Anda di halaman 1dari 7

Curriculum vitae

Full name : Mustafa Muhammad al Zeer


Nationality :Syrian
Birth date : 4-8-1959
Marital status: marred with tow boys
Address : Banias Syria p o Box 13
Tel: 096343712661
Mobil: 963988084143
Education :mechanical engineer
University: Aleppo Syria
Since: 1984
Languages: Arabic English
E- mail: mze.oils@gmail.com
:Profile
Ex-head of mechanical engineering department & assisting engineering
manager in Syrian company for oil transport, with 28 years experience in
maintenance, construction, studying of oil & oil products pipelines,
. tanks ,pumping stations, offshore- onshore works

Professional
:careers
Pipeline and tanks maintenance engineer-15-11-1984Head of Pipeline and Tanks maintenance dept -28-3-1992 Head of Mechanical Dept-6-3-1996 Assisting of Engineering Manager -29-8-2002 :Current position
Head of Mech Eng Dept + Assisting of Engineering Manage

:Some of work experience


maintenance of onshore& offshore crude oil& products main lines with
several diameters
maintenance of gate, ball, &chick valves supervising all types of welding in pipelines& tanks guiding in service crude oil& products pipeline welding ,by welding
sleeves& split-tees
maintenance of all type of pumps, centrifugal, vertical submergible ,
screwed, & reciprocated pumps with several sizes
maintenance of variable hydraulic coupling maintenance of gas turbine , major overall & partially maintenance maintenance of diesel engines maintenance of refrigerating stores& air condition systems guiding of all types of pipeline services , UT,MFL inline inspection
offshore& inshore pipeline
guiding of stopple operation in replacement of some pipeline parts -

:Some of projects which leadership supervising committee


building of 12 floating& fixed roof steel tanks ,with 32000cu m each on building of 4 spherical gas tanks with 5000cu m each construction of 40 km ,24 inches cross country pipeline -

construction of 30 km 26 inches cross country pipeline in difficult


mountains & wades

construction of 50 km 10 inches pipeline in desert construction of pumping station with tow electrical pumps, 4800 cu m each for loading of crude oil to oil tankers
construction of complete intermediate pumping station with 3 parallel 1400cu m each &2 vertical submergible pump &3 x 15000cu m storage
tanks and all service pumps & facilities
inline inspection of 24 inches dia pipeline with 116 km length by using geometric & old fashion( low resolution) MFL intelligent pigs in1984
inline inspection of 24 inches dia pipeline with 100 km length by using geometric & UT intelligent pigs in 1997
inline inspection of 24 inches dia pipeline by using geometric &MFL high resolution pigs in 1998 & 2006
inline inspection of 7 sub see loading lines by using UT modern
technology in 2004
dislodging 10 tanks& 5 ground pits by using heat treatment & chemical methods
repairing of corroded parts of main pipelines at 240 locations by using fiberglass layers with epoxy resins in 2001,2005&2011
raising four existing main line above tow new bridges ,which
constructed on tow rivers by using stopple operation method
supervising of welding execution and inspection of all welds in
pipeline and tanks construction acc to American Standards
hydrostatic testing of pipeline &tanks projects -

Some of projects technical condition books which prepared by


eng Al Zeer
Maintenance of floating & fixed roof tanks with 30000 cu m ,50 tanksreplacement of corroded parts ,offshore& onshore pipelinesinline inspection of onshore & offshore pipelines by using
MFL,UT methods& several types of pigs
repair of pipeline leaks, in service by welding steel sleeves repair of pipeline by using fiberglass layers with epoxy resins replacement of old loading pumps which operated by diesel engine by new pumps with electrical driver motors

construction of new pipeline ,10 inches dia&50 km length, in desert modification of existing berth by installation of new
displacement pipeline to be suitable to import& export gas oil& fuel oil
modification of existing gas turbine to be working by using diesel oil or gas (dowel system)if some accident occurred in gas pipeline

Some of studies which prepared by eng Al Zeer


Hydraulic calculation of pressure at selected 100 locations, between Iraqiborder to Banias marine terminal tank farm, which caused due to
several flow pumping rate, through 3 pumping stations, 450 km length,
in single pipeline&/ or in 2 parallel lines, from 150000 bbl/ d to 575000
bbl/ d , each 50000 bbl/ d and draw the graph of results
- Hydraulic calculation of surge pressure in Maine pipeline, which caused
due to sudden tripe of pump and draw the graph
Hydraulic calculation of partially filling main pipeline from Iraqi border to Banias terminal in selected locations due to several actual flow rate
Hydraulic calculation of pumping gas oil&/or gasoline from Banias tank farm to Homs tank farm ,554 m different levels
km distance, and draw the graph of pressure in selected locations 116,
due to pump 700 cu m /h and another actual flow rates
Hydraulic calculation of loading ship tankers from actual several tanks with several levels& distances by using new pumps or new pumps with
old pumps, parallel, or new pumps with parallel lines, by gravity to
prepare the complex technical condition book of new pumping station
Hydraulic calculation to increase the pumping flow rats though existing corroded pipeline, which consist of 3 steel grades between Banias to
Homs from 700 cu m /h to 1400 cu m/h and chose the best option ( to
install new intermediate pumping station
Hydraulic calculation to supplying light & heavy crude oil from fields ,at east north ,at east south of Syria & and importing crude oil from
Mediterranean sea to existing refineries, Banias & Homse & to new
proposed refineries ,Dear Elzoor ,Alfroglus

and estimate the coast of each option of pipeline corridor routes, dia,
grades & pumping stations ,generated power to chose economic option
for negotiation between ministry& investors

Hydraulic calculation to transport 1.5 Mbbl/d from Iraqi border to Mediterranean sea and identify the corridor of pipeline, dia, grades,
pumping station locations, pumps nos, generated powers
( Zanobia project )
Hydraulic calculation to import, export/ 9/ of oil products from / to refinery on supposed jetty on Mediterranean sea

Some of academic studies which eng Al Zeer supervised on


Bachelor's degree of mechanical engineering research :
Transporting water from Elsen spring to Tartous city , by pumping to high
mountain and by gravity ,40 km to Tartous city, in 1992 ,Techreen
University
:Bachelor's degree of mechanical engineering research Transporting gas oil & gasoline from Banias tank farm to Homs city, by
pumping to high point,554M ASL and 116 km distance in 1996
:Master's degree of mechanical engineering research Protection of the pipeline& tanks by using cathodic protection method
with solar system in 2008 , Techreen University
: Drs degree of mechanical engineering research Evaluation of corrosion problems in Syrian crude oil pipeline , in 2009,
Aleppo University
; Conferences
Maintenance of oil& gas pipeline, OAPEC , Bahrain, in 2011 The lecture : The pipeline problems& the new methods of maintenance
and repair
The first conference of oil & gas in Syria ,El bath Unevercity,2004 The lecture :Inline inspection technology & its effect on pipeline design
philosophy
The development of Welding Technology in Arab country Damascus- Syria 2009 , as member of science committee, head of brain storm group
The subject: the using of welding in oil & gas industry

:Books
Cross countries pipeline ,the problem of maintenance and
repair

The new method of pipeline repair &its effect on design philosophy


In service pipe line welding Inline inspection by using intelligent pigs & the analyzing of results
Pipeline design, construction,& maintenance -

Anda mungkin juga menyukai