Rpts.
IH17/00031 303-304,
321-322
3-14-05
International
Test Rpt.
95-0031/MP1009;
NEHC Rpts
IH17/000259-266
3-4-05
International Test
Rpt. 950082;
NEHC Rpts
IH17/000313317, 319-320
3-14-05

International Paint LLC

System 12-16
mils DFT
2 coats @ 4-6
mils per coat

2 coats @ 4-6
mils per coat

2 coats @ 4-6
mils per coat

2 coats @ 4-6
mils per coat

1 (max)

2 coats @ 4-6
mils per coat
0.6-1.0

Intergard 604
(THA 660 Series/THA
665)
1 Coat

4-6 mils

Intergard 604

4-6 mils
2 of 10

International Paint LLC

International Paint LLC

International Paint LLC

International Paint LLC

International Paint LLC

QPL-23236-75

GOVERNMENT
DESIGNATION

Type VII
Classes 5,13 &19
Grade C

Type V
Class 8
Grade C

Type VI
Classes 6 & 8
Grade C

MANUFACTURER'S
DESIGNATION
(THA 660 Series/THA
665)
1 Coat
Interline 624
Primer
THA 626/THA627

TOTAL DRY
FILM
THICKNESS
(mils)

6-8 mils

Topcoat
(THA 620
Series/THA/627

10-12 mils

Interplate 997
NQA990 Series/
NQA997
1 Coat

0.6-1.0

Intergard 403
(KBA Series/KBA
403)
1 Coat

4 -6 mils

Intergard 403
(KBA Series/KBA
403)
1 Coat

4 -6 mils

Interplate 997

0.6-1.0 mil

NQA990series/
NQA997
1 Coat
Intergard 264
FP Series/FCA 327
1 Coat

TEST OR
QUALIFICATION
REFERENCE

MANUFACTURER'S
NAME
(Addresses:
Last Page)

NRL Test Report #


6130/0323;
NEHC Rpts
IH17/000305-308
3-14-05

International Paint LLC

International Test
Rpt. MB1004;
NEHC Rpts
IH17/000313317, 319-320
3-14-05

International Paint LLC

International Test
Rpt #950082;
NEHC Rpts
IH17/000313317, 319-320
3-14-05

International Paint LLC

International Test
Rpt #950082;
NEHC Rpts
IH17/000313317, 319-320
3-14-05

International Paint LLC

4 -6 mils

4 -6 mils

Type VI
Classes 6 & 8
Grade B

Intergard 264
(FP Series/ FCA 327
1 Coat
Interplate 997

0.6-1.0

NQA990series/
NQA997
1 Coat
Intergard 264
(FP Series/FCA 321)
1 Coat

4 -6 mils

Intergard 264
(FP Series/ FCA 321
1 Coat

4 -6 mils

3 of 10

QPL-23236-75

GOVERNMENT
DESIGNATION
Type V
Class 7
Grade B

MANUFACTURER'S
DESIGNATION
Intertuf 262
(KHA Series/KHA
414)

TOTAL DRY
FILM
THICKNESS
(mils)
2 coats @
4 -6 mils per
coat

Type V
Class 7
Grade C

Intertuf 262
(KHA Series /KHA
062)

2 coats @
4 -6 mils per
coat

Type V
Class 8
Grade B

Interplate 997
NQA990 Series/
NQA997
1 Coat

0.6-1.0 mil

Intertuf 262
(KHA Series/ KHA
414)
1 Coat

4 6 mils

Intertuf 262
(KHA Series/KHA
414)
1 Coat
Interplate 997
NQA990/NQA997

4 -6 mils

1 Coat
Intertuf 262
(KHA Series/ KHA
062)

4-6 mils

1 Coat
Intertuf 262
(KHA Series/KHA
414)
1 Coat

4-6 mils

Type V
Class 8
Grade C

0.6 1.0

4 of 10

TEST OR
QUALIFICATION
REFERENCE
International Test
Rpt. 950082;
NEHC Rpts
IH17/000298302, 323
3-14-05
International Test
Rpt. 950082
NEHC Rpts
IH17/000298302, 323
3-14-05

MANUFACTURER'S
NAME
(Addresses:
Last Page)
International Paint LLC

International Paint LLC

International Test
Rpt. 950082;
NEHC Rpts
IH17/000313317, 319-320
3-14-05

International Paint LLC

International Test
Rpt. 950082
NEHC Rpts
IH17/000313317, 319-320
3-14-05

International Paint LLC

QPL-23236-75

GOVERNMENT
DESIGNATION
Type VII
Class 7
Grade C

MANUFACTURER'S
DESIGNATION
Intergard 143 Series
Primer:
THA 141/
THA 148 (Pink)
Stripe:
THA 144/
THA 148 (Gray)

Type VIII
Class 7
Grade D

Finish:
THA 143/
THA 148 (Buff)
Note: Stripe and
finish colors are
interchangeable
Interpon 100 Powder
Coating

Type V
Class 7
Grade C

NCP NBR 235

Type V
Classes 5 & 9
Grade C

N11G100/
N11V100 (Tankguard
No.1 Green)

Type V
Class 7
Grade C

TOTAL DRY
FILM
THICKNESS
(mils)

4-8 mils DFT

MANUFACTURER'S
NAME
(Addresses:
Last Page)
International Paint LLC

6-10 mils
DFT

10-12 mils
DFT

6-8 (min)

2 coats
Amercoat
235 @4-6
mils per coat

Submarine Materials
Review
Ser 34/0173/21
Jan 1993; NRL Ltr
6130-6001/12-16-05
NAVSEA
23236-211 (Test
reference applicable
to Amercoat 235)

NAVSEC
23236-171

International Paint LLC

NCP Coatings, Inc.


(Rebrander)
Ameron International
Performance Coatings &
Finishes Group
(Manufacturer)
The Sherwin-Williams
Co.

3.5-5.0 mils
DFT

N11L100/N11V101
(Tankguard No. 3
Blue)

3.5-5.0 mils
DFT

N11- 100 Series

System 7-10
mils DFT
4-6 mils DFT

Dura-Plate 235 Primer


B67HX235/
B67VX235
Dura-Plate UHS
Top Coat
B62W210/B62V210
(White) or
B62W210/B62G210
(Green) or
B62W210/B62A210
(Light gray) or
B62AW210/B62V210
(Haze gray) or
B62BW210/B62V210
(Black)

TEST OR
QUALIFICATION
REFERENCE
NRL Report Ser
6130/0054, 7 Mar 02
NEHC Rpts 11912,
11913, 11914, 11915,
13 Jun 01

10-12 mils
DFT

System 14-18
mils DFT

5 of 10

Sherwin Wms. Rpt.


5/13/98, NEHC Rpt.
IH6/00598
5/18/98

The Sherwin-Williams
Co.

QPL-23236-75

GOVERNMENT
DESIGNATION
Type VII
Classes 5, 7
Grade C

Type VII
Classes 5 & 7
Grade C

MANUFACTURER'S
DESIGNATION
Dura-Plate
UHS Primer
B62L210/
B62V210 (Blue)
Dura-Plate
UHS Topcoat
B62W210/B62V210
(White) or
B62W210/B62G210
(Green) or
B62W210/B62A210
(Light gray) or
B62AW210/B62V210
(Haze gray) or
B62BW210/B62V210
(Black)
Fast Clad ER
Epoxy Primer
B62L230/B62V230
(Blue)
B62W230/B62V230
(White) or
B62W230/B62G230
(Green) or
B62W230/B62A230
(Light gray)

TOTAL DRY
FILM
THICKNESS
(mils)
4-8 mils DFT

10-12 mils
DFT

System 14-20
mils DFT

9-11 mils
DFT
9-11 mils
DFT
System 18-22
mils DFT

6 of 10

TEST OR
QUALIFICATION
REFERENCE
DNV Rpt
BGN-R2799363 of
5/4/00
NEHC Rpts
IH6/00407 & 00414
of 2/23/00 & 2/24/00
Sherwin Wms. Rpt of
7/31/00
NEHC Rpts
IH6/00584 &
00588 5-18-98

NRL Report
6130/0503

MANUFACTURER'S
NAME
(Addresses:
Last Page)
The Sherwin-Williams
Co.

The Sherwin-Williams
Co.

QPL-23236-75

GOVERNMENT
DESIGNATION
Type VII
Classes 5, 7, 13, &
19
Grade C

Type VII
Classes 5, 7, 13, &
19
Grade C

Type VIII
Class 7
Grade D

Type VII
Classes 5, 7, 13 &
19
Grade C

MANUFACTURER'S
DESIGNATION
Nova-Plate
UHS Primer B62L
220/
B62V220 (Blue)
Nova-Plate UHS
Topcoat
B62W220/B62V220
(White) or
B62A220/B62V220
(Gray) or
B62W220/B62G220
Green
Nova-Plate
UHS
Primer B62L220/
B62V221 (Blue)
Nova-Plate UHS
Topcoat
B62W220/B62V221
(White) or
B62A220/B62V221
(Gray) or
B62W220/B62G221
Green
EAS8-30034
Powder Coating

Sigma Edgeguard
Primer
5427 (Cream)
Edgeguard Topcoat
White 5428
Gray 5428-5000

Type VII
Class 7
Grade C

Type VII
Class 7
Grade C

Sigmaguard BT
System 7404
Primer-Amber Sigma
BT 5404
Topcoats
Aqua 5411-S674 Gray
5411
White 5411-7000
Black 5411-8000
Sigmaguard BT
Primer 7921 (Buff)
Topcoat 7953
Gray or
Aqua or White

TOTAL DRY
FILM
THICKNESS
(mils)
4-8 mils DFT

10-12 mils
DFT

TEST OR
QUALIFICATION
REFERENCE
Sherwin Wms. Rpt of
7/31/00 Sherwin
Wms. CHT Protocol
Test Rpt of 3/17/00
NEHC Rpts
IH6/22928 & 22929

MANUFACTURER'S
NAME
(Addresses:
Last Page)
The Sherwin-Williams
Co.

System 14-20
mils DFT

4-8 mils DFT

10-12 mils
DFT

Sherwin Wms. Rpt of


7/31/00 Sherwin
Wms. CHT Protocol
Test Rpt of 3/17/00
NEHC Rpts
IH6/22928 & 22929

The Sherwin-Williams
Co.

NRL Ltr 61306002/12-16-05;


NEHC Rpts
IH17/000259000266/3-4-05
Sigma Rpt HY0019
NRL Ltr 6130/0040
6/1/01

The Sherwin-Williams
Company

NRL Test Rpt.


6316/7006
14 Feb 1997

Sigma Coatings USA

System 14-20
mils DFT

System 6-8
mils DFT
(one coat)

4-8 mils DFT

Sigma Coatings USA

10-12 mils
DFT

6-8 (min)

10-16 (min)

Sigma Coatings USA


4-8 mils

Sigma letter test


reports;

10-12 mils
10/16/2003 and
6/01/2004
7 of 10

QPL-23236-75

MANUFACTURER'S
DESIGNATION

TOTAL DRY
FILM
THICKNESS
(mils)

Type VII
Class 8
Grade C

Sigmaweld MC/

0.6-0.9 mil

Sigmaguard BT

14 20 mils

Type VII
Class 9
Grade C

Sigmaguard CSF
85 (7785)

2 coats @ 8
10 mils per
coat

Type VII
Class 16
Grade C

Sigmaguard CSF
Glassflake
(7954)

Type VIII
Class 7
Grade D

Scotchkote 135
Powder Coating

GOVERNMENT
DESIGNATION

TEST OR
QUALIFICATION
REFERENCE

MANUFACTURER'S
NAME
(Addresses:
Last Page)

Marintek Rpt.
#78.1149.03 NEHC
Rpts IH6/01936 &
01937
12/29/98
NRL Report
6130/0311

Sigma Coatings USA

2 coats @ 10
12 mils per
coat

NRL Report
6130/0304

Sigma Coatings USA

6-8 (min)

Submarine Materials
Review Ser
34/0173/21 Jan 1993;
NRL Ltr 61306003/12-16-05

3M Company

8 of 10

Sigma Coatings USA

QPL-23236-75

LIST OF MANUFACTURERS CORPORATE ADDRESSES AND PLANT LOCATIONS:

Ameron International Performance Coatings &


Finishes Group
13010 Morris Road
Suite 400
Alpharetta, GA 30004
Plant:
11605 Vimy Ridge Road
Alexander, AR 72202
CAGE: 07FX1
EuroNavy International
Estrada Vale de Mulatas
Quinta de S. Francisco
2914-516 Setubal, Portugal
Plants:
EuroNavy International
Estrada Vale de
Quinta de S. Francisco
2914-516 Setubal, Portugal
CAGE:
The Sherwin-Williams Co.
630 East 13th Street
Andover, KS 67002
CAGE: 54636
International Paint LLC
6001 Antoine Drive
Houston, TX 77091
Plants:
2270 Morris Avenue
Union, NJ 07083
CAGE: 26351
6001 Antoine Drive
Houston, TX 77091
CAGE: 69827
NCP Coatings, Inc.
225 Fort St.
Niles, MI 49120-0307
(Rebrander)
Ameron International Performance Coatings &
Finishes Group
(Manufacturer)
(See Amerons listing for plant location)

The Sherwin Williams Company


101 Prospect Avenue NW
1000 Midland
Cleveland, OH 44115
Plants:
2646 Main Street
San Diego, CA
CAGE: 9D157
3560 Elm Avenue
Portsmouth, VA
CAGE: 60163
226 Talmadge Road
Edison, NJ 08810
CAGE: 60189
6795 South Main Street
Morrow, GA 30260
CAGE: 08BG1
630 East 13th Street
Andover, KS 67002-9314
CAGE: 54636
2325 Hollins Ferry Road
Baltimore, MD 21230
CAGE: 54636
710 106th Street
Arlington, TX 76011
CAGE: 42EZ2
5526 Ontario Mills Pkwy
Ontario, CA 91761
CAGE: 42FN1
4472 Technology Drive
Rockford, IL 61109
CAGE: 42FL1
Duracoat Division
13 Iroquis Trail
Grimsby, Ontario
Canada, L3M5E6
CAGE: L4850
178 Davis Chapel Road
Spartanburg, SC 29307
CAGE: 42GF2
Sigma Coatings, USA
P.O. Box 816
Harvey, LA 70058
Plant:
1401 Destrehon Avenue
Harvey, LA 70058
CAGE: 1K005

9 of 10

QPL-23236-75

LIST OF MANUFACTURERS CORPORATE ADDRESSES AND PLANT LOCATIONS (Continued)

3M Company
3M Center
St. Paul, MN 55144
Plant:
New Ulm
Bldg. 1
1700 N. Minnesota
New Ulm, MN 56073
CAGE: 54681

10 of 10

METRIC
MIL-PRF-23236C
12 August 2003
SUPERSEDING
MIL-PRF-23236B
11 August 1988
PERFORMANCE SPECIFICATION
COATING SYSTEMS FOR SHIP STRUCTURES
This specification is approved for use by all Departments and Agencies of the Department of Defense.
1. SCOPE
1.1 Scope. This specification covers five types of air pollution regulated ship and structure coatings that
comply with the National Emission Standards for Hazardous Air Pollutants (NESHAP) for shipbuilding for state and
federal regulations (except Type VIII and VIIIA). There are 17 classes of coating systems. There are four grades of
coating systems based on temperature of application and cure. In addition to tanks, all paint systems qualified to this
specification are suitable for use on any ship structures, interior or exterior, for corrosion control. Except for trace
levels, all types are free of Lead, Chromium, Cadmium, and Asbestos (see 3.2.3). All types, except type IV, have
levels of hazardous air pollutants (HAPs) that do not exceed applicable NESHAP levels (see 3.2.2). Dry Type V,
VI, VII and VIII coating residues and debris are non-hazardous waste under U.S. Environmental Protection Agency
(USEPA) regulations in effect on the date of this specification. Type VII coating will not have any solvent added to
either the base resin component or the hardener component.
1.2 Classification.
1.2.1 Types. The types of coating systems are as follows:
Type IV

Type V

A coating system with a maximum volatile organic content (VOC) of 340


grams per liter (g/L) (2.83 pounds per gallon (lb/gal), except for classes
requiring use of an inorganic binder shop primer (see 3.2.2.2 and 6.6.5). May
be used in any air quality management district regulating VOC. Use of
pigments that are hazardous to workers is restricted (see 3.2.3.1).
A coating system having a maximum VOC content of 340 g/L (2.83 lb/gal) of
coating, except for classes requiring use of an inorganic binder shop primer
(see 3.2.2.2 and 6.6.5). Hazardous air pollutants (HAPs) in the solvent will not
exceed VOC levels. (see 3.2.2.3). Use of pigments that are hazardous to
workers or create hazardous waste is restricted to trace levels (see 3.2.3.2).
May be used in any air quality management district regulating VOC. Dry
coating is not a hazardous waste under USEPA regulations.

Comments, suggestions, or questions on this document should be addressed to Commander, Naval Sea Systems
Command, ATTN: SEA 05Q, 1333 Isaac Hull Avenue, SE, Stop 5160, Washington Navy Yard DC 20376-5160 or
emailed to commandstandards@navsea.navy.mil, with the subject line Document Comment. Since contact
information can change, you may want to verify the currency of this address information using the ASSIST Online
database at www.dodssp.daps.mil.
AMSC N/A

FSC 8010

MIL-PRF-23236C

Type VI

Type VII

Type VIII

Type VIIIa -

A coating system having a maximum VOC content of 250 g/L (2.08 lb/gal) of
coating, except for classes requiring use of an inorganic binder shop primer
(see 3.2.2.2 and 6.6.5). Hazardous air pollutants (HAPs) in the solvent will not
exceed VOC levels (see 3.2.2.3). Use of pigments that are hazardous to
workers or create hazardous waste is restricted (see 3.2.3.2). May be used in
any air quality management district regulating VOC. Dry coating is not a
hazardous waste under USEPA regulations.
A coating system having a maximum VOC content of 150 g/L (1.25 lb/gal) of
coating, except for classes requiring use of an inorganic binder shop primer
(see 3.2.2.2 and 6.6.5). Hazardous air pollutants (HAPs) in the solvent will not
exceed VOC levels (see 3.2.2.3). Use of pigments that are hazardous to
workers or create hazardous waste is restricted to trace levels (see 3.2.3.2).
May be used in any air quality management district regulating VOC. Dry
coating is not a hazardous waste under USEPA regulations. Coatings proposed
for qualification testing to this Type have no solvent added to either the base
resin component or the hardener component.
Non-metallic functional powder coating system for severe marine service
having a maximum VOC of 75 grams of solvent per 4.54 kilograms (0.17
pounds of solvent per 10 pounds) of powder.
Functional powder coating system with two coats which may contain zinc for
severe marine service with a maximum VOC of 75 grams of solvent per 4.54
kilograms (0.17 pounds of solvent per 10 pounds) of powder.

1.2.2 Classes. The classes of coating systems are as follows:


Class 5

Class 6

Class 7

Class 8

Class 9

Class 10

Class 11

Class 12

Class 13

A coating system without a shop primer (see 6.6.5) for use in fuel tanks,
seawater ballasted fuel tanks, seawater tanks, and bilges and other ship
structures interior and exterior. Class 5 coatings are not for use in tanks that
may be used for fresh or potable water.
A coating system where the first coat is a shop primer (see 6.6.5) for use in fuel
tanks, seawater ballasted fuel tanks, seawater tanks, and bilges and other ship
structures interior and exterior. Class 6 coatings are not for use in tanks that
may be used for fresh or potable water.
A coating system without a shop primer (see 6.6.5) for use in dedicated
seawater ballast tanks. Class 7 coatings are not for use in tanks that may be
used for freshwater, potable water, fuels, or other hydrocarbons.
A coating system where the first coat is a shop primer (see 6.6.5) for use in
dedicated seawater ballast tanks. Class 8 coatings are not for use in tanks that
may be used for freshwater, potable water, fuels, or other hydrocarbons.
A coating system without a shop primer (see 6.6.5) for use in dedicated potable
or freshwater tanks. Class 9 coatings are not for use in tanks that may be used
for seawater, fuels, or other hydrocarbons.
A coating system where the first coat is a shop primer (see 6.6.5) for use in
dedicated potable or freshwater tanks. Class 10 coatings are not for use in
tanks that may be used for seawater, fuels, or other hydrocarbons.
A coating system without a shop primer (see 6.6.5) for use in dedicated boiler
feedwater (pure water) tanks. Class 11 coatings may not be used for seawater,
potable water, freshwater, fuels or other hydrocarbons.
A coating system which includes a shop primer (see 6.6.5) as the first coat for
use in dedicated boiler feedwater (pure water) tanks. Class 12 coatings may
not be used for seawater, potable water, freshwater, fuels or other
hydrocarbons.
A coating system without a shop primer (see 6.6.5) for use in dedicated
chemical holding (ship sewage/waste) tanks (CHT tanks). Class 13 coatings
may not be used for seawater, potable water, freshwater, fuels or other
hydrocarbons.

MIL-PRF-23236C

Class 14

Class 15a

Class 15b

Class 15c

Class 16

Class 17

Class 18
Class 19

A coating system which includes a shop primer (see 6.6.5) as the first coat for
use in dedicated chemical holding (ship sewage/waste) tanks (CHT tanks).
Class 14 coatings may not be used for seawater, potable water, freshwater,
fuels or other hydrocarbons.
A coating system intended as a repair or touch-up coating, without a shop
primer, for use over oily surfaces that are prepared to bare metal surfaces where
paint has been removed to the bare metal substrate.
A coating system intended as a repair or touch-up coating, without a shop
primer, for use over wet surfaces that are prepared to bare metal surfaces where
the paint has been removed to the bare metal substrate.
A coating system intended as a repair or touch-up coating, without a shop
primer, for application and cure under (salt) water.
A coating system without a shop primer for use as a deck coating in high wear
areas such as passageways and machinery space decks.
A coating system without a shop primer intended for use on properly cleaned
and prepared bilge surfaces.
A single-coat coating system without a shop primer.
A coating system without a shop primer intended for use on well deck
overhead areas of Landing Craft Air Cushion (LCAC) capable ships.

1.2.3 Grades. The grades of coating systems are as follows:


Grade A

Grade B

Grade C

Grade D

A coating system which can be applied down to a temperature of 32 qF (0 qC)


and cured down to a temperature of 25 qF (-4 qC).
A coating system which is to be applied, and cured at temperatures above 32 qF
(0 qC) up to 49 qF (10 qC).
A coating system which is to be applied and cured at a temperature above 50 qF
(11 qC).
Powder coatings cured at a high temperature in accordance with manufacturers
instructions in order to meet all performance requirements of this specification.

2. APPLICABLE DOCUMENTS
2.1 General. The documents listed in this section are specified in sections 3 and 4 of this specification.
This section does not include documents cited in other sections of this specification or recommended for additional
information or as examples. While every effort has been made to ensure the completeness of this list, document
users are cautioned that they must meet all specified requirements documents cited in sections 3 and 4 of this
specification, whether or not they are listed.
2.2 Government documents.
2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks
form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these
documents are those listed in the issue of the Department of Defense Index of Specifications and Standards
(DoDISS) and supplement thereto, cited in the solicitation (see 6.2).
SPECIFICATIONS
DEPARTMENT OF DEFENSE
MIL-DTL-5624
Turbine Fuel, Aviation, Grades JP-4, JP-5, and JP-5/JP-8 ST.
MIL-DTL-24441/29 Paint, Epoxy-Polyamide, Green Primer, Formula 150, Type IV.
MIL-DTL-24441/35 Paint, Epoxy-Polyamide, Red, Formula 156, Type IV.

MIL-PRF-23236C

STANDARDS
FEDERAL
FED-STD-141

FED-STD-595

Paint, Varnish, Lacquer and Related Materials: Methods of Inspection,


Sampling and Testing.
Colors Used in Government Procurement.

(Unless otherwise indicated, copies of the above specifications, standards, and handbooks are available
from the Department of Defense Single Stocking Point for Specifications and Standards (DoDSSP), Standardization
Document Order Desk, 700 Robbins Avenue, Bldg. 4D, Philadelphia, PA 19111-5094 or
http://astimage.daps.dla.mil/quicksearch/ or www.dodssp.daps.mil)
2.2.2 Other Government documents, drawings, and publications. The following other Government
documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise
specified, the issues are those cited in the solicitation.
PUBLICATIONS
CODE OF FEDERAL REGULATIONS (CFR)
40 CFR 60, Appendix A, Method 24
Determination of Volatile Matter Content, Water Content, Density,
Volume Solids and Weight Solids of Surface Coatings.
40 CFR 63
National Emission Standards for Hazardous Air Pollutants for
Shipbuilding and Ship Repair (Surface Coating) Operations
40 CFR 82
Protection of Stratospheric Ozone.
40 CFR 261, Appendix II, Method 1311
Toxicity Characteristic Leaching Procedure (TCLP).
40 CFR 355 Appendices A and B
The List of Extremely Hazardous Substances and Their Threshold
Planning Quantities.
40 CFR 372.65
Specific Toxic Chemical Listings.
29 CFR 1910, 1915, 1917, 1918, 1926, and 1928
Hazard Communication.
29 CFR 1990
Identification, Classification, and Regulation of Potential Occupational
Carcinogens.
(The Code of Federal Regulations (CFR) is for sale on a subscription basis by the Superintendent of
Documents, U.S. Government Printing Office, Washington, DC 20402 or http://www.access.gpo.gov/nara/cfr/.
When indicated, reprints of certain regulations may be obtained from the Federal agency responsible for issuance
thereof.)
U.S. DEPARTMENT OF HEALTH AND HUMAN SERVICES
NATIONAL INSTITUTE OF ENVIRONMENTAL HEALTH SCIENCES (NIEHS)
National Toxicology Program (NTP) latest annual Report on Carcinogens
(Application for copies of the NTP report should be addressed to NIEHS, Public Information Office, MD
B2-04, Research Triangle Park, NC 27709 or http://library.niehs.nih.gov/.)
DEPARTMENT OF LABOR
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
Validated Analytical Method ID-191, "Polarization Light Microscopy of Asbestos"
(Copies of OSHA documents can be obtained from http://www.osha.gov/.)

MIL-PRF-23236C

NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH


NIOSH Analytical Method 7500, SILICA, CRYSTALLINE, by XRD
(Copies of NIOSH documents can be obtained from http://www.cdc.gov/niosh.)
2.3 Non-Government publications. The following documents form a part of this document to the extent
specified herein. Unless otherwise specified, the issues of the documents which are DoD adopted are those listed in
the issue of the DoDISS cited in the solicitation. Unless otherwise specified, the issues of documents not listed in
the DoDISS are the issues of the documents cited in the solicitation (see 6.2).
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH 0026 Documentation of the Threshold Limit Value and Biological Exposure
Indices.
(Application for copies should be addressed to the American Conference of Governmental Hygienists,
1330 Kemper Meadow Drive, Cincinnati, OH 45240.)
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z400.1 Hazardous Industrial Chemicals - Material Safety Data Sheets, Preparation
(Application for copies should be directed to the American National Standards Institute, 11 West 42nd
Street, New York, NY 10036 or http://www.ansi.org.)
AMERICAN PUBLIC HEALTH ASSOCIATION (APHA)
Standard Methods for the Examination of Water and Wastewater, 20th Edition,1998
2120 B
Visual Comparison Method
2150 B
Threshold Odor Test
2160 B
Flavor Threshold Test
4500 Cl-F
DPD Colorimetric Method
5330 C or D Phenol, Direct Photometric Method
(Application for copies should be addressed to the American Public Health Association, 1015 Fifteenth
Street, NW, Washington DC 20036.)
ASTM INTERNATIONAL
ASTM B117
ASTM D93
ASTM D130

ASTM D156

ASTM D381

ASTM D523
ASTM D714

ASTM D823

ASTM D910
ASTM D1141
ASTM D1193
ASTM D1655
ASTM D2244

Standard Practice for Operating Salt Spray (Fog) Apparatus


Standard Test Methods for Flash-Point by Pensky-Martens Closed Cup
Tester. (DoD adopted)
Standard Method for Detection of Copper Corrosion from Petroleum
Products by the Copper Strip Tarnish Test. (DoD adopted)
Standard Test Method for Saybolt Color of Petroleum Products (Saybolt
Chromometer Method). (DoD adopted)
Standard Test Method for Gum Content in Fuels by Jet Evaporation. (DoD
adopted)
Standard Test Method for Specular Gloss. (DoD adopted)
Standard Test Method for Evaluating Degree of Blistering of Paints. (DoD
adopted)
Standard Practices for Producing Films of Uniform Thickness of Paint,
Varnish, and Related Products on Test Panels. (DoD adopted)
Standard Specification for Aviation Gasolines. (DoD adopted)
Standard Practice for Substitute Ocean Water. (DoD adopted)
Standard Specification for Reagent Water. (DoD adopted)
Standard Specification for Aviation Turbine Fuels.
Standard Test Method for Calculation of Color Differences from
Instrumentally Measured Colored Coordinates. (DoD adopted)

MIL-PRF-23236C

ASTM D3272 -

Standard Practice for Vacuum Distillation of Solvents From SolventReducible Paints for Analysis.
ASTM D3278 - Standard Test Methods for Flash Point of Liquids by Small Scale ClosedCup Apparatus. (DoD adopted)
ASTM D4060 - Standard Test Method for Abrasion Resistance of Organic Coatings by the
Taber Abraser.
ASTM D4138 - Standard Test Methods for Measurement of Dry Film Thickness of
Protective Coating Systems by Destructive Means.
ASTM D4400 - Standard Test Method for Sag Resistance of Paints Using a Multinotch
Applicator.
ASTM D4417 - Standard Test Methods for Field Measurement of Surface Profile of Blast
Cleaned Steel.
ASTM D4541 - Standard Test Method for Pull-Off Strength of Coatings Using Portable
Adhesion Testers
ASTM D4585 - Standard Practice for Testing Water Resistance of Coatings Using Controlled
Condensation.
ASTM E260
- Standard Practice for Packed Column Gas Chromatography.
ASTM E1252 - Standard Practice for General Techniques for Obtaining Infrared Spectra for
Qualitative Analysis.
ASTM F718
- Standard for Shipbuilders and Marine Paints and Coatings Product/Procedure
Data Sheet. (DoD adopted)
ASTM G8
- Standard Test Method for Cathodic Disbonding of Pipeline Coatings
ASTM and Other Specifications and Classifications for Petroleum Products and Lubricants, 6th
Edition.
(Application for copies should be addressed to the American Society for Testing and Materials, 100 Barr
Harbor Drive, West Conshohocken, PA 19428-2959 or http://www.astm.org/.)
INTERNATIONAL AGENCY FOR RESEARCH ON CANCER (IARC)
International Agency for Research on Cancer (IARC) Monographs
(Application for copies should be addressed to the World Health Organization (WHO), Publication Center,
49 Sheridan Avenue, Albany, NY 12210.)
NSF INTERNATIONAL (NSF)
NSF Standard 61 - Drinking Water System Components - Health Effects.
(Application for copies or information concerning qualification should be addressed to NSF International,
3475 Plymouth Road, Anne Arbor, MI 48113-0140.)
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC PA2
- Measurement of Dry Paint Thickness with Magnetic Gages.
SSPC SP-10
- Near-White Blast Cleaning.
SSPC SP-11
- Tool Cleaning to Bare Metal
SSPC SP-15
- Commercial Grade Power Tool Cleaning
(Requests for copies should be addressed to the Society for Protective Coatings (SSPC), 40 24th Street, 6th
Floor, Pittsburgh, PA 15222.)
2.4 Order of precedence. In the event of a conflict between the text of this document and the references
cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable
laws and regulations unless a specific exemption has been obtained. Relative to preconstruction primers or shop
primers, this document does not supersede ship fabrication documents. (see 6.1.1.3)

MIL-PRF-23236C

3. REQUIREMENTS
3.1 Qualification. Coating systems furnished under this specification shall be products that are authorized
by the qualifying activity for listing on the applicable qualified products list before contract award (see 4.2 and 6.3).
Qualification inspection shall consist of compliance with Table I, Table II and Table III(Type VIII and Type VIIIa),
verification of Table IV identification characteristics and compliance with all other applicable requirements of this
specification.
3.1.1 Description of coatings. At the time of qualification submittal, manufacturer shall identify all
coatings and coating components constituting the coating system being qualified by (a) Type, Class, and Grade for
which qualification is sought, and (b) unique product nomenclature. At a minimum, this unique product
nomenclature shall consist of component name, alpha-numeric identifier and color. Nomenclature shall be as
specific as necessary to uniquely identify each total system component.
3.2 Materials. Each individual component and mixed final coating of the total coating system qualified to
this specification shall, when mixed and applied in accordance with the manufacturers instructions, be in
accordance with the appropriate requirements. The composition of the coating furnished to this specification shall
be the responsibility of the manufacturer, except as limited by this specification.
3.2.1 Description. Where coatings are composed of components to be mixed at the time of application, the
proportions for the ratio of resin component to hardener shall be 4:1, 3:1, 2:1 or 1:1 by volume. Except for Type
VIII (all Classes) and Class 18 (all Types) coatings, the coating system shall consist of at least two full coats
(excluding shop primer) (see 6.6.3 and 6.6.5).
3.2.2 Component chemistry (except Type VIII and Type VIIIa). All coating systems, except the shop
primer (see 6.6.5), shall be composed of two components: (a) one component shall contain (see 6.6.6) chemically
cross linking resins (base) and (b) a second component which shall contain a curing agent (converter). The
composition of the shop (preconstruction) primer (see 6.6.5) shall be the manufacturers responsibility.
3.2.2.1 Powder coatings. Type VIII and Type VIIIa powders are single component materials and shall be
applied by industry accepted application procedures in accordance with the powder manufacturers instructions to
obtain the performance requirements in this specification.
3.2.2.2 VOC limits. When tested as specified in 4.5.5, the VOC of all individual coatings of coating
systems, except for inorganic binder shop primers (see 6.6.5) containing zinc metal as the major pigment (zinc rich),
shall not be greater than that allowed for the type being qualified. Inorganic binder based shop primer (see 6.6.5)
containing zinc metal as the major pigment (zinc rich) shall have a VOC not greater than 650 g/L (5.35 lb/gal) of
solvent per liter of coating minus water. The selection of coating system solvents portion of Type IV coating
systems is the responsibility of the manufacturer within the limitations of 3.2.2 and 3.2.3.1.
3.2.2.3 Hazardous air pollutant (HAP) content of types V, VI, VII, VIII and VIIIa coatings. When
evaluated as specified in 4.5.6, the content of HAPs solvents in each individual liquid coating, including the shop
primers (see 6.6.5), of Types V, VI, VII, VIII and VIIIa shall be not greater than the VOC limit prescribed for the
specific types. Within this limitation and the requirement that the finished coating meet all requirements of this
specification, Types V, VI and VII coating system solvent selection is the responsibility of the manufacturer.
3.2.3 Hazardous pigments and additives.
3.2.3.1 Type IV. When tested as specified in 4.5.10, Type IV coatings shall not contain the following
materials in excess of the percentage by weight (%wt) of the dry coating listed:
a.

Asbestos or asbestos-form pigments - 0.0005%wt.

b.

Lead or its compounds - 0.005%wt.

c.

Cadmium or its compounds - 0.0005%wt.

MIL-PRF-23236C

d.

Chromium or its chromium (III) compounds - 0.56%wt.

e.

Chromium (VI) compounds - 0.0005%wt.

f.

Crystalline silica - 1.0%wt.

3.2.3.2 Types V, VI, VII, VIII and VIIIa. When tested as specified in 4.5.10, the content of each soluble
metal and total content of each metal of the coating shall not be greater than the values listed in Tables I and II. In
addition, asbestos and asbestos form pigments shall not exceed 5 milligrams per liter (mg/L). Crystalline silica shall
not exceed 1 percent by weight. If, the total metal content for an individual metal is less than the allowed soluble
metal content for that metal, the total metal value may be submitted for the soluble metal value and the actual test
for soluble metal need not be performed.
TABLE I. Soluble metals content for types V, VI, VII, VIII and VIIIa coatings.
Soluble metal and/or its compound in each
individual dry paint
Antimony

Maximum, mg/L
15

Arsenic

0.001

Barium (excluding barite)

100

Beryllium

0.75

Cadmium

Chromium (VI)

Chromium and/or chromium (III)

560

Cobalt

80

Copper

25

Fluoride salts

180

Lead

Mercury

0.2

Molybdenum

350

Nickel

20

Selenium

Silver

Tantalum

100

Thallium

Tungsten

100

Vanadium

24

Zinc

250

MIL-PRF-23236C

TABLE II. Total metals content for types V, VI, VII, VIII and VIIIa coatings.
Metal or its compounds in each individual dry paint

Maximum, %wt

Antimony

0.015

Arsenic

0.001

Asbestos

0.0005

Barium (excluding barite)

0.10

Beryllium

0.0002

Cadmium

0.0005

Chromium (VI) compounds

0.0005

Chromium or Chromium (III) compounds

0.56

Cobalt

0.005

Copper

0.01

Fluoride salts

0.18

TABLE II. Total metals content for types V, VI, VII, VIII and VIIIa coatings - Continued.
Metal or its compounds in each individual dry paint

Maximum, %wt

Lead

0.005

Mercury

0.0002

Molybdenum

0.35

Nickel

0.02

Selenium

0.001

Silver

0.001

Tantalum

0.100

Thallium

0.007

Tungsten

0.100

Vanadium

0.01

Zinc*
0.25
* Total cobalt to effect drying of the coatings may exceed Table II limits and total zinc of
shop primers may exceed Table II limits, but in neither case may soluble cobalt or soluble
zinc exceed Table I limits. Zinc levels in Type VIIIa will exceed Table I and Table II limits
since these coatings will contain sacrificial zinc for corrosion control.
3.3 Color and gloss (all types except type VIII and type VIIIa, all classes except class 16 and class 17, and
all grades). When tested in accordance with the procedures of Table V, each topcoat of the coating systems shall
have a 60-degree specular gloss of not less than 30 with the exception of specified primer or shop primer (see 6.6.5)
coatings. Succeeding coats of the coating system shall be of contrasting color, and the top coat shall be white or a
very light pastel shade. Primer shall be a contrasting color to the bare steel substrate.

MIL-PRF-23236C

3.3.1 Color and gloss (types VIII and VIIIa). For the as-cured powder coatings to achieve the required
performance of this specification, color and gloss of Type VIII and Type VIIIa powder coatings shall be within 0.5
Delta E ('E) unit of the following Federal Standard Number 595 Color Numbers; 60-degree specular gloss shall be
as indicated below in Table III.
TABLE III. Color and gloss.
FED-STD-595 Color Number

Gloss (60o Specular)


Minimum/Maximum

Green (Formula 150)

24272

---/7

Haze Gray (Formula 151)

26270

---/30

White (Formula 152)

27886

20/---

Red (Formula 156)

20152

5/25

Light Gray (Formula 157)

26622

30/60

Yellow (Formula 158)

23695

20/---

Beach Sand

22563

35/60

Rose-Wood

22519

35/60

Clipper Blue

24516

35/60

Sun Glow

23697

35/60

Soft White

27880

35/60

Pastel Green

24585

35/60

Equipment Gray

26307

35/60

Green Gray

26496

35/60

Yellow Gray

26400

35/60

Pearl Gray

26493

35/60

Dark Gray

26081

35/60

Pastel Blue

25526

35/60

Black

27038

35/60

Color

3.3.2 Color (classes 15, 16 and 17). Topcoat colors of Class 15, 16 and 17 coating systems shall be within
1.0 Delta E ('E) unit of the Federal Standard Number 595 colors #24272 Green, #26270 Haze Gray, #27886 White,
#20109 Red, #26622 Light Gray and #27038 Black when tested in accordance with the procedures of Table V.
3.4 Potable and freshwater all types, classes 9 and 10 (all grades). See 4.5.11a and 4.5.11b for panel and
test preparation.
3.4.1 NSF certification. Coatings for Class 9 and Class 10 shall be certified by NSF International to NSF
Standard 61 for 500-gallon water storage tanks. The use of Underwriters Laboratories (UL) or other NAVSEA
approved testing laboratories is also acceptable.
3.4.2 Color in water. When tested as specified in 4.5.11.1, color units shall not be greater than 10.
3.4.3 Taste in water. When tested as specified in 4.5.11.2, threshold taste values shall not be greater than
2.
3.4.4 Odor in water. When tested as specified in 4.5.11.3, threshold odor values shall not be greater than
2.

10

MIL-PRF-23236C

3.4.5 Chlorine residual. When tested as specified in 4.5.11.4, chlorine residual shall not decrease in excess
of 50 percent of concentration.
3.4.6 Phenol contamination. When tested as specified in 4.5.11.5, the cured film of each coating of the
coating system shall not leach phenolic compounds in concentrations greater than 1 part per million (p/m).
3.4.7 Immersion resistance. When tested in accordance with 4.5.2.3, the total coating system shall show
no pinhole rusting, cracking, loss of adhesion either between coats or to the substrate. There shall be no blistering
rated in excess of ASTM D714, blister size number 4, Few. There shall be no surface imperfections (includes
peeling) larger than 1.5 mm (116-inch) and any blistering shall be unbroken. Type VII coating system shall have
no edge rusting. Blisters and surface imperfections smaller than 1.5 mm, which do not increase in size after the
tenth cycle and that do not exceed 3 percent of the test panel surface area, shall not be considered failures. At the
completion of the test, adhesion of the recoat to the original coating shall be at least 50 percent of that of the original
coating area of the test panel to itself. Type VII edge rusting shall not exceed 0.1 percent of total edge length.
Physical damage caused by handling may be ignored in condition evaluation.
3.5 Cathodic protection (CP) compatibility (all classes except 16, 17 and 19). When tested as specified in
accordance with 4.5.16, the coating system shall not peel, flake, blister, dissolve or otherwise fail. Undercutting or
peeling shall not exceed 4 percent of the area of the test panel and all undercutting and peeling shall be located
adjacent to the holiday.
3.6 Drying or curing time (all types, all classes and all grades). When tested in accordance with the
procedures of Table V, each individual coating of the coating system shall require not greater than 23 hours between
coats for recoating and shall be ready for service within seven (7) days after the application of the last coat.
Application and cure shall be at the temperature specified by the manufacturer. In the absence of manufacturers
guidance, the temperature selected shall be at the low end of the temperature range.
3.7 Flash point (all types, (except VIII and VIIIa), all classes, and all grades). When tested in accordance
with the procedures of Table V, each individual coating of the coating system mixed for use shall not flash at
temperatures lower than 38 qC (100 qF), except the shop primer (see 6.6.5), which shall not flash at a temperature
lower than 10 qC (50 qF).
3.8 Application characteristics (all types (except type VIII and type VIIIa), all classes, and all grades).
When tested as specified in 4.5.7 and 4.5.8, each individual coating of the coating system shall be readily applied by
brush (touch up areas only), rolling and spray, using commercially available equipment specified by the
manufacturers data sheet. The coatings shall exhibit leveling without sagging when applied at film thickness
recommended by the manufacturer. Manufacturers product data sheets shall state at which temperature it will be
necessary to use plural component spray equipment in order to achieve an acceptable surface appearance. Apply
Type VIII and VIIIa in accordance with manufacturers instructions.
3.8.1 Edge coverage retention (Applicable to type VII, all classes and all grades). When tested as specified
in 4.5.9, the retained percent dry film thickness (DFT) of coating on any single 90-degree outside edge test specimen
shall be not less than 50 percent of the paint DFT on flat areas. The average coating (percent) retained on a 90degree outside edge of no less than three specimens shall be an average minimum of 70 percent of the measured dry
film thickness on the flat areas of the test specimen. There shall be no pin holes, cracks or other defects along the
edge that extends more than 10 percent into the thickness of the coating on the edge, nor shall any defect extend
completely to the metal of the test specimen. The edge coverage retention applies to the topcoat only and not to the
primer.
3.8.2 Sag resistance (all types, classes and grades). When tested in accordance with Table V, sag
resistance shall comply with the value submitted (3.12).
3.9 Immersion resistance (all types and grades). Any coating system failure prior to the completion of all
class specific immersion cycles (see 4.5.2) shall constitute failure of the coating system to meet the requirements of
this specification.

11

MIL-PRF-23236C

3.9.1 Classes 5 and 6 (fuel and seawater). When tested as specified in 4.5.2.1, the total coating system
shall show no pinhole rusting, cracking, loss of adhesion either between coats or to the substrate. There shall be no
blistering rated in excess of ASTM D714, blister size number 4, Few. There shall be no surface imperfections
(includes peeling) larger than 1.5 mm (116-inch) and any blistering shall be unbroken. Type VII coating system
shall have no edge rusting. Blisters and surface imperfections smaller than 1.5 mm, which do not increase in size
after the tenth cycle and that do not exceed 3 percent of the test panel surface area, shall not be considered failures.
At the completion of the test, adhesion of the recoat to the original coating shall be at least 50 percent of that of the
original coating area of the test panel to itself. Type VII edge rusting shall not exceed 0.1 percent of total edge
length. Physical damage caused by handling may be ignored in condition evaluation.
3.9.2 Shop primer corrosion resistance (Class 6, 8, 10, 12, and 14). When prepared and tested as specified
in 4.5.2(a), the shop primer shall protect the steel substrate for 1 year. After l year of exposure, the test panel shall
be free of all iron corrosion products. Shop primer meeting the requirements of this specification may be retained
for overcoating in non-critical areas such as interior habitability, work and machinery spaces, exterior freeboard,
topside vertical areas and horizontal areas not scheduled to receive non-skid coating. Regardless of performance
results, shop primer must be removed from critical ship areas such as tanks, bilges, voids, underwater hull, well deck
overhead and topside horizontal areas where non-skid application is planned.
3.9.3 Classes 7 and 8 (seawater only). When tested as specified in 4.5.2.2, the total coating system shall
show no pinhole rusting, loss of adhesion either between coats or to the substrate. There shall be no blistering rated
in excess of ASTM D714, blister size number 4, Few. There shall be no surface imperfections (includes peeling)
larger than 1.5 mm (116-inch) and any blistering shall be unbroken. Type VII coating system shall have no edge
rusting. Blisters and surface imperfections smaller than 1.5 mm (116-inch), which do not increase in size after the
tenth cycle and are not greater than 3 percent of the test panel surface area, shall not be considered failure. At
completion of the test, adhesion of the recoat to the original coating shall be at least 50 percent of that of the original
coating area of the test panel to itself. Type VII edge rusting shall not exceed 0.1 percent of total edge length.
Physical damage caused by handling may be ignored in condition evaluation. For coating systems evaluated in
Cycle B of paragraph 4.5.2.2.2, a "B1" rating must be achieved to meet this requirement.
3.10 Condition in container (all types, except VIII and VIIIa, all classes, and grades). When tested in
accordance with the procedures of Table V, each individual coating component shall be usable; that is, shall be
readily broken up with a paddle or mechanical stirring to a smooth uniform consistency, and shall not liver or show
any other objectionable properties for at least one year. Coating shall apply satisfactorily when applied as specified
in manufacturer's data sheet. See Table V.
3.10.1 Condition in container - types VIII and VIIIa. When tested to the appropriate section of the Table V
test method, the Type VIII and Type VIIIa powders shall meet all applicable specification requirements when stored
in original unopened containers at or below 72 qF (22 qC) and less than 50 percent relative humidity for a period of
one year from date of manufacture.
3.11 Toxicity (all types, classes and grades). The materials used in the coating systems, unless specific
material maximum levels are cited herein (see 3.2), shall have no known carcinogenic or potentially carcinogenic
materials identified by OSHA as regulated carcinogens, or IARC latest monographs, or the latest NTP report, or
ACGIH; and shall have no extremely hazardous substances (EHS) or toxic chemicals identified in 40 CFR 355 and
372, respectively. The manufacturer is responsible for maintaining carcinogenic free materials. The individual
coatings shall not contain any of the following materials in excess of 0.06 percent by weight of the wet coating:
chlorinated solvents, coal tar or coal tar derivatives (see 6.2 and 6.4). The manufacturer shall not, unless specific
material maximum levels are cited herein, allow the addition of any prohibited materials to the formulation; and
when any of these prohibited materials are/may be present, as a result of being present as a trace or impurity in
another ingredient(s), the concentration shall not equal or exceed 0.1 percent by weight of any individual coating of
the coating system. The coating components and mixed coating shall have no adverse effect on the health of
personnel when used for its intended purpose in accordance with the manufacturers instructions. Questions
pertinent to this toxicity requirement shall be referred by contracting activity to the qualifying activity. The
qualifying activity will act as advisor to the contracting activity. The qualifying activity will arrange for review of
questions by the appropriate departmental medical service.

12

MIL-PRF-23236C

3.12 Identification characteristics (all types, classes and grades). Values for identification (ID)
characteristics shall be those established for the product at the time submitted for qualification (see Table IV). The
purpose of these values is to serve as a basis for determining that the material being offered is essentially the same as
that which was approved under qualification testing. Identification characteristics for Grades A and B materials
shall be at the low end of the temperature range. The qualification testing for all Types, Classes, and Grades shall be
conducted at the low temperature in the range. Manufacturer shall provide ASTM method(s), FED-STD-141
methods, other consensus standards, or a copy of unique test methodology and any other necessary information on
methodology used to determine reported ID characteristics.
TABLE IV. Identification characteristics values.
Coating
component1/

Property
Chemical nature

Coating2/

Coating
system3/

Principal constituents
(10 percent or more of total)

Percent nonvolatile vehicle

Percent volatile

X
6/

Mass per liter (L) [gallon (gal)]

Color

Viscosity

6/

Flash point

X
6/

Fineness of grind

X
6/

Odor

X
5/

Pot life

X
X

Drying or curing time - Time to recoat

Gloss and appearance

Flexibility

X
5/ 6/

X
X4/

Mixing instructions

4/

Application instructions

Sag resistance

X5/

Fire resistance properties


X7/
X7/
Notes:
1/
Coating components are individually packaged components such as base component (part A) and converter
component or hardener (part B). Indicates only applicable characteristics.
2/
Coating is the resin base and converter, and any other constituents, mixed for application.
3/
Coating system is the total system (number and types of coats and approximate dry film thickness as tested for
qualification approval.
4/
Can be standard commercial or ASTM F718, except that shall include necessary 29 CFR Parts 1910, 1915,
1917, 1918, 1926 and 1928 and have attached, or incorporate, a Material Safety Data Sheet (MSDS) (see ANSI
Z400.1).
5/
Not applicable to Types VIII and VIIIa. A minimum pot life of one hour is required.
6/
Not applicable to Type VIII or Type VIIIa.
7/
Manufacturer shall provide a flame spread index and a level of smoke generation, standard fire test method used
and a list of standards organizations endorsing the results.
3.13 Aviation (JP-5 and F-76) fuel and gasoline (MOGAS and aviation gasoline) compatibility (All types,
classes 5 and 6 all Grades). When tested as specified in 4.5.4, the cured total coating systems shall not contribute
particulate or chemical contamination that is detrimental to subsequent logistics or aircraft operation. Particulate
contamination occurs when solids, color bodies and fuel reaction bodies are leached from the coating. Chemical

13

MIL-PRF-23236C

contamination evidences itself when the fuel becomes corrosive, shows increased existent gum, or suffers a loss in
diethylene bromide.
3.13.1 Fuel color. When tested as specified in 4.5.4.2, the cured total coating system shall not effect the
color of fuel:
a.

or JP-5 fuel: Saybolt color difference shall be not greater than 2.

b.

or aviation gas and MOGAS: there shall be no perceptible difference in color, turbidity, or
precipitation.

3.13.2 Corrosion. When tested as specified in 4.5.4.3, JP-5 and aviation gas shall not become corrosive
after contact with the coating system.
3.13.3 Existent gum. When tested as specified in 4.5.4.4, the cured total coating system effect on existent
gum shall be as follows:
a.

The difference in existent gum (unwashed) shall be not greater than 4 milligrams (mg) per 100
milliliters (mL).

b.

The difference in existent gum (washed) shall be not greater than 2 mg per 100-mL.

3.13.4 Solids (total sediment). When tested as specified in 4.5.4.5, the total cured coating system shall not
cause a difference in total sediment greater than 2 mg per liter (L).
3.13.5 Bromine. When tested as specified in 4.5.4.6, the effect of the total cured coating system on the
ethylene dibromide content of aviation gas shall be that the difference in bromine content shall not be greater than
10 percent.
3.14 Resistance to fuel and seawater at 32 qC (90 qF) (all types, classes 5 and 6, all grades). When tested
as specified in 4.5.2.4, coating:
a.

Shall not chalk.

b.

Shall not exhibit film failure such as peeling, blistering rated in excess of ASTM D714, blister size
number 4, few, and there shall be no surface imperfections (includes peeling) larger than 1.5 mm (116
inch) and any blistering shall be unbroken. Type VII coating system shall have no surface or edge
rusting.

c.

Shall show no loss of apparent hardness and adhesion when examined visually and knife test.

3.15 Resistance to hot water - simulated boiler feedwater (all types, classes 11 and 12, and grades). When
tested as specified in 4.5.12, coating shall have no pinhole rusting. The ASTM D4541, Type II tester, adhesion of
the tested system to itself and the substrate shall be not less than 50 percent of that of the original coating before
testing. There shall be no blistering rated in excess of ASTM D714, blister size number 4, Few. There shall be no
surface imperfections (includes peeling) larger than 1.5 mm (116-inch)and any blistering shall be unbroken. Type
VII coating system shall have no edge rusting.
3.16 Resistance to chemical solutions - simulated collection holding and transfer (CHT; sewage waste)
tanks (all types, classes 13 and 14 only, all grades). When tested as specified in 4.5.13, the coating shall have no
pinhole rusting. After testing the ASTM D4541, Type II tester, cohesion and adhesion values of the tested system to
itself and the substrate shall be at least 50 percent of the values for cohesion and adhesion of the untested original
coating to itself and the substrate before testing. There shall be no blistering rated in excess of ASTM D714, blister
size number 8, Few. There shall be no surface imperfections (includes peeling) larger than 1.5 mm (116-inch) and
any blistering shall be unbroken. Type VII coating system shall have no edge rusting.
3.17 Resistance to condensing water - simulated tank top test (all types, classes, and grades). When tested
as specified in 4.5.14, the coating system shall have no pinhole rusting. The ASTM D4541, Type II tester, adhesion
values of the tested system to itself and the substrate shall be at least 50 percent of the values for adhesion of the

14

MIL-PRF-23236C

untested original coating before testing. There shall be no blistering rated in excess of ASTM D714, blister size
number 4, Few. There shall be no surface imperfections (includes peeling) larger than 1.5 mm (116-inch) and any
blistering shall be unbroken. Type VII coating system shall have no edge rusting.
3.18 Ultraviolet fluorescence (applicable to primers of type VII, all classes, all grades). When tested in
accordance with 4.5.15, the primer shall fluoresce with sufficient brightness that coverage of test panel can be
visually ascertained.
3.19 Surface tolerant coating systems. Class 15 coating systems shall demonstrate adhesion values of at
least 50 percent of the values obtained from testing when the same coating system is applied to a dry, clean SSPC
SP - 15 surface condition. Test in accordance with 4.5.17.
3.20 Wear resistant coating systems. When applied to the test panels in accordance with the
manufacturers application instructions, Class 16 coating systems shall demonstrate a weight loss and thickness
reduction no greater than 25 percent of the weight and thickness loss experienced by an equal dry film thickness of
paint qualified to MIL-DTL-24441 when tested concurrently in accordance with 4.5.18.
3.21 Bilge coating systems. Class 17 coating systems shall demonstrate adhesion values of at least 50
percent of the value obtained when the same coating system is applied to dry, clean test panels prepared to surface
cleanliness standards SSPC SP-11, Power Cleaning to Bare Metal. Test in accordance with 4.5.19.
3.22 Single coat coating system. Class 18 coating systems shall comply with all other class coating
systems requirements when tested in accordance with the applicable test method cited in this specification (see
4.5.20 and 3.2.1).
3.23 Label. Manufacturer shall prepare label instructions in accordance with 29 CFR 1910. Each container
must be affixed with a hazardous chemical warning label in accordance with 29 CFR 1910.1200. To comply with
the Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollution (NESHAP)
requirements for shipbuilding and ship repair, the following two statements must appear on each paint-can label;
a.

Certification that the paint in the container meets the NESHAP requirements for shipbuilding and ship
repair.

b.

Statement of the ratio of volatile content to solids expressed as grams of volatile organic hazardous air
pollutants (VOHAP) per liter of solids.

3.24 Well deck overhead coating systems. Class 19 coatings systems, when tested in accordance with
4.5.21, shall exhibit heat resistance up to 260 qC (500 qF). There shall be no degradation or delamination of the
coating from the test panel. Adhesion of the coating system to the panel following the elevated heat test shall be at
least 50 percent of the adhesion value obtained prior to the test.
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are classified as follows:
a.

Qualification inspection. (see 4.2)

b.

Conformance inspection. (see 4.3)

4.2 Qualification inspection. Qualification inspection shall be as follows:


a.

Qualification approval for Types V, VI and VII shall also constitute approval for Type IV coatings of
the same class and grade.

15

MIL-PRF-23236C

b.

Qualification approval for Types VI and VII shall also constitute approval for Types IV and V coating
systems of the same class and grade.

c.

Qualification approval for Type VII shall also constitute approval for Types IV, V, and VI coatings of
the same class and grade.

d.

Qualification approval for Types VIII and VIIIa is unique and not extended to other Types.

4.3 Conformance inspection. Conformance inspection shall consist of the conformance tests specified in
Table V.
4.4 Panel preparation. Test plates of the nature and size specified in the applicable test method shall be
coated in accordance with the manufacturer's application instructions. Each individual coating of the coating system
shall be mixed in accordance with the manufacturer's mixing instructions.
4.5 Test procedures. Tests shall be conducted as specified in Table V. The temperature at which tests are
conducted shall be in accordance with the applicable FED-STD-141 and ASTM test methods identified in Table V.
For reduced temperature materials (Grade A and Grade B), the tests shall be conducted at the low end of the
temperature range. Unless otherwise specified, test panel dimensions and test conditions, such as temperature etc.,
are nominal.
TABLE V. Test procedures.

Characteristics
Chemical nature

Requirements

Test
paragraph

3.2.2 and
Table V

---

VOC

3.2.2.2

4.5.5

Hazardous air
pollutants (HAPs)

3.2.2.3

4.5.6

3.2.3

4.5.10

Hazardous pigments
Color

3.3

Gloss
Potable water
Color in water

Applicable
FED-STD-141
method

Applicable
ASTM test

Table
IV ID
test

Conformance
test

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

2/

---

---

D2244

3.3

---

---

D523

3.4

4.5.110

---

---

---

---

---

3/ 4/

3.4.2

4.5.11.1

---

---

Taste in water

3.4.3

4.5.11.2

---

---

---

---

Odor in water

3.4.4

4.5.111.3

---

---

---

---

Chlorine residual

3.4.5

4.5.11.4

---

---

---

---

Phenol

---

---

---

---

---

---

3.4.6

4.5.11.5

CP Compatibility

3.5

4.5.16

Drying or cure time

3.6

---

4061

---

---

---

Flash point

3.7

---

---

D93 or
D3278

X3/ 4/

Application
characteristics
(Mixed)

3.8

4.5.7,
4.5.8

---

D823
Method B
and D4417

---

X3/ 4/

Edge coverage

3.8.1

4.5.9

---

---

---

---

---

16

---

MIL-PRF-23236C

TABLE V. Test procedures - Continued.

Characteristics

Requirements

Test
paragraph

Applicable
FED-STD-141
method

Applicable
ASTM test

Table
IV ID
test

Conformance
test

Fuel & fuel/seawater


ballast serviceClasses 5 and 6

3.9.1

4.5.2.1

---

---

---

---

Shop primer exterior

3.9.2

4.5.2(a)

---

---

---

---

Dedicated seawater
service

3.9.3

4.5.2.2

---

---

---

---

Condition in
container

3.10 and
3.10.1

---

3011

---

---

ID principal
constituents

3.12

---

---

---

---

ID percent
nonvolatile vehicle

3.12

---

---

---

---

ID percent volatile

3.12

---

---

---

---

ID mass (g/L)
(lb/gal)

3.12

---

---

---

ID color

3.12

---

---

---

ID viscosity

3.12

---

---

---

X3/

ID flash point

3.12

---

---

---

ID fineness of grind

3.12

---

---

---

ID odor

3.12

---

---

---

ID pot life

3.12

4.5.1

---

---

X3/ 4/

ID drying or curing
time

3.12

---

---

---

X3/

ID gloss and
appearance

3.12

---

---

---

---

ID flexibility

3.12

---

---

---

---

ID sag resistance

3.12 and 3.8.2

Table V

---

D4400

X3/ 4/

ID fire resistance
properties

3.12

---

---

---

X3/

---

Aviation fuel
compatibility

3.13

4.5.4

---

---

---

---

Fuel color

3.13.1

4.5.4.2

---

---

---

---

Corrosion

3.13.2

4.5.4.3

---

---

---

---

Existent gum

3.13.3

4.5.4.4

---

---

---

---

Solid (total sediment)

3.13.4

4.5.4.5

---

---

---

---

Bromine

3.13.5

4.5.4.6

---

---

---

---

17

MIL-PRF-23236C

TABLE V. Test procedures - Continued.

Requirements

Test
paragraph

Applicable
FED-STD-141
method

Applicable
ASTM test

Table
IV ID
test

Conformance
test

Resistance to fuel
and water at 32 qC
(90 qF)

3.14

4.5.2.4

---

---

---

---

Boiler feedwater
service -Resistance
to boiling water

3.15

4.5.11

---

---

---

---

CHT service resistance to


chemical solutions

3.16

4.5.12

---

---

---

---

Tank top - resistance


to condensing water

3.17

4.5.13

---

---

---

---

Ultraviolet
fluorescence

3.18

4.5.14

---

---

---

---

Surface tolerant
coatings

3.19

4.5.17

---

-----

---

---

Wear resistant
coatings

3.20

4.5.18

----

-----

---

----

Bilge coating
systems

3.21

4.5.19

----

----

---

----

Single coat coating


systems

3.22

4.5.20

----

----

---

---

Characteristics

Well deck overhead


3.24
4.5.21
--------coating (class 19)
resistance to heat
Notes:
1/
All qualification tests shall be conducted on stored coatings after one year of storage. If all other requirements
are met, qualification approval will be granted prior to receiving these results, but qualification approval will be
withdrawn if results indicate non-compliance with this requirement. (see 3.10)
2/
Shall be compared to company color card or to FED-STD-595 designated color. (see 3.6)
3/
Combined A+B for test
4/
Mixed A+B for Classes 15a, 15b, 15c, 16, 17 and 18.
4.5.1 Pot life (except Type VIII, Type VIIIa and single coat coatings). The coatings of the coating system
shall be mixed from the components, in accordance with the manufacturer' instructions, in a container so as to result
in approximately 3.78 L (1 gallon) of finished material. For routine testing, ambient conditions above 21 C (70 F)
and 50 percent relative humidity shall be satisfactory. For referee tests, 21 3 qC (70 5 qF) and 80 10 percent
relative humidity shall prevail. The time between mixing and the loss of adequate brushing and spraying properties
shall be determined (See 3.8, 4.5.7 and 4.5.8). Record the actual temperature, humidity, and the time of loss of
adequate brushing and spraying properties. For reduced temperature coating systems (Grade A and Grade B), pot
life of individual mixed coatings shall be determined at the lower end of the temperature range or as directed by the
coating manufacturer. The pot life shall be a minimum of one hour in accordance with the requirements of 3.12.
4.5.2 Immersion resistance.
a. Coating and atmospheric testing of classes 6, 8, 10, 12, and 14 shop primers. When the coating system
includes a shop primer (see 6.6.5), the shop primer shall be applied as specified in the manufacturer's

18

MIL-PRF-23236C

instructions and shall completely coat three [minimum size: 150 by 300 by 3 mm (6 by 12 by -inch)
(nominal)] abrasive blasted, hot rolled, mild steel plates. The blast pattern shall be not greater than
0.08 mm (3 mil) (nominal) depth for shop primers having 0.13 mm (5 mils) or more dry film thickness
(DFT) and 0.04 mm (1.5-mils) for systems having less than 0.13 mm (5-mils) DFT. The test panels
shall have all mill scale, rust and rough edges completely removed and prepared to the manufacturers
recommended surface profile in accordance with SSPC-SP10. Qualification test report shall indicate
degree of surface preparation and the profile achieved. The shop primer coated test panels shall be
exposed for 1 year at a seashore exposure site no more than 300 meters (330 yards) from the high tide
line. At the end of 1 year, corrosion shall be as specified in 3.9.2.
b.

Application of all coatings, except shop primer.


(1) The coating systems not applied over an aged shop primer (Classes 5, 7, 9, 11, 13, 15, 16, 17 and
18) shall be applied as specified in the manufacturer's instructions and shall completely coat three
[minimum size: 150 by 300 by 3 mm (6 by 12 by -inch) (nominal)] abrasive blasted, hot rolled,
mild steel plates. The blast pattern shall be not greater than 0.08-mm (3-mil) (nominal) depth for
coating systems having 0.13 mm (5-mils) or more dry film thickness (DFT) and 0.04 mm (1.5
mils) for systems having less than 0.13-mm (5-mils) DFT. The test panels shall have all mill
scale, rust and rough edges completely removed and prepared to applicable surface profile in
accordance with SSPC-SP10 before coating.
(2) Coating systems applied over shop primers after exposure [see (a) above]. The test panels with
shop primer shall be cleaned and repaired with the shop primer in accordance with the
manufacturers product data sheet before proceeding with application of the remainder of the
system.
(3) Unless otherwise specified in the manufacturers data sheet, 24 hours dry time shall be allowed
between coats and 1 week at 21 qC (70 qF) (nominal) or equivalent between the last coat and
immersion. Edges shall not receive extra paint thickness or be reinforced by additional coats
unless such coating is specified in the manufacturers ASTM F718 and product data sheets under
application instructions. At test inspection points, the coatings shall be as specified for the
appropriate type, class and grade.

4.5.2.1 Immersion test for fuel and seawater ballast exposure (all types, classes 5 and 6, all grades). Two
coated panels shall be subjected to 25 cycles or to prior failure, whichever comes first, of the following test cycle.
The cycle comprises three operations carried out in the order specified with panels prepared as specified in 4.5.2(a)
and (b):
a.

Salt water immersion for 1 week (7 days): Immerse panels totally for 1 week in natural seawater or in
ASTM D1141 substitute ocean water, at a temperature of 27 6 C (80 10 qF). There shall be no
more than 8 hours between completion of step (a) and the beginning of step (b).

b.

Aromatic fuel immersion for 1 week (7 days): Following salt water immersion, immerse the panels
totally in MIL-DTL-5624, ASTM D1655 or commercial JP-4, JP-5 at a temperature of 27 6 C (80
10 F). There shall be no more than 8 hours between completion of step (b) and the beginning of step
(c).

c.

Hot water immersion for two hours: This operation is intended to simulate conditions encountered in
the use of tank cleaning equipment. Following fuel immersion, immerse the panels totally in hot,
ASTM D1141 synthetic seawater or natural seawater having a salinity of 33 to 35 p/m chloride, for 2
hours at 80 C (175 qF) (nominal).

Operations (a) to (c) constitute one complete test cycle. This cycle is repeated and coating deterioration
recorded after each complete cycle. If coating is still satisfactory after 20 cycles, wipe lightly with a soft cloth and
freshwater, allow 48 hours to thoroughly dry, and recoat the upper one third of one side of each panel, masking off
the edges, approximately 13 mm (0.5-inch), and the bottom portion of the panel with one coat of the system finish

19

MIL-PRF-23236C

coat of the coating system (or primer coat and finish coat if appropriate). Allow 1-week dry time at ambient
laboratory conditions and complete immersion test with five additional test cycles. Test panels shall be inspected at
the end of the tenth and twenty-fifth cycles for imperfections (see 3.9.1). On completion of testing, the coating
system shall be evaluated for: pinhole rusting, ASTM D4541, Type II tester, adhesion of both the original and
recoated surface areas, blistering larger than 1.5 mm (116-inch) in diameter, and surface imperfections larger than 1.5
mm (116-inch). Type VII coating systems shall be evaluated for edge rusting. The test results shall be in accordance
with the requirements of 3.9.1.
4.5.2.2 Dedicated salt water ballast (all types, classes 7 and 8, all grades). Two test panels, prepared as
specified in 4.5.2(a) and (b) above shall be tested in accordance with either of the following cycles (cycle A or cycle
B):
4.5.2.2.1 Cycle A.
a.

Salt water Immersion for 5 days: Immerse panels with panels prepared as specified in 4.5.2(a) and (b)
totally for 1 week in either natural seawater or ASTM D1141 Substitute Ocean Water solution at a
temperature of 27 6 C (80 10 F).

b. Remove panels from test and allow to dry for 2 days.


c.

Hot water immersion for 2 hours: This operation is intended to simulate conditions encountered in the
use of tank cleaning equipment. Following the drying period, immerse the panels totally in hot,
synthetic seawater for 2 hours at 80 C (175 F) (nominal).

Operations (a) to (c) constitute one complete test cycle. This cycle is repeated and coating deterioration
recorded after each complete cycle. If coating is still satisfactory after 25 cycles, wipe lightly with a soft cloth and
freshwater, allow 48 hours to thoroughly dry, and recoat the upper one third of one side of each panel, masking the
portion from the edge to 13 mm (1/2 inch) inward, with one coat of the finish coat of the coating system (or primer
coat and finish coat if appropriate). Allow 1-week dry time and complete immersion test with 25 additional test
cycles. Coating system shall be evaluated for pinhole rusting, ASTM D4541, Type II tester, adhesion of both
original and recoated surfaces, blistering larger than 1.5 mm (116 inch) in diameter, and surface imperfections larger
than 1.5 mm (116 inch). Type VII coating systems shall be evaluated for edge rusting. Test results shall be as
specified in 3.9.3.
4.5.2.2.2 Test cycle B. This test cycle shall be performed by Det Norske Veritas, N-1322, Hvik, Norway,
phone 47 67 57 00, FAX 47 67 57 99 11 and shall be as specified in the test program described in Paper no. 505 of
the NACE Corrosion 96 Conference report. Surface preparation and paint application shall be as specified in 4.4
and 4.5 and shall be performed by Marine Materials AS, unless special application equipment is required that is not
available to Marine Materials. With prior approval of NAVSEA, Marine Materials AS may arrange for application
by others with supervision by Marine Materials AS. If coating system is still satisfactory after 20 cycles in the wave
test chamber portion of the testing, surface prepare the tested coating as specified in 4.4. Recoat the central upper
third of one side of each panel as specified in 4.4 and conduct an additional 5 cycles of the wave chamber test. After
the additional testing in the wave chamber, the adhesion of the recoat and original coats shall be as specified in the
requirements of 3.9.3. After completion, all testing panels shall be rated by the criterion of Paper No, 505 and
assigned a rating. This rating shall be as specified in the requirements of 3.9.3. Test results shall also be as
specified in 3.9.3.
4.5.2.3 Potable and freshwater immersion (all types, classes 9 and 10, all grades). Class 9 and 10 coatings
for use in dedicated potable and freshwater tanks shall be tested to the following cycle with panels prepared as
specified in 4.5.2(a) and (b):
a.

Immerse two panels totally for five days in ASTM D1193 (any type) distilled water, at a temperature
of 27 6 C (8O 10 F).

b.

Remove panels from test and allow to dry for 2 days.

20

MIL-PRF-23236C

c.

Hot water immersion for 2 hours: This operation is intended to simulate conditions encountered in the
use of tank cleaning equipment. Following the drying period [see (b)], immerse the panels totally in
ASTM D1193 (any type) distilled water for 2 hours at 80 C (175 F) (nominal).

Operations (a) to (c) constitute one complete test cycle. This cycle is repeated and coating deterioration
recorded after each complete cycle. If the coating is still satisfactory after 20 cycles, wipe lightly with a soft cloth
and freshwater, allow 48 hours to thoroughly dry, and recoat the upper one third of one side of each panel, masking
the portion from the edge to 13 mm ( inch) inward, with one coat of the finish coat of the coating system (or
primer coat and finish coat if appropriate). Allow 1 week dry time and complete immersion test with 5 additional
test cycles. Coating system shall be evaluated for pinhole rusting, ASTM D4541, Type II tester, adhesion of both
original and recoated surfaces, blistering and surface imperfections larger than 1.5 mm (116 inch) in diameter. Type
VII coating systems shall be evaluated for edge rusting. Evaluation results shall be as specified in 3.4.
4.5.2.4 Resistance to fuel and salt water at 32 qC (90 qF) (All types, classes 5 and 6, all grades). Panels
shall be prepared in accordance with 4.5.2 except for size. Two test panels approximately 60- by 120 mm (2 by 5
inches) shall be immersed in 500 mm (2 inches) of either natural sea water or ASTM D1141 Substitute Ocean Water
solution covered by 50 mm (2 inches) of the fuel specified in 4.5.2.1 in a glass jar, closed and sealed. The jar shall
be kept at 32 3 qC (90 5 qF) by partial immersion in a water bath or other means for 240 hours. The panel shall
be removed, immediately examined for any change in appearance, chalking or color change, film failure such as
blistering and rusting, or loss of apparent hardness and adhesion of the coating, and edge rusting by visual
observation and method 6304.2 of FED-STD-141 (knife used may be sharp commercial pocket knife). Panels shall
be in accordance with the requirements of 3.14.
4.5.3 Recoatability (except types VIII and VIIIa). Recoatability for qualification of the coating systems
shall be determined as specified in 4.5.2.1, 4.5.2.2, 4.5.2.3, 4.5.13, 4.5.14, and 4.5.17. Recoatability shall be in
accordance as specified in 3.4.7, 3.9.1, 3.9.3, 3.15, 3.16 and 3.17.
4.5.3.1 Recoatability (types VIII and VIIIa). Recoatability of the Type VIII and Type VIIIa powder
coatings shall be demonstrated using the three-coat MIL-DTL-24441, Type III and the two-coat MIL-DTL-24441,
Type IV systems. Recoatability shall be as specified in 3.9.1, 3.9.3, 3.15, 3.16, 3.17.
4.5.4 Test for aviation (JP-5 and F-76) fuel and gasoline (MOGAS and aviation gasoline) compatibility
(classes 5 and 6 only). The effect of coating systems on fuel degradation shall be measured by comparison of test
results obtained on fuel in contact with the coating system and the same age unexposed fuel.
4.5.4.1 Preparation for fuel samples for test.
a.

Apply coating systems to four steel rods, 19 by 190 mm ( by 7 inches), drilled, threaded, and fitted
with a 3- by 19 mm ( by inch) all-thread bolt for suspension. Allow 7 days drying time at ambient
laboratory temperature after application of last coat before immersion in fuel.

b.

Prepare approximately 5 L each of particle-free aviation gas and JP-5 fuel by repeated filtration
through a Type AA millipore filter as specified in Appendix X of ASTM Standard on Petroleum
Products and Lubricants, using 100/130 aviation gas in accordance with ASTM D910, or commercial
100LL aviation gasoline, and JP-5 fuel in accordance with MIL-DTL-5624.

c.

Wash coated test rods thoroughly with hot water at 82 6 qC (180 10 qF) for 15 to 30 minutes, drain,
and dry. Mount test rod on a 6- by 180-mm (- by 7-inch) square plastic beaker cover (for 4-L
beaker), center drilled for mounting test rod.

d.

Into four clean 2-L beakers, pour 1000 to 2000-mL of particle-free aviation gasoline. Into four clean 2L beakers, pour 1000 to 2000-mL of particle-free JP-5 fuel. Cover two beakers of each fuel with rodmounted cover (for exposed fuel samples). Cover two beakers of each fuel with 6 by 180 mm (by 7
inches) square plastic beaker covers, plain (for unexposed fuel samples). Store all beakers with fuel in

21

MIL-PRF-23236C

dark and maintain at 27 6 qC (80 10 qF) for 30 days. Swirl fuel by rotating beakers at least three
times daily.
e.

On the 31st exposure day, test exposed and unexposed aviation and JP-5 fuel for color, corrosion,
existent gum, and solids. Test exposed and unexposed aviation gas for bromine as specified in the
following test procedures.

4.5.4.2 Fuel color (class 5 and 6 only). Color for JP-5 fuel shall be determined in accordance with ASTM
D156. Record difference between exposed and unexposed fuels. Colors of exposed and unexposed aviation gas
shall be compared visually. Record differences as pass or fail. Fuel color shall be as specified in 3.13.1.
4.5.4.3 Corrosion (class 5 and 6 only). Corrosiveness of both exposed and unexposed fuels shall be
determined in accordance with ASTM D130. Corrosiveness shall be as specified in 3.13.2.
4.5.4.4 Existent gum (class 5 and 6 only). Existent gum (both washed and unwashed) shall be determined
in accordance with ASTM D381. Determine differences between exposed and unexposed fuels. Existent gum shall
be as specified in 3.13.3.
4.5.4.5 Solids (total sediment) (class 5 and 6 only). Solids shall be determined in accordance with ASTM
D910 and ASTM Specifications and Classifications for Petroleum and Lubricants. Solids shall be as specified in
3.13.4.
4.5.4.6 Bromine (class 5 and 6 only). Bromine shall be determined on both exposed and unexposed fuels in
accordance with the following procedure:
4.5.4.6.1 Apparatus.
4.5.4.6.1.1 Decomposition. The apparatus used for decomposition of bromides by sodium in liquid
ammonia shall be as shown on figure 1. The center neck of the 250-mL, 2-neck, round bottom flask carries a
Teflon-sealed, corrosion resistant, steel stirring assembly. The side neck shall be fitted with a 2-hole rubber
stopper through which pass an ammonia delivery tube and a vent protected by a drying tube containing Drierite or
equal. After charging of the flask with liquid ammonia, the pictured rubber stopper shall be replaced with a 1-hole
stopper fitted with a vent tube, also protected by a drying tube.
4.5.4.6.1.2 Titration. The apparatus used for following the titration of bromide shall be a continuous
indicating hydrogen ion concentration (pH) meter such as the Beckman Model H-2 or equal, equipped with a glass
electrode and a silver electrode [see note 1 of 4.5.6.6.3(c)]. A titration set-up shall be used, such as shown on figure
2 which shall accurately deliver slip-drop quantities of silver nitrate.
4.5.4.6.2 Materials and reagents. The following materials and reagents will be required:
a.

Dry ice and acetone for cooling.

b.

Drierite or equal.

c.

Ammonia.

d.

Sodium.

e.

Alcohol.

f.

Sodium hydroxide pellets.

g.

Ammonium persulfate.

22

MIL-PRF-23236C

h.

Sodium arsenite, 10 percent.

i.

Nitric acid (HNO3) approximately 20 percent.

j.

Silver nitrate (AgNO3), 0.05N.

4.5.4.6.3 Procedure for the analyses of gasolines. The procedure for the analyses of decomposition of
bromides shall be as follows:
a.

Cool the flask with a dry-ice, acetone slurry and introduce about 15 grams of ammonia (see note 2).
Replace the rubber stopper carrying the delivery tube by the one fitted only with a protected vent and
add a cube of freshly cut sodium having an edge dimension of about 5 mm (-inch). Rotate the stirrer
slowly by hand to partially dissolve the metal. Add exactly 50-mL of the gasoline under test (see notes
3 and 4), remove the cooling bath, and start the stirrer. As soon as the ammonia starts to evolve,
disconnect the drying tube from the vent (see note 5). Continue the stirring until the ammonia has
evaporated (about 20 minutes for a 15-gram charge). If the characteristic blue color of sodium in
liquid ammonia should disappear during the earlier stages of the evaporation, add another piece of
sodium.

b.

Upon evaporation of the ammonia, add 5-mL of alcohol to the mixture to decompose the excess
sodium. Next, add 30-mL of water and stir to aid extraction of inorganic salts. Remove the reaction
flask from the stirrer, washing down the stirrer with water, and transfer the contents to a separatory
funnel. Separate the aqueous layer and extract the organic layer with two additional 30-mL portions of
water. Combine the three aqueous extracts, evaporate to about 50-mL, and cool slightly. If, at this
point, the mixture is not clear and contains a precipitate, filter and wash the paper several times with
small portions of hot water. Evaporate the combined filtrate and washings to about 50-mL and cool
slightly. Add 2 grams of sodium hydroxide pellets followed by 2 grams of ammonium persulfate.
After the solids have dissolved, boil the solution for about 15 minutes (see notes 6 and 7). Cool the
solution slightly, add 10-mL of a 10 percent solution of sodium arsenite, boil for 10 minutes, and then
cool to room temperature. Make the solution acid to phenolphthalein by adding HNO3 (20 percent)
and determine the bromides as given below (see note 8).

c.

Immerse the titration electrodes into the solution, start the stirrer, and set the pH meter to read on the
acid scale. If the pH meter shows an apparent pH reading of greater than 1.5, add more HNO3, until a
reading of 0 to 1.5 is obtained. Next, titrate the bromides with 0.05N AgN03, making a record of
apparent pH versus mL AgN03 added. From a plot of the record of the data, determine the appropriate
inflection points, and calculate the quantities of bromine by the formulas given below.
g Br = 0.003996B
or
g Br/gal at 15.6 C (60 F)

=0.3025B[1 + 0.00065(tF - 60)]


=0.3025B[1 + 0.00065(l.8 tC - 281)]

where:
B = mL 0.05N AgN03 required to titrate bromide, and
tF = temperature (F) of gasoline when sampled
tC = temperature (C) of gasoline when sampled
Bromine shall be as specified in 3.13.5.

23

MIL-PRF-23236C

NOTES:
1. A heavy-gauge silver wire attached directly to the calomel jack of the pH meter may be used. The
portion that dips into the liquid should be cleaned by rubbing lightly with fine emery paper and rinsing with ASTM
D1193 (any type) distilled water.
2. It is convenient to use a lecture bottle as the source of ammonia. From such a container, gaseous
ammonia may be introduced into the flask with virtually complete condensation at rates up to 2 grams per minute.
The quantity of ammonia being added can be followed by periodic weighing of the lecture bottle. Steps involving
the charging and evaporation of ammonia should be carried out in a hood.
3. In general, it may be advisable to pre-cool the sample by placing it in a flask surrounded by dry ice
before introducing it into the sodium, liquid ammonia mixture. In such cases, care should be taken to protect the
sample from moisture and from dissolving carbon dioxide. After adding a pre-cooled sample to the reaction
mixture, the cooling vessel may be rinsed with about 10-mL of isooctane (at room temperature) and this rinsing may
be added directly to the reaction mixture.
4. By using a slightly larger amount of ammonia (about 20 grams), it has been found that pre-cooling is not
necessary. Under these conditions, a 50-mL, sample of gasoline (at room temperature) may be added directly into
the reaction mixture without causing excessive boiling of the ammonia, provided the addition is as slow as from a
pipette.
5. If indicating Drierite or equal is used, evolution of ammonia is evidenced by a color change.
6. During this period, it is important that the solution remain alkaline. Since sulfuric acid is one of the
decomposition products of ammonium persulfate, the solution should be checked occasionally to assure alkalinity.
This may be done by using litmus paper as an external indicator or methyl orange as an internal indicator, in the
majority of cases, the 2 grams of sodium hydroxide specified will be entirely sufficient; however, should it be found
that the solution is becoming acid, more sodium hydroxide should be used.
7. In some cases, a reddish solid or a dark solution may form during the oxidation step. Such behavior will
not affect the analyses.
8. At this point, the solution may contain a precipitate. This is of no consequence and usually will
redissolve on further acidification in the next step.
4.5.5 Volatile organic content (VOC). VOC for all types, classes, and grades, shall be determined in
accordance with USEPA 40 CFR ch.1, part 60, appendix A, method 24. Solvent content shall be as specified in
3.2.2.2.
4.5.6 HAP content of coatings. Hazardous solvent content of each individual coating shall be determined
in accordance with ASTM D3272 and ASTM E260. Solvent fractions shall be identified in accordance with ASTM
E1252 with the results recorded as percent weight of the total paint. Alternate methods of analysis must be reviewed
and approved by NAVSEA. Formulation data may be used by manufacturers in lieu of testing to demonstrate
compliance with hazardous air pollutant requirements of this specification. The manufacturer's formulation data
must have a consistent and quantitatively known relationship to the testing required. Calculation of individual HAP
contents can be based on either manufacturer evaluation of batches or supplier data for raw materials used in the
product. HAP content shall be specified in 3.2.2.3.

24

MIL-PRF-23236C

4.5.7 Brushing and rolling properties (Not applicable to Types VIII and VIIIa). Coatings shall be prepared
in accordance with manufacturer's directions. Coatings shall be applied without further reduction in accordance
with method 4321.2 of FED-STD-l41 for brushing and ASTM D5150 for rolling. For routine testing, ambient
conditions above 21 C (70 F) and 50 percent relative humidity shall be satisfactory. For referee tests, 21 3 C
(70 5 F) and 50 5 percent relative humidity shall prevail. For reduced temperature coating systems,
brushability and rolling properties shall be performed with mixed coating, components and equipment equilibrated
at the lower end of the temperature range. The actual brushing can be performed at ambient laboratory conditions so
long as the paint and equipment are at the low range application temperature. Brushing and rolling properties shall
be as specified in 3.8.
4.5.8 Spraying properties. The coating shall be prepared in accordance with the manufacturer's directions.
Without further reduction, spray a coating on an abrasive blasted steel panel to the recommended wet film thickness.
For routine testing, ambient conditions above 21 C (70 F) and 50 percent relative humidity shall be satisfactory.
For referee tests, 21 3 C (70 5 F) and 50 5 percent relative humidity shall prevail. For reduced temperature
coating systems, sprayability shall be performed with mixed coating, components and equipment equilibrated at the
lower end of the temperature range. The actual spraying can be performed at ambient laboratory conditions so long
as the paint and all equipment are at the low range application temperature. The equilibration requirement for mixed
paint does not apply to spraying using spray equipment that mixes the components at the gun, either internally or
externally, however, coating components and all equipment shall be at the low range application temperature.
Observe for spraying properties in accordance with method 4331.2 of FED-STD-141. Spraying properties shall be as
specified in 3.8. Type VIII and VIIIa powder coating shall be applied in accordance with manufacturers
instructions to meet 3.8.
4.5.9 Edge coverage retention (Applicable to topcoat only of Type VII all classes and grades). Panel
preparation, paint application and percent of dry film thickness retained on an edge shall be as described in
Appendix A of this specification. Scaled photomicrographs of each edge shall be taken. This test procedure will be
conducted at government expense at the Naval Research Laboratory, Key West, Florida. Coating shall meet 3.8.1.
4.5.10 Hazardous pigments and additives. Soluble and total metal content, except tantalum and tungsten,
shall be determined on pulverized dry paint film of the coating system in accordance with 40 CFR Part 261,
Appendix II and the appropriate test listed below. Test sample shall consist of particle sieved through a U. S. sieve
no. 50. Asbestos shall be analyzed in accordance with OSHA Validated Analytical Method ID-191, Polarization
Light Microscopy of Asbestos with the coating sample treated as a bulk settled dust and test result reported as % by
weight of the cured coating. Crystalline silica (respirable) shall be analyzed in accordance with NIOSH Analytical
Method 7500 with the coating sample treated as a bulk settled dust. Soluble metal content shall be reported as
milligrams per liter (mg/L). Total metal content shall be reported as %WT of the cured coating The test results for
each metal shall be in conformance with the appropriate requirements of 3.2.3.1, 3.2.3.2. Tantalum and tungsten
soluble metal content and total metal content shall be analyzed as specified in 4.5.10.1. Formulation data may be
used by manufacturers in lieu testing required under this paragraph to demonstrate compliance with hazardous metal
content requirements of this specification. The manufacturer's formulation data must have a consistent and
quantitatively known relationship to the testing required. Calculation of individual hazardous metal contents can be
based on either manufacturer testing of batches or supplier data for raw materials used in the product. The coating
manufacturer must provide for each individual hazardous metal a formulation value that will not be exceeded if a
sample from any quality control approved production batch of the coating is tested in accordance with this
paragraph. Type VIIIa may have a high zinc content due to the presence of sacrificial zinc.

25

MIL-PRF-23236C

TABLE VI. Test methods for evaluating solid waste - physical/chemical methods, SW-846.
Metal/material

Digestion test method

All metals, except


Chromium (VI)

3050

Chromium (VI)

3060

Antimony

7040 or 7041

Arsenic

7060 or 7061

Barium

7080 or 7081

Cadmium

7131

Total chromium

7190

Chromium (VI)

7195, 7196 or 7197

Lead

7421

Mercury

7470 or 7471

Nickel

7520 or 7521

Selenium

7740 or 7741

Silver

7760 or 7761

TABLE VII. Methods for chemical analysis of water and waste, EPA-600/4-020, USEPA, 1979.
Metal/material

Test method

Beryllium

210.1 or 210.2

Cobalt

219.1 or 219.2

Copper

220.1 or 220.2

Fluoride

340.1, 340.2 or 340.3

Molybdenum

246.1 or 246.2

Thallium

279.1 or 279.2

Vanadium

286.1 or 286.2

Zinc

289.1 or 289.2

4.5.10.1 Tantalum and tungsten content. The tantalum and tungsten content of the cured film shall be
determined using any appropriate spectroscopy test method. Conduct the tests in accordance with the instrument
manufacturer's directions for the use of the instrument. Manufacturer is responsible for establishing data supporting
the test method choice and analytical accuracy. The test results for tantalum or tungsten shall be in conformance
with the requirements of 3.2.3.1 and 3.2.3.2.
4.5.11 Potable water tests (classes 9 and 10).
a.

Test sample preparation.


(1)

Using an adjustable gap clearance film applicator (doctor blade), draw down a 305 mm (12
inch) wide by 408 mm (16 inch) long wet film of the first coat (primer) of the coating system on
a flat thick polyethylene sheet (at least inch). The coating shall be prepared (mixed) in
accordance with manufacturers instructions and the wet film thickness shall be the same as the
manufacturers recommended wet film thickness. Air dry this draw-down for 24 hours at 20 qC
to 27 qC (68 qF to 81 qF).

26

MIL-PRF-23236C

b.

(2)

After the air dry of the first coat has been accomplished, using an adjustable gap clearance film
applicator (doctor blade), draw down a 305-mm (12-inch) wide by 408 mm (16-inch) long
wet film of the second coat (intermediate or topcoat, as applicable) of the coating system
perpendicular to and across the dry first coat. The coating shall be prepared (mixed) in
accordance with manufacturers instructions and the wet film thickness shall be the same as the
manufacturers recommended wet film thickness. Air dry this draw-down for 24 hours at 20 qC
to 27 qC (68 qF to 81 qF).

(3)

Repeat the procedure in (2) above for each additional coating in the coating system.

(4)

Allow the completed test sample to cure for 7 days at 20 qC to 27 qC (68 qF to 81 qF) after the
application of the final coating.

Bell jar preparation. Attach a bell jar of 500-mL capacity to the coated surface prepared in (a) above
with molten paraffin wax. The bell jar shall be fitted with a tightly fitted stopper to prevent loss of
volatile halogen reactants during testing.

4.5.11.1 Color in water (classes 9 and 10). Prepare for test as specified in 4.5.10. Fill the bell jar with 200
parts per million (p/m) chlorinated ASTM D1193 (any type) distilled water and age for 24 hours. Remove the
chlorinated water by suction and rinse the bell jar twice with ASTM D1193 (any type) distilled water. Discard the
200 p/m and rinse waters. Prepare a solution of 0.2 p/m chlorinated ASTM D1193 (any type) distilled water and
determine the exact chlorine concentration using the DPD colorimetric method of APHA method 4500-Cl F. Refill
the bell jar with determined 0.2 p/m chlorinated distilled water solution. Age the 0.2 p/m chlorinated water solution
for 24 hours in the bell jar at 20 qC to 27 qC (68 qF to 81 qF). Also retain and age the 200-mL of the 0.2 p/m
chlorinated water solution (control) in a clean, sealed glass container at 20 qC to 27 C (68 qF to 81 qF). Withdraw
100-mL of water from both the bell jar and the control, determine the color of the water in the bell jar and the
retained control water using APHA method 2120 B. Correct the bell jar color value for any change in the control
color by subtracting the color change value of the control from the color change value of the bell jar water. Color
value shall be in accordance with the requirements of 3.4.2.
4.5.11.2 Taste in water (classes 9 and 10). To assure taster safety, the taste test shall be performed only
after a coating system has been found to comply with all other requirements of this specification. The remaining
chlorinated water in the bell jar in 4.5.10.1 shall be used for the taste in water test specified in APHA method 2150
B. The remaining water shall be withdrawn from the bell jar by suction and placed in a clean gall container and
tightly sealed. The sealed container of chlorinated water shall be equilibrated to 40 qC (104 qF) in a water bath.
Threshold taste values shall be in accordance with the requirements of 3.4.3.
4.5.11.3 Odor in water (classes 9 and 10). After the chlorinated water has been removed from the bell jar
(4.5.10.1) for the taste in water test (4.6.2), rinse the bell jar twice with ASTM D1193 (any type) distilled water.
Prepare a solution of 0.2 p/m chlorinated distilled water and determine the exact chlorine concentration using the
DPD colorimetric method of APHA method 4500-Cl F. Refill the bell jar with determined 0.2 p/m chlorinated
distilled water solution. Age the 0.2 p/m chlorinated water solution for 24 hours in the bell jar at 20 qC to 27 qC (68
qF to 81 qF). Conduct the odor in water test in accordance with APHA method 2160 B. The water bath temperature
for this test shall be equilibrated to 40 C (104 F). Threshold odor values shall be in accordance with the
requirements of 3.4.4.
4.5.11.4 Chlorine residual (classes 9 and 10). Prepare for test as specified in 4.5.10. Fill the bell jar with
200 p/m chlorinated ASTM D1193 (any type) distilled water and age for 24 hours. Remove the chlorinated water by
suction and rinse the bell jar twice with ASTM D1193 (any type) distilled water. Discard the 200 p/m and rinse
waters. Prepare a solution of 10 p/m chlorinated ASTM D1193 (any type) distilled water and determine the exact
chlorine concentration using the DPD colorimetric method of APHA method 4500-Cl F. Refill the bell jar with
determined 10 p/m chlorinated distilled water solution. Age the 10 p/m chlorinated water solution for 24 hours in the
bell jar at 20 qC to 27 C (68 F to 81 F). Also retain and age the 200-mL of the 10 p/m chlorinated water solution
(control) in a clean, sealed glass container at 20 qC to 27 C (68 F to 81 F). Determine the exact chlorine
concentration of the water in the bell jar and the retained control water using the DPD colorimetric method of APHA

27

MIL-PRF-23236C

method 5330 D. Correct the bell jar chlorine value for any loss in the control by subtracting the loss in chlorine p/m
of the control from the loss of chlorine content in the bell jar water. Chlorine residual value shall be in accordance
with the requirements of 3.4.5.
4.5.11.5 Phenol leaching (classes 9 and 10). After 4.12.1 through 4.12.4 testing is completed remove
coating from the polyethylene surface. (Note: alternate method if coating cannot be removed from polyethylene
surface, cast free films of each coating of the coating system. Cure at ambient laboratory conditions for 7 days.)
Pulverize the coating film sample. (Note: If using alternate method, use equal weights of each coating of the coating
system.) Sieve pulverized particles through a U. S. sieve no. 50. A 1-gram (nominal) sample of the sieved material
shall be placed on a paper thimble and lowered into a Soxhlet extractor. The 500 ml flask in this assembly shall be
filled with 300 ml of ASTM D1193 (any type) distilled water and several boiling chips. The sample shall be
refluxed until a least four complete siphonings of the sample chamber has occurred (several hours). Pour off the
liquid into a tightly sealed, clean glass flask for phenolic concentration testing. Determine phenolic compound
concentration as specified in APHA method 5330 C or D. Phenolic compound concentration for each coating of the
coating system shall be as specified in the requirements of 3.4.6.
4.5.12 Resistance to hot water - simulated boiler feedwater (all types, classes 11 and 12 only, and all
grades). Class 11 and Class 12 panels shall be prepared in accordance with 4.5.2. Test panels shall be immersed to
150 mm (6 inches) of the 300 mm (12 inch length in 82 qC (180 F) distilled water in a beaker for 500 hours or to
prior failure. The panel shall be removed, immediately examined. The extent, nature, and time of failure shall be
reported in accordance with the requirements of 3.15.
4.5.13 Resistance to chemical solutions - simulated collection, holding and transfer tanks (CHT; sewage
waste) (all types, classes 13 and 14 only, all grades). Paint system test panels shall be prepared as specified in 4.5.2.
Test panels shall be tested to the following cycle:
a.

Immerse test panels in a solution consisting of Acetic acid in ASTM D1141 substitute or natural ocean
water (solution I) adjusted to a pH of 3.8 to 4.0 for 14 days at a temperature of 21 2.7 C (70 5 F).

b.

Remove from solution I and immerse panels in a solution consisting of 10 parts concentrated
ammonium hydroxide in 90 parts ASTM D1141 substitute or natural ocean water (solution II) for 14
days at a temperature of 21 2.7 C (70 5 F).

c.

Remove from solution II and immerse panels in a solution consisting of 7 parts concentrated sulfuric
acid in 93 parts ASTM D1141 substitute or natural ocean water (solution III) for 14 days at a
temperature of 21 2.7 C (70 5 F).

d.

Remove from solution III and immerse panels in a solution consisting of 10 parts Urea in 90 parts
ASTM D1141 substitute or natural ocean water (solution IV) for 14 days at a temperature of 21 2.7
C (70 5 F).

e.

Remove from solution IV and immerse panels in 2 parts detergent (commercial solid dishwasher
detergent) and 98 parts ASTM D1141 substitute or natural ocean water (solution V) for 14 days at a
temperature of 21 2.7 C (70 5 F).

Operations (a) to (e) constitute one complete test cycle (70 days). This cycle is repeated for a total test time
of 140 days (20 weeks) and coating deterioration reported after each complete cycle. Care shall be taken not to
contaminate solutions with carry over of solution between immersions. Panels may be rinsed if desired. Solutions
shall be tested, refreshed or replaced as necessary to maintain solution composition. Coating system shall be
evaluated for pinhole corrosion, ASTM D4541, Type II tester, adhesion of the original surfaces, ASTM D4541,
Type II tester, adhesion of both original and recoated surfaces, blistering and surface imperfections larger than 1.5
mm (116-inch) in diameter. Coating systems shall be evaluated for edge rusting. Coating performance shall be as
specified in 3.16. (See also 6.1.1.4)

28

MIL-PRF-23236C

4.5.14 Resistance to condensing water - simulated tank top test (all types, classes, grades). Panels shall be
prepared as specified in 4.5.2. Expose test panels in a condensing cabinet as specified in ASTM D4585 for 2000
hours at 38 C (100 F). Coating system shall be evaluated for pinhole corrosion, ASTM D4551 adhesion of the
original surfaces, ASTM D4541, Type II tester, adhesion of both original and recoated surfaces, blistering and
surface imperfections larger than 1.5 mm (116-inch) in diameter. Coating systems shall be evaluated for edge rusting.
Test results shall be as specified in 3.17.
4.5.15 Ultraviolet fluorescence (Applicable to primers of all types all classes, all grades). Mix primer in
accordance with the manufacturers data sheet. Apply primer to any convenient substrate. Cure hard. In a darkened
room, use a Spectroline BIB-150B Black Light Lamp (KTA-TATOR, Inc.) or equivalent 365 nanometer ultraviolet
black light, to illuminate the primer. Determine if primer fluoresces uniformly and is sufficiently bright to easily
ascertain presence of primer on all coated portions of substrate. Result shall be in accordance with the requirements
of 3.18.
4.5.16 Cathodic protection (CP) compatibility. Two steel panels shall be prepared as specified in 4.5.2 and
electrically connected to a commercial magnesium anode conforming to paragraph 5.1.2 of ASTM G8 and shall
have a -inch (nominal) hole drilled through the coating to the metal at the center of the test panel. The electrical
resistance between a point on the surface of the anode and the metal in the drilled hole of the test panel shall be less
than 0.01 ohm, when checked with an ohm meter. Connecting points on the test panel shall be coated with an epoxy
compound for insulation. The test panel shall be installed in a modified ASTM G8 test in such a manner as to
separate the test panel from the magnesium anode by two feet (nominal) for a period of 3 months. At the
completion of the 6-month test, inspect each test panel for peeling, flaking, blistering, dissolving or other failure.
Lifting, peeling or undercutting around the drilled hole shall be measured. Test results shall be in accordance with
the requirements of 3.5.
4.5.17 Surface tolerant coating systems (not applicable to Type VIII or Type VIIIa). Establish a uniform
rusted condition over the entire surface of six steel panels (150 by 300 by 3mm (6 by 12 by -inch) by exposure for
300 hours in an ASTM B117 test apparatus. Surface preparation and paint application shall be as follows;
a.

The first pair of panels shall be painted with the coating system applied to one panel in the clean, dry,
SP 15 condition and one panel in the SP 15 condition, but covered with a uniform film of oil similar to
10W40 motor oil. The film of oil shall be established by wiping an oil soaked rag over the panel until
a uniform film is established. There shall be no "pooling" of oil on the surface. Paint the oily panel in
accordance with the manufacturer's instructions and cure in accordance with the manufacturer's
instructions, but for a minimum of seven days. Immerse both panels for 10 cycles, or to prior failure,
in the desired test medium. At the end of the 10 cycles, remove from the desired test medium, dry for
48 hours and determine compliance with 3.19. Test for adhesion by method ASTM D4541, Type II
tester.

b.

The second pair of panels shall be painted with the coating system applied to one panel in the clean,
dry, SP 15 condition and one panel in the SP 15 condition, but covered with a uniform film of water.
The film of water shall be established by wiping a sea water soaked rag over the panel until a uniform
film is established. There shall be no "pooling" of water on the surface. Paint the wet panel in
accordance with the manufacturer's instructions and cure in accordance with the manufacturer's
instructions, but for a minimum of seven days. Immerse both panels for 10 cycles, or to prior failure,
in the desired test media. At the end of the 10 cycles, remove from the desired test medium, dry for 48
hours and determine compliance with 3.19. Test for adhesion by method ASTM D4541, Type II tester.

c.

The third pair of panels shall be painted with the coating system applied to one clean, dry panel
prepared in accordance with SP-2, Paragraph 5.3 and one panel prepared in accordance with SP-2,
Paragraph 5.3 but do the surface preparation of the second panel underwater (sea water). Paint the
first panel in the dry condition and paint the second panel underwater in accordance with the
manufacturer's instructions and cure the second panel underwater in accordance with the
manufacturer's instructions. Immerse both panels in sea water for six months, remove the panels, dry

29

MIL-PRF-23236C

for 48 hours and determine compliance with 3.19. Test for adhesion by method ASTM D4541, Type II
tester.
4.5.18 Wear resistant coating systems. Determine the wear resistance of the coating after 1000 cycles
when tested in accordance with ASTM D4060. Coating shall comply with 3.20.
4.5.19 Bilge coating systems. Bilge coating systems shall be tested in accordance with the following test
sequence:
a.

Paint and cure two steel test panels (150 by 300 by 3mm (6 by 12 by -inch) with Navy Formula 150
(Type IV) and one coat of Navy Formula 156 (Type IV). Observe the dry through times of MIL-DTL24441. Scribe one panel to the metal substrate with a X and expose both panels for 300 hours in an
ASTM B117 test apparatus.

b. For one panel, remove all previously applied coatings (and corrosion products) at the X scribe
mark by power tool cleaning to bare metal to achieve a SSPC SP-11 surface and feather the interface
edges between the bare metal and intact paint. Create an area of at least 12 square inches. This is
intended to simulate repair of a damaged area in a bilge coating.
c.

For the remaining panel, clean, degrease, remove any rust spots, lightly abrade with 100 grit sandpaper
to break any remaining gloss and finally solvent clean the panel. Again, create a test area of at least 12
square inches.

d. Apply to the prepared areas of the test panels the proposed bilge coating in the number of coats and
with the procedure recommended by the coating manufacturer.
e.

Reimmerse the two panel thus prepared into the desired test medium for twelve test cycles or until
prior failure.

f.

Following the twelve test cycles, remove the two panels from the immersion test and examine for
compliance with 3.21. Bilge coating systems exhibiting delamination, blisters larger than 1.5 mm, rust
breakthrough or any other coating failure compromising the substrate shall be considered a failure.

4.5.20 Single coat systems. Class 18, single coat systems, shall be tested to the requirements of Classes 5,
7, 9, 11, 13, 15, and 17 as requested in the manufacturer's application for qualification testing. The difference shall
be in panel preparation. Class 18 coatings shall be applied in a single coat in accordance with the manufacturer's
instructions.
4.5.21 Well deck overhead coating systems. The evaluation procedure for well deck overhead coating
systems shall consist of the following steps:
a.

Two panels prepared as specified in 4.5.2 shall be coated with the well deck overhead coating system
and cured for 30 days at an outdoor exposure site where the minimum ambient daytime temperature is
70 F and minimum relative humidity is 50 percent.

b.

Each panel shall be exposed to a burn test where the panel is mounted at a 45-degree angle and a
butane torch (or equal) heats the panel backside, which is uncoated. Temperature is measured on the
bare uncoated backside (at the flame contact point) and on the front in the same general area as the
flame contact on the back. The temperature at which the coating ignites is recorded. At that time the
torch is removed and the coating is allowed to burn out. The time and temperature when the coating
self extinguishes is recorded.

30

MIL-PRF-23236C

c.

The heating sequence shall be for two hours at each of the temperatures in 50 degree Fahrenheit
increments from 150 F to 500 F inclusive.

d.

Adhesion values in pounds per square inch shall be determined and recorded before and after the heat
resistance test.

e.

Check for compliance with 3.24.

4.6 Toxicity. The contractor shall have the formulations and associated toxicological information available
for review by the Navy Environmental Health Center (NEHC) as directed by the qualifying activity.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in the contract or
order (see 6.2). When actual packaging of materiel is to be performed by DoD personnel, these personnel need to
contact the responsible packaging activity to ascertain requisite packaging requirements. Packaging requirements
are maintained by the Inventory Control Points packaging activity within the Military Department or Defense
Agency, or within the Military Departments System Command. Packaging data retrieval is available from the
managing Military Departments or Defense Agencys automated packaging files, CD-ROM products, or by
contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is not
mandatory.)
6.1 Intended use. Although the different types of coating systems of this specification afford superior
protection for various shipboard tanks and similar ship applications, the coating systems are not necessarily
interchangeable or of equal merit for all kinds of tanks and conditions of application. Classes 6, 8, 10, 12 and 14 are
qualified systems, the first coat of which is a shop primer (see 6.6.5). All other classes are qualified without a shop
primer. Class 15 coatings are not intended for new construction, but for limited touch-up only where localized
repairs will be no more than 3 percent of the total surface area. Classes 16, 17 and 18 are for use as appropriate in
either new construction or maintenance painting. Types VIII and VIIIa are powder coatings intended for use in
severe marine service such as immersion and wet space application.
6.1.1 Coating selection.
6.1.1.1 Types IV, V, VI and VII, VIII and VIIIa. Type IV, V, VI and VII organic coatings are acceptable
for use where environmental regulations limit VOC of organic coatings to a maximum of 340 grams of solvent per
liter of coating. Types VI and VII have VOCs of less than 340 g/L. Inorganic zinc rich shop primers conform to
environmental regulations limiting VOC to a maximum of 650 g/L. Types V, VI,VII, and VIII dried coating
residues are non-hazardous waste under U. S. Environmental Protection Agency (USEPA) regulations in effect on
the date of this specification. All types contain less lead, chromium, cadmium, asbestos and other hazardous
ingredients than OSHA regulations allow or restrict in effect on the date of this specification.
6.1.1.2 Proprietary products. Depending on local application conditions, the acquisition guidance in 6.2
may also apply to selection of specific proprietary products within each type, class, and grade.
6.1.1.3 Shop primers. Shop primers (see 6.6.5) qualified with classes 6, 8, 10, 12, and 14 systems are not
tested for weld through capability. The user of Classes 6, 8, 10, 12, and 14 systems in Navy ship construction or
repair contracts should qualify all welding processes at the maximum manufacturers recommended coating
thickness where such coatings are used to NAVSEA Technical Publication S9074-AQ-GIB-010/248, Requirements
for Welding and Brazing Procedure and Performance Qualification. All modifications in coating formulations used
as weld through pre-construction primers require re-qualification to NAVSEA Technical Publication S9074-AQGIB-010/248.

31

MIL-PRF-23236C

6.1.1.4 Alternate test for resistance to chemical solutions. In addition to the test procedure of 4.5.13,
coating systems proposed for qualification to Classes 13 and 14 of this specification will be tested to the following
protocol:
a. through e. As currently specified
f. Fourteen-day immersion in 10% fatty acid, 90% seawater
g. Fourteen-day immersion in 50% fatty acid, 50% seawater
h. Fourteen-day immersion in 100% fatty acid
This alternate immersion resistance will not be required for qualification to this revision of this specification, but
may be required by subsequent amendments or revisions. Data generated by Navy testing to this alternate
requirement will be made available to manufacturers, for information purposes, who submit coating systems for
qualification to paragraph 3.16. This alternate testing will not affect current qualifications.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a.

Title, number, and date of this specification.

b.

Type, class and grade required (see 1.2).

c.

Issue of DoDISS to be cited in the solicitation, and if required, the specific issue of individual
documents referenced (see 2.2.1 and 2.3).

d.

Toxicity requirements (see 3.11 and 6.4).

e.

Packaging and labeling requirements (see 5.1 and 6.7). (Attention is directed to regulatory and safety
requirements for labels.)

6.2.1 Acquisition guidance. Coatings in accordance with this specification vary to some extent in surface
preparation required, and the effect of high humidity, slight surface moisture, and temperature during applications.
Requirements for specific products can be found in contractor's instructions. Many factors affect the total overall
cost per square foot per year for tank applications, possibly the least of which is the cost of the coating systems
which average about 10 percent of the total cost. The number of coats per coating system and square foot coverage
per liter, per gallon or per pound further complicate the equity of purchase solely on the basis of lowest cost per liter
or cost per gallon. Contracting officers should therefore should fully consider such factors.
6.3 Qualification. With respect to products requiring qualification, awards will be made only for products
which are, at the time of award of contract, qualified for inclusion in Qualified Products List QPL no. 23236
whether or not such products have actually been so listed by that date. The attention of the contractors is called to
these requirements, and manufacturers are urged to arrange to have the products that they propose to offer to the
Federal Government tested for qualification in order that they may be eligible to be awarded contracts or purchase
orders for the products covered by this specification. Information pertaining to qualification of products may be
obtained from Commander, Naval Sea Systems Command, ATTN: SEA 05Q, 1333 Isaac Hull Avenue, SE, Stop
5160, Washington Navy Yard DC 20376-5160.
6.4 Material safety data sheets. The contracting activity should be given a material safety data sheets
(MSDS) at the time of contract award. The MSDS should be provided in accordance with FED-STD-313 and ANSI
Z400.1. Contracting officers should identify those activities requiring copies of completed Material Safety Data
Sheets (MSDS) prepared as specified in FED-STD-313. Additional required government information is contained
in FED-STD-313. In order to obtain the MSDS, federal acquisition regulation (FAR) clause 52.223-3 must be in the
contract.
6.5 Comparability. The comparability of types and classes of MIL-P-23236(SHIPS), DOD-P23236A(SH), MIL-P-23236B(SH) and MIL-PRF-23236C is shown in Table VIII.

32

MIL-PRF-23236C

TABLE VIII. Comparability data.


MIL-P-23236(SH)

DOD-P-23236A(SH)

MIL-P-23236B(SH)

MIL-PRF-23236C

Type I

Coating

Deleted

Type II

Deleted

Deleted

Deleted

Type III

--

Deleted

Type IIIa

--

Deleted

Deleted

Type IIIb

--

Deleted

Deleted

Type IV

--

--

Type V

--

--

Type VI

--

--

Type VII

--

--

Class 1

Deleted

Class 2

Deleted

Deleted

Class 3

Deleted

Deleted

Deleted

Class 4

Deleted

Deleted

Deleted

Class 5

--

--

--

Class 6

--

--

--

Class 7

--

--

--

Class 8

--

--

--

Class 9

--

--

--

Class 10

--

--

--

Class 11

--

--

--

Class 12

--

--

--

Class 13

--

--

--

Class 14

--

--

--

Class 15

--

--

--

Class 16

--

--

--

Grade A

--

--

Grade B

--

--

--

Grade C

6.6 Definitions. Interpretation of the meaning of coating related terms in this specification are to be
consistent with the Coatings Encyclopedic Dictionary, Federation of Societies for Coating Technology, 492
Norristown Road, Blue Bell, PA 19422-2350. A limited number of definitions are given below.
6.6.1 Coating components (Except Type VIII and Type VIIIa). Coating components are individually
packaged components such as base component (part A) and converter component or hardener (part B).
6.6.2 Coating. A coating is the resin component (base) and converter mixed and ready for application.
6.6.3 Coat. A coat is a single application of the coating which may be composed of multiple passes by
application equipment.

33

MIL-PRF-23236C

6.6.4 Coating system. A coating system is the total number of coats as specified by the manufacturer at the
time of qualification testing and at the dry film thickness per coat as specified by the manufacturer at the time of
qualification testing.
6.6.5 Shop primer (Except Type VIII and Type VIIIa). A quick drying material applied as a thin film to a
metal surface after surface preparation (blast cleaning, etc.) to give protection before and during the fabrication
process. Shop primers are also as known as prefabrication primers, after blast primers, after pickling primers, and
preconstruction primers. In this specification, a shop primer is any coating having fast drying properties and
intended for equivalent use.
6.6.6 MOGAS. MOGAS is motor vehicle gasoline.
6.7 Packaging recommendations. Suggested packaging requirements are contained on Tables IX and X.
TABLE IX. Packaging.
Packaging

Recommended requirements for direct Government acquisitions

Containers (Except Type


VIII and Type VIIIa)

(1) The components should be specified to be furnished in cans appropriate to kit


requirements capable of holding 0.47 liters (L) (1-pint), 0.945L (1-quart), 3.78L (1gallon) and 18.9L (5 gallons). Kits should consist of two containers, one of which
should be large enough to contain all components for mixing purposes.
(2) Multiple friction plug containers should be in accordance with PPP-C-96, Type
V, Class 2. Interior coatings should be as specified therein. Exterior coatings,
including side seam stripping, should be as specified therein for plan B. Wire
handles as specified therein, should be provided for the 1-gallon container. Closure
of the properly filled and sealed cans should be as specified in the appendix thereto.
(3) All containers should comply with the requirements of the Uniform Freight
Classifications (UFC), the National Motor Freight Classification (NMFC), and the
applicable requirements of the Code of Federal Regulations 49CFR, Department of
Transportation (DOT).
(4) Unit of procurement: The paints covered by this specification should be
purchased by volume. The unit of procurement should be in multiples of 1 L or 1
U.S. liquid gallon at 15.5 C (60 F).
(1) Commercial packaging should be to ASTM D3951.
(2) All containers should comply with the requirements of the Uniform Freight
Classifications (UFC), the National Motor Freight Classification (NMFC), and the
applicable requirements of the Code of Federal Regulations 49CFR, Department of
Transportation (DOT).
Packing should be specified as follows:
(1) Overseas delivery packing. Intermediate containers of like size kits of paint
should be packed in close-fitting wood boxes conforming to PPP-B-601, overseas
type, or PPP-B-621, class 2. Box closure and strapping should be as specified in the
applicable box specification or the appendix thereto except that strapping should be
flat and the finish B.
(2) Domestic delivery (Level B) packing. Level B packing should be as for level A,
except that boxes should be domestic type or class and the strapping should be finish
A or B.
(3) Commercial packing. The paint, in the unit kit and intermediate containers
should, as applicable, be packed in multiples of like sizes in accordance with UFC,
NMFC and 49CFR requirements.

Commercial packaging
(Including Type VIII and
Type VIIIa)

Packing

Palletization

Intermediate containers should be palletized in accordance with MIL-STD-147. Only


one size unit or intermediate container should be placed on a pallet.

Packaging

Recommended requirements for direct Government acquisitions

34

MIL-PRF-23236C

TABLE IX. Packaging - Continued.


Packaging

Recommended requirements for direct Government acquisitions

Intermediate containers

Paints should be packaged in intermediate containers as kits. Intermediate containers


should be close-fitting corrugated fiberboard boxes in accordance with UFC, NMFC
and 49CFR requirements. Fiberboard used in the construction of interior (unit and
intermediate) and exterior containers, including interior packaging forms, should
conform to the PPP-F-320. PPP-F-320 classes should be domestic fire-retardant or
weather resistant fire-retardant (see 6.2).

Packing for acquisitions


involving direct delivery
to Navy ships or
installations

Treated lumber and plywood. All lumber and plywood, including laminated veneer
materials, used in shipping container and pallet construction, member, blocking,
bracing, and reinforcing must be fire-retardant treated material in accordance with
MIL-L-19140 as follows:
(a) General use, weather resistant:
MIL-L-19140, Type II, Category I.
(b) General use, non-weather resistant:
MIL-L-19140, Type I, Category I.

Unit kits

The paints covered by this specification should be packed and packaged as kits.

Material safety data


sheets (MSDS) and
product/procedure data
sheets

A copy of the MSDS and company product data/procedure sheets should be attached
to the shipping document for each destination (see 6.4).

VOC Certification sheets

VOC Certification sheets will be provided by the manufacturer for each batch of
combined Parts A & B for each coat of the coating system when requested by the
procuring activity.
TABLE X. Marking.

Marking type

Recommended Marking

Bar codes

Marking should include bar codes

Hazardous warnings

(a) Labels should be in accordance with 29 CFR Parts 1910, 1915, 1917, 1918, 1926
and 1928, as well as PPP-P-1892.
(b) All individual containers should have the following marking:
"CAUTION: This paint contains volatile solvents, with probable hazardous vapors.
Use with adequate ventilation. Avoid prolonged breathing of vapors or spray mists. The
solvents are highly flammable, avoid open flame and smoking."
(c) Each component container, shipping container, and palletized load should be
marked with the appropriate hazardous symbol.
(d) Unit containers should be marked: "This product is Asbestos, Lead, Chromium,
Cadmium free, except for possible trace levels." Types V, VI and VII should also be
marked: "This product is free of volatile organic hazardous air pollutants
(VOHAPS/HAPS), except for possible trace levels."

Volatile organic content


(VOC)

"Contains (insert VOC content) grams per liter (insert VOC content in lb/gal) of volatile
organic content per 40 CFR 60, Appendix A (EPA) Method 24. Maximum thinning
allowed is (insert number in g/L, lb/gal and volume/gal [if appropriate]."

Hazardous air pollutants

"Contains [insert HAP content here in g/L and lb/gal] solids (nonvolatiles) per 40 CFR
63."

Shelf life

Each unit container, intermediate container where applicable, and shipping container
should be marked as follows: "Date of first re-inspection (insert here date 2 years after
date of manufacture)."

35

MIL-PRF-23236C

6.8 Part or identifying number (PIN).


M

23236

Prefix for Military


Specification

Specification
Number

Type (see code


below)

Class (see
code below)

Grade (see
code below)

PIN Code:
Type Code

Class Code

Grade Code

Type

Code

Class

Code

Grade

Code

IV

VI

VII

VIII

VIIIa

10

11

12

13

14

10

Example:

15a

11

15b

12

15c

13

16

14

17

15

18

16

M23236-A2B

36

MIL-PRF-23236C

6.9 Subject term (key word) listing.


Asbestos
Ballast
Boilerwater
Coating
Fuel
HAP
Hazardous air pollutants
Lead free
Paint
Potable
Powder coating
Seawater
Sewage
Ship
Tank
Volatile organic content
VOHAP
6.10 Changes from previous issue. Marginal notations are not used in this revision to identify changes with
respect to the previous issue due to the extent of the changes.

37

MIL-PRF-23236C

FIGURE 1. Apparatus for the decomposition of organic halides.

FIGURE 2. Potentiometric titration assembly.

38

MIL-PRF-23236C

FIGURE 3. Structural angle milling and painting.

FIGURE 4. Paint film thickness measurement.

39

MIL-PRF-23236C
Appendix A
EDGE RETENTION TEST
A.1 Scope. This appendix is intended to provide the test method procedure referenced in paragraph 4.5.9
of this specification for compliance with paragraph 3.8.1 of this specification. This Appendix is a mandatory part of
the specification. The information contained herein is intended for compliance.
A.2 Specimen preparation. The edge retention specimen should use an Aluminum Alloy 6061 structural
angle (90-degree) section approximately 6 inches long. Preparation of the specimen for test will require three basic
steps: sample machining to meet initial dimension requirements, grit blasting to provide acceptable anchor tooth and
surface cleaning prior to coatings application. Procedures for preparation are as follows:
A.2.1 Sample machining. Both exterior surfaces should be milled so that faces are square (90-degree
0.1-degree) and have a surface finish of 63 micro-inch. The exterior edge should be left as a "sharp" edge with no
radius tolerance or chamfer.
A.2.2 Grit blasting. Specimen should be grit blasted using Al2O3 media to achieve an anchor tooth profile
of 1-3 mil. Care should be taken to minimize rounding of the edge with excess blasting. Final edge radius should
not exceed 0.04 inch (10 percent).
A.2.3 Cleaning. Specimen should be cleaned thoroughly with acetone or appropriate solvent to remove all
traces of grease prior to abrasive blasting and coating application.
A.3 Paint application. Topcoat is then spray applied to unprimed metal, maintaining correct pump
pressure and distance from substrate (approx. 18 inches) according to manufacturers recommendations. Paint is
applied to both sides (first) and the edge (last) within one minute. Measure the wet film thickness on the flat sides to
ensure compliance with minimum recommended film thickness. After paint application, cure the specimens at
ambient laboratory conditions for a minimum of 72 hours before sectioning. (see figure A-1)

40

MIL-PRF-23236C
Appendix A

FIGURE A-1. Spray.


A.4 Dry film thickness. The test sample is cut at a minimum of -inch thicknesses, mounted in
metallurgical sample holder and the cut is smoothed by sanding. The dry film thickness is measured using an
optical microscope. Measurements are made at sufficient distance from the 90-degree angle to ensure there is no
edge effect; this is dft (flat). The lowest thickness visible at the edge is also measured to determine dft (edge).
A.5 Edge retention calculation. The edge retention is calculated from:
% Retention = dft (edge)/dft (flat) x 100 (see figure A-2)
A.6 Pass/fail criteria. Three sectioned specimens shall be cut from each sample, the coating thickness
measured and edge retention calculated. Any specimen with less than 50 percent edge retention shall constitute a
failure. The average of the three shall not be less than 70 percent.

41

MIL-PRF-23236C
Appendix A

FIGURE A-2. Edge retention calculation.

NOTES:
1. Aluminum is used due to ease of availability, handling and cutting.
2. Mounting the sample in a metallurgical mount prevents damage to the edge during measurement and
allows "polishing" of the specimen to highlight the interfaces for measurement.

Custodians:
Army - MR
Navy - SH
Air Force - 99

Preparing Activity:
Navy - SH
(Project 8010-0182)

Review Activities:
Navy - AS, CG
Air Force - 03, 84
CIV - 6FEE

42

PPI NBR: 63101- 001H (REV 06)

DATE: March 10, 2004

PRESERVATION PROCESS INSTRUCTION (PPI) for


BALLAST TANKS, FLOODABLE VOIDS, COLLECTION, HOLDING, AND
TRANSFER TANKS, AND FUEL/COMPENSATING FUEL TANKS
to be used in conjunction with
CORE PPI 63101- 000 with a
Surface Preparation Method of Abrasive Blasting

Tank PPI
March 10, 2004, REV 06

1.

SCOPE:

1.1

Cleaning, Surface Preparation and Painting Requirements for: Ballast Tanks, Floodable Voids, Collection,
Holding and Transfer (CHT) Tanks, and Fuel/Compensating Fuel Tanks.

1.2

RISK STATEMENT:

1.2.1

Risk for installation. If proper surface preparation and application procedures are not adhered to, coating
system failure can occur within 3-6 months.

1.2.2

Risk for curing. If overcoat window timeframes are not adhered to, coating system failure is possible within the
first 6-9 months of application.

1.2.3

If the PPI checkpoint criteria are met, the following table provides service life expectancy for the listed
systems:
Coating System Life Expectancy:
Area
System
Ballast Tanks and
Sigmaguard BT
Floodable Voids
Sherwin Williams Dura-Plate UHS
Ameron 133/333
EuroNavy ES 301 K, L and S
International Intergard 143
International Interline 624
International Interline 624
CHT Tanks
Sigma Edgeguard
Sherwin Williams Nova-Plate
Fuel/Compensating
Sigma Edgeguard
Fuel Oil Tanks
Sherwin Williams Nova-Plate
International Interline 624

Life Expectancy
20 years
20 years
20 years
20 years
20 years
20 years
8 years
8 years
8 years
20 years
20 years
20 years

(IN ADDITION TO THE ELEMENTS CONTAINED IN THE CORE


PPI, ADD THE FOLLOWING SUPPLEMENTAL ELEMENTS)

2.

REFERENCES:

2.c.

MSDS and manufacturers ASTM F 718 sheets, Shipbuilders and Marine Paints and Coating Product /
Procedure Data Sheet for coating systems being applied for specified area.
Ballast Tank------------------------------------------- QPL-23236, International Interline 624
Collection Holding and Transfer Tank ---------- Sigma-Edgeguard, International Interline 624,
Sherwin Williams Nova-Plate UHS,
Fuel/Compensating Fuel Tank ------------------- Sigma-Edgeguard, International Interline 624,
Sherwin Williams Nova-Plate UHS,

3.

APPENDICES:

(REFER TO CORE PPI EXCEPT FOR APPENDICES 5, 6, 7,


and 10)

4.

REQUIREMENTS:

(REFER TO CORE PPI)

5.

PRE-SURFACE PREPARATION:

(THE FOLLOWING ELEMENT AUGMENTS THE CORE PPI)

5.5

For CHT TANKS (Prior to Abrasive Blasting): Remove cement from the flanges of longitudinal and transverse
overheads beams, horizontal stiffeners, brackets and covering.

6.

SURFACE PREPARATION:

6.2

USE ABRASIVE BLASTING FOR SURFACE PREPARATION.

6.3

Not Applicable to this PPI

7.

PAINTING REQUIREMENTS:

Tank PPI
March 10, 2004, REV 06

(REFER TO CORE PPI AND AUGMENT IT WITH THE


FOLLOWING CORRELATE ELEMENT)

(REFER TO CORE PPI AND AUGMENT IT WITH THE


FOLLOWING CORRELATE/SUPPLEMENTAL ELEMENTS)

NOTES:

WHEN USING SHERWIN WILLIAMS DURA-PLATE UHS, IN TANKS WHERE AMBIENT TEMPERATURE
EXCEEDS 85F THE USE OF PLURAL COMPONENT EQUIPMENT (PCE) IS MANDATORY.
WHEN USING SHERWIN WILLIAMS NOVA-PLATE UHS, THE USE OF PLURAL COMPONENT
EQUIPMENT (PCE) IS MANDATORY.
(REFER TO CORE PPI)
(REFER TO CORE PPI)

8.
9.
10.
11.
12.

PRIMER COAT APPLICATION:


STRIPE COAT APPLICATION:
Not Applicable to this PPI
Not Applicable to this PPI
TOP COAT APPLICATION:

13.

LATEX CEMENT APPLICATION FOR CHT TANKS:

13.1

Where applicable, install new latex cement conforming to MIL-D-21631 onto all flanges of transverse overhead
beams, horizontal stiffeners, brackets and protrusions using a plastic trowel after topcoat has cured. The
cement shall be installed at an angle of 45 degrees from the horizontal, ensuring closed film with no
depressions and holidays, and in a manner to ensure that sewage will not be trapped on the tank framing or
on the latex cement. Do not cut or scratch the new paint coating.

14.

FINAL INSPECTION:

(REFER TO CORE PPI)

(REFER TO THE ELEMENTS CONTAINED IN


SECTION 13 OF THE CORE PPI)

(REFER TO CORE PPI)


APPENDIX 1: QA INSPECTION FORM ENVIRONMENTAL READING
APPENDIX 2: QA INSPECTION FORM SURFACE SOLUBLE SALT CONDUCTIVITY LOG (REFER TO CORE PPI)
APPENDIX 3: QA INSPECTION FORM SURFACE PROFILE LOG
(REFER TO CORE PPI)
(REFER TO CORE PPI)
APPENDIX 4: QA INSPECTION FORM DRY FILM THICKNESS MEASUREMENTS
APPENDIX 5: CHECKPOINTS & MILESTONES COMPLETION LOG
(REFER TO THIS PPI)
APPENDIX 6: CERTIFIED COATING INSPECTORS CHECKPOINT SIGN OFF LOG
(REFER TO THIS PPI)
APPENDIX 7: PAINT APPLICATION EQUIPMENT & PAINT CONSUMPTION LOG
(REFER TO THIS PPI)
APPENDIX 8: SURFACE CONDUCTIVITY TESTING PROCEDURE
(REFER TO CORE PPI)
APPENDIX 9: WET FILM THICKNESS MEASUREMENTS
(NOT APPLICABLE TO THIS PPI)
(REFER TO THIS PPI)
APPENDIX 10: COATING SYSTEM (S)

Tank PPI
March 10, 2004, REV 06

APPENDIX 5
CHECKPOINT & MILESTONE COMPLETION LOG
SHIP: ________________________________________________________
DATE: ________
LOCATION: ___________________________________________________
PRODUCT BEING APPLIED: ________________________________________________________
MAINTAIN SEPARATE LOG FOR EACH AREA / LOCATION, PREPARED OR PAINTED SURFACE,
WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION
ACTIVITY

TIME

Date Process Control Procedure (PCP) Demonstrated


Implementing Contractor (Print/ Signature): __________________________________________
Date Pre-Surface Preparation and Cleaning Begins
Implementing Contractor (Print/ Signature): __________________________________________
Date of Pre-Surface Preparation and Cleaning Checkpoint
--Date of Visual and UV Light or Water-Break Inspection Check
--Date of Structural and Pre-Surface Conditioning (ensuring de-burring and grinding) Check
--Date of Contamination Containment and Masking Check
Implementing Contractor (Print/ Signature): __________________________________________
Date Surface Preparation Begins
Implementing Contractor (Print/ Signature): __________________________________________
Date of Surface Preparation Checkpoint
--Date of Surface Profile Measurement Check
--Date of Soluble Salt Measurement Check
--Date of Environmental Check
--Date of Contamination Containment and Masking Check
--Date of Inspection of Prepared area (ensuring all areas are properly prepared) Check
--Date of Inspection of area cleanliness prior to paint application Check
Implementing Contractor (Print/ Signature): __________________________________________
Date Paint Storage Area Inspected
Implementing Contractor (Print/ Signature): __________________________________________
Date Paint Mixing Inspected
--Date of Shelf Life Check
--Date of Temperature Check
--Date of Mixing Check
Implementing Contractor (Print/ Signature): __________________________________________
Date Prime Coat is Applied
Implementing Contractor (Print/ Signature): __________________________________________
Date of Prime Coat Checkpoint
Implementing Contractor (Print/ Signature): __________________________________________
Date Stripe Coat Applied
Implementing Contractor (Print/ Signature): __________________________________________
Date of Stripe Coat Checkpoint
Implementing Contractor (Print/ Signature): __________________________________________
Date Top Coat Applied
Implementing Contractor (Print/ Signature): __________________________________________
Date of Top Coat Checkpoint
Implementing Contractor (Print/ Signature): __________________________________________
Date Finished Painted Surfaces Checkpoint
Implementing Contractor (Print/ Signature): __________________________________________

Tank PPI
March 10, 2004, REV 06

DATE

APPENDIX 6
CERTIFIED COATING INSPECTORS CHECKPOINT SIGN OFF LOG

Must Be Signed By Certified Coating Inspector To Pass Checkpoints


SHIP: ________________________________________________________
DATE: ________
LOCATION: ___________________________________________________
PRODUCT BEING APPLIED: ________________________________________________________
MAINTAIN SEPARATE LOG FOR EACH AREA / LOCATION, PREPARED OR PAINTED SURFACE,
WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION
Process Control Procedure Demonstrated Inspected and Accepted:
Certified Inspector (Print): _________________________________________
Certified Inspector (Signature): _____________________________________
NBPI Certification
NACE Session I Certification
Inspector #: _________________ Certification Expiration Date: ___________

Date: ___________
Time: ___________

Pre-Surface Preparation and Cleaning Inspected and Accepted:


Certified Inspector (Print): _________________________________________
Certified Inspector (Signature): _____________________________________
NBPI Certification
NACE Session I Certification
Inspector #: _________________ Certification Expiration Date: ___________

Date: ___________
Time: ___________

Surface Preparation Inspected and Accepted:


Certified Inspector (Print): _________________________________________
Certified Inspector (Signature): _____________________________________
NACE Session I Certification
NBPI Certification
Inspector #: _________________ Certification Expiration Date: ___________

Date: ___________
Time: ___________

Paint Storage Area Inspected and Accepted:


Certified Inspector (Print): _________________________________________
Certified Inspector (Signature): _____________________________________
NACE Session I Certification
NBPI Certification
Inspector #: _________________ Certification Expiration Date: ___________

Date: ___________
Time: ___________

Paint Mixing Inspected and Accepted:


Certified Inspector (Print): _________________________________________
Certified Inspector (Signature): _____________________________________
NACE Session I Certification
NBPI Certification
Inspector #: _________________ Certification Expiration Date: ___________

Date: ___________
Time: ___________

Prime Coat Inspected and Accepted:


Certified Inspector (Print): _________________________________________
Certified Inspector (Signature): _____________________________________
NACE Session I Certification
NBPI Certification
Inspector #: _________________ Certification Expiration Date: ___________

Date: ___________
Time: ___________

Stripe Coat Inspected and Accepted:


Certified Inspector (Print): _________________________________________
Certified Inspector (Signature): _____________________________________
NACE Session I Certification
NBPI Certification
Inspector #: _________________ Certification Expiration Date: ___________

Date: ___________
Time: ___________

Top Coat Inspected and Accepted:


Certified Inspector (Print): _________________________________________
Certified Inspector (Signature): _____________________________________
NACE Session I Certification
NBPI Certification
Inspector #: _________________ Certification Expiration Date: ___________

Date: ___________
Time: ___________

Finished Painted Surfaces Inspected and Accepted:


Certified Inspector (Print): _________________________________________
Certified Inspector (Signature): _____________________________________
NACE Session I Certification
NBPI Certification
Inspector #: _________________ Certification Expiration Date: ___________

Date: ___________
Time: ___________

Tank PPI
March 10, 2004, REV 06

APPENDIX 7
PAINT APPLICATION EQUIPMENT AND PAINT CONSUMPTION LOG
SHIP: ________________________________________________________
DATE: ________
LOCATION: ___________________________________________________
PRODUCT BEING APPLIED: ________________________________________________________
MAINTAIN SEPARATE LOG FOR EACH AREA / LOCATION, PREPARED OR PAINTED SURFACE,
WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION
Prime
Coat
Airless Paint Hose Size
Airless Paint Hose Length
Airless Tip Orifice Diameter / Fan Width
Plural Airless
Airless Pump Used
& Model

Conventional
Airless

Airless Pump Ratio


If plural component:
Fixed or Variable

If Using Inline
Heater
Temperature in F
(Fahrenheit)

Temperature
Setting At
Heater
Temperature
At Tip

Product Applied
Product Manufacturer
Expiration Date
Color Applied
Product VOC
Base Portion Batch
(Part A)
Hardener Portion Batch
(Part B)
Gallons Used per Coat
Square Feet Painted

Tank PPI
March 10, 2004, REV 06

Stripe
Coat

Top
Coat

APPENDIX 10
COATING SYSTEMS
COATINGS FOR BALLAST TANKS/ FLOODABLE VOIDS
Coating

Sigmaguard BT

Prime

4 8 mils

Stripe
Top
System
DFT
Coating
Prime
Stripe
Top

Sherwin Williams
Dura-Plate UHS

DFT Amber 5404

Interline 624

4 - 8 mils DFT

4 8 mils DFT 133

6 10 mils DFT Gray 5411

6 10 mils DFT

6 - 10 mils DFT 333

10 12 mils DFT Aqua 5411

10 - 12 mils DFT

10 12 mils DFT 333

14 20 mils DFT

14 20 mils DFT

14 - 20 mils DFT

20 - 30 mils DFT
for Stripe Coat Areas

20 - 30 mils DFT
for Stripe Coat Areas

20 - 30 mils DFT
for Stripe Coat Areas

EuroNavy ES 301 K, L and S


4 - 6 mils DFT (ES 301 K or L)
6 - 8 mils DFT (ES 301 S)
6 - 8 mils DFT (ES 301 S)
10 14 mils DFT
16 22 mils DFT for Stripe Coat
Areas

System
DFT

Ameron Amercoat
133/333

4 8 mils DFT
(THA 626/627)
6 10 mils DFT
(THA 624/627)
10 12 mils DFT
(THA 625/627)
14 - 20 mils DFT
20 - 30 mils DFT
for Stripe Coat
Areas

International Intergard 143


4 - 8 mils DFT (142/148 Off-White)
6 10 mils DFT (143/148 Buff)
10 12 mils DFT (144/148 Gray)
14 - 20 mils DFT
20 - 30 mils DFT Stripe Coat Areas

COATINGS FOR COLLECTION, HOLDING, & TRANSFER TANKS (CHT)


Coating

Sigma Edgeguard

14 - 20 mils DFT

Sherwin Williams Nova-Plate UHS


4 - 8 mils DFT (Buff B62H220 /
B62V220)
6 10 mils DFT (Gray B62A220 /
B62V220)
10 -12 mils DFT (White B62W220 /
B62V220)
14 - 20 mils DFT

20 - 30 mils DFT for Stripe Coat Areas

20 - 30 mils DFT for Stripe Coat Areas

Prime

4 - 8 mils DFT (Cream Color 5427)

Stripe

6 - 10 mils DFT (WD Gray 5428)

Top

10 12 mils DFT (White 5428)

System
DFT

Interline 624
4 8 mils DFT
(THA 626/627)
6 10 mils DFT
(THA 623/627)
10 12 mils DFT
(THA 625/627)
14 - 20 mils DFT
20 - 30 mils DFT
for Stripe Coat Areas

COATINGS FOR FUEL/COMPENSATING FUEL OIL TANKS


Coating
Prime
Stripe
Top
System
DFT

Sigma Edgeguard

Sherwin Williams Nova-Plate UHS

Interline 624

4 - 8 mils DFT
(Cream Color 5427)
6 - 10 mils DFT
(WD Gray 5428)
10 12 mils DFT
(WD Gray 5428)

4 - 8 mils DFT
(Buff B62H220 / B62V220)
6 - 10 mils DFT
(Gray B62A220 / B62V220)
10 - 12 mils DFT
(White B62W220 / B62V220)

4 8 mils DFT
(THA 626/627)
6 10 mils DFT
(THA 623/627)
10 12 mils DFT
(THA 625/627)

14 - 20 mils DFT

14 - 20 mils DFT

14 - 20 mils DFT

20 - 30 mils DFT
for Stripe Coat Areas

20 - 30 mils DFT
for Stripe Coat Areas

20 - 30 mils DFT
for Stripe Coat Areas

Tank PPI
March 10, 2004, REV 06

EURONAVY S.A.

ES301 TESTING REGARDING FIRE


FLAME SPREAD AND SMOKE DEVELOPMENT
VALUES OBTAINED BY ASTM E 84 STANDARD
& CLASSIFICATION UNDER US NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

The Flame Spread Index and Smoke Developed Index values obtained by the ASTM E 84 test are
frequently used by code officials and regulatory agencies in the acceptance of interior finish materials for
various applications. The most widely accepted classification system is described in the United States
National Fire Protection Association publication NFPA standard No. 101 Life Safety Code, where:
Rating

Flame Spread Index

Class "A"

0 - 25

Class "B"

26 - 75

Class "C"

76 - 100

If a coatings system presents 0 25 Flame Spread Index and a Smoke developed index of 0 450 it may
be rated as Class A.
A number of different ES301 two-coat systems were tested at independent NGC Labs (Fire Testing
Laboratory). The flame spread index of ES301 systems ranged from 15 to 20 (0 100 scale) and the
smoke developed index from 300 to 450. Accordingly, the ES301 systems can be rated as Class A as
per NFPA standard N101.
Attached please find the NGC Lab report and detailed results.

2004-12-27

EURONAVY SA, Estrada Vale de Mulatas . Quinta de S. Francisco . 2914-516 Setbal . PORTUGAL
Phone +351 265 739 440 * Fax. +351 265 702 711 * www.euronavy.net * sales@euronavy.net

EURONAVY S.A.

A GUIDE FOR ES301 COATING SYSTEM APPRAISAL


October 2008

The Petrobras Case


Petrobras tested and thoroughly evaluated EURONAVY products since mid90s. The result was the recognition of the superior performance of the
EURONAVY products, and it specification and use in Petrobras Projects in
USA, Europe, Singapore, Brazil, South Korea, and many other places (oil
rigs, FPSOs, ships, equipments, etc.). More than 4 million m2 have been
coated with ES301 at Petrobras and Transpetro projects.
One example of the impressive performance of ES301 coating system was
the inspection performed by ABS onboard Ataulfo Alves tanker in January
2008. More than 5 years after the cargo oil tank bottoms being
hydroblasted and coated with ES301 2-coat 300 microns DFT system, the
condition was pristine: not one single dot of corrosion was detected in the
tenths of thousands square meters that have been treated in 2002.

Attached
x

Petrobras experience with ES301: text received from Petrobras reporting


comprehensive data on ES301 system use by Petrobras since the 90s.

List of Projects done with Petrobras

ABS Report RJ-939982 Cargo Oil Tanks Coating Condition M/V Ataulfo Alves

Technical Specification N I-ET-3010.00-1300-140-PPC-002: Surface Tolerant


Solvent Free Epoxy Paint For Wet Surfaces. ES301 complies with this product
specification.

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal
Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

From:
Sent:
To:
Cc:
Subject:

quintela@petrobras.com.br
quinta-feira, 10 de Janeiro de 2008 16:24
j.azevedo@euronavy.net
m.paiva@euronavy.net
Re: Petrobras experience with Euronavy

Attachments:

pic22249.jpg

pic22249.jpg (283
KB)

Dear Joo Azevedo,


As requested we are transmitting a summary of PETROBRAS experience with EURONAVY
technology (ES301 coating system) and our conclusions about the significance of such
experience in terms of IMO PSPC compliance (IMO Resolution MSC.215(82) Performance
Standard for Protective Coatings for Dedicated Seawater Ballast Tanks).
Definition of ES301 coating system
Euronavys ES301 coating system, as used by Petrobras, is a system composed by 2 coats
of EURO-basic ES301 (150 microns per coat, total dry film thickness of 300 microns).
The system was tested and applied in PETROBRAS equipments over two types of surface
preparation: Ultra High Pressure water jetting to WJ2M (SSPC SP12) and abrasive
blasting to SA 2 (ISO 8501, equivalente to SSPC SP10). The below conclusions, test
results and track record conclusions are valid for both surface preparation methods
(the water jetting have been the most used).
Compliance with PSPC
Both the results of testing (see below) and the track record of the application of
ES301 system in tanks (ballast tanks, voids, cargo tanks) of PETROBRAS ships, FPSOs
and Oil Rigs are showing overwhelming evidence of the compliance of such system with
the IMO PSPC requirements. Such evidence can be seen in both the test results and the
status of tank areas coated with ES301 coating system at 3, 5 or more years and that
are still in pristine condition.
According to IACS Procedural Requirement on Application of the IMO PSPC under IACS
Common Structural Rules for Bulk Carriers and Oil Tankers a coating system will be
considered compliant with IMO PSPC if passing prequalification laboratory tests
(defined in PSPC Table 1, paragraph 1.3.) OR presenting condition GOOD after 5 years
field exposure in tanks in service (<3% breakdown, <20% rust on edges and welds).
We consider that the test results of ES301 coating system (see below), namely the
tests for approval by Petrobras I-ET-3010.00-1300-140-PPC-002 (see attachment) are
equivalent to the IMO PSPC pre-qualification tests required at Table 1, paragraph
1.3.As ES301 passed the tests with good results, this is seen at PETROBRAS as evidence
of compliance with IMO PSPC.
Moreover, ES301 system had shown the compliance with IMO PSPC by proving its
performance after at least 5 years field exposure. The below listed track record of
PETROBRAS with ES301 coating system describe more than 3 million m2 where this system
as been applied at Petrobras ships or rigs, part of it in tanks. A significant
proportion of these areas is exposed for more than 5 years, and some have been
inspected recently. Up to now we did not have a single case of failure or a tank
classification below GOOD.
Recent inspections related tanks in service with ES301 system applied more than 5
years ago that show 0% failed area and 0% rust in edges and welds, what is better than
we could ever expected. In January we inspected (a joint inspection
PETROBRAS/Transpetro/Cenpes, ABS, Euronavy) the tanks of Ataulfo Alves vessel coated
in 2002 with ES301 coating system over water jetting WJ2M (SSPC 12). The condition of
the areas have been seen as
outstanding: no failures were observed, after more than five years in service. No
breakdown of any kind and no rust at all in edges and welds.
1

Our conclusion at PETROBRAS is that the joint evidence of test results and field
exposure of ES301 coating system, performed at our laboratories and at our ships and
rigs, is more than enough to grant ES301 coating system a Statement of Compliance with
IMO PSPC.

ANNEX 1 TEST RESULTS


PETROBRAS tests with EURONAVY products begun in April 1996. They consisted in
laboratory and in situ tests (refineries and platforms in Campos Basin).
The results are the following:
Preliminary Laboratory Tests Product EURONAVY ES-301
Pull-off test (ASTM D-4541 A.2) under the following conditions:
Hydroblasting WJ 3 (NACE 5/SSPC 12 Standard) Mechanical Treatment (St 2 and St 3
ISO 8501-1 Standard) with wet and dry
surfaces
Slurry Blast (Wet sand blast)
In all of these conditions the values of adhesion were very high, ranging from 17.0MPa
to 24.0MPa (170kgf/cm2 240kgf/cm2). We used a Pneumatic Adhesion Test model Patly 2A.
In these conditions we tested paints from many manufacturers and the highest values
were got by Euronavy FS-301.
Further Laboratory Testing System ES301
Based on this above results we carried out more tests with the following coating
system:
Surface Preparation: WJ 3 (NACE 5/SSPC 12 Standard)
Paint: Two coasts of ES-301 (150mm each)
This paint system was submitted following tests:
1 - Salt-spray fog test (ASTM B117): 5,000 hours
2 - 100% relative Humidity (ASTM D-2247): 5,000 hours
3 - Immersion in Artificial Sea Water: 14 months
4 - Destiled water @ 40C: 3,000 hours
5 Xilene: 14 months
6 - Crude Oil: 14 months
7 Diesel: 14 months
8 - NaOH solution 40% w/v: 3,000 hours
9 - H2SO4 solution 30% w/v: 3,000 hours
The results were considered very good. No failure was observed in specimens without
intentional damage.
Based in first laboratory tests results we decided to test this paint system in situ.
Than, we selected places with extremely aggressive conditions in platforms and
refineries. Lines with constant water condensation (platforms) that were impossible
to be painted before and refineries under high relative humidity (above 90%) and in
rainy days.
One year later the application we return and perform inspections and adhesion test
(same equipment used in laboratory) and visual observation.
No failures and no adhesion loss were observed.
Final Laboratory Tests (PETROBRAS STANDARD)
Later, PETROBRAS established a technical specification
(I-ET-3010.00-1300-140-PPC-002) for solvent free epoxy paints (in annex) for use on
steel surfaces under severe humidity conditions (up to 100% relative humidity). The
product EURO-basic ES-301 was tested and approved in all technical requirements
specified in this PETROBRAS norm. The tests included passing

ANNEX 2 - TRACK RECORDS


Based in the good results of laboratory and in situ tests as above listed, PETROBRAS
decided to extend the use of this paint system. Now Euronavy System is approved for
platforms, FSO and FPSO and refineries. It is also being extensively used in ballast
and cargo tanks in ships, by our crude carrier company TRANSPETRO. Euronavy was the
major paint supplier for PETROBRAS in recent constructions. The following table
present a summary of
it:
(Embedded image moved to file: pic22249.jpg)
I believe that the total area coated with Euronavys technology is around
4.000.000 square meters.
Best Regards,
Joaquim Quintela
Joaquim Pereira Quintela
CONSULTOR TCNICO
PETROBRAS/CENPES/PDP/TMEC
Tel. 55-21-38656502
Fax. 55-21-38656790
Celular. 55-21-98727605
"O emitente desta mensagem responsvel por seu contedo e endereamento.
Cabe ao destinatrio cuidar quanto ao tratamento adequado. Sem a devida autorizao, a
divulgao, a reproduo, a distribuio ou qualquer outra ao em desconformidade com
as normas internas do Sistema Petrobras so proibidas e passveis de sano
disciplinar, cvel e criminal."
"The sender of this message is responsible for its content and addressing.
The receiver shall take proper care of it. Without due authorization, the publication,
reproduction, distribution or the performance of any other action not conforming to
Petrobras System internal policies and procedures is forbidden and liable to
disciplinary, civil or criminal sanctions."
" El emisor de este mensaje es responsable por su contenido y direccionamiento. Cabe
al destinatario darle el tratamiento adecuado. Sin la debida autorizacin, su
divulgacin, reproduccin, distribucin o cualquier otra accin no conforme a las
normas internas del Sistema Petrobras estn prohibidas y sern pasibles de sancin
disciplinaria, civil y penal."

(Embedded image moved to file: pic22249.jpg)

TECHNICAL SPECIFICATION
CLIENT OR USER

I-ET-3010.00-1300-140-PPC-002
SHEET

UN-RIO

JOB OR PROJECT

of

CC

PRODUCTION UNITS

AREA OR UNIT

TITLE

CENPES

SURFACE TOLERANT SOLVENT FREE EPOXY PAINT FOR WET SURFACES

MICROSOFT WORD / 7.0 / I-ET-3010.00-1300-140-PPC-002_B.DOC

INDEX OF REVISIONS
REV

DESCRIPTION AND/OR REVISED SHEETS

ORIGINAL

Pages 1, 3, 4, 5 and 6
Pages 2, 3, 4, 5 and 6

ORIGINAL
DATE
PROJECT

10/06/03

REV. A

REV. B

27/10/04

20/07/2005

CENPES

CENPES

CENPES

EXECUTION

QUINTELA

QUINTELA

QUINTELA

CHECKING

SILVIA

LLA

ALVARO

APPROVAL

CDV

SARTORI

QUINTELA

REV. C

REV. D

REV. E

REV. F

THE DATA, OR PART THEREOF, ARE PETROBRAS PROPERTY AND THUS MUST NOT BE USED IN ANY W ITHOUT PERMISSION.

REV. G

REV. H

TECHNICAL SPECIFICATION

No.

REV.

I-ET-3010.00-1300-140-PPC-002

AREA OR UNIT

B
SHEET

of

TITLE

SURFACE TOLERANT SOLVENT FREE EPOXY PAINT FOR WET SURFACES

INDEX
1 SCOPE
2 SUPPLEMENTARY DOCUMENTS
3 GENERAL CONDITIONS
4 SPECIFIC CONDITIONS
4.1 Requirements for components A and B
4.2 Requirements for paint, ready to apply
4.3 Requirements for dry film
5 INSPECTION
5.1 Test Panels
5.2 Cyclic Corrosion Test - Norsok M-501 Rev 4 Standard
5.3 Cyclic Corrosion Test ASTM D 5894
5.4 Cyclic Corrosion Test PETROBRAS
5.5 Cathodic Disbonding ASTM G8
5.6 Scribing of Test Panels

THE DATA, OR PART THEREOF, ARE PETROBRAS PROPERTY AND THUS MUST NOT BE USED IN ANY W ITHOUT PERMISSION.

TECHNICAL SPECIFICATION

No.

REV.

I-ET-3010.00-1300-140-PPC-002

AREA OR UNIDADE

B
SHEET

of

TITLE

SURFACE TOLERANT SOLVENT FREE EPOXY PAINT FOR WET SURFACES

1 SCOPE
1.1 This specification covers two-component surface tolerant solvent free epoxy poliamine coating for use on
steel surfaces. This paint shall be to be applied on either a dry or wet surface under severe conditions of
humidity (up to 100% relative humidity).
1.2 This Standard contains Mandatory Requirements.

2 SUPPLEMENTARY DOCUMENTS
The documents listed below are mentioned in the text and contain valid prescriptions for this Standard.

3 GENERAL CONDITIONS
3.1 The coatings supplied under this specification are two-part products composed of a base component and a
curing agent component. When the two components are mixed in the proper proportions the coating are
capable of curing at temperatures as low as 10 C fully curing in seven days.
3.2 Each component of this paint based on the specified ingredients shall be uniform, stable in storage up to
40 C, and free from grit and coarse particles.
3.3 Each container of each component shall be legibly marked with the following information:
a)
b)
c)
d)
e)
f)
g)
h)
i)

PETROBRAS standard NI-2680;


surface tolerant solvent free epoxy paint;
component Identification A or B;
paint volume and paint weight in the each recipient;
manufacturer`s name;
lote number of each component and date of manufacture;
shelf-life;
mixing ratio by volume and by weight;
color Munsell notation.

3.4 If there is a conflict between the requirements of any of the cited reference standards and this
specification, the requirements of this specification shall prevail.

4 SPECIFIC CONDITIONS
4.1 Requirements for components A and B
The epoxy resin and cure agent identification must be analyzed by infrared spectroscopy in accordance with
the annex A.
4.2 Requirements for paint, ready to apply
Table 1 shows the requirements for the liquid paint ready to apply. These tests shall be performed at 25 C.

THE DATA, OR PART THEREOF, ARE PETROBRAS PROPERTY AND THUS MUST NOT BE USED IN ANY W ITHOUT PERMISSION.

TECHNICAL SPECIFICATION

No.

REV.

I-ET-3010.00-1300-140-PPC-002

AREA OR UNIDADE

B
SHEET

of

TITLE

SURFACE TOLERANT SOLVENT FREE EPOXY PAINT FOR WET SURFACES

Table 1 Acceptance Criteria for the Liquid Paint


TESTS

REQUIREMENTS

Standard

1,35 maximum

ASTM D 1475

3 minimum

see note

Consistency, KU

90 minimum 110max

ASTM D 562

Flash point, C

55 minimum

ASTM D 56

Sag resistance, m

150 minimun

ASTM D 4400

Drying time to Touch, hours

6 maximum

ASTM D 1640

Drying time Hard, hours

16 maximum

ASTM D 1640

12 minimum 120max

ASTM D 1640

Specific weight, g/ml


Pot-life, hours

Drying time to Recoat, hours

Note Pot-life Determination Procedure


Determine pot life of the paint as follow. Thoroughly mix 1000 ml of A component and corresponding volume of
B component according paint mixing ratio. Turn 700 ml of the mixed paint into a cylindrical can gallon total
volume and let stand at 25 2C for three hours. At the end of this time there shall be no evidence of gelation.
The coatings shall be in a free-flowing condition and brushable without thinning.

4.3 Requirements for dry film


Table 2 Acceptance Criteria for the cured paint system
Tests/Method
Cyclic Corrosion Test - Norsok M-501 25
cycles
Cyclic Corrosion Test ASTM D 5894
12 cycles
Cyclic Corrosion Test - PETROBRAS
20 cycles
Cathodic Disbonding ASTM G8
(30 days)
Xylene resistance (immersion),
2.000 hours
Artificial sea water (ASTM D 1141)
immersion, 40 C, 2000 hours *
Adhesion Pull-Off Test
ASTMD-4541A4,
CSt3 ISO 8501-1 WET
Adhesion Pull-Off Test
ASTMD-4541A4,
Sa 2 1/2 ISO 8501-1 WET (see Note)

Requirements
No Blistering, No Rusting, Chalking Grade
4 maximum, Corrosion under creep 8,0 mm
maximum
No Blistering, No Rusting, Chalking Grade
4 maximum, Corrosion under creep 10,0
mm maximum
No Blistering, No Rusting, Chalking Grade
4 maximum, Corrosion under creep 10,0
mm maximum
Cathodic Disbondment = 10,0 mm
maximum
No Blistering, No Rusting,
No Coating Failures
No Blistering, No Rusting,
No Coating Failures
12 Mpa minimum; A/B failure

12 Mpa minimum; Y or Z failure


70 UB minimum

Bright, 60

THE DATA, OR PART THEREOF, ARE PETROBRAS PROPERTY AND THUS MUST NOT BE USED IN ANY W ITHOUT PERMISSION.

TECHNICAL SPECIFICATION

No.

REV.

I-ET-3010.00-1300-140-PPC-002

AREA OR UNIDADE

B
SHEET

of

TITLE

SURFACE TOLERANT SOLVENT FREE EPOXY PAINT FOR WET SURFACES

Note Procedures for coating application at Adhesion Pull-off Test


The adhesion pull-off tests also shall be carried on other two different surface preparation standards, following
the coating application procedures shown bellow:
a) Wet surface without flash rust: the specimen shall be kept on vertical position and a brush shall be used
on coating application .
b) Wet surface with medium flash rust (NACE VIS7/SSPC VIS4): the specimen shall be kept on horizontal
position and coating application shall be done with bar type applicator. It shall be applied one coat at 200
Pm wet film thickness.
5 INSPECTION
5.1 Test Panels
Test panels shall be AISI-1020 carbon steel size 150mm x 100mm x 4mm thick. They shall be blast cleaned
in accordance with Sa 2 ISO 8501-1, "Near-White Blast Cleaning." Roughness profile 50m 70 m. Three
test panels are required for each test. Apply three coats at 150 m dry film thickness each. Air dry ten days.
Protect back and edges. Dry film thickness measurements should be carried out on each coat applied in
accordance with a suitable not destructive method as described in ISO 2808 (Method 10).
5.2 Cyclic Corrosion Test - Norsok M-501 Rev 4 Standard
Coating system test panels are subjected to the following exposure conditions as part of a cycle:
 Neutral Salt Spray Exposure for 72 hours (ISO 7253, with artificial sea water as per ASTM D1141)
 Dry-off in air at ambient temperature for 16 hours
 UV-A Exposure for 80 hours (ASTM G154, 4 hours dry UV-A at 60C/4hours condensation at 50C)
The duration of one cycle shall be 168 hours (1 week). Each coating system test panel shall undergo 25 cycles
(4200 hours).
All test panels are scribed down to the substrate by the method described at 5.6
5.3 Cyclic Corrosion Test ASTM D 5894
Coating system test panels are subjected to the following exposure conditions as part of a cycle:
 UV-A Exposure for 1 week (ASTM G154, 4 hours dry UV-A at 60C/4 hours condensation at 50C)
 Prohesion Salt Spray Exposure for 1 week (ASTM G85, Annex A5, 1 hour spray at 25C/ 1 hour dry-off at
35C)
The duration of one cycle shall be 336 hours (2 weeks). Each coating system panel undergoes 12 cycles
(4032 hours).
All test panels are scribed down to the substrate by the method described at 5.6

THE DATA, OR PART THEREOF, ARE PETROBRAS PROPERTY AND THUS MUST NOT BE USED IN ANY W ITHOUT PERMISSION.

TECHNICAL SPECIFICATION

No.

REV.

I-ET-3010.00-1300-140-PPC-002

AREA OR UNIDADE

B
SHEET

of

TITLE

SURFACE TOLERANT SOLVENT FREE EPOXY PAINT FOR WET SURFACES

5.4 Cyclic Corrosion Test PETROBRAS


This test was devised as part of draft ISO 20340 Standard.
Coating system test panels are subjected to the following exposure conditions as part of a cycle:
 Neutral Salt Spray Exposure for 72 hours (ISO 7253, with Sodium Chloride)
 24 hours Freeze at 10 C
 UV-A Exposure for 72 hours (ASTM G154, 4 hours dry UV-A at 60C/4 hours condensation at 50C)
The duration of one cycle shall be 168 hours (1 week). Each coating system test panel shall undergo 20 cycles
(3360 hours).
5.5 Cathodic Disbonding ASTM G8
Coating system test panels are subjected to a potential range of -1,45 V to 1.55 V, with respect to a
Cu/CuSO4 reference electrode, via an impressed current system or a sacrificial magnesium anode whilst
immersed in an electrolyte of composition 1% Sodium Chloride, 1% Sodium Sulphate, 1% Sodium Carbonate
at a temperature in the range of 21-25C.
The duration of the test shall be 30 days.
One 6.35 mm diameter circular holiday shall be made in the centre of the test panel down to the metal
substrate.
This procedure is described in the ASTM G8 standard (Method B).
5.6 Scribing of Test Panels
Scribing of test panels involves placing a horizontal cut into the coating system down to the underlying
substrate. This can provide data such as corrosion under creep and blistering/cracking associated with film
perforation, and provides a means of evaluating the anti-corrosive ability of the coating system under test.
This standard specifies a 50mm x 2mm (70mm from the bottom) wide horizontal scribe cut into each test panel
using a slot drill and drill press. The maximum width of corrosion (across the scribe) was measured at the
centre of the scribe and at four points either side of the centre at 5mm intervals. This gives a total of 9
measurements for each scribe. The equation below was used to evaluate the average corrosion under creep:
A= (P L) / 2
A = Average corrosion under creep (mm)
P = Average of the 9 measurements (mm)
L = Width of the scribe (2mm)

THE DATA, OR PART THEREOF, ARE PETROBRAS PROPERTY AND THUS MUST NOT BE USED IN ANY W ITHOUT PERMISSION.

TECHNICAL SPECIFICATION

No.

REV.

I-ET-3010.00-1300-140-PPC-002

AREA OR UNIDADE

B
SHEET

of

TITLE

SURFACE TOLERANT SOLVENT FREE EPOXY PAINT FOR WET SURFACES

ANNEX A - FIGURES

THE DATA, OR PART THEREOF, ARE PETROBRAS PROPERTY AND THUS MUST NOT BE USED IN ANY W ITHOUT PERMISSION.

TECHNICAL SPECIFICATION

No.

REV.

I-ET-3010.00-1300-140-PPC-002

AREA OR UNIDADE

B
SHEET

of

TITLE

SURFACE TOLERANT SOLVENT FREE EPOXY PAINT FOR WET SURFACES

FIGURE A-1 Infrared Spectrum of Epoxy resin Component A

THE DATA, OR PART THEREOF, ARE PETROBRAS PROPERTY AND THUS MUST NOT BE USED IN ANY W ITHOUT PERMISSION.

TECHNICAL SPECIFICATION

No.

REV.

I-ET-3010.00-1300-140-PPC-002

AREA OR UNIDADE

B
SHEET

of

TITLE

SURFACE TOLERANT SOLVENT FREE EPOXY PAINT FOR WET SURFACES

FIGURE A-2 Infrared Spectrum of Cure Agent Component B

THE DATA, OR PART THEREOF, ARE PETROBRAS PROPERTY AND THUS MUST NOT BE USED IN ANY W ITHOUT PERMISSION.

EURONAVY S.A.

A GUIDE FOR ES301 COATING SYSTEM APPRAISAL


October 2008

The Transocean Case


Transocean had chosen the ES301 system for the refurbishment of the
tanks of the Discoverer 534 drill ship in 2007, using hydroblasting. The
quality of the protection after application (pull-off tests), the quality of
technical service from Euronavy and for the overall service life extension
project have been praised by Transoceans project team.
Thanks to the good indications from the D534 project, Euronavy was proud
to receive repeated business from Transocean in 2008. It was the case of
the Discoverer Seven Seas drill ship refurbishment project, in Singapore (all
tanks got the ES301 coatings system), and the Nordic jack up tank
refurbishment job performed at pier side in Johor, Malaysia, in the first half
of 2008.

Attached

x Letter of recommendation from Transocean (Discoverer 534 project)

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal
Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

EURONAVY S.A.

A GUIDE FOR ES301 COATING SYSTEM APPRAISAL


October 2008

The Aker Case


Aker Floating Production ASA, a subsidiary of Aker Group, launched
recently his FPSO conversion program. The first FPSO being converted by
Aker is the Aker Smart 1. This project started in 2007 at Jurong Shipyard in
Singapore and Euronavy was chosen as single coating supplier, with ES301
system being applied in most of the areas.

Attached

x Photo Report and Pull-off Test Report on ES301 application over hydroblasting
(Aker Smart 1 Project).

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal
Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

PULL-OFF TEST REPORT


Project: FPSO AKER SMART 1
Report No.:

POT-AS1-001

Date:

Wednesday, 14 March 2007

Client:

Aker Floating Production ASA

Contractor:

ENTRACO

Item/Location Main Deck

Substrate

SURFACE PREPARATION
Preparation Method

Carbon steel with minor pitting

Coat

Date Applied

1st Coat

01 Feb. 2007

Visual Standard

Hydroblasting

WJ2M

COATING SYSTEM
Product Name
Base Batch #
EURO-basic ES301K62

Curing Agent #

Color

58014

Red Oxide

17931

PULL-OFF TEST RESULTS


Dolly No.

DFT (Pm)

Strength

175Pm

21.72 MPa
3,149 psi

Y/Y (100% glue failure)

135Pm

19.89 MPa
2,884 psi

Y/Y (100% glue failure)

100Pm

18.15 MPa
2,632 psi

Y/Y (100% glue failure)

105Pm

20.55 MPa
2,980 psi

Y/Y (100% glue failure)

85Pm

15.11 MPa
2,191 psi

Y/Y (100% glue failure)

120Pm

18.74 MPa
2,717 psi

Y/Y (100% glue failure)

Average

120Pm

19.03 MPa
2,759 psi

Note: Failure types are A=Substrate, B=1st coat,


C=2nd coat, Y=Adhesive, Z=Dolly

TYPE OF FAILURE

Adhesive Used

Date Attached

Date Pulled

Araldite (Red)

08 March 2007

09 March 2007

Comments:
The pull-off adhesion test was carried out using a calibrated Elcometer hydraulic adhesion tester model 108
witnessed by Mr. Raymond Hansen (Aker Floating Productions ASA), Mr. Jonathan Suerte and Mr. Norman
Soh (Euronavy). In all the test spots the substrate was not exposed.
Surface preparation, paint application and test photos are attached below.

EURONAVY

AKER

PULL-OFF TEST REPORT


Project: FPSO AKER SMART 1
Photo No. 1 Hydroblasting

Photo No. 2 Surface Condition Before Painting

PULL-OFF TEST REPORT


Project: FPSO AKER SMART 1
Photo No. 3 First Full Coat Application

Photo No. 4 Surface Condition During First Full Coat Application

PULL-OFF TEST REPORT


Project: FPSO AKER SMART 1
Photo No. 5 Dolly Attached for Adhesion Test

Photo No. 6 Dollies Attached for Adhesion Test

PULL-OFF TEST REPORT


Project: FPSO AKER SMART 1
Photo No. 7 Dollies Attached for Adhesion Test

Photo No. 8 Pull-Off Adhesion Test

PULL-OFF TEST REPORT


Project: FPSO AKER SMART 1
Photo No. 9 Pull-Off Adhesion Test Result

Photo No. 10 Pull-Off Adhesion Test Result

PULL-OFF TEST REPORT


Project: FPSO AKER SMART 1
Photo No. 11 Pull-Off Adhesion Test Result

Photo No. 12 Pull-Off Adhesion Test Result

PULL-OFF TEST REPORT


Project: FPSO AKER SMART 1
Photo No. 13 Pull-Off Adhesion Test Result

Photo No. 14 Pull-Off Adhesion Test Result

EURONAVY S.A.

A GUIDE FOR ES301 COATING SYSTEM APPRAISAL


October 2008

The BP Case
The joint use of ES301 system and hydroblasting greatly improved the
blasting and painting maintenance operations outcome onboard the biggest
oil platform in the world.

Attached

x Painting at Night in the Gulf of Mexico. Ken Judice Jr., Coatings&Linings

Feb2007. Article on the use of ES301 technology together with hydroblasting at


Thunder Horse field.

Euronavy Tintas Martimas e Industriais S.A.


Estrada Vale de Mulatas, Quinta de S. Francisco
2914-516 Setbal
Portugal
Tel.: (351) 265739440 | Fax: (351) 265702711
sales@euronavy.net | www.euronavy.net

)
8IQV\QVOI\
807:/7<<-680-675-6)

UIRWZWQTKWUXIVaZMKMV\TaI[SML
UM\W[]XMZ^Q[MIVLM`MK]\M\PM
ZMXIQV\QVO WN Q\[ PMTQXWZ\
TWKI\MLUQTM[SUNZWU
\PMKWI[\QV\PM/]TNWN5M`QKW<PM_WZS
PIL\WJMLWVMI\VQOP\8IQV\QVOI\VQOP\
QV\PM/]TNQ[VW\IKWUUWVXZIK\QKMNWZ
WJ^QW][ZMI[WV[<PMKWI\QVO[a[\MU\PI\
PIL ZMKMV\Ta JMMV IXXTQML _I[ NIQTQVO
*TQ[\MZQVO IVL KZIKSQVO _MZM XZM^ITMV\
KI][QVOLM\IKPMLTWW[MKWI\QVOIVLM`
XW[QVO\PM[]J[\ZI\M\W\PMWNN[PWZMMTM
UMV\[ <PM WQT KWUXIVa IVL \PM =;
+WI[\/]IZL_MZMKWVKMZVMLIJW]\XMZ
[WVVMT[INM\aJMKI][MWN\PMXW[[QJQTQ\aWN
aQVOXIQV\LMJZQ[IVL[QOVQKIV\UM\IT
3-62=,1+-2:2]LQKM1V[XMK\QVOIVL+WV[]T\QVO6M_*ZI]VNMT[<M`I[ TW[[<PMKWI\QVO[a[\MU_I[JMaWVLZM
XIQZ IVL _W]TL ZMY]QZM KWUXTM\M ZM
UW^IT<PM[\Z]K\]ZMQ[\PM_WZTL[TIZOM[\
[MUQ[]JUMZ[QJTM IVL Q[ QV f N\
 !UWN_I\MZ<PMPMTQXWZ\WV\PQ[
^MZaTIZOM[\Z]K\]ZMQ[N\!U
)JZI[Q^MJTI[\QVO_I[W]\WN\PMY]M[\QWV
JMKI][MWN\PMTIZOMV]UJMZWNKZIN\[UMV
IVLZW\I\QVOMY]QXUMV\WV\PMPMTQXWZ\
1 IOZMML _Q\P \PM KTQMV\ \PI\ _WZS
KW]TLVW\XW[[QJTaJMXMZNWZUMLL]ZQVO
LIaTQOP\PW]Z[JMKI][MWNI^MZaJ][aIVL
KZ]KQIT NTQOP\ [KPML]TM )\ TMI[\ \PZMM
QOP\[_MZM[KPML]TMLM^MZaLIaIVLWV
UIVa LIa[ ^M QOP\[ WKK]ZZML <PMZM
_MZM IT[W \_W WI\MT[ WI\QVO PW\MT[
VMIZJaNWZ\PM_WZSMZ[IVL\PMPMTQXWZ\
_I[ ][ML I[ I [\IOQVO IZMI \W \ZIV[NMZ
\PM[MNWTS[\WIVLNZWU\PMWI\MT[L]ZQVO
LIaTQOP\PW]Z[JM\_MMVQOP\[
1ZMUMUJMZMLWVMWNUaZ[\QV[XMK
\QWVRWJ[[M^MZITaMIZ[IOWQV4W]Q[QIVI
1 _I[ _WZSQVO WV [WUM TIZOM \WX[QLM
UWL]TM[JMQVONIJZQKI\MLI\ITWKITaIZL
IVL_M_MZMXIQV\QVOI\VQOP\QVIPMI^a
NWO ]VLMZ \PM LQZMK\QWV WN \PM XIQV\
UIV]NIK\]ZMZ<PMXZWL]K\_I[IUWQ[
\]ZM\WTMZIV\ [WT^MV\NZMM MXW`a <PM
KWI\QVO[a[\MUXMZNWZUMLXPMVWUMVITTa
_MTTQVPQOPP]UQLQ\aIVLKW]TLJMIX
XTQML W^MZ LIUX []ZNIKM[ 1\ _I[ ]VTQSM
IVa KWI\QVO 1 PI^M M^MZ M`XMZQMVKML

6QOP\QV\PM
/]TNWN5M`QKW
FIFMJQPSUPOBWFSZMBSHFPTIPSFTUSVDUVSF

SFRVJSFEDPNQMFUFDPBUJOHSFNPWBMBOE

SFQMBDFNFOUFXPSLDPVMEOPUCFQFSGPSNFE

EVSJOHEBZMJHIUIPVSTCFDBVTFPGBWFSZCVTZBOE
DSVDJBMnJHIUTDIFEVMF BTXFMMBTTBGFUZDPODFSOTGPS

UIFXPSLFSTGSPNQBJOUEFCSJTBOENFUBMMPTTJT
BSUJDMFEFTDSJCFTUIFNFUIPETBOENBUFSJBMTVTFEUP

QFSGPSNUIFXPSLEVSJOHOJHIUUJNFIPVSTF
KPCXBTTVDDFTTGVMMZDPNQMFUFEJOUXPXFFLT

 -!4%2)!,30%2&/2-!.#% .MJZ]IZa


" /   -      -

1,

:MUMUJMZQVO\PMM`KMTTMV\XMZNWZUIVKM
WN\PQ[XZWL]K\1XZWXW[MLQ\I[\PM[WT]
\QWVNWZ\PQ[VQOP\\QUM_WZS<PMKTQMV\
LMKQLML\PI\\PMaLQLVW\PI^MU]KP\W
TW[MIVL\WWSIKPIVKM
1ZM_ZW\M\PMKWI\QVO[XMKQKI\QWV\W
QVKT]LM]T\ZIPQOPXZM[[]ZM_I\MZRM\\QVO
=08?2 I\  X[Q NWZ []ZNIKM
XZMXIZI\QWV-XW`aUIV]NIK\]ZMLNWZ][M
W^MZ _I\MZRM\\ML []ZNIKM[ _QTT \WTMZI\M
UWLMZI\M []ZNIKM Z][\ IVL Q[ L]ZIJTM
MVW]OPNWZ][MWVPMI^a_MIZLMKS[]Z
NIKM[][QVOVWV[SQLILLQ\Q^M[1\ZMY]QZM[
I?25LMOZMMWNKTMIVTQVM[[J]\\PM
[XMKQKI\QWV_I[_ZQ\\MV\WZMY]QZM?2
5_PQKPM`KMMLML\PMUIV]NIK\]ZMZ[
ZMKWUUMVLI\QWV ;IT\ \M[\QVO _I[ IT[W
QVKWZXWZI\MLXMZ6)+-6W;;8+;8
<IJTM)IVL6>WV\PM_I\MZ
RM\\ML[]ZNIKM[<PM_I\MZ][MLNWZKTMIV
QVO _I[ IT[W KPMKSML NZMY]MV\Ta ][QVO
[QUQTIZ IKKMX\IVKM KZQ\MZQI .QVITTa \W
MV[]ZMILMY]I\MILPM[QWV\PM[XMKQKI
\QWV ZMY]QZML \PZMM ILPM[QWV \M[\[ ZIV
LWUTa[MTMK\MLNWZM^MZaN\!
UWN_I\MZRM\\MLIVLXZQUML[]ZNIKM
_Q\PIUQVQU]UZMY]QZMUMV\WNX[Q
NWZM^MZaLWTTaX]TTML
?MI^MZIOMLN\!UIVQOP\
][QVO _ITSJMPQVL UW_MZ[ WV \PM I\
LMKS[]ZNIKM[_Q\PPIVLPMTLTIVKM[\W
ZMUW^MKWI\QVOIVL[KITMIZW]VLPIZL
\WZMIKPIZMI[?MVMMLML\W_I\MZRM\
\PM[]ZNIKMIVLIXXTa\PMXZQUMZI[[WWV
I[XW[[QJTMMIKPVQOP\\WITTW_\PMXZWL
]K\\W[M\]XMVW]OPfPI\.NWZ
\PMPMTQKWX\MZ[\WTIVL_Q\PW]\LIUIO
QVO\PMVM_TaIXXTQMLKWI\QVO<PMZ[\
QOP\TIVLMLI\"IUMIKPLIa.QO
]ZM
<MUXWZIZa KWV\IQVUMV\ JIZZQKILM[
_MZMMZMK\ML][QVO[KINNWTLQVOUI\MZQIT[
IVL \IZX[ MIKP IN\MZVWWV QUUMLQI\MTa
NWTTW_QVO\PMLMXIZ\]ZMWN\PMTI[\QOP\
WN\PMLIaIVL\ISMVLW_VMIKPUWZVQVO
IN\MZXIQV\QVO_I[VQ[PML<PQ[KWV\IQV
UMV\.QO]ZM_I[LM[QOVML\WJM\ISMV
LW_VY]QKSTa_Q\PQVUQVQVKI[MWN

/V>iVi>>

1,

>iL>i>ii}}i

IVMUMZOMVKaQOP\?I\MZZ]VWNN_I[
KIX\]ZML Ja \PM WXMV LZIQV [a[\MU WV
JWIZL IN\MZ JMQVO T\MZML \W KIX\]ZM ITT
TWW[MXIQV\XIZ\QKTM[
;IT\TM^MT[WV\PM_I\MZRM\\ML[]ZNIKM[
_MZMVM^MZNW]VL\WM`KMMLOKU

_MTT JMTW_ \PM ZMY]QZML  OKU  


=08?2 I\  X[Q ITWVO _Q\P I
LQ[KPIZOM\MUXMZI\]ZMWN.!+I\
\PM_I\MZRM\VWbbTM[OI^M][ILMOZMMWN
KTMIVTQVM[[WV\PM[]ZNIKM\PI\1PILVW\
M`XMZQMVKMLJMNWZM.QO]ZM
.MJZ]IZa -!4%2)!,30%2&/2-!.#% 


" /   -      -

8IQV\QVOI\6QOP\QV\PM/]TNWN5M`QKW
1,

7>iii`v>Vi

<_MT^M LIa[ TI\MZ \PM PMTQXWZ\ _I[


KWUXTM\ML IVL ITT \PI\ ZMUIQVML _I[
[\MVKQTQVO?MVQ[PML\PM]ZM\PIVM\WX
KWI\ IVL UIZSQVO[ L]ZQVO \PM LIa\QUM
_PMVIUJQMV\KWVLQ\QWV[_MZMNI^WZIJTM
7V_MMSMVL[\PMTI[\QOP\TMN\I\"
IU#\PQ[ITTW_MLXTMV\aWN\QUMNWZ\PM
]ZM\PIVM\WJMIXXTQMLIVLK]ZM_Q\PW]\
JT][PQVOJMNWZMPQOPP]UQLQ\a[M\QV
<PMILPM[QWV\M[\[ZM[]T\[_MZMM`KMT
TMV\-^MZaLWTTa_MOT]MLX]TTMLI\TMI[\
 X[Q_Q\PUIVaWN\PMUM`KMMLQVO
\PM QV[\Z]UMV\ UI`QU]U WN  X[Q
<PM MV\QZM PMTQXWZ\ KWI\QVO _I[ KWU
XTM\MLQVLIa[
,iviiVi
 6)+-6W;;8+;8;]ZNIKM
8ZMXIZI\QWVIVL+TMIVQVOWN;\MMTIVL
7\PMZ0IZL5I\MZQIT[Ja0QOPIVL
=T\ZIPQOP8ZM[[]ZM?I\MZ2M\\QVO
0W][\WV<@"6)+-1V\MZVI\QWVIT
 1 
],i`iv`ViiV
>`
}]->`] i >vi]
/8ni>i>i>vV>}
iiiViiv
>>`vviV
`ii>ii>V>}V>>`iV
>>}i]> 
Viwi`
>}iV]>`>
7-Viwi`7i`}iVi>Lii>

iLivi>

 -!4%2)!,30%2&/2-!.#% .MJZ]IZa

Anda mungkin juga menyukai