METRADO DE LOSAS CONCRETO 30MPa - EWTP

FRENTES
FRENTE 1
FRENTE 2
FRENTE 3
FRENTE 4
FRENTE 5A
FRENTE 5B
FRENTE 6
FRENTE 7
FRENTE 8
FRENTE 9
FRENTE 10
FRENTE 11

VOLUMEN TOTAL

AREA (m2)

CONCRETO (m3)

103.55
90.74
113.83
127.91
224.93
203.46
89.88
144.66
162.46
93.23
134.46
42.71

20.71
18.148
22.766
25.582
44.986
40.692
17.976
28.932
32.492
18.646
26.892
8.542

1531.82
m2

306.364
m3

LOSA (CONCRETO ARMADO 30 Mpa /300 kg/cm2)

HOJA METRADO DE LA QUINUA LQ EWTP - PIPE RACK - REACTOR, US


FEED & FRESH WATER TANKS

UBICACIN

1
2
2

3410

PLANO

REV-0

REV-1

REV-H

PARTIDA

Aprom

veces

m3

hprom

Lprom

1-00-01-01-3410

3410
3410
TOTALES

Total Losa (m3)

Total Losa (m3)

LOSA (CONCRETO ARMADO 30 Mpa /300 kg/cm2)

TOTAL (M3)

HOJA METRADO DE LA QUINUA LQ EWTP - PIPE RACK - REACTOR, US


FEED & FRESH WATER TANKS

UBICACIN

1
2
2

3410

PLANO

REV-0

REV-1

REV-H

3410
3410
TOTALES

Total Losa (m3)

veces

m3

MUROS ALTOS (CONCRETO ARMADO 30 Mpa /300 kg/cm2)

HOJA METRADO DE LA QUINUA LQ EWTP- ELECTRICAL ROOM

UBICACIN

PLANO

REV-0

REV-1

REV-H

PARTIDA

hprom

Lprom

veces

m3

hprom

Lprom

MUROS ALTOS (CONCRETO ARMADO 30 Mpa /300 kg/cm2)

TOTAL (M3)

HOJA METRADO DE LA QUINUA LQ EWTP- ELECTRICAL ROOM

UBICACIN

PLANO

REV-0

REV-1

REV-H

veces

m3