Table of Contents
Page
Bus Scorecard Overview

Bus Service Performance Systemwide


In-Service On-Time Performance
Scheduled Revenue Service Hours Delivered

Bus Maintenance Performance


Mean Miles Between Chargeable Mechanical Failures
Past Due Critical Preventive Maintenance Program

14

Attendance
Maintenance Attendance

20

Bus Cleanliness

21

Rail Scorecard Overview

24

Rail Performance
In-Service On-Time Performance
Schedule Revenue Service Hours Delivered
Mean Miles Between Chargeable Mechanical Failures
On-time Service

26

Safety Performance
Bus Accidents per 100,000 Hub Miles
Bus Passenger Accidents per 100,000 Boardings
Rail Accidents per 100,000 Revenue Train Miles
Rail Passenger Accidents per 100,000 Boardings

31

Customer Satisfaction
Complaints per 100,000 Boardings

39

New Workers' Compensation Claims


New Workers' Compensation Claims per 200,000 Exposure Hours
OSHA Injuries Filed per 200,000 Exposure Hours
Number of Lost Work Days Paid per 200,000 Exposure Hours

43

"How You Doin'?" Incentive Program

53

Page 2

Metro Bus Systemwide and Division Scorecard Overview


Metro Bus has eleven Metro operating divisions: Division 1 and 2, both operating out of the downtown Los Angeles area;
Division 3 in Cypress Park; Arthur Winston Division 5 in South Los Angeles; Division 6 in Venice (Closed); Division 7 in West
Hollywood; Division 8 in Chatsworth; Division 9 in El Monte; Division 10 in Los Angeles; Division 13 in Los Angeles; Division 15
in Sun Valley; Division 13 in Los Angeles; and Division 18 in Carson. Metro Bus systemwide is responsible for the operation of
approximately 2,490 Metro buses and 144 Metro Bus lines carrying nearly 395.5 million boarding passengers each year. Metro
bus also operates the Orange and Silver Lines.
This report gives a brief overview of Systemwide and Division operations:
* Mean Miles Between Mechanical Failures Requiring Bus Exchange (MMBMF).
* Mean Miles Between Total Road Calls (MMBTRC).
* In-Service On-Time Performance.
* Traffic Accidents per 100,000 Hub Miles.
* Complaints per 100,000 Boardings.
* New Reported Workers' Compensation Indemnity & Medical Claims per 200,000 Exposure Hours.

Measurement
Bus Systemwide
Mean Miles Between Mechanical Failures
Requiring Bus Exchange. (MMBMF)
No. of unaddressed road calls
Mean Miles Between Total Road Calls (MMBTRC)
**
Bus Traffic Accidents Per 100,000 Miles
Number of "482 alleged accidents"
Complaints per 100,000 Boardings
New Reported Workers' Compensation Claims
per 200,000 Exposure Hours *
In-Service On-time Performance - Early
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

FY 2013 FY 2014 FY 2015

FY 2016 FY 2016
Target
YTD

3,827

4,163

4,710

4,680

5,033

15

42

40

114

2,443

2,962

3,369

3,359

3,846

3.65
214
3.39

3.61
219
3.77

3.83
230
3.78

3.67
3.91

4.28
218
4.26

16.80

18.34

17.50

16.83

4.66%
19.51%
75.84%

4.64%
19.21%
76.14%

4.00%
20.65%
75.35%

3,827

3,961

15

42

2,443

FYTD
Status

Mar
Month

Apr
Month

May
Month

5,116

5,073

5,199

18

19

12

4,116

3,984

4,127

4.07
16
5.42

5.27
22
4.74

4.20
30
4.23

16.06

17.28

13.91

15.98

2.00%
18.00%
80.00%

4.04%
22.43%
73.54%

4.43%
22.73%
72.84%

4.69%
23.54%
71.78%

4.51%
21.92%
73.57%

4,482

4,529

4,808

4,869

4,865

5,110

40

114

18

19

12

2,863

3,271

3,311

3,741

4,002

3,829

3,923

4.09

4.85

4.11

16

22

30

Bus Directly Operated


Mean Miles Between Mechanical Failures
Requiring Bus Exchange. (MMBMF)
No. of unaddressed road calls
Mean Miles Between Total Road Calls (MMBTRC)
**
Bus Traffic Accidents Per 100,000 Miles

3.65

3.57

3.77

3.69

4.21

Number of "482 alleged accidents"

214

219

230

218

Complaints per 100,000 Boardings

3.15
16.80
4.69%
19.49%

3.64
18.34
5.01%
18.84%

3.63
17.50
4.29%
20.68%

3.59
16.83
2.00%
18.00%

4.12
16.06
4.29%
22.63%

5.26
17.28
4.74%
23.11%

4.54
13.91
5.00%
23.73%

4.07
15.98
4.75%
22.10%

75.82%

76.15%

75.03%

80.00%

73.08%

72.15%

71.27%

73.15%

New Reported Workers' Compensation Claims


per
200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

Bus Purchased Transportation


Mean Miles Between Mechanical Failures
Requiring Bus Exchange. (MMBMF)
No. of unaddressed road calls
Mean Miles Between Total Road Calls (MMBTRC)
**
Bus Traffic Accidents Per 100,000 Miles

0
N/A
0
0.00

11,120

12,302

N/A

N/A

5,164
4.04

5,267
4.56

7,500
N/A
4,000
3.48

10,874
N/A
5,659

N/A

N/A

N/A

N/A

N/A

Complaints per 100,000 Boardings

0.00
N/A
0.73%
22.06%

6.44
N/A
0.52%
23.35%

6.89
N/A
0.70%
20.29%

10.00
N/A
2.00%
18.00%

7.10
N/A
1.05%
19.98%

77.22%
76.13%
79.01%
80.00%
Green - High probability of achieving the target (on track). Meets Target at 100% or better.

78.97%

In-Service On-time Performance - Late


In-Service On-time Performance - OnTime

N/A
5,915

5.01

Number of "482 alleged accidents"


New Reported Workers' Compensation Claims
per
200,000
Exposure
Hours * - Early
In-Service
On-time
Performance

11,238
N/A

3.86
N/A
N/A

9,302
N/A
7,001
9.68

6,384
N/A
9,261
5.17

N/A

N/A

N/A

8.66
N/A
1.22%
18.77%

9.01
N/A
1.14%
21.38%

7.39
N/A
1.52%
19.67%

80.00%

77.48%

78.81%

Yellow - Uncertain if the target will be achieved -- slight problems, delays or management issues. Falls below Target 70 - 99%.
Red - High probability that the target will not be achieved -- significant problems and/or delays. Falls below Target >70%.

Page 3

Measurement

FY 2013 FY 2014 FY 2015

FY 2016 FY 2016
Target
YTD

FYTD
Status

Mar
Month

Apr
Month

May
Month

Division 1
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No.
of unaddressed
road calls
Mean Miles Between Total Road Calls (MMBTRC)
**
Bus Traffic Accidents Per 100,000 Miles

3,539
0

3,649
0

3,099
18

3,141
-

3,551
44

1,915

2,077

2,058

2,083

2,765

4.02

5.07

3,738
9

4,089
10

4,648
10

3,075

3,135

3,486

4.58

6.38

6.57

3.71

3.94

4.18

Number of "482 alleged accidents"

23

25

42

Complaints per 100,000 Boardings

2.37
16.95
4.59%
15.85%

2.72
19.57
4.54%
17.69%

2.92
16.40
3.88%
21.47%

2.90
15.56
2.00%
18.00%

3.91
13.96
4.16%
25.94%

5.44
14.34
4.46%
26.86%

4.28
12.82
4.89%
26.54%

3.21
18.16
4.76%
23.88%

79.56%

77.77%

74.65%

80.00%

69.90%

68.68%

68.57%

71.36%

2,993
8

3,151
1

3,461
2

3,469
-

5,173
2

6,361
0

6,517
0

6,435
1

1,892

2,251

2,360

2,388

3,540

4,597

4,697

4,144

4.31

4.25

4.24

4.10

4.52

3.84

6.90

4.20

Number of "482 alleged accidents"

16

24

25

Complaints per 100,000 Boardings

2.04
20.29
5.24%
20.74%

2.40
21.72
4.71%
19.17%

2.20
20.68
4.96%
20.79%

2.14
19.90
2.00%
18.00%

2.59
24.62
4.74%
23.32%

3.33
37.62
4.68%
23.59%

3.05
35.65
4.65%
25.29%

2.72
11.05
3.94%
23.57%

74.02%

76.12%

74.26%

80.00%

71.94%

71.73%

70.07%

72.49%

3,446
2
2,575
3.86
28

4,614
3
3,732
4.47
7

5,599
3
3,924
4.67
2

5,664
3,948
4.57
-

5,278
1
4,403
5.27
10

5,444
0
4,413
5.49
2

4,614
0
3,649
7.16
3

5,602
0
4,455
5.13
0

3.22
13.24
5.18%
18.72%

3.70
15.09
6.18%
18.69%

3.81
14.16
5.64%
19.95%

3.75
12.21
2.00%
18.00%

4.20
18.88
5.29%
21.98%

5.09
21.56
5.93%
22.44%

4.44
11.18
6.43%
23.00%

3.87
30.21
6.67%
19.70%

76.10%

75.12%

74.41%

80.00%

72.73%

71.63%

70.57%

73.63%

3,428
0
2,211
4.49
36

3,954
3
2,731
4.81
37

5,383
3
3,838
4.88
37

5,428
3,878
4.74
-

5,898
4
4,664
4.78
34

6,359
1
5,270
4.10
2

4,907
2
4,270
4.65
0

5,918
0
5,111
3.91
6

2.41
21.74
5.78%
18.33%

2.92
17.88
6.05%
19.11%

2.84
17.28
5.05%
20.62%

2.82
16.13
2.00%
18.00%

3.59
18.34
5.17%
22.21%

4.56
15.12
6.41%
20.71%

3.86
10.75
6.52%
22.11%

3.26
18.76
6.02%
21.45%

75.89%

74.84%

74.32%

80.00%

72.63%

72.89%

71.37%

72.54%

11,013
0
3,726
7.08
0

7,017
0
2,861
4.75
1

10,370
0
4,093
5.14
3

10,689
4,179
5.12
-

11,087
0
4,891
5.01
3

0
0
0
0.00
0

0
0
0
0.00
0

0
0
0
0.00
0

2.34
11.46
4.43%
20.31%

4.29
35.33
7.83%
16.73%

5.34
20.22
4.56%
23.34%

5.05
20.15
2.00%
18.00%

5.66
22.38
4.89%
26.84%

0.00
0.00
0.00%
0.00%

0.00
0.00
0.00%
0.00%

0.00
0.00
0.00%
0.00%

75.26%
75.44%
72.10%
80.00%
Green - High probability of achieving the target (on track). Meets Target at 100% or better.

68.27%

0.00%

0.00%

0.00%

New Reported Workers' Compensation Claims


per
200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

37

Division 2
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No. of unaddressed
road calls
Mean Miles Between Total Road Calls (MMBTRC)
**
Bus Traffic Accidents Per 100,000 Miles

New Reported Workers' Compensation Claims


per 200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

16

Division 3
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No.
of unaddressed
road calls
Mean Miles Between Total Road Calls (MMBTRC)
** Traffic Accidents Per 100,000 Miles
Bus
Number of "482 alleged accidents"
Complaints per 100,000 Boardings
New Reported Workers' Compensation Claims
per 200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

Division 5
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No.
of unaddressed
road calls
Mean Miles Between Total Road Calls (MMBTRC)
** Traffic Accidents Per 100,000 Miles
Bus
Number of "482 alleged accidents"
Complaints per 100,000 Boardings
New Reported Workers' Compensation Claims
per 200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

Division 6
Mean Miles Between Mechanical Failures
No. of unaddressed road calls
Mean Miles Between Total Road Calls (MMBTRC)
Bus Traffic Accidents Per 100,000 Miles
Number of "482 alleged accidents"
Complaints per 100,000 Boardings
New Reported Workers' Compensation Claims
per 200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

Yellow - Uncertain if the target will be achieved -- slight problems, delays or management issues. Falls below Target 70 - 99%.
Red - High probability that the target will not be achieved -- significant problems and/or delays. Falls below Target >70%.

Page 4

Measurement

FY 2013 FY 2014 FY 2015

FY 2016 FY 2016
Target
YTD

FYTD
Status

Mar
Month

Apr
Month

May
Month

Division 7
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No.
of unaddressed
road calls
Mean Miles Between Total Road Calls (MMBTRC)
** Traffic Accidents Per 100,000 Miles
Bus
Number of "482 alleged accidents"
Complaints per 100,000 Boardings
New Reported Workers' Compensation Claims
per 200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

3,394
0
1,980
4.06
27

3,453
2
2,423
4.60
12

5,913
2
4,216
4.59
12

6,027
4,316
4.50
-

5,055
0
3,976
4.62
22

5,199
0
4,249
3.63
3

5,590
0
4,285
5.45
4

5,565
0
4,717
4.21
1

3.13
12.82
4.95%
23.09%

3.32
13.74
5.32%
22.71%

3.28
11.36
4.28%
24.09%

3.23
11.00
2.00%
18.00%

3.85
11.28
4.33%
25.30%

5.06
11.84
4.80%
25.03%

4.99
6.45
5.22%
26.25%

4.18
14.95
5.17%
23.98%

71.96%

71.98%

71.64%

80.00%

70.37%

70.18%

68.53%

70.85%

5,957
2
4,348
2.14
9

5,292
21
4,717
1.86
10

5,623
0
4,979
2.01
8

5,766
5,051
2.05
-

5,280
29
4,753
2.44
18

4,461
7
4,545
1.80
1

5,005
3
4,376
3.45
2

5,538
1
5,207
2.58
1

3.77
14.80
3.95%
16.23%

4.30
18.34
3.97%
12.38%

3.42
17.88
3.21%
12.05%

3.35
17.88
2.00%
18.00%

4.42
18.27
3.13%
13.68%

5.51
12.40
3.59%
16.04%

4.14
14.07
3.95%
16.80%

4.72
27.72
4.04%
16.17%

79.82%

83.65%

84.74%

80.00%

83.19%

80.36%

79.25%

79.79%

5,109
2
4,100
2.30
17

4,366
4
4,100
2.22
25

5,141
0
4,104
2.23
12

5,091
4,115
2.17
-

5,858
17
4,068
2.50
5

4,740
0
3,749
2.43
0

5,305
0
3,242
2.78
1

5,726
0
3,758
1.98
1

5.08
18.34
4.35%
19.61%

5.33
25.80
5.65%
18.80%

5.88
24.72
5.01%
19.98%

5.86
23.94
2.00%
18.00%

6.59
17.89
4.04%
20.68%

7.76
12.13
3.71%
20.27%

7.43
13.05
4.03%
21.63%

6.20
17.29
3.95%
20.82%

76.04%

75.55%

75.00%

80.00%

75.28%

76.02%

74.34%

75.23%

2,999
0
1,947
4.82
10

2,931
5
2,145
3.92
20

2,961
2
2,343
4.61
29

2,995
2,373
4.57
-

3,522
3
2,748
5.24
23

3,548
0
2,956
4.97
2

3,621
0
3,528
4.69
0

3,481
0
2,724
5.50
7

2.59
18.73
4.54%

2.93
16.74
5.00%

2.95
24.23
4.12%

2.89
24.12
2.00%

3.23
16.56
4.79%

4.80
16.27
6.72%

3.92
15.55
6.74%

3.32
12.91
5.65%

23.70%

23.13%

24.39%

18.00%

25.55%

25.93%

26.31%

24.63%

71.76%

71.87%

71.49%

80.00%

69.66%

67.35%

66.95%

69.73%

N/A
N/A

N/A
N/A

N/A
N/A

N/A
-

6,428
0

N/A
-

9,263
0

6,082
0

5,030
0

N/A

N/A

N/A

N/A

4,339

N/A

6,175

5,322

4,072

N/A

8.64

10.57

9.36

Division 8
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No.
of unaddressed
road calls
Mean Miles Between Total Road Calls (MMBTRC)
** Traffic Accidents Per 100,000 Miles
Bus
Number of "482 alleged accidents"
Complaints per 100,000 Boardings
New Reported Workers' Compensation Claims
per 200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

Division 9
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No.
of unaddressed
road calls
Mean Miles Between Total Road Calls (MMBTRC)
** Traffic Accidents Per 100,000 Miles
Bus
Number of "482 alleged accidents"
Complaints per 100,000 Boardings
New Reported Workers' Compensation Claims
per 200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

Division 10
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No.
of unaddressed
road calls
Mean Miles Between Total Road Calls (MMBTRC)
** Traffic Accidents Per 100,000 Miles
Bus
Number of "482 alleged accidents"
Complaints per 100,000 Boardings
New Reported Workers' Compensation Claims
per 200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

Division 13
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No.
of unaddressed
road calls
Mean Miles Between Total Road Calls (MMBTRC)
**
Bus Traffic Accidents Per 100,000 Miles

N/A

N/A

N/A

N/A

9.22

Number of "482 alleged accidents"

Complaints per 100,000 Boardings

N/A
N/A
N/A
N/A

N/A
N/A
N/A
N/A

N/A
N/A
N/A
N/A

N/A
N/A
N/A
N/A

3.90
3.63
5.39%
23.45%

N/A
N/A
N/A
N/A

4.04
0.00
5.10%
21.72%

2.98
0.00
5.84%
24.51%

4.07
0.00
5.54%
20.37%

N/A
N/A
N/A
N/A
Green - High probability of achieving the target (on track). Meets Target at 100% or better.

71.15%

N/A

73.17%

69.64%

74.09%

New Reported Workers' Compensation Claims


per
200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

Yellow - Uncertain if the target will be achieved -- slight problems, delays or management issues. Falls below Target 70 - 99%.
Red - High probability that the target will not be achieved -- significant problems and/or delays. Falls below Target >70%.

Page 5

Measurement

FY 2013 FY 2014 FY 2015

FY 2016 FY 2016
Target
YTD

FYTD
Status

Mar
Month

Apr
Month

May
Month

Division 15
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No.
of unaddressed
road calls
Mean Miles Between Total Road Calls (MMBTRC)
** Traffic Accidents Per 100,000 Miles
Bus
Number of "482 alleged accidents"
Complaints per 100,000 Boardings
New Reported Workers' Compensation Claims
per 200,000
Exposure
Hours * - Early
In-Service
On-time
Performance
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

4,285
0
2,984
3.25
18

4,210
0
3,552
3.19
23

4,133
9
3,485
3.12
19

4,235
3,544
3.04
-

4,319
13
3,865
3.94
15

3.26
12.97
3.68%
18.86%
77.46%

4.27
13.26
4.19%
17.71%
78.10%

4.47
13.50
3.71%
18.74%
77.55%

4.46
12.90
2.00%
18.00%
80.00%

4.80
14.03
3.79%
21.53%
74.68%

3,712
1
2,024
4.04
30

4,425
3
2,558
3.43
35

5,168
1
3,176
4.12
41

5,185
3,206
4.03
-

5,093
1
3,602
4.70
35

3.79

4.45

4.31

4.27

4.19

5.37

4.52

4.46

19.28
4.82%
20.97%

19.15
4.99%
20.14%

15.30
4.00%
24.37%

14.90
2.00%
18.00%

10.47
3.96%
25.30%

13.86
4.38%
25.58%

6.22
4.64%
25.32%

2.08
4.30%
23.58%

74.21%

74.87%

71.63%

80.00%

70.74%

70.04%

70.04%

72.12%

18,327
N/A
6,602
4.94
N/A

7,500
N/A
4,000
3.48
N/A

49,305
N/A
21,973
3.66
N/A

94,362
N/A
17,157
1.59
N/A

61,603
N/A
20,534
8.12
N/A

91,518
N/A
22,880
3.82
N/A

6.82
N/A
0.54%
18.60%

8.19
N/A
0.45%
23.05%

6.31
N/A
0.42%
19.33%

80.85%

76.49%

80.25%

5,346
N/A
4,440
2.67
N/A

4,524
N/A
4,871
6.71
N/A

5,050
N/A
5,853
3.88
N/A

8.54
N/A
0.82%
18.52%

10.54
N/A
0.65%
19.43%

7.16
N/A
0.92%
19.15%

80.66%

79.93%

79.94%

24,844
N/A
5,082
7.16
N/A

19,364
N/A
6,656
14.55
N/A

4,339
N/A
11,418
7.84
N/A

10.53
N/A
2.34%
19.26%

7.63
N/A
2.43%
22.44%

8.63
N/A
3.11%
20.56%

78.40%

75.14%

76.33%

4,665
1
4,214
4.70
2

4,393
4
3,844
4.09
2

4,633
0
3,655
3.66
1

6.00
24.07
3.76%
22.55%
73.70%

4.98
19.42
3.56%
22.27%
74.17%

4.83
14.64
3.54%
21.20%
75.26%

5,879
0
4,064
5.43
3

5,495
0
4,058
4.17
4

4,891
0
3,543
4.14
4

Division 18
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No.
of unaddressed
road calls*
Mean Miles Between Total Road Calls (MMBTRC)
** Traffic Accidents Per 100,000 Miles
Bus
Number of "482 alleged accidents"*
Complaints per 100,000 Boardings
New Reported Workers' Compensation*
In-Service On-time Performance - Early
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

Division 95
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No.
of unaddressed
road calls*

N/A

Mean Miles Between Total Road Calls (MMBTRC)


** Traffic Accidents Per 100,000 Miles
Bus
Number of "482 alleged accidents"*

0
0.00
N/A

14,936
N/A
7,636
3.16
N/A

Complaints per 100,000 Boardings

0.00
N/A
0.47%
22.63%

7.17
N/A
0.48%
23.04%

7.59
N/A
0.27%
19.90%

10.00
N/A
2.00%
18.00%

6.35
N/A
0.57%
20.29%

76.89%

76.48%

79.83%

80.00%

79.14%

0
0
0.00
N/A

8,082
N/A
4,188
5.25
N/A

8,154
N/A
4,301
4.38
N/A

7,500
N/A
4,000
3.48
N/A

6,243
N/A
4,353
4.82
N/A

0.00
N/A
0.80%
22.83%

7.04
N/A
0.38%
26.27%

8.18
N/A
0.82%
23.32%

10.00
N/A
2.00%
18.00%

8.18
N/A
0.76%
20.11%

76.37%

73.35%

75.85%

80.00%

79.13%

0
0
0.00
N/A

14,548
N/A
4,837
3.38
N/A

22,149
N/A
6,079
4.41
N/A

7,500
N/A
4,000
3.48
N/A

14,632
N/A
4,235
6.68
N/A

0.00
N/A
0.92%
20.05%

4.66
N/A
0.79%
19.12%

4.11
N/A
0.91%
16.62%

10.00
N/A
2.00%
18.00%

6.18
N/A
1.81%
19.56%

79.02%

80.09%

82.47%

80.00%

78.63%

New Reported Workers' Compensation*


In-Service On-time Performance - Early
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

N/A

N/A
N/A

Division 97
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No. of unaddressed
road calls*
Mean Miles Between Total Road Calls (MMBTRC)
** Traffic Accidents Per 100,000 Miles
Bus
Number of "482 alleged accidents"*
Complaints per 100,000 Boardings
New Reported Workers' Compensation*
In-Service On-time Performance - Early
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

N/A

N/A

N/A
N/A

Division 98
Mean Miles Between Mechanical Failures
Requiring
Bus Exchange.
(MMBMF)
No. of unaddressed
road calls*
Mean Miles Between Total Road Calls (MMBTRC)
** Traffic Accidents Per 100,000 Miles
Bus
Number of "482 alleged accidents"*
Complaints per 100,000 Boardings
New Reported Workers' Compensation*
In-Service On-time Performance - Early
In-Service On-time Performance - Late
In-Service On-time Performance - OnTime

N/A

N/A

N/A
N/A

*Data not available for Purchased Transportation


Green - High probability of achieving the target (on track). Meets Target at 100% or better.
Yellow - Uncertain if the target will be achieved -- slight problems, delays or management issues. Falls below Target 70 - 99%.
Red - High probability that the target will not be achieved -- significant problems and/or delays. Falls below Target >70%.

Page 6

BUS SERVICE PERFORMANCE


IN-SERVICE ON-TIME PERFORMANCE
Definition: This performance indicator measures the percentage of actual buses in revenue service that depart selected time
points no more than 1 minute early and no more than five minutes later than scheduled. (Includes Rapid buses).
Calculation: ISOTP%: Early = Early Cases/Total Cases; OnTime = OnTime Cases/Total Cases; Late = Late Cases/Total
Cases
Systemwide Trend
Bus Operating Divisions
ISOTP - 1 Minute Tolerance for Running Hot
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Goal

Nov-15
Early

Dec-15

Jan-16

On-Time

Feb-16

Mar-16

Apr-16

May-16

Mar-16

Apr-16

May-16

Late

Remaining Above the Goal line is the target.

Directly Operated
ISOTP - 1 Minute Tolerance for Running Hot
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
May-15

Jun-15

Jul-15

Aug-15

Sep-15
Goal

Oct-15

Nov-15
Early

Dec-15
On-Time

Jan-16

Feb-16
Late

Remaining Above the Goal line is the target.

Page 7

Purchased Transportation
ISOTP - 1 Minute Tolerance for Running Hot
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Goal

Nov-15

Dec-15

Early

Jan-16

On-Time

Feb-16

Mar-16

Apr-16

May-16

Late

Bus Operating Divisions - May 2016


100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
01

02

03

05

06
Late

07

08

09

10
On-Time

13

15

18

95

97

98

Sys

DO

PT

Early

Page 8

ISOTP By Division
Div 1

90%

Div 2

90%

85%

85%

80%

80%

75%

75%

70%

70%

65%

65%

60%

60%
M

On-Time

Goal

On-Time

Prior Year

Goal

Prior Year

Remaining Above the Goal line is the target.


Div 3

90%

Div 5

90%

85%

85%

80%

80%

75%

75%

70%

70%

65%

65%

60%

60%
M

On-Time

Goal

On-Time

Div 6

90%

Prior Year

85%

80%

80%

75%

75%

70%

70%

65%

65%

M
Prior Year

Div 7

90%

85%

Goal

60%

60%
M

On-Time

Goal

On-Time

On-Time

Div 8

90%

85%

80%

80%

75%

75%

70%

70%

65%

65%

M
Prior Year

Div 9

90%

85%

Goal

60%

60%
M

A
On-Time

N
Goal

M
Prior Year

A
On-Time

D
Goal

M
Prior Year

Page 9

Div 10

90%

Div 13

90%

85%

85%

80%

80%

75%

75%

70%

70%

65%

65%
60%

60%
M

On-Time

Goal

Prior Year

On-Time

Div 15

90%

85%

80%

80%

75%

75%

70%

70%

65%

65%

60%

Prior Year

Div 18

90%

85%

D
Goal

60%
M

On-Time

Goal

On-Time

Div 95

90%

Prior Year

85%

80%

80%

75%

75%

70%

70%

65%

65%

M
Prior Year

Div 97

90%

85%

D
Goal

60%

60%
M

On-Time

Goal

A
On-Time

Prior Year

D
Goal

M
Prior Year

Div 98

90%
85%
80%
75%
70%
65%
60%
M

A
On-Time

D
Goal

Prior Year

Page 10

ISOTP By Division
Year-to-Date Compared To Last Year
FY 2015

FY 2016 YTD Variance

Division 1
Early
On-Time
Late

3.88%
74.65%
21.47%

4.16%
69.90%
25.94%

Division 2
Early
On-Time
Late

4.96%
74.26%
20.79%

Division 3
Early
On-Time
Late

FY 2015 FY 2016 YTD

Variance

0.28%
-4.76%
4.47%

Division 13
Early
On-Time
Late

N/A
N/A
N/A

5.39%
71.15%
23.45%

N/A
N/A
N/A

4.74%
71.94%
23.32%

-0.22%
-2.32%
2.54%

Division 15
Early
On-Time
Late

3.71%
77.55%
18.74%

3.79%
74.68%
21.53%

0.08%
-2.87%
2.79%

5.64%
74.41%
19.95%

5.29%
72.73%
21.98%

-0.35%
-1.67%
2.03%

Division 18
Early
On-Time
Late

4.00%
71.63%
24.37%

3.96%
70.74%
25.30%

-0.04%
-0.89%
0.93%

Division 5
Early
On-Time
Late

5.05%
74.32%
20.62%

5.17%
72.63%
22.21%

0.11%
-1.70%
1.58%

Division 95
Early
On-Time
Late

0.27%
79.83%
19.90%

0.57%
79.14%
20.29%

0.29%
-0.69%
0.39%

Division 6
Early
On-Time
Late

4.56%
72.10%
23.34%

4.89%
68.27%
26.84%

0.33%
-3.83%
3.50%

Division 97
Early
On-Time
Late

0.82%
75.85%
23.32%

0.76%
79.13%
20.11%

-0.06%
3.27%
-3.21%

Division 7
Early
On-Time
Late

4.28%
71.64%
24.09%

4.33%
70.37%
25.30%

0.05%
-1.27%
1.22%

Division 98
Early
On-Time
Late

0.91%
82.47%
16.62%

1.81%
78.63%
19.56%

0.90%
-3.85%
2.94%

Division 8
Early
On-Time
Late

3.21%
84.74%
12.05%

3.13%
83.19%
13.68%

-0.08%
-1.56%
1.64%

SYSTEMWIDE
Early
4.00%
On-Time 75.35%
Late 20.65%

4.04%
73.54%
22.43%

0.03%
-1.81%
1.77%

Division 9
Early
On-Time
Late

5.01%
75.00%
19.98%

4.04%
75.28%
20.68%

-0.97%
0.27%
0.70%

DIRECTLY OPERATED
Early
4.29%
On-Time 75.03%
Late 20.68%

4.29%
73.08%
22.63%

0.00%
-1.95%
1.95%

Division 10
Early
On-Time
Late

4.12%
71.49%
24.39%

4.79%
69.66%
25.55%

0.67%
-1.83%
1.16%

PURCHASED TRANSPORTATION
Early
0.70%
1.05%
On-Time 79.01%
78.97%
Late 20.29%
19.98%

0.35%
-0.04%
-0.31%

Page 11

ACTUAL TO SCHEDULED REVENUE HOURS DELIVERED


Definition: This performance indicator shows the percentage of scheduled Revenue Hours delivered after deducting
cancellations, outlates and in-service equipment failures.
Calculation: SRHD% = Actual Revenue Hours / Scheduled Revenue Hours

Actual To Scheduled Revenue Hours Delivered - Systemwide Trend


100.9%
100.7%
100.5%
100.3%
100.1%
99.9%
99.7%
99.5%
99.3%
99.1%
98.9%
98.7%
98.5%
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Goal

Nov-15

Dec-15

Systemwide

Jan-16

Feb-16

Mar-16

Apr-16

May-16

Mar-16

Apr-16

May-16

Apr-16

May-16

Prior Year

Remaining At the Goal line is the target.

Actual To Scheduled Revenue Hours Delivered - Directly Operated


100.9%
100.7%
100.5%
100.3%
100.1%
99.9%
99.7%
99.5%
99.3%
99.1%
98.9%
98.7%
98.5%
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Goal

Nov-15

Dec-15

DO Total

Jan-16

Feb-16

Prior Year

Remaining At the Goal line is the target.

Actual To Scheduled Revenue Hours Delivered - Purchased Transportation


100.9%
100.7%
100.5%
100.3%
100.1%
99.9%
99.7%
99.5%
99.3%
99.1%
98.9%
98.7%
98.5%
May-15

Jun-15

Jul-15

Aug-15

Sep-15
Goal

Oct-15

Nov-15
PT Total

Dec-15

Jan-16

Feb-16

Mar-16

Prior Year

Remaining At the Goal line is the target.

Page 12

Actual To Scheduled Revenue Hours Delivered - by Divisions


Mar 2016 - May 2016
102.0%
101.5%
101.0%
100.5%
100.0%
99.5%
99.0%
98.5%
98.0%

7
Mar-16

9
Apr-16

10

13
May-16

15

18

95

97

98

Sys

DO

PT

Goal

Page 13

BUS MAINTENANCE PERFORMANCE


MEAN MILES BETWEEN MECHANICAL FAILURES (MMBMF)
Definition: Number of Hub Miles traveled between mechanical failures. This includes only those Road Calls
that required a bus exchange.
Calculation: MMBMF = Total Hub Miles / Mechanical Failures Requiring a Bus Exchange
Mean Miles Between Mechanical Failures (MMBMF) - Systemwide Trend
5,600

5,100

4,600

4,100

3,600

3,100
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Goal

Nov-15

Dec-15

Systemwide

Jan-16

Feb-16

Mar-16

Apr-16

May-16

Apr-16

May-16

Prior Year

Remaining Above the Goal line is the target.

Mean Miles Between Mechanical Failures (MMBMF) - Directly Operated


5,600

31

5,100
4,600
4,100

39

3,600
3,100
May-15

Jun-15

Jul-15

45
Aug-15

Sep-15

Oct-15

Goal

Nov-15

Dec-15

DO Total

Jan-16

Feb-16

Mar-16

Prior Year

Remaining Above the Goal line is the target.

Mean Miles Between Mechanical Failures (MMBMF) - Purchased Transportation


19,100
17,100
15,100

57

13,100
11,100
9,100
7,100
5,100
3,100
May-15

Jun-15

Jul-15

Aug-15

Sep-15
Goal

Oct-15

Nov-15
PT Total

Dec-15

Jan-16

Feb-16

Mar-16

Apr-16

May-16

Prior Year

Remaining Above the Goal line is the target.

Page 14

Mean Miles Between Mechanical Failures (MMBMF) - Bus Operating Divisions


Mar 2016 - May 2016
60,000
50,000
40,000
30,000
20,000
10,000
0

Mar-16

Apr-16

May-16

Goal

Remaining Above the Goal line is the target.


Div 1

10,000

Div 2

10,000

8,000

8,000

6,000

6,000

4,000

4,000

2,000

2,000

01

Goal

02

Prior Year

Div 3

10,000

8,000

6,000

6,000

4,000

4,000

2,000

2,000

Prior Year

Div 5

10,000

8,000

Goal

03

Goal

05

Prior Year

Div 6

50,000

8,000

30,000

6,000

20,000

4,000

10,000

2,000

Goal

Prior Year

Div 7

10,000

40,000

06

Goal

07

Prior Year

Div 8

10,000

8,000

6,000

6,000

4,000

4,000

2,000

2,000

Prior Year

Div 9

10,000

8,000

N
Goal

J
08

N
Goal

M
Prior Year

J
09

N
Goal

M
Prior Year

Page 15

Div 10

10,000

Div 13

10,000

8,000

8,000

6,000

6,000

4,000

4,000

2,000

2,000

10

Goal

13

Div 15

10,000

Prior Year

8,000

6,000

6,000

4,000

4,000

2,000

2,000

Prior Year

Div 18

10,000

8,000

N
Goal

15

Goal

18

Div 95

200,000

Prior Year

Goal

Prior Year

Div 97

15,000

150,000
10,000
100,000
5,000

50,000
0

95

Goal

Prior Year

97

Goal

Prior Year

Div 98

200,000
150,000
100,000
50,000
0

98

Goal

Prior Year

Unaddressed Road Calls -- Bus Operating Divisions


Mar 2016 - May 2016
Definition: Road Calls that were not assigned in the system.
Calculation: Unaddressed Road Calls = Total Number of Unaddressed Road Calls.
12.0
10.0
8.0
6.0
4.0
2.0
0.0
Div.1

Div.2

Div.3
Mar-16

Div.5

Div.6

Div.7

Div.8
Apr-16

Div.9

Div.10

Div.13

Div.15

Div.18

May-16

Page 16

MEAN MILES BETWEEN TOTAL ROAD CALLS (MMBTRC)


Definition: Number of Hub Miles traveled between Total Road Calls. This includes all Road Calls that required
a mechanic dispatch.
Calculation: MMBTRC = Total Hub Miles / Total Road Calls
MMBTRC Systemwide Trend
4,700
4,200
3,700
3,200
2,700
2,200
1,700
1,200
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Goal

Nov-15

Dec-15

Jan-16

Systemwide

Feb-16

Mar-16

Apr-16

May-16

Mar-16

Apr-16

May-16

Mar-16

Apr-16

May-16

Prior Year

Remaining Above the Goal line is the target.

MMBTRC Directly Operated


4,700
4,200
3,700
3,200
2,700
2,200
1,700
1,200
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Goal

Nov-15

Dec-15

Jan-16

DO Total

Feb-16
Prior Year

Remaining Above the Goal line is the target.

MMBTRC Purchased Transportation


10,200
9,200
8,200
7,200
6,200
5,200
4,200
3,200
2,200
1,200
May-15

Jun-15

Jul-15

Aug-15

Sep-15
Goal

Oct-15

Nov-15
PT Total

Dec-15

Jan-16

Feb-16
Prior Year

Remaining Above the Goal line is the target.

Page 17

MMBTRC -- Bus Operating Divisions


Mar 2016 - May 2016
14,000
12,000
10,000
8,000
6,000
4,000
2,000
0

01

02

03

05

06

07
Mar-16

08

09

10

13

Apr-16

15

18

May-16

95

97

98

Sys

DO

PT

Goal

Fleet Mix by Fuel Type Systemwide (Including Contract Services)


Number of Buses
2,252
5
0
0
0
0
2,257

CNG
Electric
Diesel
Gasoline
Propane
Hybrid
Total

Percent of Buses
99.78%
0.22%
0.00%
0.00%
0.00%
0.00%
100.00%

Average Age of Fleet by Divisions


Div 1
6.28

Div 2
4.52

Div 3
6.20

Div 5
5.97

Div 7
4.96

Div 9
8.98

Div 10
8.51

Div 13
3.23

Div 15
7.68

Div 18
6.05

Div 8
8.52

Page 18

PAST DUE CRITICAL PREVENTIVE MAINTENANCE PROGRAM JOBS (PMPs)


Definition: Number of critical preventative maintenance jobs that are not completed on the last day of the
month. This indicator measures maintenance managements ability to prioritize and perform critical repairs and
indicates the general maintenance condition of the fleet.
Calculation: Past Due Critical PMPs = Total Past Due Critical PMPs / Number of Buses
Systemwide Trend
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15
Goal

Nov-15

Dec-15

Systemwide

Jan-16

Feb-16

Mar-16

Apr-16

Div.13

Div.15

Div.18

May-16

Prior Year

Remaining Below the Goal line is the target.

Past Due Critical PMPs - by Divisions


Mar 2016 - May 2016
0.12
0.10
0.08
0.06
0.04
0.02
0.00

Div.1

Div.2

Div.3

Div.5

Div.6

Mar-16

Div.7

Div.8

Apr-16

Div.9

May-16

Div.10

DO Total

Goal

Page 19

ATTENDANCE
MAINTENANCE ATTENDANCE
Definition: Maintenance Mechanics and Service Attendants - % attendance Monday through Friday for
the calendar month.
Calculation: Total FTEs assigned - FTEs absent / Total FTEs assigned
Maintenance Attendance - Systemwide Trend
14

100.0%
99.5%
99.0%

20

98.5%
98.0%

21

97.5%

26

97.0%
96.5%
96.0%
95.5%
95.0%
May-15 Jun-15

31
Jul-15

Aug-15 Sep-15

Oct-15

Systemwide

Nov-15 Dec-15
Prior Year

Jan-16

Feb-16 Mar-16

Apr-16

May-16

Goal

Higher is better.

Maintenance Attendance - By Divisions


Mar 2016 - May 2016
45
100.0%
99.0%
98.0%
97.0%
96.0%

57

95.0%
94.0%
93.0%
92.0%

Div.1

Div.2

Div.3

Div.5

Div.6

Mar-16

Div.7

Div.8

Apr-16

Div.9

Div.10

Div.13

Div.15

Div.18

DO Total

May-16

Page 20

BUS CLEANLINESS
Definition: A team of two Quality Assurance Supervisors inspects and rates ten percent of the fleet at each division per time period. Sixteen
categories are examined and assigned a point value as follows: 1-3 = Unsatisfactory; 4-7 = Conditional; 8-10 = Satisfactory. The individual item
scores are averaged, unweighted, to produce an overall cleanliness rating.

Calculation: Overall Cleanliness Rating = Total Points Accumulated / number of categories

Bus Cleanliness - Systemwide


9.25

9.00

8.75

8.50

8.25

8.00
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Systemwide

Dec-15

Jan-16

Goal

Feb-16

Mar-16

Apr-16

May-16

Mar-16

Apr-16

May-16

Mar-16

Apr-16

May-16

Prior Year

Remaining Above the Goal line is the target.

Bus Cleanliness - Directly Operated


9.25
9.00

31
8.75
8.50
8.25
8.00
May-15

39
Jun-15

Jul-15

Aug-15

Sep-15

45

Oct-15

Nov-15

DO Total

Dec-15
Goal

Jan-16

Feb-16

Prior Year

Remaining Above the Goal line is the target.

Bus Cleanliness - Purchased Transporation


9.25
9.00

57
8.75
8.50
8.25
8.00
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15
PT Total

Nov-15

Dec-15
Goal

Jan-16

Feb-16

Prior Year

Remaining Above the Goal line is the target.

Page 21

Cleanliness by Bus Operating Divisions


Mar 2016 - May 2016
9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50
7.25
7.00

10

Mar-16

13

15

Apr-16

18

95

May-16

97

98

Sys

DO

PT

Goal

Remaining Above the Goal line is the target.


Div 1

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

01

Goal

03

06

A
08

N
Goal

M
Prior Year

07

Prior Year

Goal

M
Prior Year

Goal

M
Prior Year

Div 9

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

Div 7

Prior Year

05

N
Goal

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

Div 5

Div 8

Prior Year

Goal

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

J
02

Div 6

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

Goal

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

Prior Year

Div 3

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

Div 2

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

A
09

N
Goal

M
Prior Year

Page 22

Div 10

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

10

Goal

15

95

18

Prior Year

M
Prior Year

Div 97

A
97

Prior Year

Goal

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

N
Goal

Div 18

Prior Year

Goal

13

Div 95

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

Goal

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

Prior Year

Div 15

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

Div 13

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

N
Goal

Prior Year

Div 98

9.50
9.25
9.00
8.75
8.50
8.25
8.00
7.75
7.50

A
98

N
Goal

Prior Year

Page 23

Metro Rail Scorecard Overview


Rail data not available in time for this report.
Metro Rail operates heavy rail lines, Metro Red and Purple Lines, from Union Station to North Hollywood and Union Station to
Wilshire/Western. Data for Red and Purple lines are reported under Metro Red line in this report. Metro Rail operates four light
rail lines: 1. Metro Blue Line from downtown to Long Beach; 2. Metro Green Line along the 105 freeway; 3. Metro Gold Line
from Pasadena and East Los Angeles; and 4. Expo Line from Los Anageles to La Cienega Bl. Metro Rail is responsible for the
operation of approximately 104 heavy rail cars and 121 light rail cars carrying nearly 5.8 million passengers boarding each year.
This report gives a brief overview of Metro Rail operations:
* On-Time Pullout Percentage.
* Mean Miles Between Chargeable Mechanical Failures (MMBMF).
* In-Service On-Time Performance.
* Traffic Accidents per 100,000 Train Miles.
* Complaints per 100,000 Boardings.
* New Reported Workers' Compensation Indemnity & Medical Claims per 200,000 Exposure Hours.

Measurement

FY 2013 FY 2014 FY 2015

FY 2016 FY 2016
Target
YTD

FYTD
Status

Mar
Month

Apr
Month

May
Month

Systemwide
New Workers' Compensation Indemnity Claims
per 200,000 Exposure Hours

10.53

14.35

9.55

11.47

10.50

11.12

9.92

6.58

On-Time Pullouts

99.37%

99.72%

99.91%

100.00%

99.77%

100.00%

100.00%

100.00%

Mean Miles Between Chargeable Mechanical


Failures
In-Service On-time Performance

60,223

63,099

85,090

84,868

92,933

82,363

80,096

40,718

99.32%

98.91%

99.13%

100.00%

99.43%

99.51%

99.48%

99.40%

Traffic Accidents Per 100,000 Train Miles

0.19

0.47

0.13

0.14

0.00

0.00

0.00

0.00

Complaints per 100,000 Boardings

0.26

0.25

0.12

0.12

0.04

0.03

0.05

0.06

11.25

20.22

6.20

6.15

15.44

17.57

21.33

26.44

On-Time Pullouts

99.34%

99.37%

99.41%

100.00%

99.56%

99.42%

100.00%

100.00%

Mean Miles Between Chargeable Mechanical


Failures
In-Service On-time Performance

16,597

18,731

23,716

23,934

19,639

17,832

21,109

25,682

95.80%

95.84%

97.28%

99.19%

96.40%

96.24%

98.13%

98.64%

Traffic Accidents Per 100,000 Train Miles

1.45

1.46

0.89

0.79

1.34

1.81

2.51

0.00

Complaints per 100,000 Boardings

0.91

0.61

0.27

0.27

0.14

0.09

0.30

0.13

17.36

17.46

15.10

14.96

15.01

15.21

10.23

10.33

N/A

N/A

N/A

N/A

99.83%

N/A

N/A

99.67%

100.00%

N/A

N/A

N/A

N/A

27,673

N/A

N/A

25,788

29,557

Metro Red Line (MRL)

New Workers' Compensation Indemnity Claims


per 200,000 Exposure Hours

Metro Blue Line (MBL)

New Workers' Compensation Indemnity Claims


per 200,000 Exposure Hours

Metro Expo Line (MExL)


On-Time Pullouts
Mean Miles Between Chargeable Mechanical
Failures
In-Service On-time Performance

98.47%

98.70%

99.14%

100.00%

98.81%

99.18%

98.13%

98.06%

Traffic Accidents Per 100,000 Train Miles

0.34

1.17

1.02

1.10

0.42

0.00

0.00

1.04

Complaints per 100,000 Boardings

2.32

1.00

0.38

0.40

0.60

2.25

1.02

0.95

New Workers' Compensation Indemnity Claims


per 200,000 Exposure Hours

8.15

0.00

24.97

26.18

0.00

0.00

0.00

0.00

Green - High probability of achieving the target (on track). Meets Target at 100% or better.
Yellow - Uncertain if the target will be achieved -- slight problems, delays or management issues. Falls below Target 70 - 99%.
Red - High probability that the target will not be achieved -- significant problems and/or delays. Falls below Target >70%.

Page 24

Measurement
Metro Green Line (MGrL)
On-Time Pullouts
Mean Miles Between Chargeable Mechanical
Failures
In-Service On-time Performance

FY 2013 FY 2014 FY 2015

FY 2016 FY 2016
Target
YTD

FYTD
Status

Mar
Month

Apr
Month

May
Month

99.71%

99.69%

99.32%

100.00%

99.44%

100.00%

100.00%

100.00%

13,297

19,513

21,054

21,008

19,306

38,675

13,558

28,148

98.06%

97.85%

97.39%

99.22%

98.60%

98.49%

98.77%

98.84%

Traffic Accidents Per 100,000 Train Miles


Complaints per 100,000 Boardings

0.14
0.64

0.00
0.61

0.14
0.32

0.15
0.31

0.15
0.20

0.00
0.10

0.00
0.22

0.00
0.11

New Workers' Compensation Indemnity Claims


per 200,000 Exposure Hours

9.16

16.51

7.32

6.09

7.82

0.00

0.00

0.00

99.88%

99.56%

99.98%

100.00%

99.67%

99.28%

99.77%

99.23%

28,299

45,894

44,171

45,762

43,232

55,882

28,196

57,485

98.45%

98.03%

98.56%

100.00%

97.92%

97.50%

98.45%

99.05%

0.22
0.84

0.24
0.60

0.54
0.34

0.47
0.34

0.58
0.75

0.42
4.83

1.21
0.51

0.39
0.44

New Workers' Compensation Indemnity Claims


16.15
14.98
15.96
15.71
perGreen
200,000
Exposure
Hours
- High
probability
of achieving the target (on track). Meets Target at 100% or better.

10.31

5.76

5.23

0.00

Metro Gold Line (MGoL)


On-Time Pullouts
Mean Miles Between Chargeable Mechanical
Failures
In-Service On-time Performance
Traffic Accidents Per 100,000 Train Miles
Complaints per 100,000 Boardings

Yellow - Uncertain if the target will be achieved -- slight problems, delays or management issues. Falls below Target 70 - 99%.
Red - High probability that the target will not be achieved -- significant problems and/or delays. Falls below Target >70%.

Page 25

RAIL SERVICE PERFORMANCE


IN-SERVICE ON-TIME PERFORMANCE (ISOTP)
Definition: A ratio of OnTime Trips to Total Trips. A trip is deemed to be not On Time if it is Early, Late, or
Cancelled.
Calculation: ISOTP% = [(100% minus [(Total runs in which a train left any timecheck point either late or
early) / by Total scheduled runs) X by 100)]

Heavy Rail (Red/Purple Line) ISOTP


100.0%
99.5%
99.0%
98.5%
98.0%
97.5%
97.0%
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Dec-15

Heavy Rail (Red/Purple Line)

Jan-16

Feb-16

Mar-16

Apr-16

May-16

Goal

Remaining Above the Goal line is the target.

31

Light Rail (Blue, Expo, Green, & Gold Line) ISOTP


99.5%
98.5%

39

97.5%
96.5%

45
95.5%
94.5%
93.5%
92.5%
May-15

Jun-15

Jul-15
Goal

Aug-15

Sep-15
Blue Line

Oct-15

Nov-15
Green Line

Dec-15

Jan-16
Gold Line

Feb-16

Mar-16

Apr-16

May-16

Expo Line

Page 26

Scheduled Revenue Hours Delivered (SRHD) by Rail Line

Calculation: SRSHD% = (1-(Total Service Hours Lost / by Total Scheduled Service Hours))

Heavy Rail (Red/Purple Line) SRHD


100.0%
99.8%
99.6%
99.4%
99.2%
99.0%
May-15
98.8%

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Heavy Rail (Red/Purple Line)

Dec-15

Jan-16

Prior Year

Feb-16

Mar-16

Apr-16

May-16

Apr-16

May-16

Goal

Remaining At the Goal line is the target.

Light Rail (Blue, Expo, Green & Gold Line) SRHD


99.5%
98.5%
97.5%
96.5%
95.5%
94.5%
93.5%
May-15

Jun-15

Blue Line

Jul-15
Expo Line

Aug-15

Sep-15
Green Line

Oct-15

Nov-15
Gold Line

Dec-15

Jan-16

Feb-16

Prior Year Light Rail Avg

Mar-16

Goal

Page 27

Mean Vehicle Miles between Revenue Vehicle Failures


Definition: Mean vehicle miles between Revenue Vehicle Failures. NTD defined Revenue Vehicle Failures
are vehicle systems failures that occur in revenue service and during deadhead miles in which the vehicle
did not complete its scheduled revenue trip or in which the vehicle did not start its next scheduled revenue
trip.
Calculation: MVMBRVF = Total Vehicle Miles / Revenue Vehicle Systems Failures
Remaining Above the Goal line is the target.

Heavy Rail (Red/Purple Line)


614,500

514,500

414,500

314,500

214,500

114,500

14,500
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Goal

Dec-15

Jan-16

Feb-16

Mar-16

Apr-16

May-16

Mar-16

Apr-16

May-16

Heavy Rail (Red/Purple Line)

Remaining Above the Goal line is the target.

Light Rail (Blue/Expo, Green & Gold Line)


304,500

254,500

204,500

154,500

104,500

54,500

4,500
May-15

Jun-15
Goal

Jul-15

Aug-15

Sep-15

Blue Line

Oct-15

Nov-15
Green Line

Dec-15

Jan-16

Feb-16

Gold Line

Expo Line

Page 28

NEW WORKERS' COMPENSATION CLAIMS FILED PER 200,000 EXPOSURE HOURS


Definition: Number of New Rail Workers Compensation Indemnity and Medical Claims filed per 200,000
Rail Exposure hours.
Calculation: New reported workers' compensation Indemnity and Medical claims filed per 200,000
Exposure Hours = New Claims/(Exposure Hours/200,000)
Data now reflects combination of Indeminity and Medical Claims reported in the current month.
Remaining Below the Goal line is the target.

Rail Combined (Blue, Expo, Green, Gold & Red/PurpleLine)


21.0
19.0
17.0
15.0
13.0
11.0
9.0
7.0
5.0
May-15

Jun-15

Jul-15

Aug-15
Goal

Sep-15

Oct-15

Nov-15
Rail

Dec-15

Jan-16

Feb-16

Mar-16

Apr-16

May-16

Ops Systemwide Claims

Page 29

ON-TIME PULLOUTS (OTP)


Definition: Ratio of OnTime Pullouts to Total Pullouts.
Calculation: OTP% = [(100% - [(Total cancelled pullouts plus late pullouts) / by Total scheduled pullouts) X
by 100)]
Rail data not available in time for this report.

Heavy Rail (Red/Purple Line)


100.0%

99.5%

99.0%

98.5%

98.0%

97.5%
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Dec-15

Heavy Rail (Red/Purple Line)

Jan-16

Feb-16

Mar-16

Apr-16

May-16

Feb-16

Mar-16

Apr-16

May-16

Goal

Remaining Above the Goal line is the target.

Light Rail (Blue, Green & Gold Line)


100.0%

99.5%

99.0%

98.5%

98.0%

97.5%
May-15

Jun-15

Jul-15
Goal

Aug-15

Sep-15
Blue Line

Oct-15

Nov-15
Green Line

Dec-15

Jan-16

Gold Line

Expo Line

Page 30

SAFETY PERFORMANCE
BUS TRAFFIC ACCIDENTS PER 100,000 HUB MILES
Definition: Number of Traffic Accidents for every 100,000 Hub Miles traveled.
Calculation: Traffic Accidents Per 100,000 Hub Miles = Number of Traffic Accidents / (Hub Miles /
100,000)
Bus Traffic Accidents per 100,000 Hub Miles - Systemwide Trend
5.7

5.2

4.7

4.2

3.7

3.2

2.7
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Goal

Nov-15

Dec-15

Jan-16

Prior Year

Feb-16

Mar-16

Apr-16

May-16

Systemwide

Note: The thirteen months prior to the reporting month are re-examined each month to allow for reclassification of accidents and late filing of reports.

Remaining Below the Goal line is the target.

Bus Traffic Accidents per 100,000 Hub Miles - Directly Operated


5.2

39
4.7

45

4.2

3.7

3.2

2.7
May-15

Jun-15

57
Jul-15

Aug-15

Sep-15
Goal

Oct-15

Nov-15

Dec-15

Prior Year

Jan-16

Feb-16

Mar-16

Apr-16

May-16

DO Total

Note: The thirteen months prior to the reporting month are re-examined each month to allow for reclassification of accidents and late filing of reports.

Remaining Below the Goal line is the target.

Page 31

Bus Traffic Accidents per 100,000 Hub Miles - Purchased Transportation


10.7
9.7
8.7
7.7
6.7
5.7
4.7
3.7
2.7
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Goal

Dec-15

Jan-16

Prior Year

Feb-16

Mar-16

Apr-16

May-16

PT Total

Note: The thirteen months prior to the reporting month are re-examined each month to allow for reclassification of accidents and late filing of reports.

Remaining Below the Goal line is the target.

Bus Traffic Accidents per 100,000 Hub Miles - by Divisions


Mar 2016 - May 2016
16.0
15.0
14.0
13.0
12.0
11.0
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0

01

02

03

05

06

07
Mar-16

08

09

10
Apr-16

13

15

18
May-16

95

97

98

Sys

DO

PT

Goal

Page 32

Number of 482 Accidents in Vehicle Accident Management System (VAMS) Download by


Avoidable (A), Pending (P) or Unavoidable (U)
Bus Operating Divisions - May 2016
Definition: Number of accidents that are coded as Alleged Accidents (482).
Calculation: Number of accidents in prior 13 months coded 482 "alledged" in the categories of
avoidable (A), pending investigation (P) or unavoidable (U).
NOTE: Accident code 482 (alleged accidents) has been excluded from "Accidents per 100,000 Hub Miles" calculation per management decision.

7.5
7.0
6.5
6.0
5.5
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
0.0

01

02

03

05

06

07

Total 482-A

08

09

Total 482-P

10

13

15

18

Total 482-U

BUS TRAFFIC ACCIDENTS PER 100,000 HUB MILES


Bus Operating Divisions
Remaining Below the Goal line is the target.
Div 1

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00

Div 2

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
M

Goal

01

Div 3

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
M

Goal

03

Prior Year

Goal

Prior Year

02

Prior Year

Div 5

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
D

S
Goal

N
05

Prior Year

Page 33

BUS TRAFFIC ACCIDENTS PER 100,000 HUB MILES


Bus Operating Divisions
Remaining Below the Goal line is the target.
Div 6

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
M

Goal

06

Goal

A
Goal

N
15

F
Prior Year

Goal

07

Prior Year

09

F
Prior Year

13

F
Prior Year

Div 18

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
J

Div 13

Prior Year

Goal

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
10

Div 15

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00

Div 9

Prior Year

Goal

Goal

Div 10

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00

08

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00

Prior Year

Div 8

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00

Div 7

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00

A
Goal

N
18

F
Prior Year

Page 34

BUS PASSENGER ACCIDENTS PER 100,000 BOARDINGS


Definition: Number of Passenger Accidents for every 100,000 boardings.
Calculation: Passenger Accidents Per 100,000 Boardings = Number of Passenger Accidents /
(Boardings / by 100,000)
Bus Passenger Accidents per 100,000 Boardings - Systemwide Trend
1.95
1.75
1.55
1.35
1.15
0.95
0.75
0.55
0.35
0.15
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Systemwide

Dec-15

Jan-16

Prior Year

Feb-16

Mar-16

Apr-16

May-16

Goal

Remaining Below the Goal line is the target.


Note: The thirteen months prior to the reporting month are re-examined each month to allow for reclassification of accidents and
late filing of reports.

Bus Passenger Accidents per 100,000 Boardings - Directly Operated


1.95
1.75
1.55
1.35
1.15
0.95
0.75
0.55
0.35
0.15
May-15

Jun-15

Jul-15

Aug-15

Sep-15
DO Total

Oct-15

Nov-15

Dec-15
Prior Year

Jan-16

Feb-16

Mar-16

Apr-16

May-16

Goal

Remaining Below the Goal line is the target.

Page 35

Bus Passenger Accidents per 100,000 Boardings - Purchased Transportation


2.65

2.15

1.65

1.15

0.65

0.15
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

PT Total

Dec-15

Jan-16

Feb-16

Prior Year

Mar-16

Apr-16

May-16

Goal

Remaining Below the Goal line is the target.

Bus Passenger Accidents per 100,000 Boardings - by Divisions


Mar 2016 - May 2016
3.00
2.50
2.00
1.50
1.00
0.50
0.00
01

02

03

05

06

07
Mar-16

08

09

10
Apr-16

13

15

18
May-16

95

97

98

Sys

DO

PT

Goal

Page 36

RAIL TRAFFIC ACCIDENTS PER 100,000 REVENUE TRAIN MILES (PUC Reportable)
Definition: Number of CPUC related Rail Traffic Accidents for every 100,000 Train Miles traveled.
Calculation: Rail Accidents Per 100,000 Revenue Train Miles = The number of Rail Accidents / by
(Revenue Train Miles / by 100,000)
4.50

Heavy Rail (Red/Purple Line) CPUC Related Accidents

0.16
4.00
0.14
3.50
0.12
3.00
0.10
2.50
0.08
2.00
0.06
1.50
0.04
1.00
0.02
0.50
0.00
0.00
May-15

Jun-15

Jul-15

#REF!

4.50
3.50
4.00

Aug-15

Sep-15

Oct-15

Nov-15

Dec-15

#REF!
Heavy Rail (Red/Purple Line)
#REF!

Jan-16

#REF!

Feb-16

Mar-16

Goal
#REF!

Apr-16

May-16

#REF!

Light Rail (Blue, Expo, Green & Gold Lines) CPUC Related
Accidents

3.50
3.00
3.00
2.50
2.50
2.00
2.00
1.50
1.50
1.00
1.00
0.50
0.50
0.00
0.00
May-15

Jun-15
#REF!
Blue Line

Jul-15

Aug-15
#REF!

Sep-15
Expo Line

Oct-15
#REF!

Nov-15

Dec-15

Green Line

#REF!

Jan-16

Feb-16
Gold Line
#REF!

Mar-16

Apr-16

May-16

Goal
#REF!

Remaining Below the Goal line is the target.

Page 37

RAIL PASSENGER ACCIDENTS PER 100,000 BOARDINGS


Definition: Number of Passenger Accidents for every 100,000 boardings.
Calculation: Rail Passenger Accidents Per 100,000 Boardings = (The number of Rail Passenger
Accidents / by (Train Boardings / by 100,000))

Heavy Rail (Red/Purple Line) Passenger Accidents


0.030
0.025
0.020
0.015
0.010
0.005
0.000
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Dec-15

Jan-16

Heavy Rail (Red/Purple Line)

Feb-16

Mar-16

Apr-16

May-16

Apr-16

May-16

Goal

Light Rail (Blue, Expo, Green & Gold Lines) Passenger


Accidents

0.12
0.10
0.08
0.06
0.04
0.02
0.00
May-15

Jun-15
Blue Line

Jul-15

Aug-15

Sep-15
Expo Line

Oct-15

Nov-15

Dec-15

Green Line

Jan-16

Feb-16
Gold Line

Mar-16

Goal

Page 38

CUSTOMER SATISFACTION
COMPLAINTS PER 100,000 BOARDINGS
Definition: Number of customer complaints per 100,000 boardings.
Calculation: Customer complaints per 100,000 Boardings = Complaints/(Boardings/100,000)
Complaints per 100,000 Boardings - Systemwide Trend
6.0
5.5
5.0
4.5
4.0
3.5
3.0
2.5
2.0
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Goal

Nov-15

Dec-15

Jan-16

Feb-16

Prior Year

Mar-16

Apr-16

May-16

Apr-16

May-16

Apr-16

May-16

Systemwide

Remaining Below the Goal line is the target.

Complaints per 100,000 Boardings - Directly Operated


5.5
5.0

31

4.5
4.0
3.5
3.0

39

2.5
2.0
May-15

Jun-15

45
Jul-15

Aug-15

Sep-15

Oct-15

Goal

Nov-15

Dec-15

Jan-16

Feb-16

Prior Year

Mar-16
DO Total

Remaining Below the Goal line is the target.

Complaints per 100,000 Boardings - Purchased Transportation


11.0
10.0
9.0
8.0

57

7.0
6.0
5.0
4.0
3.0
2.0
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Goal

Oct-15

Nov-15
Prior Year

Dec-15

Jan-16

Feb-16

Mar-16
PT Total

Remaining Below the Goal line is the target.

Page 39

Complaints per 100,000 Boardings by Division


Mar 2016 - May 2016
12.0

10.0

8.0

6.0

4.0

2.0

0.0
01

02

03

05

06

07
Mar-16

08

09
Apr-16

10

13

15
May-16

18

95

97

98

Sys

DO

PT

Goal

Page 40

COMPLAINTS PER 100,000 BOARDINGS


Div 1

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
M

A Goal S

01

Prior Year

Goal

03

06

Prior Year

A
Goal

M
Prior Year

Prior Year

05

Goal

Prior Year

Div 7

Prior Year

08

Goal

Div 5

07

Prior Year

Div 9

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
M

N
02

Div 8

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00

Goal

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00

Goal

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00

Div 6

10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00

Div 3

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00

Div 2

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00

A
Goal

D
09

Prior Year

Remaining Below the Goal line is the target.

Page 41

COMPLAINTS PER 100,000 BOARDINGS - Continued


Div 10

Goal

10

Goal

Goal

Goal

Goal

Prior Year

13

18

Prior Year

Prior Year

Div 97

12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
95

Div 18

Prior Year

Div 95

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
15

12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00

Prior Year

Div 15

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00

Div 13

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00

A
Goal

D
97

Prior Year

Div 98

12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
M

A
Goal

98

Prior Year

Remaining Below the Goal line is the target.

Page 42

WORKERS COMPENSATION CLAIMS


New Workers Compensation Claims per 200,000 Exposure Hours
Definition: Number of New Bus Workers Compensation Indemnity and Medical Claims filed per
200,000 Bus exposure hours.
Calculation: New reported workers' compensation indemnity and medical claims filed per 200,000
Exposure Hours = New Claims/(Exposure Hours/200,000)
7
Bus Systemwide Trend
20.0
17.5
15.0
12.5
10.0
7.5
5.0
May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Goal

Dec-15

Jan-16

Systemwide

Feb-16

Mar-16

Apr-16

May-16

Prior Year

Transportation & Maintenance Performance combined.

Remaining Below the Goal line is the target.

NEW CLAIMS PER 200,000 EXPOSURE HOURS - MONTH BY BUS DIVISION


Definition: Number of New Bus Workers Compensation Indemnity and Medical Claims filed per
200,000 Bus exposure hours.
Calculation: New reported workers' compensation indemnity and medical claims filed per 200,000
Exposure Hours = New Claims/(Exposure Hours/200,000)
New Claims per 200,000 Exposure Hours by Division
Mar 2016 - May 2016
Transportation & Maintenance Performance combined.
40
35
30
25
20

57

15
10
5
0
01

02

03

05

06
Mar-16

07

08
Apr-16

09

10

13

15

18

May-16

Page 43

New Claims per 200,000 Exposure Hours - Rail by Line


Mar 2016 - May 2016
Transportation & Maintenance Performance combined.
30

25

20

15

10

0
Blue/Expo

Heavy Rail (Red/Purple Line)


Mar-16

Green Line
Apr-16

Gold Line

May-16

Page 44

NEW WORKERS' COMPENSATION CLAIMS FILED PER 200,000 EXPOSURE HOURS


Bus Operating Divisions
Definition: Number of new reported Workers Compensation Indemnity and Medical claims filed per 200,000 exposure
hours. This indicator measures safety.
Calculation: New reported Workers' Compensation Indemnity and Medical claims filed per 200,000 Exposure Hours = New
Claims/(Exposure Hours/200,000)

Div 2

Div 1
60.00

60.00

50.00

50.00

40.00

40.00

30.00

30.00

20.00

20.00

10.00

10.00

0.00

0.00
M

Goal

Div Total

Goal

Div Total

Remaining Below the Goal line is the target.

Div 5

Div 3
60.00

60.00
50.00

50.00

31

40.00

40.00

30.00

30.00

20.00

20.00
10.00

10.00

39

0.00
M

Goal

0.00
O

Div Total

Goal

Div Total

Div 7

Div 6
60.00

60.00

50.00

50.00

57

40.00

40.00

30.00

30.00

20.00

20.00

10.00

10.00
0.00

0.00
M

J
Goal

O
Div Total

F
T

A
M

J
Goal

O
Div Total

F
T

A
M

Page 45

Div 8

Div 9

60.00

60.00

50.00

50.00

40.00

40.00

30.00

30.00

20.00

20.00

10.00

10.00

0.00
M

J
Goal

Div Total

F
T

0.00
M

Goal

Div 10
60.00

50.00

50.00

40.00

40.00

30.00

30.00

20.00

20.00

10.00

10.00

0.00

0.00
M

May- Jun- Jul-15 Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May15
15
15
15
15
15
15
16
16
16
16
16
Div Total

J
Goal

Div 15
60.00

50.00

50.00

40.00

40.00

30.00

30.00

20.00

20.00

10.00

10.00

0.00

0.00

May- Jun- Jul-15 Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May15
15
15
15
15
15
15
16
16
16
16
16
Div Total

Div Total

F
T

Div 18

60.00

Goal

Div 13

60.00

Goal

O
Div Total

May- Jun- Jul-15 Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May15
15
15
15
15
15
15
16
16
16
16
16
Goal

Div Total

Remaining Below the Goal line is the target.

Page 46

OSHA INJURIES FILED PER 200,000 EXPOSURE HOURS


Systemwide and Bus Operating Divisions
Definition: Work-related injuries and illnesses that result in: death, loss of consciousness, days away from work, restricted
work activity or job transfer, or medical treatment beyond first aid which are filed per 200,000 exposure hours.
Calculation: New OSHA Injuries filed per 200,000 Exposure Hours = New Injuries /(Exposure Hours/200,000)
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) RECORDABLE INJURIES PER 200,000
EXPOSURE HOURS
One month lag from current month

Bus Systemwide Operations OSHA Injuries Trend


12 10.84
10
8
6
4
2
0
Apr-15

May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Goal

Dec-15

Jan-16

Feb-16

Mar-16

Apr-16

Div.15

Div.18

DO Total

Div.15

Div.18

DO Total

Systemwide

Remaining Below the Goal line is the target.

*no FY16 target

OSHA: Bus Operating Transportation Divisions - by Division


Feb 2016 - Apr 2016
35
30
25
20

31

15
10
5
0
Div.1

Div.2

Div.3

Div.5

Div.6

Div.7

Feb-16

Div.8

Div.9

Div.10

Div.13

Mar-16

Apr-16

OSHA: Bus Operating Maintenance Divisions - by Division


35

45

30
25
20
15
10
5
0
Div.1

Div.2

57

Div.3

Div.5
Feb-16

Div.6

Div.7

Div.8
Mar-16

Div.9

Div.10

Div.13
Apr-16

Page 47

Remaining Below the Goal line is the target.

One month lag in reporting.


Div 1

Div 2

50.00

50.00

40.00

40.00

30.00

30.00

20.00

20.00

10.00

10.00

0.00

0.00
A

Div Total

Div Total

Remaining Below the Goal line is the target.

One month lag in reporting.


Div 3

Div 5

50.00

50.00

40.00

40.00

30.00

30.00

20.00

20.00

10.00

10.00

0.00

0.00
A

Div Total

Div Total

F
M

One month lag in reporting.


Div 6

Div 7

50.00

50.00

40.00

40.00

30.00

30.00

20.00

20.00

10.00

10.00

0.00
A

Div Total

0.00
A

Div Total

F
M

One month lag in reporting.


Div 8

Div 9

50.00

50.00

40.00

40.00

30.00

30.00

20.00

20.00

10.00

10.00
0.00

0.00
A

Div Total

N
T

F
M

Div Total

N
T

Page 48

Remaining Below the Goal line is the target.

One month lag in reporting.


Div 13

Div 10

50.00

50.00

40.00

40.00

30.00

30.00

20.00

20.00

10.00

10.00
0.00

0.00
A

Div Total

Div Total

One month lag in reporting.


Div 15

Div 18

50.00

50.00

40.00

40.00

30.00

30.00

20.00

20.00

10.00

10.00

0.00

0.00
A

Div Total

N
T

F
M

Div Total

N
T

F
M

One month lag in reporting.

Page 49

NUMBER OF LOST WORK DAYS PAID PER 200,000 EXPOSURE HOURS


Systemwide and Bus Operating Divisions
Definition: Number of paid working days lost due to employees workers compensation injuries each month per
200,000 exposure hours. This indicator measures use of Transitional Duty Program.
Calculation: : (Total Temporary Disability Benefit Payments / Estimated TD Benefit Rate) x (5/7) / (Number
of Exposure Hours / 200,000)
One month lag from current month

LWD Systemwide Trend


1,400
1,300
1,200
1,100
1,000
900
800
700
600
500
400
Apr-15

May-15

Jun-15

Jul-15

Aug-15

Sep-15

Oct-15

Nov-15

Systemwide

Dec-15

Jan-16

Feb-16

Mar-16

Apr-16

Prior Year

One month lag from current month

LWD/200,000 Exposure Hours per Operating Divisions - by Bus Division


Feb 2016 - Apr 2016
3,500

3,000

39

2,500

2,000

45
1,500

1,000

500

0
Div.1

Div.2

Div.3

Div.5

Div.6

Div.7
Feb-16

Div.8
Mar-16

Div.9

Div.10

Div.13

Div.15

Div.18

DO Total

Apr-16

Page 50

One month lag from current month

LWD/200,000 Exposure Hours per Operating Divisions - by Rail Division


Feb 2016 - Apr 2016
3,500

3,000

2,500

2,000

1,500

1,000

500

0
Blue/Expo

Heavy Rail (Red/Purple Line)

Green Line

Feb-15

Mar-15

Gold Line

Apr-15

LWD/200,000 Exposure Hours per Operating Divisions - by Bus Division


One month lag in reporting.

Lower is better.

Div 1

Div 2

6,000

6,000

5,000

5,000

4,000

4,000

3,000

3,000

2,000

2,000

1,000

1,000
0

0
A

Div Total

Div Total

Div 5

Div 3

6,000

6,000

5,000

5,000

4,000

4,000

3,000

3,000

2,000

2,000

1,000

1,000
0

0
A

J
Div Total

O
T

F
M

J
Div Total

O
T

J
M

Page 51

Div 6

Div 7

140,000

6,000

120,000

5,000

100,000

4,000

80,000
3,000

60,000

2,000

40,000

1,000

20,000
0

0
A

Div Total

Div Total

Div 9

Div 8

6,000

6,000

5,000

5,000

4,000

4,000

3,000

3,000

2,000

2,000

1,000

1,000
0

0
A

Div Total

5,000

5,000

4,000

4,000

3,000

3,000

2,000

2,000

1,000

1,000

0
J

Div Total

J
M

Div 13

6,000

O
T

Div 10

6,000

Div Total

0
A

Div Total

Div 15

Div 18

6,000

6,000

5,000

5,000

4,000

4,000

3,000

3,000

2,000

2,000

1,000

1,000

0
A

Div Total

N
T

F
M

J
Div Total

N
T

J
M

One month lag in reporting.


Page 52

"HOW YOU DOIN'?" PERFORMANCE INCENTIVE PROGRAM


ATMS upgrade has Transportation HYD data available and posted June 7, 2007.

Monthly Calculations - May 2016


Metro Bus - Maintenance
Definition: A performance awareness program designed to increase productivity and efficiency.
Calculation: Performances by Division are ranked from best to worst. A score of 1 to 11 is assigned, with 11 being the best and 1 being the worst. Each
score for each performance indicator is then multiplied by the weight assigned to the particular performance indicator and then summed. Summed values are
sorted from high to low and the Division with the highest score wins the program award for the month.

Maintenance
Weight

10

15

18

79.79%
11

75.23%
9

69.73%
1

74.09%
8

75.26%
10

72.12%
4

4,717.5
9

5,207.4
11

3,757.8
5

2,724.0
1

4,072.1
6

3,654.6
4

3,543.0
3

0.005
4

0.029
1

0.000
5

0.008
3

0.000
5

0.000
5

0.000
5

0.000
5

8.67
5

8.55
3

8.71
7

8.80
9

8.66
4

8.46
2

9.12
10

9.16
11

8.78
8

0.00
6

12.11
3

0.00
6

27.56
2

11.51
5

0.00
6

11.63
4

0.00
6

35.75
1

0.00
6

3.50

4.70

5.90

5.95

10

5.10

8.40

4.75

2.55

6.95

6.30

5.15

11

In-Service On-Time
Performance
Points

10%

71.36%
3

72.49%
5

73.63%
7

72.54%
6

70.85%
2

Miles Between
Total Road Calls
Points

30%

3,485.7
2

4,143.8
7

4,455.2
8

5,110.6
10

Past Due PMPs


Points

25%

0.014
2

0.000
5

0.000
5

Bus Cleanliness
Points

25%

8.68
6

8.36
1

10%

0.00
6

New WC Claims
/200,000 Exp Hrs
Points
Totals
FINAL
RANKING

DIV.
Score
Rank

4
7
1
Maintenance Division Ranking (Sorted)

13

8
8.40

13
6.95

15
6.30

5
5.95

3
5.90

18
5.15

7
5.10

9
4.75

2
4.70

1
3.50

10
2.55

10

11

MAINTENANCE
10.00
9.00

8.40

8.00
6.95

Points

7.00

6.30

5.95

6.00

5.90
5.15

5.10

5.00

4.75

4.70

4.00

3.50

3.00

2.55

2.00
1.00
0.00
8

13

15

18

10

Page 53

Monthly Calculations - May 2016


Metro Bus - Transportation
ATMS upgrade has Transportation HYD data available and posted June 7, 2007.
Definition: A performance awareness program designed to increase productivity and efficiency.
Calculation: Performance by Division are ranked from best to worst. A score of 1 to 11 is assigned, with 11 being the best and 1 being the worst. Each
score for each performance indicator is then multiplied by the weight assigned to the particular performance indicator and then summed. Summed values
are sorted from high to low and the Division with the highest score wins the program award for the month.

Transportation
Weight

20%

71.36%
3

72.49%
5

73.63%
7

72.54%
6

70.85%
2

35%

6.57
2

4.20
6

5.13
4

3.91
8

Complaints/100K
Boardings
Points

35%

3.21
10

2.72
11

3.87
7

New WC Claims
/200,000 Exp Hrs
Points

10%

23.70
4

14.25
6

5.20
8

7.55
1

In-Service On-Time
Performance
Points

Accident Rate
Points

Totals
FINAL
RANKING

10

13

15

18

79.79%
11

75.23%
9

69.73%
1

74.09%
8

75.26%
10

72.12%
4

4.21
5

2.58
10

1.98
11

5.50
3

9.36
1

3.66
9

4.14
7

3.26
9

4.18
5

4.72
3

6.20
1

3.32
8

4.07
6

4.83
2

4.46
4

35.52
1

24.69
3

11.13
8

32.86
2

22.05
5

13.28
7

0.00
11

8.19
9

2.70
10

5.35
7

7.45
2

4.70
11

6.95
3

6.50
5

4.75
10

5.15
9

6.75
4

5.65
6

Transportation Division Ranking (Sorted)


DIV.
Score
Rank

2
7.55

5
7.45

8
6.95

15
6.75

9
6.50

18
5.65

3
5.35

1
5.20

13
5.15

10
4.75

7
4.70

10

11

TRANSPORTATION
8.00

7.55

7.45
6.95

7.00

6.75

6.50

6.00

5.65
5.35

5.20

5.15

Points

5.00

4.75

4.70

10

4.00
3.00
2.00
1.00
0.00
2

15

18

13

Page 54

Anda mungkin juga menyukai