PART 4.A
Method Statement for Tilling Works
(Installation of Ceramic Tiles)
Project Name/Number:
Revision:
Date of last Revision:
Page 1
ALARGAN PROJECTS
I.
II.
Title
Method statement for installation of ceramic tiles.
Purposed of Scope
The purpose of this is to describe the means and ways of doing tiling works for walls and
floors at bathroom, toilet, roof, bedrooms, kitchen, store room, hallways and etc. Works
shall be carried out in compliance with the drawing and project specification.
III.
Materials
A. Approved tiles
B. Adhesive
C. Tile grout
D. Potable Water
E. Tile trim/Tile nosing
F. Tile spacer
IV.
V.
Project Name/Number:
Revision:
Date of last Revision:
Page 2
ALARGAN PROJECTS
TILLING WORKS PROCEDURE
VI.
General Requirements
A. Ensure that materials, sample and method of statement have been submitted and
approved.
B. Ensure that tiling tools and equipment are approved.
C. Ensure proper working platform and lighting arrangement are provided.
D. Ensure that tile spacers are approved.
E. Delivered tile materials shall be checked the following details:
Manufacturers name
Type of tiles
Color
Size
F. Different batches of delivered materials shall not be mixed and installed in the same
area to avoid color variation.
G. Obtain necessary clearances and approvals from engineers including MEP clearance.
H. The surface to which tiles to be fixed shall be free from all defects.
I. Rendered substrate must be fully cured prior to the tilling installation.
J. Backfilled materials shall be properly compacted and moistened prior to the tile
installation.
K. Soak the tiles inside the container with potable water at least one hour prior to
installation or as per manufacturers recommendation.
L. Ensure that the laying of tiles shall be as per direction and pattern on approved shop
drawings.
M. Wall tiles shall be plumbed and leveled without sags.
N. Tile joints shall be straight and aligned from the adjacent tiles.
O. Ensure that leveling and slope of floor tiles shall be as per approved shop drawings.
P. Drilling shall be patterned on fittings to be fitted (e.g. circular and rectangular). Without
marring visible surfaces.
Q. Junction from floor and wall tiles shall be terminated at zero spaced.
R. Zero space shall also be observed at the junction between different materials (e.g. wall
skirting to door architrave and floor tiles to threshold).
S. Tile trim and tile nosing shall be installed as per approved shop drawings.
T. Junction between wall skirting to create nosing shall be terminated neatly at 45.
U. Ensure that color of grout shall be approved by engineer.
V. Approved sealant shall be inserted between tiles and sanitary fittings. Adequate amount
shall be observed and avoid over application.
W. The completed tiled floor shall be cleaned and protected from any traffic.
X. Inspection request shall be submitted to the assigned engineer/inspector prior to the
commencement of tiling works and upon work completion.
Project Name/Number:
Revision:
Date of last Revision:
Page 3
ALARGAN PROJECTS
VII.
VIII.
Project Name/Number:
Revision:
Date of last Revision:
Page 4
ALARGAN PROJECTS
IX.
Mockups
A. Mockups sample would be made in designated areas for selection and approval of the
engineer/consultant prior to the commencement of works using correct materials and
shall be in adjacent location.
B. Actual works will be carried out in accordance with approved mock up.
X.
XI.
XII. References
A. Approved materials
B. Scope of works or specifications
C. ALARGAN Standards
D. Approved drawings