Anda di halaman 1dari 60

ABB Switzerland Ltd - 1

2009-04-09

Sub-System Intertripping

REB500

ABB

Consists of


Busbar Replica

ABB Switzerland Ltd - 2


2009-04-09

Based on switchyard topology




Which CTs are located within one protection zone.


(BBP/EFP).

Which breakers do belong to one protection zone


(BFP,Intertrip).

Which Lines/Transformers cannot be switched off due to


Breaker bypass or 11/2 Breaker.

Triplogic


Generates trip commands

ABB

Busbar Replica

Slow Part (approx. each 128 ms):




Fast Part (approx. each 8 ms):




ABB Switzerland Ltd - 3


2009-04-09

General assignment of Protection Zones


according to isolator/breaker positions

Merge Protection Zones in case Breaker without


CT between buszones is closing.

ABB

Triplogic

ABB Switzerland Ltd - 4


2009-04-09

Generates Trip Commands (per zone) for the


following protection functions:


External Trip.

Busbar Protection (The Faulty Prot. Zone)

End Fault Protection (The Prot. Zone in which the


End-Fault is located.

Breaker Failure Protection (The Prot. Zone in


which the faulty Breaker is located).

ABB

Building up a Replica

Using the topological method:

ABB Switzerland Ltd - 5


2009-04-09

Starting at a busbar, all electrical connections


are checked, and a protection zone is build,
whereby a protection zone is demarcated by :
 A Breaker/CT combination.
 A Coupler Breaker.
 A CT/Feeder combination.
 A Feeder.
This procedure is repeated until all busbars
are assigned.

ABB

Building up a Replica

Topological elements:






ABB Switzerland Ltd - 6


2009-04-09





Busbar
Isolators,Sectionalizers
Circuit Breaker
CT
Coupler_CT
Buscouplers,Tie-Breaker
Feeder
Junctions

ABB

Building up a replica
Busbar
I
II
Closed
Isolator

ABB Switzerland Ltd - 7


2009-04-09

CB
CT
Feeder

Junction
Coupler_CB

Open
Isolator

Coupler_CT

ABB

Building up a replica

Topological rules (1):




Busbar:


Isolators,Sectionalizers:


ABB Switzerland Ltd - 8


2009-04-09

Open => End of a protection zone

CT (Feeder)


Starting point of the protection zone assignment.

Combined with a CB, end of a protection zone

Circuit Breaker (Feeder)





Combined with a CT => End of a protection zone


Open => End of a protection zone

ABB

Building up a replica

Topological rules (2):




Coupler_CT


Buscouplers,Tie-Breaker


ABB Switzerland Ltd - 9


2009-04-09

Combined with a Coupler_CT => End of a protection zone

Feeder


Combined with a Coupler_CB => End of a protection zone

End of a prot. zone, combined with CT without a CB (e.g.


Bypass)

Junctions


Ordinary connections.

ABB

Building up a replica

How to build up a replica using the


topological method.


ABB Switzerland Ltd - 10


2009-04-09

Double busbar.
1 1/2 Breaker.

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 11


2009-04-09

I
II

Start at a busbar

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 12


2009-04-09

I
II

Open Isolator,
end of prot. zone

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 13


2009-04-09

I
II

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 14


2009-04-09

I
II

Open Isolator,
end of prot zone

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 15


2009-04-09

I
II

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 16


2009-04-09

I
II

Closed Isolator,
continue

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 17


2009-04-09

I
II

Open Isolator,
end of prot. zone

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 18


2009-04-09

I
II

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 19


2009-04-09

I
II

Coupler Breaker,
end of prot. zone

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 20


2009-04-09

I
II

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 21


2009-04-09

I
II

Open Isolator
end of protection zone

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 22


2009-04-09

I
II

Breaker / CT arrangement
return

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 23


2009-04-09

I
II

Repeat procedure for


the next busbar

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 24


2009-04-09

I
II

Breaker / CT arrangement
end of prot. zone

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 25


2009-04-09

I
II

Coupler Breaker,
assigned 2nd time

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 26


2009-04-09

I
II

Assign according CT

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 27


2009-04-09

I
II

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 28


2009-04-09

I
II

Open Isolator, end of prot zone

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 29


2009-04-09

I
II

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 30


2009-04-09

I
II

Open Isolator, end of prot zone

ABB

Building up a replica : Double Busbar

ABB Switzerland Ltd - 31


2009-04-09

I
II

All busbars have been assigned ,


replica is updated/ready

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 32


2009-04-09

I
II

Start at a busbar

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 33


2009-04-09

I
II

Coupler Breaker,
end of prot. zone

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 34


2009-04-09

I
II

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 35


2009-04-09

I
II

Coupler Breaker,
end of prot. zone

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 36


2009-04-09

I
II

Repeat procedure for the next busbar

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 37


2009-04-09

I
II

Coupler Breaker,
end of prot. zone

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 38


2009-04-09

I
II

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 39


2009-04-09

I
II

Coupler Breaker,
end of prot. zone

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 40


2009-04-09

I
II

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 41


2009-04-09

I
II

Repeat procedure for the next busbar

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 42


2009-04-09

I
II

Coupler Breaker,
end of prot. zone

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 43


2009-04-09

I
II

Coupler Breaker,
assigned 2nd time

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 44


2009-04-09

I
II

Assign according CT

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 45


2009-04-09

I
II

Open Isolator,
end of protection zone

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 46


2009-04-09

I
II

repeat procedure
for the next busbar

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 47


2009-04-09

I
II

Coupler Breaker,
assigned 2nd time

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 48


2009-04-09

I
II

Assign according CT

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 49


2009-04-09

I
II

Coupler Breaker,
assigned 2nd time

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 50


2009-04-09

I
II

Assign according CT

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 51


2009-04-09

I
II

Feeder Node,
end of protection zone

ABB

Building up a replica : 1 1/2 Breaker

ABB Switzerland Ltd - 52


2009-04-09

I
II

repeat, next 2 busbars

ABB

What is found in the replica

After building up the replica following information


is available for the different functions:



ABB Switzerland Ltd - 53


2009-04-09

Which CB is in which protection zone


Which CT is in which protection zone
Which Feeder is located in which protection zone

ABB

Dependencies

Wich functions use the information found in the


ITT.

Busbar Protection.
Breaker Failure Protection.
End-Fault.
External Protection.

Transfer Trip

Overview




ABB Switzerland Ltd - 54


2009-04-09

ABB

Dependencies

Busbar Protection:


ABB Switzerland Ltd - 55


2009-04-09

Gets information which CT measurements are located in


one protection zone and should be evaluated for the BBP
algorithm.
Indicates which protection zone should trip due to a busbar
fault.

ABB

Dependencies

Breaker Failure:


End-Fault:


ABB Switzerland Ltd - 56


2009-04-09

After a breaker has the trip failed executing command, the


BFP will initiate an intertrip to the associated protection
zone.
A trip command initiated by the intertrip will start the BFP
function.
A fault between an open Breaker and a CT initiates an
intertrip to the associated protection zone.

ABB

Dependencies

External Protection:



Transfer trip :



ABB Switzerland Ltd - 57


2009-04-09

Ext Tripping per Busbar (CU)


Ext. Tripping per Feeder (BU)

Due to a bypass of a CB
Feeder without a CB

ABB

Dependencies ITT/Replica Overview

CU

Trip

ITT

BBP

EXT

BU
ABB Switzerland Ltd - 58
2009-04-09

EFP
EXT

BFP

Trip
BBP

OCP

ABB

Intertripping (ITT)
Trip_Prot_Zone

BBP

Prot_Zone_Of_CT

ITT

BFP_Intertrip

BFP

EFP_Intertrip

EFP
Transfer_Trip

ABB Switzerland Ltd - 59


2009-04-09

Ext_Trip_Buszone
Trip_Buszone
Ext_Release_Buszone

EXT_CU

Ext_Trip_BU
Ext_Trip_Buszone

ITT_Trip_BU

Trip_BU

Switch_Positions

EXT_BU

ABB

ABB Switzerland Ltd - 60


2009-04-09

REB500

The End !